CN109262155A - A kind of sandwich composite wall body double layer bar welding equipment and welding method - Google Patents

A kind of sandwich composite wall body double layer bar welding equipment and welding method Download PDF

Info

Publication number
CN109262155A
CN109262155A CN201811378088.5A CN201811378088A CN109262155A CN 109262155 A CN109262155 A CN 109262155A CN 201811378088 A CN201811378088 A CN 201811378088A CN 109262155 A CN109262155 A CN 109262155A
Authority
CN
China
Prior art keywords
plate core
steel mesh
welding
puncher
punching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811378088.5A
Other languages
Chinese (zh)
Other versions
CN109262155B (en
Inventor
唐元元
唐方方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811378088.5A priority Critical patent/CN109262155B/en
Publication of CN109262155A publication Critical patent/CN109262155A/en
Application granted granted Critical
Publication of CN109262155B publication Critical patent/CN109262155B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B41/00Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/04Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass for both machining and other metal-working operations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention proposes a kind of sandwich composite wall body double layer bar welding equipment and welding methods, its welding equipment includes plate core puncher and steel mesh automatic welder, the plate core puncher and steel mesh automatic welder are respectively provided on the rack, rack is equipped with the conveying roller driven by drive system, conveying roller intermittently rotates, and the plate core puncher and steel mesh automatic welder are located at punching station and welding post in rack;The plate core puncher includes the perforating cutting tool of the energy upper and lower displacement driven by puncher upper arm, and the cross section in the punching portion of the perforating cutting tool is rectangle;Steel mesh automatic welder includes upper soldering tip and lower soldering tip, and the station for installing steel mesh connector is additionally provided between plate core puncher and steel mesh automatic welder.High production efficiency of the present invention can be reduced the labor intensity of worker, and can improve welding quality, guarantee that plate core does not shift, to ensure the quality of sandwich composite wall body.

Description

A kind of sandwich composite wall body double layer bar welding equipment and welding method
Technical field
The present invention relates to building material technologies, set more particularly to a kind of welding of sandwich composite wall body double layer bar Standby and welding method.
Background technique
Popularization with China to novel wall new material, the increase of application, sandwich composite wall body using more and more, Sandwich composite wall body requires to be filled in wall middle layer using lightweight plate core, is steel mesh in the two sides of plate core, with connection steel Muscle is inserted through plate core to make plate core and double layer bar be connected as an entirety, becomes the skeleton and filled layer of combined wall. It is all now to pass through plate core using reinforcing bar oblique cutting or straight cutting, then the reinforcing bar of insertion and double layer bar are manually welded on one at present It rises, is on the one hand that human weld's working efficiency is low, after the steel mesh for having welded side, then welds the steel mesh of the other side;It is another Aspect since connection bar diameter is small, after plate core with the contact point of double layer bar is small is less easily accessible to double layer bar On reinforcing bar, double layer bar connecting welding is slow, and welding efficiency is low, has been easy many solder skips, and weldering is insecure, so as to cause because not firm Admittedly plate core is located among wall, when construction is poured hardened material, plate core displacement influences entire wall quality.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provide a kind of sandwich composite wall body double layer bar welding equipment and Welding method, high production efficiency can be reduced the labor intensity of worker, and can improve welding quality, guarantee that plate core does not shift, from And ensure the quality of sandwich composite wall body.
To reach above-mentioned purpose, on the one hand technical solution provided by the invention is: a kind of sandwich composite wall body clad steel Muscle net welding equipment, including plate core puncher and steel mesh automatic welder, the plate core puncher and steel mesh automatic welder are equal It is arranged on the rack, rack is equipped with the conveying roller driven by drive system, and conveying roller intermittently rotates, the plate core punching Machine and steel mesh automatic welder are located at punching station and welding post in rack;The plate core puncher includes by punching The perforating cutting tool for the energy upper and lower displacement that machine upper arm drives, the cross section in the punching portion of the perforating cutting tool are rectangle;Steel mesh is certainly Dynamic welding machine includes upper soldering tip and lower soldering tip, and upper soldering tip is driven and energy upper and lower displacement by welding machine upper arm, lower soldering tip and welding machine lower cylinder Connection;When the plate core puncher and steel mesh automatic welder work, conveying roller stops operating, in plate core puncher and reinforcing bar The station for installing steel mesh connector is additionally provided between net automatic welder.
Above-mentioned technical proposal includes plate core puncher and steel mesh automatic welder, plate core puncher and steel mesh automatic welder Material all is conveyed using conveying roller, expeditiously plate core hole is accomplished fluently by welding position in rows using plate core punching function, Position is accurate, and hole is vertical, and the cross-sectional area of the puncture site of perforating cutting tool is rectangle, and punched hole is rectangular opening, and use is flat Steel makees steel mesh connector and double layer bar reinforcement welding, and contact surface is big, firm welding.Again by manually grasping after plate core punching Make the steel mesh connector for installing band steel shape on platform, steel mesh connector is passed through into the hole in plate core on station, in steel Upper gasket is covered in the two ends of muscle net connector stretching plate core respectively, and is connected to steel mesh with plug-in card part in the outside of washer and connects On fitting in set blocked hole, plug-in card part fixes plate core;It will be mounted with the plate core and two steel meshes of steel mesh connector again Common to be sent into steel mesh automatic welder, two steel meshes are located above and below plate core, and two steel meshes are connect with steel mesh The both ends of part offset, and when plate core component passes through welding post, upper soldering tip and lower soldering tip are displaced to plate core direction respectively, by reinforcing bar The both ends of net connector and steel mesh weld.Since puncher punching is accurate, and each punch position and upper and lower soldering tip position pair It answers, upper and lower soldering tip welds simultaneously, the time is not only saved, high production efficiency, and weld accurately, the contact area of welding is big, weldering Quality height is connect, guarantees that plate core is not shifting, to ensure the quality of sandwich composite wall body.
Further, compact-sized to make, and it is easily installed the cylinder for driving upper arm, the rack includes portal frame With board frame, be provided with above the punching station with the puncher upper arm that connect of punching cylinder, on puncher upper arm Perforating cutting tool directed downwardly is installed, the punching cylinder is mounted on the portal frame of rack, and the conveying roller is mounted on board frame On frame.
Further, it is provided with positioning device for material on the conveying roller or board frame, positioning device for material is for fixed Position plate core, keeps plate core accurate in the position of punching station and welding post, can complete punching and welding in setting position.
Further, the positioning device for material is mounted in the positioning ring of conveying roller both side ends, positioning device for material It is also possible to the idler wheel being mounted on board frame, idler wheel is located at the defeated two sides up to roller and is higher than conveying roller, the axis of idler wheel Perpendicular to conveying roller.Positioning ring and idler wheel can adjust the position on board width, to realize determining for different in width plate core Position.
Further, the puncher upper arm is one, and puncher upper arm is parallel with conveying roller, installs on puncher upper arm Perforating cutting tool be arranged in a row, the cross section in the punching portion of the perforating cutting tool is rectangle.When conveying roller stops moving ahead, As soon as punching station just once gets round hole, repeatedly the processing of multiple rows of hole in plate core is completed in punching.
Further, it welds while two steel meshes to realize, is respectively arranged with above and below the welding post Corresponding upper soldering tip and lower soldering tip, the upper soldering tip are installed on the welding machine upper arm connecting with welding machine upper cylinder, the welding machine gas Cylinder is mounted on the portal frame of rack, and the lower soldering tip is mounted on board frame by welding machine lower cylinder.
Further, the plate core puncher and steel mesh automatic welder are provided with control system, and control system controls institute Drive system, plate core puncher and steel mesh automatic welder are stated, plate core is intermittently advanced under the conveying of conveying roller, and is being beaten Hole station and welding post are respectively completed plate core punching and welding.
Further, punching inductor and weldering are separately installed in the rack of the punching station and welding post side Connect inductor, when punch inductor sense plate core front end when, conveying roller stops operating, at this time punch position just with perforating knife Tool corresponds to, and perforating cutting tool downlink punching, plate core continues to move ahead after perforating cutting tool uplink, and conveying roller periodically stops operating simultaneously It is displaced and is punched by perforating cutting tool during its stopping, plate core is sent plate core puncher after the punching of whole setting hole; When interted steel mesh connector plate core and two steel meshes be sent into steel mesh automatic welder jointly, and weld inductor induction When to material front end, conveying roller stops operating, and corrects in the steel mesh connector two that punch position interts and welds at this time above and below Corresponding, steel mesh connector both ends are resisted and are welded with steel mesh upper and lower soldering tip by downlink and uplink respectively, and welding finishes Afterwards, upper and lower soldering tip distinguishes uplink and downlink, and conveying roller periodically stops operating and upper and lower soldering tip carries out during its stopping Displacement and welding, plate core component is sent steel mesh automatic welder after the welding of whole steel mesh connectors.
Secondly, additionally providing a kind of welding method of sandwich composite wall body double layer bar, include the following steps: that (1) is adopted With above-mentioned sandwich composite wall body double layer bar welding equipment, plate core is placed on the plate core puncher, plate core is defeated It send and whole punchings is completed by punching station under the conveying of roller;(2) plate core after punching sends out plate core puncher, in station On by steel mesh connector pass through plate core on hole, steel mesh connector stretch out plate core two ends on cover upper gasket respectively, And be connected in blocked hole set on steel mesh connector in the outside of washer with plug-in card part, plug-in card part fixes plate core;(3) The plate core for being mounted with steel mesh connector and two steel meshes are sent into steel mesh automatic welder jointly, two steel meshes are located at plate Above and below core, the both ends of two steel meshes and steel mesh connector offset, when plate core component passes through welding post, upper weldering Head and lower soldering tip are displaced to plate core direction respectively, and the both ends of steel mesh connector and steel mesh are welded;(4) plate core group after welding Part sends out steel mesh automatic welder.
Further, the welding back plate core assembly step (4) sent out is examined, and is checked whether there is or not solder skip, qualified product enters Library pile.
In conclusion the beneficial effects of the present invention are:
1, expeditiously plate core hole is accomplished fluently by welding position in rows using plate core punching function, position is accurate, hole Hole is vertical, and the cross-sectional area of the puncture site of perforating cutting tool is rectangle, and punched hole is rectangular opening, makees steel mesh company using band steel Fitting and double layer bar reinforcement welding, contact surface is big, firm welding.
2, the plate core for being mounted with steel mesh connector and two steel meshes are sent into steel mesh automatic welder jointly, when plate core group When part passes through welding post, upper soldering tip and lower soldering tip are displaced to plate core direction respectively, by the both ends of steel mesh connector and reinforcing bar Net welding.Since puncher punching is accurate, and each punch position is corresponding with upper and lower soldering tip position, and upper and lower soldering tip welds simultaneously It connects, not only saves the time, high production efficiency, and weld accurately, the contact area of welding is big, and welding quality is high, guarantees plate core It is not shifting, to ensure the quality of sandwich composite wall body.
It 3, will on station again by manually installing the steel mesh connector of band steel shape on station after plate core punching Steel mesh connector passes through the hole in plate core, covers upper gasket respectively in the two ends that steel mesh connector stretches out plate core, and The outside of washer is connected in blocked hole set on steel mesh connector with plug-in card part, and plug-in card part fixes plate core, guarantees plate Between core and steel mesh wall quality can be improved there are concrete is poured into form the interval of protective layer.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of plate core puncher side-looking direction of the present invention.
Fig. 2 is the structural schematic diagram of plate core puncher overlook direction of the present invention.
Fig. 3 is the structural schematic diagram of steel mesh automatic welder side-looking direction of the present invention.
Fig. 4 is the structural schematic diagram of steel mesh automatic welder overlook direction of the present invention.
Fig. 5 is the structural schematic diagram of steel mesh automatic welder welding post of the present invention.
Fig. 6 is the assembly relation schematic diagram of plate core and steel mesh connector.
Fig. 7 is the main view of steel mesh connector.
Fig. 8 is the main view of plug-in card part.
Specific embodiment
As shown in Figures 1 to 5, a kind of sandwich composite wall body double layer bar welding equipment, including plate core puncher 1 and steel Muscle net automatic welder 2 is provided with for installing steel mesh connector between plate core puncher 1 and steel mesh automatic welder 2 Station (not shown).Two independent boards can be set into plate core puncher 1 and steel mesh automatic welder 2, can also lead to The station for installing steel mesh connector is crossed to link together.Whether need to connect it is in alignment, mainly according to each The design time of process, if the rhythm of production of plate core puncher 1 adjusts comparatively fast, it is necessary to station be separately provided, ability Keep up with the rhythm of production of subsequent steel mesh automatic welder 2.
Plate core puncher 1 and steel mesh automatic welder 2 are arranged in rack 3, and rack 3 includes portal frame 31 and board frame The conveying roller 4 driven by drive system, institute are respectively equipped in the rack 3 of frame 32, plate core puncher 1 and steel mesh automatic welder 2 It states conveying roller 4 to be mounted on board frame 32, conveying roller 4 intermittently rotates under control of the control system, and the plate core is beaten Hole machine 1 and steel mesh automatic welder 2 are located at punching station and welding post in rack 3.The plate core puncher 1 includes By the perforating cutting tool 12 for the energy upper and lower displacement that puncher upper arm 11 drives, puncher upper arm 11 is located at the top of punching station, beats Hole machine upper arm 11 is one, and puncher upper arm 11 is parallel with conveying roller 4, and puncher upper arm 11 is connect with punching cylinder 13, is punched Cylinder 13 is mounted on the portal frame 31 of rack 3, and perforating cutting tool 12 directed downwardly, puncher upper arm are equipped on puncher upper arm 11 The perforating cutting tool 12 installed on 11 is arranged in a row, and the cross section in the punching portion of the perforating cutting tool 12 is rectangle, whenever conveying roller 4 When stopping moving ahead, as soon as just once getting round hole in punching station, repeatedly the processing of multiple rows of hole in plate core 5 is completed in punching. The cross section in the punching portion of perforating cutting tool 12 is rectangle, and just punched hole is rectangular opening in plate core 5, for interting band steel shape Steel mesh connector 6, the reinforcement welding of the steel mesh connector 6 of band steel shape and double-deck steel mesh 7, contact area is big, Firm welding.
As shown in Figures 3 to 5, steel mesh automatic welder 2 includes upper soldering tip 21 and lower soldering tip 22, and upper soldering tip 21 is by welding machine Arm 23 drives and energy upper and lower displacement, and lower soldering tip 22 is connect with welding machine lower cylinder 24.It is welded while two steel mesh 7 to realize, institute It states and is respectively arranged with corresponding upper soldering tip 21 and lower soldering tip 22 above and below welding post, the upper soldering tip 21 is installed on The welding machine upper arm 23 connecting with welding machine upper cylinder 25, the welding machine upper cylinder 25 is mounted on the portal frame 31 of rack 3, under described Soldering tip 22 is mounted on board frame 32 by welding machine lower cylinder 24.
In order to keep plate core 5 accurate in the position of punching station and welding post, punching and weldering can be completed in setting position It connects, positioning device for material is provided on conveying roller 4 or board frame 32, positioning device for material is for positioning plate core 5.Material positioning Device can be mounted in the positioning ring of 4 both side ends of conveying roller, be also possible to the idler wheel 8 being mounted on board frame 32, rolling Wheel 8 is located at the defeated two sides up to roller and is higher than conveying roller 4, and the axis of idler wheel 8 is perpendicular to conveying roller 4.Positioning ring and idler wheel 8 can The position on board width is adjusted, so that the positioning of different in width plate core 5 is realized, as shown in figures 1 and 3, in the present embodiment Positioning device for material is used as using idler wheel 8.
Plate core puncher 1 and steel mesh automatic welder 2 are provided with control system, control system control the drive system, Plate core puncher 1 and steel mesh automatic welder 2, plate core 5 are intermittently advanced under the conveying of conveying roller 4, when the plate core is beaten When hole machine 1 and steel mesh automatic welder 2 work, conveying roller 4 stops operating, to be respectively completed in punching station and welding post The punching of plate core 5 and welding.If the work rhythm of plate core puncher 1 and steel mesh automatic welder 2 can be with manually installed steel therebetween The rhythm of muscle net connector 6 is consistent, so that it may a control system be arranged to control whole conveying rollers 4, complete to beat incessantly Hole, installation and welding sequence.It otherwise is exactly that two independent plate core puncheres 1 and steel mesh automatic welder 2 are set, and exist respectively Matched control system is set on plate core puncher 1 and steel mesh automatic welder 2, is individually controlled.
Punching inductor 91 and welding induction are separately installed in the rack 3 of the punching station and welding post side Device 92, when punch inductor 91 sense 5 front end of plate core when, conveying roller 4 stops operating, at this time punch position just with perforating knife Tool 12 is corresponding, and 12 downlink of perforating cutting tool punching, plate core 5 continues to move ahead after 12 uplink of perforating cutting tool, and conveying roller 4 periodically stops Rotation stop is dynamic and is displaced and is punched by perforating cutting tool 12 during its stopping, and plate core 5 is sent after the punching of whole setting hole Plate core puncher 1;When the common feeding steel mesh of the steel mesh 7 of the plate core 5 and upper and lower of having interted steel mesh connector 6 is automatic Welding machine 2, and when welding inductor 92 and sensing material front end, conveying roller 4 stops operating, the steel interted at this time in punch position 6 liang of muscle net connector corrects corresponding with upper and lower soldering tip 21,22, and upper and lower soldering tip 21,22 distinguishes downlink and uplink for reinforcing bar 6 both ends of net connector resist and weld with steel mesh 7, and after welding, upper and lower soldering tip 21,22 distinguishes uplink and downlink, conveying Roller 4 periodically stops operating and upper and lower soldering tip 21,22 is displaced and is welded during its stopping, when whole steel meshes connect After fitting 6 welds, 5 component of plate core is sent steel mesh automatic welder 2.
As shown in Figure 6 to 8, the manually installed steel mesh connector 6 on station, is to pass through steel mesh connector 6 Plate core 5 is engaged by plug-in card part 62 by 5 clamping position of plate core, and steel mesh connector 6 is the band steel of rectangular strip, steel mesh connection There are two blocked hole 63, blocked hole 63 is located at two sides corresponding position of the steel mesh connector 6 after plate core 5 for setting on part 6, inserts Fastener 62 is clamped by flexible deformation and blocked hole 63.Washer 61 is also installed on steel mesh connector 6, washer 61 is located at institute It states between plug-in card part 62 and plate core 5, washer 61 positions relatively reliable to increase the contact area with 5 clamping position of plate core.It inserts Fastener 62 includes the card 621 being connected and elasticity card base 622, and the outer end of elasticity card base 622 is the fastener with step, institute State plug-in card part 62 it is upper by elasticity card base 622 and the card of blocked hole 63 and by the card 621 by 5 clamping position of plate core.In this way, if Dry steel mesh connector 6 passes through plate core 5 and is engaged by plug-in card part 62 by 5 clamping position of plate core, can reliably guarantee plate core 5 and steel It at a distance of certain interval between muscle net 7, is used cooperatively by steel mesh connector 6 and plug-in card part 62, quick and easy for installation, clamping It is reliable and stable, and the both ends of steel mesh connector 6 are welded with two steel meshes 7, so that being formed between two pieces of steel meshes 7 several Dagger, two pieces of steel meshes 7 are connected as the rectangular frame of a reinforcement.
The present embodiment additionally provides a kind of welding method of sandwich composite wall body double layer bar, includes the following steps: (1) Using above-mentioned sandwich composite wall body double layer bar welding equipment, plate core 5 is placed on the plate core puncher 1, plate core 5 Whole punchings are completed by punching station under the conveying of conveying roller 4;(2) plate core 5 after punching sends out plate core puncher 1, Steel mesh connector 6 is passed through into the hole in plate core 5 on station, is divided in the two ends that steel mesh connector 6 stretches out plate core 5 Not Tao upper gasket 61, and be connected on steel mesh connector 6 in set blocked hole 63 in the outside plug-in card part 62 of washer 61, Plug-in card part 62 is fixed by plate core 5;(3) steel mesh 7 of the plate core 5 for being mounted with steel mesh connector 6 and upper and lower is sent into jointly Steel mesh automatic welder 2, two steel meshes 7 are located above and below plate core 5, two steel meshes 7 and steel mesh connector 6 Both ends offset, and when 5 component of plate core passes through welding post, upper soldering tip 21 and lower soldering tip 22 are displaced to 5 direction of plate core respectively, by steel The both ends of muscle net connector 6 and steel mesh 7 weld;(4) welding back plate core assembly sends out steel mesh automatic welder 2;It (5) will be described The welding back plate core assembly that step (4) is sent out is examined, and whether there is or not solder skip, qualified products to be put in storage pile for examination.
Sandwich composite wall body double layer bar, high production efficiency, energy are produced using equipment and welding method of the invention The labor intensity of worker is reduced, and welding quality can be improved, guarantees that plate core does not shift, to ensure the quality of sandwich composite wall body
The above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to preferred embodiment to this hair It is bright to be described in detail, those skilled in the art should understand that, it can modify to technical solution of the present invention Or equivalent replacement should all cover in claim of the invention without departing from the spirit and scope of the technical solution of the present invention In range.

Claims (10)

1. a kind of sandwich composite wall body double layer bar welding equipment, it is characterised in that: certainly including plate core puncher and steel mesh Dynamic welding machine, the plate core puncher and steel mesh automatic welder are respectively provided on the rack, and rack is equipped with and is driven by drive system Conveying roller, conveying roller intermittently rotates, and the plate core puncher and steel mesh automatic welder are located at beating in rack Hole station and welding post;The plate core puncher includes the perforating cutting tool of the energy upper and lower displacement driven by puncher upper arm, institute The cross section for stating the punching portion of perforating cutting tool is rectangle;Steel mesh automatic welder includes upper soldering tip and lower soldering tip, and upper soldering tip is by welding Machine upper arm drives and energy upper and lower displacement, and lower soldering tip is connect with welding machine lower cylinder;When the plate core puncher and steel mesh automatic welding When machine works, conveying roller stops operating, and is additionally provided between plate core puncher and steel mesh automatic welder for installing reinforcing bar The station of net connector.
2. sandwich composite wall body double layer bar welding equipment as described in claim 1, it is characterised in that: the rack includes Portal frame and board frame are provided with the puncher upper arm connecting with punching cylinder, puncher above the punching station Perforating cutting tool directed downwardly is installed, the punching cylinder is mounted on the portal frame of rack, and the conveying roller is mounted on upper arm On board frame.
3. sandwich composite wall body double layer bar welding equipment as claimed in claim 2, it is characterised in that: the conveying roller or Positioning device for material is provided on board frame.
4. sandwich composite wall body double layer bar welding equipment as described in claim 1, it is characterised in that: the material positioning Device is mounted in the positioning ring of conveying roller both side ends, and positioning device for material is also possible to the rolling being mounted on board frame Wheel, idler wheel are located at the defeated two sides up to roller and are higher than conveying roller, and the axis of idler wheel is perpendicular to conveying roller.
5. sandwich composite wall body double layer bar welding equipment as described in claim 1, it is characterised in that: on the puncher Arm is one, and puncher upper arm is parallel with conveying roller, and the perforating cutting tool installed on puncher upper arm is arranged in a row.
6. sandwich composite wall body double layer bar welding equipment as claimed in claim 2, it is characterised in that: the welding post Above and below be respectively arranged with corresponding upper soldering tip and lower soldering tip, the upper soldering tip is installed on to be connect with welding machine upper cylinder Welding machine upper arm, the welding machine cylinder is mounted on the portal frame of rack, and the lower soldering tip is mounted on machine by welding machine lower cylinder On table frame.
7. sandwich composite wall body double layer bar welding equipment as described in claim 1, it is characterised in that: the plate core punching Machine and steel mesh automatic welder are provided with control system, and control system controls the drive system, plate core puncher and steel mesh Automatic welder, plate core are intermittently advanced under the conveying of conveying roller, and are respectively completed plate core in punching station and welding post Punching and welding.
8. sandwich composite wall body double layer bar welding equipment as claimed in claim 7, it is characterised in that: in the punching work Punching inductor and welding inductor are separately installed in the rack of position and welding post side, when punching inductor senses plate When core front end, conveying roller stops operating, and punch position is just corresponding with perforating cutting tool at this time, the punching of perforating cutting tool downlink, plate core Continue to move ahead after perforating cutting tool uplink, conveying roller periodically stop operating and during its stopping by perforating cutting tool displacement and Punching, plate core is sent plate core puncher after the punching of whole setting hole;When interted the plate core of steel mesh connector with Two steel meshes are sent into steel mesh automatic welder jointly, and when welding inductor and sensing material front end, conveying roller stops operating, Corrected at this time in the steel mesh connector two that punch position interts it is corresponding with upper and lower soldering tip, upper and lower soldering tip difference downlink and On be about to steel mesh connector both ends and resist and welded with steel mesh, after welding, upper and lower soldering tip distinguishes uplink and downlink, Conveying roller periodically stops operating and upper and lower soldering tip is displaced and is welded during its stopping, when whole steel meshes connect Plate core component is sent steel mesh automatic welder after part welds.
9. a kind of sandwich composite wall body double layer bar welding method, which comprises the steps of: (1) using as weighed Benefit require 1 described in sandwich composite wall body double layer bar welding equipment, plate core is placed on the plate core puncher, plate core Whole punchings are completed by punching station under the conveying of conveying roller;(2) plate core after punching sends out plate core puncher, is grasping Make that steel mesh connector is passed through the hole in plate core on platform, covers and pad respectively in the two ends that steel mesh connector stretches out plate core Circle, and be connected in blocked hole set on steel mesh connector in the outside of washer with plug-in card part, plug-in card part fixes plate core; (3) plate core for being mounted with steel mesh connector and two steel meshes are sent into steel mesh automatic welder jointly, two steel meshes distinguish position Above and below plate core, the both ends of two steel meshes and steel mesh connector offset, when plate core component passes through welding post, Upper soldering tip and lower soldering tip are displaced to plate core direction respectively, and the both ends of steel mesh connector and steel mesh are welded;(4) back plate is welded Core assembly sends out steel mesh automatic welder.
10. sandwich composite wall body double layer bar welding method as claimed in claim 9, it is characterised in that: by the step (4) the welding back plate core assembly sent out is examined, and whether there is or not solder skip, qualified products to be put in storage pile for examination.
CN201811378088.5A 2018-11-19 2018-11-19 Welding equipment and welding method for double-layer reinforcing mesh of sandwich composite wall Active CN109262155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811378088.5A CN109262155B (en) 2018-11-19 2018-11-19 Welding equipment and welding method for double-layer reinforcing mesh of sandwich composite wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811378088.5A CN109262155B (en) 2018-11-19 2018-11-19 Welding equipment and welding method for double-layer reinforcing mesh of sandwich composite wall

Publications (2)

Publication Number Publication Date
CN109262155A true CN109262155A (en) 2019-01-25
CN109262155B CN109262155B (en) 2024-03-29

Family

ID=65189989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811378088.5A Active CN109262155B (en) 2018-11-19 2018-11-19 Welding equipment and welding method for double-layer reinforcing mesh of sandwich composite wall

Country Status (1)

Country Link
CN (1) CN109262155B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109986365A (en) * 2019-05-10 2019-07-09 厉雄伟 A kind of vertical steel wire rack welding production line

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4402869A1 (en) * 1994-01-31 1995-08-03 Se Hong Ahn Construction board
CN102430850A (en) * 2010-09-29 2012-05-02 上海中吉机械制造有限公司 Compound oblique insertion assembly welding machine
CN102449248A (en) * 2009-05-15 2012-05-09 杜得胜 Steel reinforcement structure of bubbledeck slab elements and procedure of manufacturing bubbledeck slab elements
CN206981668U (en) * 2017-06-16 2018-02-09 建科机械(天津)股份有限公司 Full-automatic welding machine of mesh
CN207386783U (en) * 2017-09-20 2018-05-22 李慧 The production equipment of steel plate wall member
CN108265626A (en) * 2018-03-29 2018-07-10 同济大学 Reinforcing steel bar-steel plate skeleton combined bridge deck and its construction method
CN108326207A (en) * 2018-01-25 2018-07-27 河北骄阳丝网设备有限责任公司 Fine groove steel wire welding production line
CN209175134U (en) * 2018-11-19 2019-07-30 唐元元 Sandwich composite wall body double layer bar welding equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4402869A1 (en) * 1994-01-31 1995-08-03 Se Hong Ahn Construction board
CN102449248A (en) * 2009-05-15 2012-05-09 杜得胜 Steel reinforcement structure of bubbledeck slab elements and procedure of manufacturing bubbledeck slab elements
CN102430850A (en) * 2010-09-29 2012-05-02 上海中吉机械制造有限公司 Compound oblique insertion assembly welding machine
CN206981668U (en) * 2017-06-16 2018-02-09 建科机械(天津)股份有限公司 Full-automatic welding machine of mesh
CN207386783U (en) * 2017-09-20 2018-05-22 李慧 The production equipment of steel plate wall member
CN108326207A (en) * 2018-01-25 2018-07-27 河北骄阳丝网设备有限责任公司 Fine groove steel wire welding production line
CN108265626A (en) * 2018-03-29 2018-07-10 同济大学 Reinforcing steel bar-steel plate skeleton combined bridge deck and its construction method
CN209175134U (en) * 2018-11-19 2019-07-30 唐元元 Sandwich composite wall body double layer bar welding equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109986365A (en) * 2019-05-10 2019-07-09 厉雄伟 A kind of vertical steel wire rack welding production line

Also Published As

Publication number Publication date
CN109262155B (en) 2024-03-29

Similar Documents

Publication Publication Date Title
CN106041376B (en) A kind of door of elevator welding production line
CN106078145B (en) A kind of automatic package system of electric energy meter carrier wave box light-guiding pillar
JPH0794076B2 (en) Method for manufacturing a heat exchanger and apparatus for carrying out this method
CN106584128A (en) Automatic assembly production line of spool
CN106903431A (en) A kind of automobile chair frame laser welding system
CN209175134U (en) Sandwich composite wall body double layer bar welding equipment
CN109262155A (en) A kind of sandwich composite wall body double layer bar welding equipment and welding method
CN106238664B (en) A kind of door hinge automatic pressing forming assembling device and method
CN107717483A (en) Door of elevator full-automation production line
CN210306696U (en) Steel grating shearing mechanism and steel grating production bus
CN208584114U (en) A kind of efficient, facilitation production line for the processing of angle steel Turbogrid plates
CN113042947A (en) Production line and production method of steel wire mesh frame composite insulation board
CN107498130A (en) Conflux welding bonding machine
CN208772967U (en) Compound insulation system steel bar truss welding forming production line
CN107585226A (en) A kind of intelligent assemble method of automobile door plate
CN211541623U (en) Automatic positioning and claw nail beating system and automatic claw nail beating production line
CN207651784U (en) Full automatic terminal riveting machine
CN206824821U (en) A kind of automobile chair frame laser welding system
CN210547515U (en) Automatic PIN device that send of modulus of continuity
CN108281870A (en) Full automatic terminal riveting machine
CN109483890B (en) Modularized flexible production line
CN207309400U (en) Door of elevator full-automation production line
CN205967880U (en) Weld assembly line from moving point entirely
CN214921652U (en) Steel wire net rack composite insulation board production line
CN109571038A (en) Front-axle beam shaping equipment under refrigerator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant