CN109267679A - Cell curtain wall - Google Patents

Cell curtain wall Download PDF

Info

Publication number
CN109267679A
CN109267679A CN201811310066.5A CN201811310066A CN109267679A CN 109267679 A CN109267679 A CN 109267679A CN 201811310066 A CN201811310066 A CN 201811310066A CN 109267679 A CN109267679 A CN 109267679A
Authority
CN
China
Prior art keywords
connecting portion
connection
curtain wall
connecting plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811310066.5A
Other languages
Chinese (zh)
Inventor
剪爱森
许�鹏
庄奇贵
黄卫栈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN KEYUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
SHENZHEN KEYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN KEYUAN CONSTRUCTION GROUP CO Ltd filed Critical SHENZHEN KEYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201811310066.5A priority Critical patent/CN109267679A/en
Publication of CN109267679A publication Critical patent/CN109267679A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/967Details of the cross-section of the mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a kind of cell curtain walls, including cell curtain wall plate, column and and secondary joist, the secondary joist is mutually spliced by two pieces of symmetrically arranged sub- keel to be formed, the sub- keel include for connection unit curtain wall panel column connecting plate and with the integrally formed spademan of connecting plate, connecting plate is located at the identical side of spademan equipped with first connecting portion, the first connecting portion is equipped with the first connection through-hole, connecting plate is equipped with and the vertically disposed second connecting portion of connecting plate far from the one side edge of first connecting portion, the second connecting portion is equipped with the second connection through-hole, slot is equipped in the column side opposite with secondary joist, the cell wall opposite with first connecting portion both side surface is equipped with the third for connecting through-hole connection with first and connects through-hole on the slot.Compared with prior art, since welding portion is not present in secondary joist, deformation is small, and also assures the grafting precision of secondary joist;Welding material cost can also be reduced, cost of labor improves safety coefficient.

Description

Cell curtain wall
Technical field
The present invention relates to a kind of building structure, in particular to a kind of cell curtain wall.
Background technique
Currently, most of curtain wall engineering first floor glass curtain wall, lighting roof or the biggish curtain wall of span, because aluminum profile is made It is inadequate for the intensity of column, use T-steel to do keel (column and crossbeam) to meet Force Calculation in proof strength.It is existing to do The form that method is welded frequently with two panels steel plate is made, if there is ornamental strip in outside or needs outer-side connecting steel plate, The way of welding can only be taken.The shortcomings that this method is that junction steel plate welding positioning is cumbersome, time-consuming, and the welding of steel plate sake becomes Shape is more, when correcting difficulty, and will appear the problems such as welding position lacks weldering by the way of welding, causes safety problem.
Summary of the invention
The purpose of the present invention is to provide a kind of cell curtain wall, technical problems to be solved are the reduction of welding sequence, keep away Exempt from the problem on deformation occurred by welding, improves safety coefficient, reduce cost.
To solve the above problems, the present invention is implemented with the following technical solutions: a kind of cell curtain wall, including cell curtain wall Plate, the column for being connected and fixed cell curtain wall plate and the secondary joist being connected and fixed with column by bolt assembly, described time Keel are mutually spliced by two pieces of symmetrically arranged sub- keel to be formed, and the sub- keel include for connection unit curtain wall panel column Connecting plate and with the integrally formed spademan of connecting plate, the spademan be set to connecting plate wherein one side edge be aligned, the connection Plate is located at the identical side of spademan equipped with first connecting portion, and the first connecting portion is equipped with the first connection through-hole, two son dragons Connecting plate is bonded to each other far from a side surface of spademan in bone, the connecting plate far from first connecting portion one side edge be equipped with The vertically disposed second connecting portion of connecting plate, the second connecting portion is equipped with the second connection through-hole, in column and secondary joist phase Pair side be equipped with slot, the slot is oppositely arranged with first connecting portion, on the slot with first connecting portion both side surface Opposite cell wall is equipped with the third for connecting through-hole connection with first and connects through-hole, and the first connecting portion is worn by bolt assembly It is connected and fixed after crossing the first connection through-hole, third connection through-hole with slot.
Further, the surface of the first connecting portion and the surface of connecting plate are parallel.
Further, the first connecting portion is successively spaced setting along the length direction of connecting plate, forms zigzag.
Further, the first connecting portion is equidistantly spaced.
Further, the width of the slot and the thickness of first connecting portion are equal.
Further, groove, two connections are respectively equipped in two sub- keel on the opposite side surface of two connecting plates Groove on plate is adapted connection.
Compared with prior art, the present invention using the secondary joist being made of symmetrically arranged two sub- keel, every height dragon The connecting plate and spademan of bone are integrally formed, and slot corresponding with column is connected solid by bolt assembly after mutual splicing Fixed, since welding portion is not present in secondary joist, deformation is small, and also assures the grafting precision of secondary joist;Using aforementioned This structure, additionally it is possible to reduce welding material cost, cost of labor improves safety coefficient.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of the sub- keel of the present invention;
Fig. 3 is the structural schematic diagram of column of the present invention.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and examples.
As shown in Figure 1, Figure 2 and Figure 3, the invention discloses a kind of cell curtain wall, including cell curtain wall plate 1, for connecting The column 3 of fixed cell curtain wall plate 1 and the secondary joist 2 being connected and fixed with column 3 by bolt assembly, it is in the present invention, secondary Connection between keel 2 and external wall is used is arranged anchoring piece 4, secondary joist 2 and anchoring piece on concrete or reinforcing bar keel Between carried out by conventional connection type, be such as bolted;Connection between column 3 and cell curtain wall plate 1 uses existing skill Art is not specifically limited herein, in which:
The secondary joist 2 is made of two pieces of symmetrically arranged sub- mutually splicings of keel 21, and the sub- keel 21 include being used for The connecting plate 22 of connection unit curtain wall panel column 1 and with the integrally formed spademan 23 of connecting plate 22, the spademan 23 be set to connect Wherein one side edge is aligned fishplate bar 22, and the connecting plate 22 is located at the identical side of spademan 23 equipped with first connecting portion 24, makes son The cross sectional shape of keel 21 is T-shaped;The first connecting portion 24 is equipped with the first connection through-hole 25, and the first connection through-hole 25 passes through Wear the opposite sides surface of first connecting portion 24;
Connecting plate 22 is bonded to each other far from a side surface of spademan 23 in two sub- keel 21;
It is equipped in connecting plate 22 far from the one side edge of first connecting portion 24 and is connect with connecting plate 22 vertically disposed second Portion 26, the second connecting portion 26 are equipped with the second connection through-hole 27, and connecting plate 22 is connected by second in second connecting portion 26 Connecting hole 27 realizes the fixation between anchoring piece;It is equipped with slot 31 in the side opposite with secondary joist 2 of column 3, it is described to insert Slot 31 is oppositely arranged with first connecting portion 24, and the width of the slot 31 is equal with the thickness of first connecting portion 24;The slot The cell wall opposite with 24 both side surface of first connecting portion is equipped with the third for connecting the connection of through-hole 25 with first and connects through-hole on 31 32, the first connecting portion 24 passes through the first connection through-hole 25 by bolt assembly, third connects after connecting through-hole 32 with slot 31 Fixation is connect, specifically, the third connection through-hole 32, first that the screw rod of bolt assembly sequentially passes through side connects through-hole 25, another The nut set up after the third connection through-hole 32 of side with bolt is threadedly coupled, and realizes fastening.
As shown in figure 3, being respectively equipped with groove 33, the groove 33 in the two sides that column 3 is located at third connection through-hole 32 Bolt assembly is assembled for convenient.
As shown in Fig. 2, the surface of first connecting portion 24 is parallel with the surface of connecting plate 22, and specifically, first connection Portion 24 is successively spaced setting along the length direction of connecting plate 22, forms zigzag;Preferably, the first connecting portion 24 is equidistant Interval setting.
In order to guarantee the stable connection between two sub- keel, two connecting plates 22 are opposite in two sub- keel 21 Groove 28 is respectively equipped on one side surface, the groove 28 on two connecting plates 22 is adapted connection, increases friction to play Effect, specifically,.
In the present invention, galvanized steel plain sheet or stainless steel is can be used in secondary joist 2.
The present invention is attached using integrally formed two sub- keel with anchoring piece;For entire processing above, reduce Welding deformation, quality is more excellent, and also easy to accomplish;In addition in terms of welding: the sake welding of junction steel plate needs additional Fixation and welding positioning process, and the present invention by being stamped and formed out entirety, reduces site welding without welding And additional fixation, reduce welding material cost, cost of labor, measure cost.

Claims (6)

1. a kind of cell curtain wall, column (3) including cell curtain wall plate (1), for being connected and fixed cell curtain wall plate (1) and with The secondary joist (2) that column (3) is connected and fixed by bolt assembly, it is characterised in that: the secondary joist (2) is symmetrical arranged by two pieces Sub- keel (21) mutually splicing composition, the sub- keel (21) include be used for connection unit curtain wall panel column (1) connecting plate (22) and with connecting plate (22) integrally formed spademan (the 23) spademan (23) it is set to connecting plate (22) wherein one side edge Alignment, the connecting plate (22) are located at the identical side of spademan (23) equipped with first connecting portion (24), the first connecting portion (24) it is equipped with the first connection through-hole (25), a side surface phase of the connecting plate (22) far from spademan (23) in two sub- keel (21) Mutually fitting, the connecting plate (22) are equipped with and connecting plate (22) vertically disposed the far from the one side edge of first connecting portion (24) Two interconnecting pieces (26), the second connecting portion (26) is equipped with the second connection through-hole (27), in column (3) and secondary joist (2) phase Pair side be equipped with slot (31), the slot (31) is oppositely arranged with first connecting portion (24), with the on the slot (31) The opposite cell wall of one interconnecting piece (24) both side surface is equipped with third connection through-hole (32) for connecting through-hole (25) connection with first, The first connecting portion (24) passes through the first connection through-hole (25), third connection through-hole (32) afterwards and slot by bolt assembly (31) it is connected and fixed.
2. cell curtain wall according to claim 1, it is characterised in that: the surface of the first connecting portion (24) and connecting plate (22) surface is parallel.
3. cell curtain wall according to claim 1, it is characterised in that: the first connecting portion (24) is along connecting plate (22) Length direction is successively spaced setting, forms zigzag.
4. cell curtain wall according to claim 3, it is characterised in that: first connecting portion (24) equidistant intervals are set It sets.
5. cell curtain wall according to claim 1, it is characterised in that: the width and first connecting portion of the slot (31) (24) thickness is equal.
6. cell curtain wall according to claim 1 or 4, it is characterised in that: two connecting plates in two sub- keel (21) (22) it is respectively equipped with groove (28) on an opposite side surface, the groove (28) on two connecting plates (22) is adapted connection.
CN201811310066.5A 2018-11-04 2018-11-04 Cell curtain wall Pending CN109267679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811310066.5A CN109267679A (en) 2018-11-04 2018-11-04 Cell curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811310066.5A CN109267679A (en) 2018-11-04 2018-11-04 Cell curtain wall

Publications (1)

Publication Number Publication Date
CN109267679A true CN109267679A (en) 2019-01-25

Family

ID=65192116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811310066.5A Pending CN109267679A (en) 2018-11-04 2018-11-04 Cell curtain wall

Country Status (1)

Country Link
CN (1) CN109267679A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203755508U (en) * 2014-03-26 2014-08-06 武汉凌云建筑装饰工程有限公司 T-shaped section steel keel glass curtain wall system
CN104005497A (en) * 2013-02-27 2014-08-27 深圳市方大建科集团有限公司 T shape steel curtain wall keel and connecting method thereof
CN204266433U (en) * 2014-12-03 2015-04-15 中建八局第一建设有限公司 A kind of card slot type curtain skeleton linkage
CN205012527U (en) * 2015-09-23 2016-02-03 四川盛邦建设工程有限公司 Novel curtain coupling assembling
CN105298145A (en) * 2015-11-23 2016-02-03 常州第一建筑集团有限公司 Vertical external sun-shading welding-free construction method of hidden-frame curtain wall
WO2017129042A1 (en) * 2016-01-29 2017-08-03 金粤幕墙装饰工程有限公司 Press-fit unitized curtain wall and sealing member
CN206448421U (en) * 2017-02-13 2017-08-29 中山中瑞建筑装饰工程有限公司 A kind of opening aluminium alloy plate curtain wall system of hanging-connecting
CN209260990U (en) * 2018-11-04 2019-08-16 深圳市科源建设集团股份有限公司 Cell curtain wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005497A (en) * 2013-02-27 2014-08-27 深圳市方大建科集团有限公司 T shape steel curtain wall keel and connecting method thereof
CN203755508U (en) * 2014-03-26 2014-08-06 武汉凌云建筑装饰工程有限公司 T-shaped section steel keel glass curtain wall system
CN204266433U (en) * 2014-12-03 2015-04-15 中建八局第一建设有限公司 A kind of card slot type curtain skeleton linkage
CN205012527U (en) * 2015-09-23 2016-02-03 四川盛邦建设工程有限公司 Novel curtain coupling assembling
CN105298145A (en) * 2015-11-23 2016-02-03 常州第一建筑集团有限公司 Vertical external sun-shading welding-free construction method of hidden-frame curtain wall
WO2017129042A1 (en) * 2016-01-29 2017-08-03 金粤幕墙装饰工程有限公司 Press-fit unitized curtain wall and sealing member
CN206448421U (en) * 2017-02-13 2017-08-29 中山中瑞建筑装饰工程有限公司 A kind of opening aluminium alloy plate curtain wall system of hanging-connecting
CN209260990U (en) * 2018-11-04 2019-08-16 深圳市科源建设集团股份有限公司 Cell curtain wall

Similar Documents

Publication Publication Date Title
US3593477A (en) Reinforced concrete columns or beams
CZ281115B6 (en) Corner joint of two profiled bars with attaching parts of c-section
JP2015506428A (en) Modular stud brace
KR20120104205A (en) Structural reinforcement
US10900220B2 (en) Concrete weldment
CN104018581A (en) Prestress concrete F slab and framework structure system
US10858820B2 (en) Reinforced beam system
CN110206295A (en) A kind of wooden frame bearing plate
US20070095002A1 (en) Nx steel lumber
CN209260990U (en) Cell curtain wall
CN109267679A (en) Cell curtain wall
AU2014280871B2 (en) Frame Fitting
US20190177975A1 (en) Structural element
CN113585559B (en) Curtain wall unit and curtain wall with same
WO2019007229A1 (en) Floor slab system
CN211172654U (en) Assembled light gauge steel structure
DE19805913A1 (en) Facade element for cladding outside walls
DE202013103884U1 (en) Mounting strip of a heat-insulating system
RU2600887C1 (en) Method of making lattice structures of tubular (bent-welded) profiles
US2075875A (en) Frameless building unit
CN221031143U (en) Single hanging plate keel
CN116497982B (en) Truss constraint steel plate shear wall system with fireproof decorative plate
CN217027448U (en) Good steel constructs beam column connecting piece
CN216552689U (en) High-strength steel beam
CN210459687U (en) Assembled building wall based on girder steel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Room 302-03, No. 3, No. 231 Taoyuan Road, Shoot Hill Street, Luohu District, Shenzhen City, Guangdong Province

Applicant after: Shenzhen Keyuan Construction Group Co., Ltd.

Address before: Room 302-03, No. 3, No. 231 Taoyuan Road, Shoot Hill Street, Luohu District, Shenzhen City, Guangdong Province

Applicant before: Shenzhen Keyuan Construction Group Co., Ltd.