CN109267935A - A kind of construction method of building pile foundation - Google Patents

A kind of construction method of building pile foundation Download PDF

Info

Publication number
CN109267935A
CN109267935A CN201811101996.XA CN201811101996A CN109267935A CN 109267935 A CN109267935 A CN 109267935A CN 201811101996 A CN201811101996 A CN 201811101996A CN 109267935 A CN109267935 A CN 109267935A
Authority
CN
China
Prior art keywords
pile foundation
stake
construction method
construction
piling machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811101996.XA
Other languages
Chinese (zh)
Inventor
李秀利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811101996.XA priority Critical patent/CN109267935A/en
Publication of CN109267935A publication Critical patent/CN109267935A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/16Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using gaseous fluids

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of construction methods of building pile foundation, its construction technology is as follows, stake position setting-out, piling machine is in place, adjust pile foundation, pile foundation boring, dusting proposes stake and lower stake is stirred again, stake position setting-out: checking stake position according to construction drawing, the piling machine is in place: piling machine is moved to the position for needing to drive piles, standard of fuselage is calibrated, piling machine is checked, the adjustment pile foundation: checking the connection in each portion of main body, powder spraying system each section installation situation, the pile foundation boring: starting drilling machine, drill bit drill in rotation, start air compressor air-supply.The construction method of the building pile foundation by air compressor blow, send air blast wind, with prevent drill bit dust mouth blocking, thereby may be ensured that being normally carried out for construction.

Description

A kind of construction method of building pile foundation
Technical field
The present invention relates to building piling technology field, specially a kind of construction methods of building pile foundation.
Background technique
Piling is exactly to make pile foundation, and pile foundation is exactly stake and the deep foundation that stake top cushion cap is constituted, and stake is according to stress condition It is divided into friction pile and end-bearing pile, friction pile is the weight that top-out structure is born using the friction of pile lining and the silt of surrounding Amount, end-bearing pile is stake to be got to the solid stratum in underground, and the load of top-out structure is passed to standing ground by pile body On.
The construction method of traditional building pile foundation, since the friction between drill bit and ground can generate heat, is grown during piling The fever of time may cause danger, and affect the safety of construction, and drill bit dust nozzle is easy to happen blocking in use, The progress of construction is affected, for this purpose, it is proposed that a kind of construction method of building pile foundation.
Summary of the invention
The purpose of the present invention is to provide a kind of construction methods of building pile foundation, mentioned above in the background art to solve The construction method of traditional building pile foundation, since the friction between drill bit and ground can generate heat, is sent out for a long time during piling Heat may cause danger, and affect the safety of construction, and drill bit dust nozzle is easy to happen blocking in use, affects and apply The problem of progress of work.
To achieve the above object, the invention provides the following technical scheme: a kind of construction method of building pile foundation, work of constructing Skill is as follows, and the setting-out of stake position, piling machine is in place, adjusts pile foundation, pile foundation boring, dusting proposes stake and lower stake is stirred again.
Preferably, stake position stake position setting-out: is checked according to construction drawing.
Preferably, the piling machine is in place: piling machine being moved to the position for needing to drive piles, calibrates standard of fuselage, air exercise Stake machine is checked.
Preferably, the connection in each portion of main body, powder spraying system each section installation situation the adjustment pile foundation: are checked.
Preferably, the pile foundation boring: starting drilling machine, drill bit drill in rotation, start air compressor air-supply.
Preferably, described dust proposes stake: revolving speed is reduced, drill bit is gradually lifted, cement powder and ice cube powder are packed into ash can, It dusts.
Preferably, lower pile is stirred again: providing revolving speed, drill bit is continued deeper into, stirred again.
Compared with prior art, beneficial effects of the present invention are as follows: the construction method of the building pile foundation is compressed by air Machine air-supply, send air blast wind, with prevent drill bit dust mouth blocking, thereby may be ensured that being normally carried out for construction, in the mistake dusted Ice cube powder is added in journey, the heat generated due to drill bit friction can be absorbed in ice cube powder, avoids due to drill bit for a long time Fever leads to danger, ensure that the safety of construction, improves construction efficiency, substantially increases the reality of the construction method of building pile foundation The property used.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
The present invention provides a kind of technical solution: a kind of construction method of building pile foundation, construction technology is as follows, and stake position is put Sample, piling machine is in place, adjusts pile foundation, pile foundation boring, dusting proposes stake and lower stake is stirred again, stake position setting-out: according to construction drawing Check stake position, the piling machine is in place: piling machine be moved to the position for needing to drive piles, calibrate standard of fuselage, to piling machine into Row checks that the adjustment pile foundation: checking the connection in each portion of main body, the pile foundation boring: powder spraying system each section installation situation opens Dynamic drilling machine, drill bit drill in rotation, start air compressor air-supply, and described dust proposes stake: reducing revolving speed, gradually lifts brill Cement powder and ice cube powder are packed into ash can, dusted, lower pile is stirred again: providing revolving speed by head, and drill bit continues deeper into, into Row stir again, blown by air compressor, send air blast wind, with prevent drill bit dust mouth blocking, thereby may be ensured that construction It is normally carried out.

Claims (7)

1. a kind of construction method of building pile foundation, it is characterised in that: its construction technology is as follows, and the setting-out of stake position, piling machine is in place, adjusts Whole pile foundation, pile foundation boring, dusting proposes stake and lower stake is stirred again.
2. a kind of construction method of building pile foundation according to claim 1, it is characterised in that: stake position setting-out: according to Construction drawing checks stake position.
3. a kind of construction method of building pile foundation according to claim 1, it is characterised in that: the piling machine is in place: will Piling machine is moved to the position for needing to drive piles, and calibrates standard of fuselage, checks piling machine.
4. a kind of construction method of building pile foundation according to claim 1, it is characterised in that: the adjustment pile foundation: checking The connection in each portion of main body, powder spraying system each section installation situation.
5. a kind of construction method of building pile foundation according to claim 1, it is characterised in that: the pile foundation boring: starting Drilling machine, drill bit drill in rotation, start air compressor air-supply.
6. a kind of construction method of building pile foundation according to claim 1, it is characterised in that: described dust proposes stake: reducing Revolving speed gradually lifts drill bit, and cement powder and ice cube powder are packed into ash can, dusted.
7. a kind of construction method of building pile foundation according to claim 1, it is characterised in that: lower pile is stirred again: providing Revolving speed, drill bit continue deeper into, and are stirred again.
CN201811101996.XA 2018-09-20 2018-09-20 A kind of construction method of building pile foundation Pending CN109267935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811101996.XA CN109267935A (en) 2018-09-20 2018-09-20 A kind of construction method of building pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811101996.XA CN109267935A (en) 2018-09-20 2018-09-20 A kind of construction method of building pile foundation

Publications (1)

Publication Number Publication Date
CN109267935A true CN109267935A (en) 2019-01-25

Family

ID=65197244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811101996.XA Pending CN109267935A (en) 2018-09-20 2018-09-20 A kind of construction method of building pile foundation

Country Status (1)

Country Link
CN (1) CN109267935A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839658A (en) * 2011-08-23 2012-12-26 中冶(北京)交通科技发展有限公司 Root supporting type cement injection pile construction method
CN104563148A (en) * 2014-12-29 2015-04-29 重庆工商职业学院 Building pile foundation construction method
CN106996106A (en) * 2017-01-10 2017-08-01 周涛 Pile base construction method
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN108505935A (en) * 2018-04-17 2018-09-07 上海建工集团股份有限公司 Rectangle pile foundation drilling construction equipment and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839658A (en) * 2011-08-23 2012-12-26 中冶(北京)交通科技发展有限公司 Root supporting type cement injection pile construction method
CN104563148A (en) * 2014-12-29 2015-04-29 重庆工商职业学院 Building pile foundation construction method
CN106996106A (en) * 2017-01-10 2017-08-01 周涛 Pile base construction method
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN108505935A (en) * 2018-04-17 2018-09-07 上海建工集团股份有限公司 Rectangle pile foundation drilling construction equipment and construction method

Similar Documents

Publication Publication Date Title
CN106949797B (en) The moulding composite spherical energy-dissipating structure of impact for vertical holes explosion
CN111396063A (en) Construction method for short-distance upward-crossing existing line downward-passing sewage jacking pipe of water-rich sand layer shield
US9663916B2 (en) Foundation structure of an offshore plant, in particular an offshore wind turbine, which foundation structure is to be installed at a low noise level, and installation method therefor
CN109870086B (en) High-wave-impedance directional sliding combined energy dissipation body suitable for rock foundation excavation molding
CN105890475A (en) Underpass superhighway tunnel trunk excavation static blasting construction method
CN106988673B (en) A kind of damping type air inlet revolving gear
CN109267935A (en) A kind of construction method of building pile foundation
CN111764818A (en) Eccentric casing following drilling construction structure and method for anchoring engineering
CN203114170U (en) In-hole hammer drilling embedding rock-socketed prestressed pipe pile device
CN107063020B (en) A kind of hole stake Excavation blasting flyrock protection device
CN106337520A (en) The construction technology of large-cell point glass curtain wall
CN203756036U (en) Vacuum effect prevented rotary drilling rig bit
CN209523218U (en) Prestress anchorage cable fan foundation structure for Rock Region
CN209162820U (en) One kind preventing the inclined device of driven cast-in-place pile
CN207091940U (en) Consuming type Rolling Stone guard system
CN206972096U (en) A kind of new lightweight aggregate concrete airtight blast door
CN107538046A (en) A kind of portable beam bottom laser positioning bar planting is bored
CN207293977U (en) A kind of boom hoisting for trackless gantry crane
CN215441884U (en) Drilling and hammering integrated machine
CN201746830U (en) Long screw bored concrete pile post-inserted cage tool
CN209163725U (en) A kind of shaped pile pile-forming equipment
CN107642052A (en) A kind of guideboard vertical rod with controllability
CN204436263U (en) The double-deck diameter-enlarging drill bit of a kind of civil engineering pile foundation construction
CN203584300U (en) Roof bolter with hoisting equipment
CN209761331U (en) Eccentric casing drilling construction structure for anchoring engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190125