CN109255590A - A kind of construction project cost auditing system - Google Patents

A kind of construction project cost auditing system Download PDF

Info

Publication number
CN109255590A
CN109255590A CN201811047023.2A CN201811047023A CN109255590A CN 109255590 A CN109255590 A CN 109255590A CN 201811047023 A CN201811047023 A CN 201811047023A CN 109255590 A CN109255590 A CN 109255590A
Authority
CN
China
Prior art keywords
module
construction
client
information
audit file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811047023.2A
Other languages
Chinese (zh)
Inventor
金石
王宇
孙强
徐江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Jingcheng Engineering Consulting Co Ltd
Original Assignee
China Construction Jingcheng Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Jingcheng Engineering Consulting Co Ltd filed Critical China Construction Jingcheng Engineering Consulting Co Ltd
Priority to CN201811047023.2A priority Critical patent/CN109255590A/en
Publication of CN109255590A publication Critical patent/CN109255590A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of construction project cost auditing systems, belong to Project Cost Field, its key points of the technical solution are that including Construction Audit file generating module, contractor client, engineer's client, financial client, supervisor's client and public notification of information module, based on contract content automatically generates Construction Audit file, then it is modified to Construction Audit file by each side by respective client and is individually backed up respectively, change item and conflict item are sent to all clients, it solves when simultaneously participating in engineering construction in many ways, the not high enough problem of midway modification confidence level to project cost, reach and can while modify in many ways Construction Audit file without confusion reigned, and all modifications content all carries out publicity, effect with a high credibility.

Description

A kind of construction project cost auditing system
Technical field
The present invention relates to Project Cost Field, in particular to a kind of construction project cost auditing system.
Background technique
Project cost refers to the construction price of engineering, embodies the full payment spent needed for carrying out an engineering construction, work Journey can be specially house, road, bridge etc..Technical staff carries out the audit of project cost according to audit project file, with right The total cost of truth, engineering of engineering construction is understood and is supervised.
The prior art can refer to the Chinese invention patent that application notification number is CN106203779A, and it discloses a kind of engineerings Cost auditing system, the system include: Construction Audit file generating module, for generating Construction Audit according to engineering signing contract File, Construction Audit file include: inventory file in contract, change lacuna file, claim visa file;Inventory processing module, For calculating the project amount and comprehensive unit price of inventory in each contract;Lacuna processing module is changed, for calculating change lacuna file In change inventory and the corresponding comprehensive unit price of lacuna inventory;Visa processing module is claimed damages, for calculating the statement of claim and visa The corresponding comprehensive unit price of inventory.
Although above-mentioned construction project cost auditing system compares the project cost variation generated in construction process Timely change, but in change procedure various extra charges typing exist can operating space, in the construction process, due to Construction may be contracted out to construction company, Financial information processing is contracted out to capital company by contractor, while can also engineering be asked to be supervised Reason engineer to carry out management to construction, it is possible that it is multi-party to have contractor, project supervision side, construction party, capital company etc. Construction is participated in, since entire engineering is just able to build successfully often through multi-party effort, the data of independent side typing are difficult to have There is higher confidence level.
Summary of the invention
The object of the present invention is to provide a kind of construction project cost auditing systems, can carry out simultaneously to Construction Audit file in many ways Modification is without confusion reigned, and all modifications content all carries out publicity, with a high credibility.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of construction project cost auditing system, comprising: Construction Audit file generating module, the Construction Audit file generating module are used In generating and storage Construction Audit file, when engineering starts, contractor is according to the contract signed in advance by initial engineering Audit document is stored in Construction Audit file generating module;Contractor client, the contractor client connection engineering are examined File generating module is counted, contractor client is checked and changed in Construction Audit file generating module for contractor administrative staff Construction Audit file, generate a individually backup file being modified every time to Construction Audit file;Engineer visitor Family end, engineer's client connect Construction Audit file generating module, and engineer's client is used for construction site engineer The Construction Audit file in Construction Audit file generating module is checked and changed, Construction Audit file is being modified every time Generate a individually backup file;Financial client, the finance client connect Construction Audit file generating module, finance The personnel that client is used to manage the every expenditure of construction check and change the Construction Audit text in Construction Audit file generating module Part generates a individually backup file being modified every time to Construction Audit file;Supervisor's client, the management People's client connects Construction Audit file generating module, and Construction Audit is checked and changed to supervisor's client for supervising engineer Construction Audit file in file generating module generates a individually backup being modified every time to Construction Audit file File;Public notification of information module, the public notification of information module is daily by all individual backup file consolidations at a Construction Audit File simultaneously highlights all change items therein, when inconsistent there are change of multiple backup files to single change item It is simultaneously emitted by contractor client, engineer's client, financial client and supervisor's client and to be made of conflicting information Conflict report.
By using above scheme, had recorded in Construction Audit file inventory file in contract, subsequent change file and Visa file is claimed damages, user can understand all project cost relevant informations, contractor, project supervision from Construction Audit file Side, construction party and capital company respectively possess independent client, can individually modify to Construction Audit file, and information is public Show that Construction Audit file is sent to all clients daily by module, and modification item highlighted, allow user can quickly, The modification item for clearly finding the same day makes change information disclose enough, is transparent, while the report that conflicts can remind user to modify It is abnormal, it is convenient that the modification of project cost is verified in time in many ways, finishing operations are reduced, keep the Construction Audit ultimately produced literary Part is with a high credibility.
Preferably, public notification of information module will arrange resulting Construction Audit file daily carries out date mark, it will be on mark The Construction Audit file on date is sent to Construction Audit file generating module and is stored.
By using above scheme, it can add with dated Construction Audit file and search related data convenient for user's later period.
Preferably, further include: cloud information storage module, the cloud information storage module link information publicity module, Yun Xin Breath memory module receives the Construction Audit file that public notification of information module issues and is stored in network cloud disk.
By using above scheme, cloud information storage module is stored information in network cloud disk and is backed up, if engineering Loss of data in audit document generation module can quickly be restored.
Preferably, further include: remark information generation module, the remark information generation module connection contractor client, Engineer's client, financial client, supervisor's client and public notification of information module, all parties change by each client Start building journey audit document when, change details can be inputted remark information generation module, remark information generation module will change details It is arranged according to change item, the change details after arrangement is sent to public notification of information module.
By using above scheme, remark information life can be added when modifying Construction Audit file in modification reason by user Produce module, facilitate other users to the modification cause of the modification item in Construction Audit file have quickly, get information about, increase can Reliability.
Preferably, public notification of information module when that will change item and highlight, change details is hidden, are needed in user Change item can be clicked when checking change details to be shown.
It will affect user because change details may be very long by using above scheme and check Construction Audit file, institute Hidden state is in when user usually consults Construction Audit file to change details, it should be understood that it can when changing details in user To click display manually by user.
Preferably, further include: Comparison of standards module, Comparison of standards module link information publicity module, Comparison of standards module The Construction Audit file that public notification of information module is sent is received, Comparison of standards module is inquired according to the change item in Construction Audit file The material market valence in item and mechanical rental market price are changed, and the material market valence inquired is rented into market price hair with mechanical Public notification of information module is given, material market valence and mechanical market price of renting are added after Construction Audit file again public notification of information module Construction Audit file is issued.
By using above scheme, Comparison of standards module by Construction Audit file in modification item in relation to material and mechanical item Mesh is individually selected, and searches for the average price of Vehicles Collected from Market, and average price is labeled in modification item, user's more intuitive understanding is facilitated to repair Change the reasonability of item.
Preferably, further include: image capture module, described image acquisition module connect engineer's client, financial client End, supervisor's client and public notification of information module, engineer are inputted the image information of live shooting by engineer's client Image capture module, financial staff input picture acquisition module, supervising engineer after shooting obtains image information by invoice By the image information input picture acquisition module of live shooting, image capture module sends out all image informations after arranging Public notification of information module is given, image information is added in Construction Audit file public notification of information module.
By using above scheme, image capture module enables engineer, financial staff and supervising engineer by picture Construction Audit file is added in information and publicity comes out, and image information can more have confidence level compared with simple text information.
Preferably, image capture module deletes image similar in the image information of acquisition, it will be after deleting Image information be sent to public notification of information module.
By using above scheme, similar image-erasing is facilitated user to check image information by image capture module, is subtracted Few unnecessary workload of user.
In conclusion the invention has the following advantages:
1. having recorded the inventory file in contract, subsequent change file and claim visa file, Yong Huke in Construction Audit file To understand all project cost relevant informations, contractor, project supervision side, construction party and capital company from Construction Audit file Respectively possess independent client, can individually modify to Construction Audit file, public notification of information module daily examines engineering Meter file is sent to all clients, and modification item is highlighted, and allows user that can quickly, clearly find the same day Modification item makes change information disclose enough, is transparent, while the report that conflicts can remind user to modify exception, convenient multi-party timely The modification of project cost is verified, finishing operations are reduced, keeps the Construction Audit file trust ultimately produced high;
2. modification reason can be added remark information when modifying Construction Audit file and produce module by user, facilitate other use Family to the modification cause of the modification item in Construction Audit file have quickly, get information about, increase confidence level;
3. Comparison of standards module will individually be selected in modification item in relation to material and machinery item in Construction Audit file, search is worked as The average price in preceding market, and average price is labeled in modification item, facilitate the reasonability of user's more intuitive understanding modification item.
Detailed description of the invention
Fig. 1 is the overall structure diagram of embodiment.
In figure, 1, Construction Audit file generating module;2, contractor client;21, engineer's client;22, finance visitor Family end;23, supervisor's client;3, public notification of information module;4, cloud information storage module;5, remark information generation module;6, it marks Quasi- contrast module;7, image capture module.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.The wherein identical appended drawing reference of identical components It indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to it is attached Direction in figure, word " bottom surface " and " top surface ", "inner" and "outside" are referred respectively to towards or away from geometric center of specific component Direction.
Embodiment: a kind of construction project cost auditing system includes Construction Audit file generating module 1, contractor as shown in Figure 1 Client 2, engineer's client 21, financial client 22, supervisor's client 23, public notification of information module 3, remark information production Module 5, Comparison of standards module 6 and image capture module 7.Construction Audit file generating module 1 is examined for generating and storing engineering File is counted, inventory file, subsequent change file and claim visa file in contract, Yong Huke are had recorded in Construction Audit file To understand all project cost relevant informations from Construction Audit file.Later period contractor can be according to Construction Audit file to taking It is called to account with the relevant person in charge of abnormal growth, facilitates finishing engineering total cost.
As shown in Figure 1, contractor administrative staff check and change Construction Audit file generated mould by contractor client 2 Construction Audit file in block 1.Construction site engineer checks and changes the life of Construction Audit file by engineer's client 21 At the Construction Audit file in module 1.The financial staff of the every expenditure of management construction passes through financial client 22 and checks and change Construction Audit file in Construction Audit file generating module 1.Supervising engineer is checked and is changed by supervisor's client 23 Construction Audit file in Construction Audit file generating module 1.Contractor client 2, engineer's client 21, financial client 22 and supervisor's client 23 be all connected with Construction Audit file generating module 1, public notification of information module 3 and remark information generation module 5.Contractor administrative staff, construction site engineer, the financial staff of the every expenditure of management construction and supervising engineer are changing When Construction Audit file, change information is first transferred to public notification of information module 3, public notification of information module 3 daily will be all individual Backup file consolidation highlights all change items therein at a Construction Audit file, and will arrange gained daily Construction Audit file carry out date mark.
As shown in Figure 1, contractor administrative staff, construction site engineer, the every expenditure of management construction financial staff and Change details can be inputted remark information generation module 5 when changing Construction Audit file by supervising engineer, and remark information generates Module 5 will be changed details and be arranged according to change item, and each change details is made to correspond to single change item.Remark information generates Change details after arrangement are sent to public notification of information module 3 by module 5, public notification of information module 3 when that will change item and highlight, Change details are hidden, show that change details not when user checks Construction Audit file, if user needs to check Details are changed, then change details can be popped up by clicking change item, change details are shown to user.Facilitate other users to work The modification cause of modification item in journey audit document have quickly, get information about, and usually will not influence user consult work Journey audit document, the modification item for wanting to check can be clicked directly on when user needs to check can pop up corresponding change in detail Feelings.
As shown in Figure 1, public notification of information module 3 connects Comparison of standards module 6, Comparison of standards module 6 first receives public notification of information The Construction Audit file that module 3 is sent, the change item in Construction Audit file is extracted, the change that then selective extraction goes out Containing material and the related information of machinery in, material market valence and mechanical rental in change item are inquired according to the information of selection Market price.The material market valence inquired and mechanical market price of renting are sent to public notification of information module 3 by Comparison of standards module 6, Public notification of information module 3 by material market valence with machinery rent market price it is corresponding on change item after addition Construction Audit file.It is convenient User is intuitively compared the fund of ancillary cost and Vehicles Collected from Market average price, makes user's more intuitive understanding modification item Reasonability finds out obvious problematic change item.
As shown in Figure 1, engineer's client 21, financial client 22, supervisor's client 23 are all connected with Image Acquisition mould Block 7, engineer pass through engineer's client 21 for the image information input picture acquisition module 7 of live shooting, and financial staff will Invoice input picture acquisition module 7, supervising engineer after shooting obtains image information is defeated by the image information of live shooting Enter image capture module 7.7 link information publicity module 3 of image capture module, image capture module 7 is by the image information of acquisition In similar image deleted, by through deletion after image information be sent to public notification of information module 3.Public notification of information module 3 The image information received is added in the change details of corresponding change item, makes to change details with more confidence level.
As shown in Figure 1, public notification of information module 3 connects Construction Audit file generating module 1 and cloud information storage module 4, letter The Construction Audit file ultimately generated is sent to Construction Audit file generating module 1 to breath publicity module 3 and cloud information stores mould Block 4, Construction Audit file generating module 1 store Construction Audit file.Cloud information storage module 4 is by Construction Audit file It stores into network cloud disk, when loss of data in Construction Audit file generating module 1, all data can be sent to work Journey audit document generation module 1.Meanwhile public notification of information module 3 directly transmitted the Construction Audit file ultimately generated on the same day To contractor client 2, engineer's client 21, financial client 22 and supervisor's client 23, and when there are multiple standby Part file is generated when inconsistent to the change of single change item and is reported by the conflict that conflicting information forms, and the report that will conflict is sent to Contractor client 2, engineer's client 21, financial client 22 and supervisor's client 23.Contractor administrative staff, construction Field engineer, the financial staff of the every expenditure of management construction and supervising engineer can repair according to conflict report to problematic Change item quickly to be revised, guarantees that the final project cost after engineering construction can be accurate, and confidence level is enough It is high.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of construction project cost auditing system characterized by comprising
Construction Audit file generating module (1), the Construction Audit file generating module (1) is for generating and storing Construction Audit File, when engineering starts, initial Construction Audit file is stored in engineering according to the contract signed in advance and examined by contractor It counts in file generating module;
Contractor client (2), the contractor client (2) connect Construction Audit file generating module (1), contractor client The Construction Audit file in Construction Audit file generating module (1) is checked and changed in end (2) for contractor administrative staff, every Secondary be modified to Construction Audit file generates a individually backup file;
Engineer's client (21), engineer's client (21) connect Construction Audit file generating module (1), engineer visitor The Construction Audit file in Construction Audit file generating module (1) is checked and changed in family end (21) for construction site engineer, A individually backup file is generated being modified every time to Construction Audit file;
Financial client (22), the finance client (22) connect Construction Audit file generating module (1), financial client (22) literary for managing the Construction Audit that the personnel of the every expenditure of construction are checked and changed in Construction Audit file generating module (1) Part generates a individually backup file being modified every time to Construction Audit file;
Supervisor's client (23), supervisor's client (23) connect Construction Audit file generating module (1), supervisor visitor The Construction Audit file in Construction Audit file generating module (1) is checked and changed in family end (23) for supervising engineer, every Secondary be modified to Construction Audit file generates a individually backup file;
Public notification of information module (3), the public notification of information module (3) is daily by all individual backup file consolidations at a engineering Audit document simultaneously highlights all change items therein, when there are change of multiple backup files to single change item is different It is sent out simultaneously when cause to contractor client (2), engineer's client (21), financial client (22) and supervisor's client (23) It is reported out by the conflict that conflicting information forms.
2. a kind of construction project cost auditing system according to claim 1, it is characterised in that: public notification of information module (3) will be every Day arranges resulting Construction Audit file and carries out date mark, and the Construction Audit file for marking the upper date is sent to Construction Audit File generating module (1) is stored.
3. a kind of construction project cost auditing system according to claim 2, which is characterized in that further include: cloud information stores mould Block (4), cloud information storage module (4) the link information publicity module (3), cloud information storage module (4) receive public notification of information Module (3) issue Construction Audit file and stored in network cloud disk.
4. a kind of construction project cost auditing system according to claim 1, which is characterized in that further include: remark information generates Module (5), remark information generation module (5) connection contractor client (2), engineer's client (21), financial client (22), supervisor's client (23) and public notification of information module (3) are held, all parties are changing Construction Audit by each client When file, can will change details input remark information generation module (5), remark information generation module (5) will change details according to Change item is arranged, and the change details after arrangement are sent to public notification of information module (3).
5. a kind of construction project cost auditing system according to claim 4, it is characterised in that: public notification of information module (3) is being incited somebody to action Change details are hidden when highlighting by change item, can be clicked when user needs to check change details change item into Row display.
6. a kind of construction project cost auditing system according to claim 1, which is characterized in that further include: Comparison of standards module (6), Comparison of standards module (6) link information publicity module (3), Comparison of standards module (6) receive public notification of information module (3) and send Construction Audit file, Comparison of standards module (6) according in Construction Audit file change item inquiry change item in material city Field valence and mechanical rental market price, and the material market valence inquired and machinery are rented into market price and are sent to public notification of information module (3), material market valence and mechanical market price of renting are added after Construction Audit file again by Construction Audit public notification of information module (3) File issues.
7. a kind of construction project cost auditing system according to claim 1, which is characterized in that further include: image capture module (7), described image acquisition module (7) connection engineer's client (21), financial client (22), supervisor's client (23) and The image information input picture of live shooting is acquired mould by engineer's client (21) by public notification of information module (3), engineer Block (7), by invoice, input picture acquisition module (7), supervising engineer after shooting obtains image information will show financial staff The image information input picture acquisition module (7) of field shooting, image capture module (7) is by all image informations after arranging It is sent to public notification of information module (3), image information is added in Construction Audit file public notification of information module (3).
8. a kind of construction project cost auditing system according to claim 7, it is characterised in that: image capture module (7) will obtain Similar image is deleted in the image information obtained, and the image information after deleting is sent to public notification of information module (3).
CN201811047023.2A 2018-09-08 2018-09-08 A kind of construction project cost auditing system Pending CN109255590A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811047023.2A CN109255590A (en) 2018-09-08 2018-09-08 A kind of construction project cost auditing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811047023.2A CN109255590A (en) 2018-09-08 2018-09-08 A kind of construction project cost auditing system

Publications (1)

Publication Number Publication Date
CN109255590A true CN109255590A (en) 2019-01-22

Family

ID=65047880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811047023.2A Pending CN109255590A (en) 2018-09-08 2018-09-08 A kind of construction project cost auditing system

Country Status (1)

Country Link
CN (1) CN109255590A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110238430A1 (en) * 2008-04-23 2011-09-29 ProvidedPath Software, inc. Organization Optimization System and Method of Use Thereof
CN103400226A (en) * 2013-07-31 2013-11-20 湖南省烟草公司永州市公司 Integrated tobacco industry information security, operation and maintenance application platform system
CN104991886A (en) * 2015-07-22 2015-10-21 网易(杭州)网络有限公司 Data table editing method, apparatus and system
CN105225076A (en) * 2015-11-12 2016-01-06 国网宁夏电力公司经济技术研究院 Analysis of prices data Collection & Processing System
CN106021369A (en) * 2016-05-11 2016-10-12 上海佳依佳信息科技有限公司 Method and equipment for data change management
CN106127398A (en) * 2016-06-30 2016-11-16 国网山东省电力公司经济技术研究院 A kind of construction costs being applicable to project of transmitting and converting electricity calculates system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110238430A1 (en) * 2008-04-23 2011-09-29 ProvidedPath Software, inc. Organization Optimization System and Method of Use Thereof
CN103400226A (en) * 2013-07-31 2013-11-20 湖南省烟草公司永州市公司 Integrated tobacco industry information security, operation and maintenance application platform system
CN104991886A (en) * 2015-07-22 2015-10-21 网易(杭州)网络有限公司 Data table editing method, apparatus and system
CN105225076A (en) * 2015-11-12 2016-01-06 国网宁夏电力公司经济技术研究院 Analysis of prices data Collection & Processing System
CN106021369A (en) * 2016-05-11 2016-10-12 上海佳依佳信息科技有限公司 Method and equipment for data change management
CN106127398A (en) * 2016-06-30 2016-11-16 国网山东省电力公司经济技术研究院 A kind of construction costs being applicable to project of transmitting and converting electricity calculates system

Similar Documents

Publication Publication Date Title
US11921894B2 (en) Data processing systems for generating and populating a data inventory for processing data access requests
US10181051B2 (en) Data processing systems for generating and populating a data inventory for processing data access requests
US11307770B2 (en) Capacity forecasting based on capacity policies and transactions
US20070288275A1 (en) It services architecture planning and management
US20120246115A1 (en) Folder structure and authorization mirroring from enterprise resource planning systems to document management systems
CN106845742A (en) Hotel integrated management system
CN106600326B (en) Airport charging management method and system
CN111815290B (en) Territorial space planning system based on GIS
CN113722301A (en) Big data processing method, device and system based on education information and storage medium
WO2019028405A1 (en) Data processing systems for the identification and deletion of personal data in computer systems
CN112506892A (en) Index traceability management system based on metadata technology
CN110728567B (en) Electronic invoice reimbursement management system and method
CN112685443A (en) Data query method and device, electronic equipment and computer readable storage medium
CN108121579B (en) Method and device for modifying rule file
US20170193409A1 (en) Business resource modeling
CN112365362A (en) Method for protecting existing IT domain asset data based on power grid by adopting block chain technology
CN109255590A (en) A kind of construction project cost auditing system
CN114124977B (en) Cross-tenant data sharing method and device and electronic equipment
CN115640457A (en) Information management method, apparatus, device, medium, and program product
CN114153860A (en) Business data management method and device, electronic equipment and storage medium
US20210082061A1 (en) Data governance system, model and process for multi-source financial reference data using automated business logic
US10810640B1 (en) Automated time tracking of events in a calendar and use of the same to generate invoices
JP7241362B2 (en) Accounting processing system, accounting processing method and accounting processing program
CN112527884B (en) Main data management method in charge of segmentation
US20070260983A1 (en) Method for providing a summary of user activities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190122

RJ01 Rejection of invention patent application after publication