CN109254187A - A kind of system and method for determining transformer substation system short circuit current - Google Patents
A kind of system and method for determining transformer substation system short circuit current Download PDFInfo
- Publication number
- CN109254187A CN109254187A CN201710575818.XA CN201710575818A CN109254187A CN 109254187 A CN109254187 A CN 109254187A CN 201710575818 A CN201710575818 A CN 201710575818A CN 109254187 A CN109254187 A CN 109254187A
- Authority
- CN
- China
- Prior art keywords
- circuit current
- module
- short circuit
- voltage
- electric parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 35
- 239000011159 matrix material Substances 0.000 claims abstract description 27
- 238000004364 calculation method Methods 0.000 claims abstract description 12
- 238000007781 pre-processing Methods 0.000 claims abstract description 12
- 238000012545 processing Methods 0.000 claims abstract description 6
- 230000005611 electricity Effects 0.000 claims description 7
- 238000006243 chemical reaction Methods 0.000 claims description 2
- 238000012800 visualization Methods 0.000 claims 1
- 238000011161 development Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000013178 mathematical model Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of systems of determining transformer substation system short circuit current.The system includes that initial electric parameter provides module, for providing the initial electric parameter of transformer substation system;Data preprocessing module calculates standard reduced value for pre-processing to initial electric parameter;Matrix computing module, for carrying out matrixing processing to standard reduced value, to obtain admittance matrix;Error coefficient computing module for calculating the voltage coefficient of transformer substation system, and combines admittance matrix to calculate short circuit current;And result export module is visually presented with calculated result for exporting calculation of short-circuit current result.The invention also discloses a kind of methods of determining transformer substation system short circuit current.For system and method for the invention in the case where considering different calculating principles, energy is convenient, fast and accurately carries out distant view short circuit current prospect and engineering calculation of short-circuit current.
Description
Technical field
The present invention relates to electric power network technique field, relate more specifically to a kind of determining transformer substation system short circuit current system and
Method.
Background technique
Stage tends to be saturated for the development of power grid scale, and the center of gravity of project of transmitting and converting electricity gradually " is increased by " newly-built " steering
Appearance ", " enlarging ", " transformation " etc., it means that transition period complication will occur for electricity power engineering, engineering quantity increases, engineering is built
If cycle time etc. changes, this will face higher want to the accuracy, professional, versatility and computational efficiency of system-computed
It asks.
Core foundation of the calculation of short-circuit current as grid equipment type selecting is provided with weight in Practical Project and Electric Power Network Planning
Want meaning.To improve Engineering Task efficiency, different calculating principles, convenient accurate progress distant view short circuit current water how are considered
The problem of open and flat prestige and rapid cut-off galvanometer need system projector further to improve at last.
The correctness of existing implementation or its result is established on basis detailed, complicated, accurate modeling to power grid
On, and under different calculating principles, carry out the rapid cut-off galvanometer in the specific short circuit current level prospect of distant view and engineering
When calculation, redundancy and cumbersome is then shown slightly using professional software;Simplified calculating can only be carried out, interactivity and accuracy are poor,
And different calculation of boundary conditions are faced, versatility also leads to inefficiency there are larger defect.
Therefore, this field is badly in need of developing a kind of system and method for new quick determining transformer substation system short circuit current.
Summary of the invention
The object of the present invention is to provide a kind of system and methods for rapidly and accurately determining transformer substation system short circuit current.
In the first aspect of the present invention, the present invention provides a kind of systems of determining transformer substation system short circuit current.It is described
System includes:
Initial electric parameter provides module, for providing the initial electric parameter of transformer substation system;
Data preprocessing module obtains the initial electric parameter for providing module from the initial electric parameter, and
The initial electric parameter is pre-processed, standard reduced value is calculated;
Matrix computing module carries out matrixing processing for the standard reduced value to the data preprocessing module, thus
Obtain admittance matrix;
Error coefficient computing module, for calculating the voltage coefficient of the transformer substation system, and in conjunction with the admittance matrix
Short circuit current is calculated, and
As a result export module can for exporting the calculation of short-circuit current result of the error coefficient computing module
Calculated result is presented depending on changing ground;
Wherein, the initial electric parameter provides module and connect with the data preprocessing module, the data prediction
Module is connect with the matrix computing module, the error coefficient computing module and the matrix computing module and the result
Export module connection.
In another preferred example, the system also includes control systems.
In another preferred example, the control system is connect with transformer substation system.
In another preferred example, the control system is connect with the result export module.
In another preferred example, the initial electric parameter provides module and connect with transformer substation system.
In another preferred example, it further includes data manual input module that the initial electric parameter, which provides module,.
In another preferred example, the system also includes result display modules.
In another preferred example, the result display module is display.
In another preferred example, the result export module is connect with result display module.
In the second aspect of the present invention, the present invention provides a kind of methods of determining transformer substation system short circuit current.It is described
Method the following steps are included:
(a) transformer substation system is provided, the initial electric parameter of the system is obtained;The initial electric parameter includes master
It is short to become number of units, power grid voltage rating, nominal voltage, capacity, practical tap voltage, main transformer impedance and height/medium voltage side system side
Road electric current;
(b) the initial electric parameter is pre-processed, calculates standard reduced value;
(c) matrixing processing is carried out to the standard reduced value, obtains N platform transformer admittance matrix Y arranged side by side;
(d) voltage coefficient of the transformer substation system is calculated by the initial electric parameter;And
(e) the short circuit current result of the transformer substation system is calculated by the admittance matrix Y and the voltage coefficient.
The standard reduced value includes: main transformer impedance per unit value, height, medium voltage side system impedance per unit value and low-pressure side string
Anti- per unit value.
In another preferred example, the standard reduced value further includes non-standard no-load voltage ratio conversion factor.
Each element Y in the admittance matrix YijIt is defined as follows:
Wherein, i, j=1~2N+2;
N is transformer number of units;
x(s1)For high-side system impedance per unit value;
x(s2)For medium voltage side system impedance per unit value;
xcn*For the anti-per unit value of low-pressure side string;
x(1)n*, x(2)n*, x(3)n*For main impedance per unit value;
k(1)n, k(2)n, k(3)nFor non-standard no-load voltage ratio conversion factor;
N=1~N+2.
The short circuit current result is by InIt indicates:
Wherein, ku(1), ku(2), ku(3)For each survey voltage coefficient;
N=1~N+2.
When the voltage coefficient is zero, the calculating voltage of short circuit current is voltage rating;
When the voltage coefficient is not zero, calculating voltage=voltage coefficient × nominal voltage of short circuit current.
It should be understood that above-mentioned each technical characteristic of the invention and having in below (eg embodiment) within the scope of the present invention
It can be combined with each other between each technical characteristic of body description, to form a new or preferred technical solution.As space is limited, exist
This no longer tires out one by one states.
Detailed description of the invention
Fig. 1 is the system structure diagram of determination transformer substation system short circuit current of the invention.
Specific embodiment
After extensive and in-depth study, develop a kind of determining transformer substation system short circuit current for the first time is the present inventor
System and method.This method is intended to consider different calculating principles, easily carries out power grid distant view short circuit current level prospect and fast
The carry out calculation of short-circuit current of speed can provide foundation not only for lectotype selection in engineering, but also can be for different regions electricity
The following short circuit current level development is netted, macroscopical Electric Power Network Planning is cooperated, lectotype selection guidance is provided.In bulk power grid, some is paid close attention to
Power grid except substation can be carried out system equivalent, thus simplified mathematical model by the short circuit current level of substation.For by
Common three-winding transformer forms substation, and high-side system equivalent impedance is xs1, and medium voltage side system equivalent impedance is xs2,
Every main transformer high-pressure side, medium voltage side, low-pressure side equivalent impedance be respectively x1 (i), x2 (i), x3 (i), using this model as base
Plinth, the short circuit current level that can carry out electricity grid substation calculate.
Simultaneously when determining transformer substation system short circuit current, to improve accuracy and usability, need to examine in the case of feature
Consider following principle:
Consider foozle: impedance can have error to transformer in the actual production process, in general in -10%~﹢
Between 10%, therefore, the foozle of transformer impedance can have an impact the short circuit current level of substation;
Consider non-standard no-load voltage ratio: when the tap voltage rating and power grid voltage rating of transformer are inconsistent or pressure regulation tap
After head position is adjusted as needed, consider to have an impact the short circuit current level to substation whether non-standard no-load voltage ratio.
The present invention is completed on this basis.
Term
As used herein, term " short circuit current " refers to electric system in operation, sends out between phase and phase or between phase and ground
The electric current flowed through when raw improper connection, value are far longer than rated current.
As used herein, term " non-standard no-load voltage ratio " refers to when the tap voltage rating and power grid voltage rating of transformer are different
After cause or pressure regulation tap joint position are adjusted as needed, the ratio between each side voltage rating of the practical no-load voltage ratio and power grid of transformer is different
When, generate non-standard no-load voltage ratio.
Main advantages of the present invention include:
(a) system and method for determination transformer substation system short circuit current of the invention, in the case where considering different calculating principles,
Energy is convenient, fast and accurately carries out distant view short circuit current prospect and engineering calculation of short-circuit current;
(b) method of determination transformer substation system short circuit current of the invention has good versatility, expansibility and intelligence
It can property;
(c) method of determination transformer substation system short circuit current of the invention, modeling is convenient, and computational efficiency is high.
Determine initial electric parameter that short circuit current need to provide include: main transformer number of units, power grid voltage rating, nominal voltage,
Each main transformer parameter (capacity, practical tap voltage, main transformer impedance etc.), height/medium voltage side system side short circuit current, impedance foozle
Deng;Output content includes: the short circuit current of each voltage class of substation.
Meanwhile to improve calculation of short-circuit current accuracy and applicability, it is contemplated that impedance foozle and non-standard no-load voltage ratio.
Main transformer impedance per unit value (only through overcapacity conversion and meter and impedance error) is calculated according to different input datas,
High, middle side system impedance per unit value, the anti-per unit value of low-pressure side string, non-standard no-load voltage ratio conversion factor and voltage coefficient;
Matrixing is carried out on this basis, forms N platform transformer admittance matrix Y arranged side by side.
Y matrix is defined as follows:
Wherein, i, j=1~2N+2.
According to newest short circuit current result in Y matrix and voltage coefficient calculating.
As a result as follows:
Wherein, n=1~N+2.
Calculated result includes voltage gear, voltage value and the circulation of the pressure regulation side of every main transformer.
The system of determination transformer substation system short circuit current of the invention is provided with result export module, can lead output result
It is used out to excel convenient for directly duplication.
The system of determination transformer substation system short circuit current of the invention is additionally provided with result display module, and calculating structure can be straight
It connects and is shown in result display module.
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention
Rather than it limits the scope of the invention.
It should be noted that in the claim and specification of this patent, such as first and second or the like relationship
Term is only used to distinguish one entity or operation from another entity or operation, without necessarily requiring or implying
There are any actual relationship or orders between these entities or operation.Moreover, the terms "include", "comprise" or its
Any other variant is intended to non-exclusive inclusion so that include the process, methods of a series of elements, article or
Person's equipment not only includes those elements, but also including other elements that are not explicitly listed, or further includes for this mistake
Journey, method, article or the intrinsic element of equipment.In the absence of more restrictions, being limited by sentence " including one "
Element, it is not excluded that there is also other identical elements in the process, method, article or apparatus that includes the element.
Embodiment 1
As shown in Figure 1, the system of determination transformer substation system short circuit current of the invention includes: that initial electric parameter provides mould
Block, for providing the initial electric parameter of transformer substation system;Data preprocessing module, for being provided from the initial electric parameter
Module obtains the initial electric parameter, and pre-processes to the initial electric parameter, calculates standard reduced value;Matrix meter
Module is calculated, matrixing processing is carried out for the standard reduced value to the data preprocessing module, to obtain admittance matrix;Accidentally
Poor coefficients calculation block calculates short circuit electricity for calculating the voltage coefficient of the transformer substation system, and in conjunction with the admittance matrix
Stream and result export module, for exporting the calculation of short-circuit current result of the error coefficient computing module, visually
Change ground and calculated result is presented;Wherein, the initial electric parameter provides module and connect with the data preprocessing module, the number
Data preprocess module is connect with the matrix computing module, the error coefficient computing module and the matrix computing module and
The result export module connection.The system considers impedance foozle, non-standard no-load voltage ratio and the anti-data of low pressure lateral confinement, tool
Standby higher accuracy and applicability.
Embodiment 2
Engineering feasibility study-impedance type selecting
Somewhere 500kV substation four main transformers of status, wherein #1, #2 main transformer capacity are 750MVA;#3, #4 main transformer hold
Amount is 1000MVA, this engineering project transform #1, #2 main transformer as 2 × 1200MVA, and each main transformer parameter is as follows:
#1, #2 main transformer: it is 14% that senior middle school/height/medium or low resistance, which resists,;
#3, #4 main transformer: high middle impedance is 16%;
This engineering replaces one of an important factor for high middle impedance of main transformer is chosen as the station short circuit current level, is advised according to power grid
It draws, rack variation in two years is smaller, and short circuit current level is close.
Therefore, it is the prospect zone for meeting engineering proposal, distant view short circuit current level need to be looked forward to, look forward to the change
Power station 500kV busbar short-circuit electric current reaches 60kA, calculates station 220kV busbar short-circuit electric current, while according to the power transformation
220kV subregion installation scale, the short circuit current that main transformer medium voltage side system provides are estimated by 7.5kA where standing.
It is calculated using the short circuit current of method of the invention to different high middle impedances, considers non-standard no-load voltage ratio, as a result
Such as table 1, according to calculated result, this engineering replaces the high middle impedance selection 22% of main transformer, if station distant view 4 × 1200MVA of scale,
The side 220kV short circuit current can be controlled in 48kA or less;If the station 2 × 1200+2 of distant view scale × 1000MVA, can incite somebody to action
Short circuit current control in the side 220kV is in 48kA hereinafter, comprehensively considering power network development uncertainty and prospect zone, it is proposed that this engineering
It replaces the high middle impedance of main transformer and chooses 22%.
Certain station distant view three short circuit current (unit kA) of table 1
Embodiment 3
The research of somewhere 1000MVA main transformer low-pressure side short circuit current and impedance, which are chosen, to be suggested
As Power grid structure is increasingly close, power supply increases, the short circuit current level of power grid is caused to increase, 1000MVA
Important component of the transformer as power grid, impedance type selecting can generate shadow to grid short circuit levels of current, space truss project
It rings.
The common modular design impedance of 1000MVA main transformer at present have two groups: 18%/58%/38% and 20%/62%/
40%, using method of the invention, consider the gradually development of power grid, high-pressure side, medium voltage side short circuit current level are adjusted to far
The level of scape 60kA, 48kA record low-pressure side short circuit current level, as shown in table 2 under different calculating principles.According to calculating
Results, it can be seen that 20%/62%/40% main transformer, reaches higher in high-pressure side, medium voltage side distant view short circuit current level
Level under the premise of, consider that different calculating principles, low-pressure side maximum short circuit current do not exceed 40kA still, therefore, for meet
The development of area power grid distant view, lectotype selection unification, it is proposed that the impedance of newly-built 1000MVA main transformer is examined by 20%/62%/40%
Consider.
Low-pressure side short circuit current level (unit kA) under the different calculating principle of table 2
To sum up, by calculating, the method for method of the invention compared with prior art, calculated result is more accurate, calculates
Process is more simplified efficiently, has good directive significance for sorts of systems conceptual design, decision in practical projects.
All references mentioned in the present invention is incorporated herein by reference, independent just as each document
It is incorporated as with reference to such.In addition, it should also be understood that, after reading the above teachings of the present invention, those skilled in the art can
To make various changes or modifications to the present invention, such equivalent forms equally fall within model defined by the application the appended claims
It encloses.
Claims (10)
1. a kind of system of determining transformer substation system short circuit current, which is characterized in that the system comprises
Initial electric parameter provides module, for providing the initial electric parameter of transformer substation system;
Data preprocessing module obtains the initial electric parameter for providing module from the initial electric parameter, and to institute
It states initial electric parameter to be pre-processed, calculates standard reduced value;
Matrix computing module carries out matrixing processing for the standard reduced value to the data preprocessing module, to obtain
Admittance matrix;
Error coefficient computing module is calculated for calculating the voltage coefficient of the transformer substation system, and in conjunction with the admittance matrix
Short circuit current;And
As a result export module, for the calculation of short-circuit current result of the error coefficient computing module to be exported, visualization
Calculated result is presented in ground;
Wherein, the initial electric parameter provides module and connect with the data preprocessing module, the data preprocessing module
It is connect with the matrix computing module, the error coefficient computing module and the matrix computing module and the result export
Module connection.
2. the system as claimed in claim 1, which is characterized in that the system also includes control systems;
Preferably, the control system is connect with transformer substation system;
Preferably, the control system is connect with the result export module;
Preferably, the initial electric parameter provides module and connect with transformer substation system.
3. the system as claimed in claim 1, which is characterized in that it further includes that data are manual that the initial electric parameter, which provides module,
Input module;
Preferably, the system also includes result display modules;
Preferably, the result display module is display;
Preferably, the result export module is connect with result display module.
4. a kind of method of determining transformer substation system short circuit current, which is characterized in that the described method comprises the following steps:
(a) transformer substation system is provided, the initial electric parameter of the system is obtained;The initial electric parameter includes main transformer platform
Number, power grid voltage rating, nominal voltage, capacity, practical tap voltage, main transformer impedance and height/medium voltage side system side short circuit electricity
Stream;
(b) the initial electric parameter is pre-processed, calculates standard reduced value;
(c) matrixing processing is carried out to the standard reduced value, obtains N platform transformer admittance matrix Y arranged side by side;
(d) voltage coefficient of the transformer substation system is calculated by the initial electric parameter;And
(e) the short circuit current result of the transformer substation system is calculated by the admittance matrix Y and the voltage coefficient.
5. method as claimed in claim 4, which is characterized in that the standard reduced value include: main transformer impedance per unit value, height,
Medium voltage side system impedance per unit value and the anti-per unit value of low-pressure side string.
6. method as claimed in claim 4, which is characterized in that the standard reduced value further includes non-standard no-load voltage ratio conversion system
Number.
7. method as claimed in claim 4, which is characterized in that each element Y in the admittance matrix YijIt is defined as follows:
Wherein, i, j=1~2N+2;
N is transformer number of units;
x(s1)For high-side system impedance per unit value;
x(s2)For medium voltage side system impedance per unit value;
xcn*For the anti-per unit value of low-pressure side string;
x(1)n*, x(2)n*, x(3)n*For main impedance per unit value;
k(1)n, k(2)n, k(3)nFor non-standard no-load voltage ratio conversion factor;
N=1~N+2.
8. method as claimed in claim 4, which is characterized in that the short circuit current result is by InIt indicates:
Wherein, ku(1), ku(2), ku(3)For each survey voltage coefficient;
N=1~N+2.
9. method as claimed in claim 4, which is characterized in that when the voltage coefficient is zero, the calculating electricity of short circuit current
Pressure is voltage rating.
10. method as claimed in claim 4, which is characterized in that when the voltage coefficient is not zero, the calculating of short circuit current
Voltage=voltage coefficient × nominal voltage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710575818.XA CN109254187A (en) | 2017-07-14 | 2017-07-14 | A kind of system and method for determining transformer substation system short circuit current |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710575818.XA CN109254187A (en) | 2017-07-14 | 2017-07-14 | A kind of system and method for determining transformer substation system short circuit current |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109254187A true CN109254187A (en) | 2019-01-22 |
Family
ID=65051869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710575818.XA Pending CN109254187A (en) | 2017-07-14 | 2017-07-14 | A kind of system and method for determining transformer substation system short circuit current |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109254187A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112924755A (en) * | 2020-12-30 | 2021-06-08 | 广东电网有限责任公司电力科学研究院 | Transformer monitoring method and device based on short-circuit current and storage medium |
CN113659571A (en) * | 2021-08-13 | 2021-11-16 | 云南电网有限责任公司电力科学研究院 | Prediction device and method for predicting short-circuit current of power grid in-operation transformer in real time |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103500249A (en) * | 2013-09-25 | 2014-01-08 | 重庆大学 | Visual relay protection setting calculation system and method |
CN104143039A (en) * | 2013-09-30 | 2014-11-12 | 国家电网公司 | System impedance calculating method |
CN104252567A (en) * | 2014-10-13 | 2014-12-31 | 国家电网公司 | Modeling method for general model of three-phase magnetic leakage admittance matrix of power transformer |
CN104331619A (en) * | 2014-10-30 | 2015-02-04 | 国网上海市电力公司 | Short-circuit current calculation method of electric system containing inverter connector power source |
CN105160058A (en) * | 2015-07-10 | 2015-12-16 | 国网四川省电力公司电力科学研究院 | Network boundary equivalence method for electromagnetic transient calculation of power grid |
CN105260949A (en) * | 2015-10-22 | 2016-01-20 | 江苏省电力公司南京供电公司 | Distribution network short-circuit calculation method based on matrix transformation |
CN106066918A (en) * | 2016-06-06 | 2016-11-02 | 国网山东省电力公司经济技术研究院 | Based on homotopy containing distributed power source and the short-circuit current calculation method of nonlinear-load |
EP3098924A1 (en) * | 2015-05-29 | 2016-11-30 | Electricité de France | A method and device for calculation of power flow in the distribution grid |
CN106296451A (en) * | 2016-08-08 | 2017-01-04 | 国家电网公司 | A kind of fault current limiter Optimizing collocation method based on genetic algorithm |
CN106356845A (en) * | 2016-09-30 | 2017-01-25 | 广东电网有限责任公司电力调度控制中心 | Short circuit current acquisition method for electric power system including impedance matching balance traction transformer |
CN106599373A (en) * | 2016-11-21 | 2017-04-26 | 中国能源建设集团江苏省电力设计院有限公司 | Transformer substation short-circuit current calculation system based on three-dimensional design platform and method thereof |
CN106786540A (en) * | 2017-01-03 | 2017-05-31 | 国家电网公司 | A kind of short-circuit current calculation method and system |
CN206906465U (en) * | 2017-07-14 | 2018-01-19 | 中国电力工程顾问集团华东电力设计院有限公司 | A kind of system for determining transformer substation system short circuit current |
-
2017
- 2017-07-14 CN CN201710575818.XA patent/CN109254187A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103500249A (en) * | 2013-09-25 | 2014-01-08 | 重庆大学 | Visual relay protection setting calculation system and method |
CN104143039A (en) * | 2013-09-30 | 2014-11-12 | 国家电网公司 | System impedance calculating method |
CN104252567A (en) * | 2014-10-13 | 2014-12-31 | 国家电网公司 | Modeling method for general model of three-phase magnetic leakage admittance matrix of power transformer |
CN104331619A (en) * | 2014-10-30 | 2015-02-04 | 国网上海市电力公司 | Short-circuit current calculation method of electric system containing inverter connector power source |
EP3098924A1 (en) * | 2015-05-29 | 2016-11-30 | Electricité de France | A method and device for calculation of power flow in the distribution grid |
CN105160058A (en) * | 2015-07-10 | 2015-12-16 | 国网四川省电力公司电力科学研究院 | Network boundary equivalence method for electromagnetic transient calculation of power grid |
CN105260949A (en) * | 2015-10-22 | 2016-01-20 | 江苏省电力公司南京供电公司 | Distribution network short-circuit calculation method based on matrix transformation |
CN106066918A (en) * | 2016-06-06 | 2016-11-02 | 国网山东省电力公司经济技术研究院 | Based on homotopy containing distributed power source and the short-circuit current calculation method of nonlinear-load |
CN106296451A (en) * | 2016-08-08 | 2017-01-04 | 国家电网公司 | A kind of fault current limiter Optimizing collocation method based on genetic algorithm |
CN106356845A (en) * | 2016-09-30 | 2017-01-25 | 广东电网有限责任公司电力调度控制中心 | Short circuit current acquisition method for electric power system including impedance matching balance traction transformer |
CN106599373A (en) * | 2016-11-21 | 2017-04-26 | 中国能源建设集团江苏省电力设计院有限公司 | Transformer substation short-circuit current calculation system based on three-dimensional design platform and method thereof |
CN106786540A (en) * | 2017-01-03 | 2017-05-31 | 国家电网公司 | A kind of short-circuit current calculation method and system |
CN206906465U (en) * | 2017-07-14 | 2018-01-19 | 中国电力工程顾问集团华东电力设计院有限公司 | A kind of system for determining transformer substation system short circuit current |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112924755A (en) * | 2020-12-30 | 2021-06-08 | 广东电网有限责任公司电力科学研究院 | Transformer monitoring method and device based on short-circuit current and storage medium |
CN112924755B (en) * | 2020-12-30 | 2022-03-04 | 广东电网有限责任公司电力科学研究院 | Transformer monitoring method and device based on short-circuit current and storage medium |
CN113659571A (en) * | 2021-08-13 | 2021-11-16 | 云南电网有限责任公司电力科学研究院 | Prediction device and method for predicting short-circuit current of power grid in-operation transformer in real time |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Müller et al. | Modeling framework for planning and operation of multi-modal energy systems in the case of Germany | |
CN107506854B (en) | 220kV power grid structure planning method considering differentiation scene | |
CN102567603B (en) | Method for automatically generating BPA calculation file based on actual measurement topology and measured data | |
Shayesteh et al. | ATC-based system reduction for planning power systems with correlated wind and loads | |
CN101179195A (en) | Power distribution network planning scheme assistant decision system | |
CN105930575B (en) | A kind of PSASP data model translation is the automatic switching method of PSCAD data model | |
CN107230999B (en) | Regional distributed photovoltaic maximum capacity access evaluation method | |
Mahdavi et al. | Dynamic transmission network expansion planning considering network losses DG sources and operational costs-part 1: Review and problem formulation | |
CN109598377B (en) | AC/DC hybrid power distribution network robust planning method based on fault constraint | |
CN105574291B (en) | A kind of electric power loop method of automatic configuration and system | |
KR20120137612A (en) | Optimization system and method of power distribution system using power flow calculation | |
CN109494719A (en) | A kind of mesolow mixing power distribution network stratification impedance analysis method | |
Gan et al. | Coordinated planning of large-scale wind farm integration system and transmission network | |
CN115622053B (en) | Automatic load modeling method and device for considering distributed power supply | |
CN110739719A (en) | Two-step decision method for optimized access of flexible multi-state switch | |
CN113239512A (en) | Toughness-considered screening method and system for AC/DC power distribution network planning scheme | |
CN109254187A (en) | A kind of system and method for determining transformer substation system short circuit current | |
Gupta et al. | Power system network equivalents: Key issues and challenges | |
CN111313406B (en) | Current collecting line determining method and device and power station | |
CN107944631B (en) | Power distribution network distributed power supply planning method based on vector sequence optimization | |
CN113806899B (en) | Power distribution network topological relation identification method and device and mobile terminal | |
CN206906465U (en) | A kind of system for determining transformer substation system short circuit current | |
Chen et al. | ATC determination for the AC/DC transmission systems using modified CPF method | |
Du et al. | Hosting capacity assessment in distribution networks considering wind–photovoltaic–load temporal characteristics | |
Samajpati | Distributed generation allocation for power loss minimization and voltage improvement of radial distribution systems using genetic algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |