CN109214771A - Method, equipment, storage medium and the terminal of everyday tasks management - Google Patents

Method, equipment, storage medium and the terminal of everyday tasks management Download PDF

Info

Publication number
CN109214771A
CN109214771A CN201810860445.5A CN201810860445A CN109214771A CN 109214771 A CN109214771 A CN 109214771A CN 201810860445 A CN201810860445 A CN 201810860445A CN 109214771 A CN109214771 A CN 109214771A
Authority
CN
China
Prior art keywords
task
current
pond
limit
deadline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810860445.5A
Other languages
Chinese (zh)
Inventor
彭飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qiku Internet Technology Shenzhen Co Ltd
Original Assignee
Qiku Internet Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qiku Internet Technology Shenzhen Co Ltd filed Critical Qiku Internet Technology Shenzhen Co Ltd
Priority to CN201810860445.5A priority Critical patent/CN109214771A/en
Publication of CN109214771A publication Critical patent/CN109214771A/en
Priority to PCT/CN2019/097558 priority patent/WO2020024862A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1093Calendar-based scheduling for persons or groups
    • G06Q10/1097Task assignment

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Calculators And Similar Devices (AREA)
  • Alarm Systems (AREA)

Abstract

The present invention relates to software technology fields, method, equipment, storage medium and the terminal of a kind of everyday tasks management are provided, the method of the everyday tasks management includes obtaining the task definition formation current task pond of all tasks, the task emergency priority and task deadline limit for obtaining each task in current task pond are ranked up according to the distance of the corresponding task deadline limit of each task;If the task deadline limit of two in current task pond or the multi-task is identical, minor sort again is carried out with the corresponding task emergency priority height of each task, and ranking results are pushed.In this way, each task is ranked up according to urgency to be processed, i.e., always currently primarily completing in processing according to ranking results, user for task, so that task be avoided to omit because exceeding the time limit, task management is more clear.

Description

Method, equipment, storage medium and the terminal of everyday tasks management
Technical field
The present invention relates to software technology fields, especially provide the method for everyday tasks management a kind of, equipment, storage medium and Terminal.
Background technique
Currently, existing task management method, task order sequence usually using the task creation time as it is main according to According to, i.e., in one day, each task according to its create time-sequencing, i.e., it is more early establish task then sort it is more forward, for example, with Family in the morning 9 when creation create a precedent can task, 9 points of 30 minutes creation replied mail tasks and so on.But this kind of task management Method can not carry out intelligent sequencing according to the pressing degree of each task, chaotic so as to cause task omission and task management Problem.Therefore, caused by the existing task management method of urgent need to resolve can not be ranked up according to the pressing degree of each task Task is omitted and the problem of task management confusion.
Summary of the invention
The purpose of the present invention is to provide a kind of methods of everyday tasks management, it is intended to solve existing task management method Task caused by can not being ranked up according to the pressing degree of each task is omitted and the problem of task management confusion.
To achieve the above object, the technical solution adopted by the present invention is that: in a first aspect, a kind of side of everyday tasks management Method, which comprises
The task definition for obtaining all tasks forms current task pond, obtains each task in the current task pond Task emergency priority and task deadline limit are ranked up according to the distance of the corresponding task deadline limit of each task;
If the task deadline limit of two in the current task pond or the multi-task is identical, with each task pair The task emergency priority height answered carries out minor sort again, and ranking results are pushed;
Wherein, the task emergency priority is the absolute value and task of the difference of current starting time and task deadline limit The ratio of required time, also, will be biggish as molecule in the absolute value of the difference and the required by task time, it is described Task deadline is limited to the timing node that task should be completed, and the current starting time is the initial time node of each task.
Further, it is described ranking results are subjected to push step after, the method also includes:
It, will when closing the task deadline freight weight limit of first task in current time node and the current task pond The first task is highlighted, also, whether prompt executes next task;
If execute task, the corresponding task of remaining task recalculated in the current task pond is urgent Grade, also, the task with task emergency priority described in highest is highlighted, and prompt whether preferentially to execute;
If abandon executing next task, the first task is continued to execute, also, the described of the first task of postponing Task deadline limit, until current time node is closed with the task deadline freight weight limit after postponing.
Further, the first task that postpones the task deadline limit, until current time node with it is suitable After the step of task deadline freight weight limit delayed closes, the method also includes:
The task termination time limit for obtaining the first task, when current time node institute corresponding with the first task When stating the coincidence of task termination time limit, the first task is transferred in terminated task pond, and becomes the first terminated task;
The task termination time limit is the timing node that first task terminates.
Further, described that the first task is transferred in terminated task pond, and become the step of the first terminated task After rapid, the method also includes:
The obtaining the first terminated task of the task restarts the time limit, when current time node is corresponding with the first task Task when restarting the time limit and being overlapped, prompt whether the first terminated task to be transferred in the current task pond;
If the first terminated task is transferred to the current task pond, corresponding task emergency priority is reacquired It is limited with task deadline;
If abandoning the first terminated task being transferred to the current task pond, the first terminated task is deleted;
The task restarts the timing node reactivated for the first terminated task in the time limit.
Further, the method also includes:
The task important level of each task in current terminus time and the current task pond is obtained, it will be described current Between starting time and the current terminus time and with task important level described in highest task is highlighted, and is mentioned Show whether preferentially execute;
Wherein, the current terminus time is the terminal time node of each task.
Further, the method also includes:
Obtain each newly-increased task task emergency priority and task deadline limit, will each newly-increased task and it is described currently Each task rearrangement in task pool, also, according to the sequencing of each newly-increased task, it is highlighted, and prompt one by one Whether preferentially execute;
If preferentially executing each newly-increased task, after the completion of each newly-increased task, in the current task pond Remaining task is resequenced;
If abandoning preferentially executing each newly-increased task, in current task pond described in the sequential processes according to rearrangement Each task.
Further, the method also includes:
The obtaining each task in the current task pond of the task relies on grade, and the size of grade is relied on according to the task Each task is classified in the ranking results in the current task pond and is highlighted, and prompts whether preferentially to execute one by one;
The task relies on the number that grade is relied on other people by completion task.
Beneficial effects of the present invention: method, equipment, storage medium and the terminal of everyday tasks management of the invention will be worked as Preceding need to sorting for task carries out being aggregated to form current task pond, and each task in current task pond is corresponding according to its first Task deadline limit sequence, secondly, being carried out in the identical task of task deadline further according to the task emergency priority of task Sequence, finally, ranking results are pushed, in this way, each task is ranked up according to urgency to be processed, i.e., according to row Sequence is as a result, the task that user always currently primarily completes in processing, so that task be avoided to omit because exceeding the time limit, task management is more clear It is clear.
Second aspect, the present invention also provides a kind of equipment of everyday tasks management, the equipment includes:
Sorting module, the task definition for obtaining all tasks form current task pond, obtain the current task pond In each task task emergency priority and task deadline limit, according to the remote of the corresponding task deadline limit of each task Closely it is ranked up;
Pushing module, for pushing ranking results.
The third aspect, the present invention also provides a kind of storage mediums, are stored thereon with computer program, the computer program The step of method described above is realized when being executed by processor.
Fourth aspect, the present invention also provides a kind of terminal, including memory, processor and storage are on a memory and can The computer program run on a processor, the processor realize the step of method as described above when executing described program Suddenly.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention one provides;
Fig. 2 is the flow chart of the method for everyday tasks management provided by Embodiment 2 of the present invention;
Fig. 3 is the specific flow chart of the method for everyday tasks management provided by Embodiment 2 of the present invention;
Fig. 4 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention three provides;
Fig. 5 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention four provides;
Fig. 6 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention five provides;
Fig. 7 is the structural schematic diagram of the equipment of everyday tasks management provided in an embodiment of the present invention;
Fig. 8 is another structural schematic diagram of the equipment of everyday tasks management provided in an embodiment of the present invention.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
It is being ranked up the embodiment of the invention provides a kind of pressing degree according to everyday tasks and ensure daily Each task carries out in an orderly manner, the method for avoiding task omission or expired everyday tasks management.The everyday tasks management method User can be helped to plan daily stroke, task is avoided to overstock.
Fig. 1 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention one provides, as shown in Figure 1, this implementation The method of example includes the following steps:
Step S100, the task definition for obtaining all tasks form current task pond, obtain the items in current task pond The task emergency priority and task deadline of task limit, and are ranked up according to the distance of the corresponding task deadline limit of each task;
Task emergency priority is absolute value and the required by task time of the difference of current starting time and task deadline limit Ratio, also, biggish in the absolute value of difference and required by task time will be used as molecule, task deadline is limited to task and answers The timing node of completion, current starting time are the initial time node of each task.For example, current starting time is morning eight Point, the task deadline of a certain task is limited to 10 points of morning, and the required by task time of this task is one and a half hours, that , the task emergency priority of this task is 1.333, also, the ratio illustrates that task emergency priority is higher closer to numerical value 1.
Step S101, if the task deadline limit of two in current task pond or the multi-task is identical, with each task Corresponding task emergency priority height carries out minor sort again, and ranking results are pushed.
It is to be appreciated that the task deadline of each task of overriding concern limits when need to sort there are each task, avoid Task is exceeded the time limit, secondly, be then in the identical situation of task deadline, further according to every task task emergency priority into Row minor sort again, in such manner, it is possible to which processing time more urgent task in time, avoids completion sequence between each task chaotic.
Need to currently sorting for task be aggregated to form working as by the method for everyday tasks management provided in an embodiment of the present invention Preceding task pool, by each task in current task pond first according to its corresponding task deadline limit sequence, secondly, in task In the identical task of deadline, it is ranked up further according to the task emergency priority of task, finally, ranking results are pushed away It send, in this way, each task is ranked up according to urgency to be processed, i.e., according to ranking results, user is always current first in processing Being completed for task, so that task be avoided to omit because exceeding the time limit, task management is more clear.
Fig. 2 is the flow chart of the method for everyday tasks management provided by Embodiment 2 of the present invention.It is unlike the embodiments above Place is, embodiment two to when exceeding the time limit in everyday tasks management there are task this how to operate and be described, as shown in Fig. 2, The step of this method includes:
Step S200, the task definition for obtaining all tasks form current task pond, obtain the items in current task pond The task emergency priority and task deadline of task limit, and are ranked up according to the distance of the corresponding task deadline limit of each task;
Step S201, if the task deadline limit of two in current task pond or the multi-task is identical, with each task Corresponding task emergency priority height carries out minor sort again, and ranking results are pushed;
Step S202, when closing the task deadline freight weight limit of first task in current time node and current task pond, First task is highlighted, also, whether prompt executes next task;
It is to be appreciated that first task is the task of sorting position first in current task pond, after pushing ranking results, Each task is according to processing sequence from front to back.When task deadline limit can be the practical cut-off that task should be completed Intermediate node is also possible to the projected cutoff timing node that task should be completed.For example, the task deadline limit of the task is user It is assumed that, it is believed that it can be completed in timing node, i.e., this task deadline limit can postpone as needed.Therefore, with The gradually loss of task processing time, whenever the task deadline of first task in current time node and current task pond limits It is overlapped, i.e., when this task is to the time limit that should be completed, user is prompted by way of highlighting, for example, the mark of this task Color burn is inscribed, is formed and is distinguished with the title of other tasks, to reach prompt effect.
Step S2021, if execute task, the corresponding task of remaining task recalculated in current task pond is tight Anxious grade, also, the task with super objective emergency priority is highlighted, and prompt whether preferentially to execute;
It is to be appreciated that current starting time is that passage variation occurs with task process progress, therefore, whenever completion When one task, the task grade grade of remaining task in current task pond also changes accordingly.At this point, task is tight The anxious highest task of grade is highlighted, for example, the task title color burn, alternatively, being distinguished with other colors, to mention Show whether user needs priority processing.In this way, to the time that user judges, if abandoning preferentially executing task emergency priority highest Task, then, it is continued with according to the ranking results that step S201 is pushed.
If step S2022 continues to execute first task abandon executing next task, also, times for the first task that postpones Business deadline, until current time node is closed with the task deadline freight weight limit after postponing.
It is to be appreciated that when first task can not be when task deadline for the first time limits completion, then by its task deadline Limit postpones, and secondary tasks deadline then can be according to customized setting, until current time node is cut with the task after postponing Only the time limit is overlapped, that is, the first task is handled twice.
It needs explanatorily, step S2021 and step S2022 are without sequencing.
Fig. 3 is the specific flow chart of the method for everyday tasks management provided by Embodiment 2 of the present invention, as shown in figure 3, One specific example is provided, further includes following sub-step after above-mentioned steps 2022:
Step S2023 obtains the task termination time limit of first task, when current time node is corresponding with first task When the task termination time limit is overlapped, first task is transferred in terminated task pond, and becomes the first terminated task;
It is to be appreciated that the task termination time limit is the timing node that first task terminates.Some tasks are in its task that postpones After deadline, discovery is still unable to complete the task, in this way, the task is then identified as being impossible mission.For It avoids its task deadline limit from postponing always, and upsets the sequence of remaining task processing.So, when current time node with When task deadline freight weight limit after postponing closes, then the task termination time limit of first task is obtained, within the task time of expiration also not This first task is completed, which is transferred in terminated task pond from current task pond, does termination.Together When, according to ranking results, carry out the next item down task.
Step S2024, the obtaining institute's first place terminated task of the task restarts the time limit, when current time node and first task When corresponding task restarts time limit coincidence, prompt whether the first terminated task to be transferred in current task pond;
It is to be appreciated that it is the timing node that the first terminated task reactivates that task, which restarts the time limit,.Sometimes, task is being located The midway of reason lies on the table or is terminated, and if the time is not handled, user very likely has forgotten this task, therefore, in order to avoid The generation of above situation.When a certain task is transferred to terminated task pond, task restarts the time limit and then starts to start, preferably Ground, settable when being transferred to task one in terminated task pond, task restarts the time limit and begins to countdown starting, when its with work as When preceding timing node is overlapped, then prompt the user whether for the task to be transferred out from terminated task pond, for example, prompt can be passed through The mode of sound combination interface switching prompts the user whether to be transferred to the task in current task pond.
It is urgent etc. to reacquire corresponding task if the first terminated task is transferred to current task pond by step S2025 Grade and task deadline limit;
When the task is transferred to again in current task pond, in order to avoid clashing with other tasks, and combining should The processed urgency of task need to reacquire its task emergency priority and task deadline limit, that is, restore the task again Into ranking results.
Step S2026 deletes the first terminated task if abandoning the first terminated task being transferred to current task pond.
For example, in the morning 8 when, the task deadline that first task is arranged is limited to 10 points of morning, when time is up At 10, if user's selection continues to execute first task, and task deadline limit is postponed to 12 noon.When time is up 12 Point when, first task remains unfulfilled, then, be arranged its task termination time limit be at 5 points in afternoon, if in the afternoon 5 points still do not complete First task is then transferred in terminated task pond by the first task.It, can but in order to avoid first task is forgotten by user Be arranged first task task restart the time limit be 8 points of the next morning, i.e., to second day 8 points of morning, prompt user again Whether need to reactivate the task.If desired it reactivates, then the task deadline for reacquiring the task limits and task is tight Anxious grade sorts in the current task pond on the day of.
Fig. 4 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention three provides.Not with above-described embodiment one It is with place, embodiment three is described to needing when priority processing this how to operate there are task in everyday tasks management, such as Shown in Fig. 4, the step of this method, includes:
Step S300, the task definition for obtaining all tasks form current task pond, obtain the items in current task pond The task emergency priority and task deadline of task limit, and are ranked up according to the distance of the corresponding task deadline limit of each task;
Step S301, if the task deadline limit of two in current task pond or the multi-task is identical, with each task Corresponding task emergency priority height carries out minor sort again, and ranking results are pushed;
Step S302 obtains the task important level of each task in current terminus time and current task pond, will work as It is between preceding starting time and current terminus time and highlighted with the task of super objective important level, and prompt whether It is preferential to execute;
It is to be appreciated that the current terminus time is the terminal time node of each task.Within the darg time, exist When multiple tasks need to be handled, task of emphasis being needed to treat there will necessarily be, still, since its task deadline limit comes other After the task deadline limit of business, according to conventional processing sequence, may result in it and exceed the time limit, then just need by the task into Row major processing.
For example, it is 8 points of morning that current starting time, which is arranged, the current terminus time is at 16 points in afternoon, in section this period It is interior, tri- tasks of A, B, C are shared, the task deadline of A task is limited to 9 points of morning, and the required by task time is 0.75 hour, and B appoints The task deadline of business is limited to 11 points of morning, and the required by task time is 2 hours, and the task deadline of C task is limited at 16 points in afternoon, The required by task time is 3 hours.According to calculating, the ranking results of three tasks are A, B, C, still, as task emergency priority Minimum C task, user need priority processing for some purposes, then its task important level can be improved, and 8 points to afternoon in the morning In 16 points of section, the task important level highest of task C, also, priority processing is prompted the user whether by way of highlighting.
Fig. 5 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention four provides.Not with above-described embodiment one It is with place, example IV is described to there is newly-increased task in everyday tasks management and take this and how to operate, such as Fig. 5 institute Show, the step of this method includes:
Step S400, the task definition for obtaining all tasks form current task pond, obtain the items in current task pond The task emergency priority and task deadline of task limit, and are ranked up according to the distance of the corresponding task deadline limit of each task;
Step S401, if the task deadline limit of two in current task pond or the multi-task is identical, with each task Corresponding task emergency priority height carries out minor sort again, and ranking results are pushed;
Step S402 obtains the task emergency priority and task deadline limit of each newly-increased task, by each newly-increased task with work as Each task rearrangement in preceding task pool, also, according to the sequencing of each newly-increased task, it is highlighted, and mention one by one Show whether preferentially execute;
It is to be appreciated that every newly-increased task the case where there is also the orders of importance and emergency, sometimes, newly-increased task must be located immediately Reason, sometimes, and can be handled in order according to ranking results.Therefore, when there is the addition of newly-increased task, then priority processing is newly-increased appoints Business.For example, newly-increased task is replied mail, replied mail need to only spend the time less than five minutes, but must handle at once.
Step S4021, if preferentially executing each newly-increased task, after the completion of each newly-increased task, to its in current task pond Remaining task is resequenced;
Step S4022, if abandoning preferentially executing each newly-increased task, according to the sequential processes current task pond of rearrangement In each task.
Fig. 6 is the flow chart of the method for the everyday tasks management that the embodiment of the present invention five provides.Not with above-described embodiment one Be with place, embodiment five in everyday tasks management in the presence of when need to rely on task that other people could complete this how to operate into Row description, as shown in fig. 6, the step of this method includes:
Step S500, the task definition for obtaining all tasks form current task pond, obtain the items in current task pond The task emergency priority and task deadline of task limit, and are ranked up according to the distance of the corresponding task deadline limit of each task;
Step S501, if the task deadline limit of two in current task pond or the multi-task is identical, with each task Corresponding task emergency priority height carries out minor sort again, and ranking results are pushed;
Step S502, the obtaining each task in current task pond of the task rely on grade, rely on the big of grade according to task Whether small be classified each task in the ranking results in current task pond highlights, and prompt preferentially to execute one by one;
Task relies on the number that grade is relied on other people by completion task.It is to be appreciated that when the number for relying on other people is got over It is more, then, this task is just increasingly difficult to complete.This kind of task should be monitored in real time, avoid exceeding the time limit.
Step S503, if when preferential execution, obtaining the briefing period, the briefing period turns in the current priority task Progress countdown starting after being relied on people is moved to, until being prompted after briefing end cycle, also, the circulation open after prompt The dynamic briefing period, until current preference task returns in the current task pond for relying on people.
The briefing period is to be handed over to the time cycle after being relied on people to current preference task, for dependence task Speech can be divided into dependence task and be relied on task according to the object relied on.Dependence task refers to the association that you need to be dependent on others Could completing for task is helped, handles the personnel of dependence task to rely on people.The task of being relied on refers to that others needs to rely on your assistance Could completing for task, the personnel that processing is relied on task are to be relied on people.People is relied on since current preference task is handed over to Afterwards, then remaining task in current task pond can be handled, also, under the prompt in briefing period help, is monitored in real time The schedule of current preference task.
Fig. 7 is the structural schematic diagram of the equipment of everyday tasks management provided in an embodiment of the present invention, as shown in fig. 7, this reality The equipment for applying the everyday tasks management of example includes sorting module 1 and pushing module 2.
Sorting module 1, the task definition for obtaining all tasks form current task pond, obtain in current task pond The task emergency priority and task deadline of each task limit, and are arranged according to the distance of the corresponding task deadline limit of each task Sequence;
Pushing module 2, for pushing ranking results.
Fig. 8 is another structural schematic diagram of the equipment of everyday tasks management provided in an embodiment of the present invention, as shown in figure 8, The equipment of the everyday tasks management of the present embodiment further includes the first cue module 31, the second cue module 32, third cue module 33, the 4th cue module 34, the 5th cue module 35 and the 6th cue module 36.
First cue module 31, for the task deadline whenever first task in current time node and current task pond When freight weight limit closes, first task is highlighted, also, whether prompt executes next task.
Second cue module 32, for obtaining the task termination time limit of first task, when current time node and the first When the corresponding task termination time limit of business is overlapped, first task is transferred in terminated task pond, and becomes the first terminated task.
Third cue module 33, the task for obtaining the first terminated task restart the time limit, when current time node and head When the corresponding task of position/task restarts time limit coincidence, prompt whether the first terminated task to be transferred in current task pond;
4th cue module 34, task for obtaining each task in current terminus time and current task pond are important etc. Grade highlights between current starting time and current terminus time and with super objective important level task, And it prompts whether preferentially to execute.
5th cue module 35, for obtaining the task emergency priority and task deadline limit of each newly-increased task, Jiang Gexin Each task is resequenced in increasing task and current task pond, also, according to the sequencing of each newly-increased task, is highlighted, and It prompts whether preferentially to execute one by one.
6th cue module 36, for obtain each task in current task pond task rely on grade, according to task according to Rely the size of grade to be classified each task in the ranking results in current task pond to highlight, and prompts whether preferentially to hold one by one Row.
In addition, the embodiment of the present invention also proposes a kind of readable storage medium storing program for executing, it is stored thereon with computer instruction, the instruction The step of management method of the various embodiments described above is realized when being executed by processor.
In addition, in addition, the embodiment of the present invention also proposes a kind of terminal, including memory, processor and it is stored in On reservoir and the computer program that can run on a processor, processor realize the manager of the various embodiments described above when executing program The step of method.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for Instruction execution system, device or equipment (such as computer based system, including the system of processor or other can be held from instruction The instruction fetch of row system, device or equipment and the system executed instruction) it uses, or combine these instruction execution systems, device or set It is standby and use.For the purpose of this specification, " computer-readable medium ", which can be, any may include, stores, communicates, propagates or pass Defeated program is for instruction execution system, device or equipment or the dress used in conjunction with these instruction execution systems, device or equipment It sets.The more specific example (non-exhaustive list) of computer-readable medium include the following: there is the electricity of one or more wirings Interconnecting piece (electronic device), portable computer diskette box (magnetic device), random access memory (RAM), read-only memory (ROM), erasable edit read-only storage (EPROM or flash memory), fiber device and portable optic disk is read-only deposits Reservoir (CDROM).In addition, computer-readable medium can even is that can on it the paper of print routine or other suitable be situated between Matter, because can then be edited, be interpreted or when necessary with other for example by carrying out optical scanner to paper or other media Suitable method is handled electronically to obtain program, is then stored in computer storage.
It should be appreciated that each section of the invention can be realized with hardware, software, firmware or their combination.Above-mentioned In embodiment, software that multiple steps or method can be executed in memory and by suitable instruction execution system with storage Or firmware is realized.It, and in another embodiment, can be under well known in the art for example, if realized with hardware Any one of column technology or their combination are realized: having a logic gates for realizing logic function to data-signal Discrete logic, with suitable combinational logic gate circuit specific integrated circuit, programmable gate array (PGA), scene Programmable gate array (FPGA) etc..
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not Centainly refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any One or more embodiment or examples in can be combined in any suitable manner.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of method of everyday tasks management, which is characterized in that the described method includes:
The task definition for obtaining all tasks forms current task pond, obtains the task of each task in the current task pond Emergency priority and task deadline limit are ranked up according to the distance of the corresponding task deadline limit of each task;
It is corresponding with each task if the task deadline limit of two in the current task pond or the multi-task is identical The task emergency priority height carries out minor sort again, and ranking results are pushed;
Wherein, the task emergency priority is the absolute value and required by task of the difference of current starting time and task deadline limit The ratio of time, also, molecule, the task are used as by biggish in the absolute value of the difference and the required by task time Deadline is the timing node that task should be completed, and the current starting time is the initial time node of each task.
2. the method for everyday tasks management according to claim 1, which is characterized in that described to push ranking results After step, the method also includes:
It, will be described when closing the task deadline freight weight limit of first task in current time node and the current task pond First task is highlighted, also, whether prompt executes next task;
If execute task, it is urgent etc. to recalculate the corresponding task of remaining task in the current task pond Grade, also, the task with task emergency priority described in highest is highlighted, and prompt whether preferentially to execute;
If abandon executing next task, the first task is continued to execute, also, the task for the first task that postpones Deadline, until current time node is closed with the task deadline freight weight limit after postponing.
3. the method for everyday tasks management according to claim 2, which is characterized in that the first task that postpones After the step of task deadline limit, the task deadline freight weight limit up to current time node and after postponing closes, institute State method further include:
The task termination time limit for obtaining the first task, described corresponding with the first task when current time node When the business time of expiration is overlapped, the first task is transferred in terminated task pond, and becomes the first terminated task;
The task termination time limit is the timing node that first task terminates.
4. the method for everyday tasks management according to claim 3, which is characterized in that described to shift the first task Into terminated task pond, and after the step of becoming the first terminated task, the method also includes:
The obtaining the first terminated task of the task restarts the time limit, when current time node institute corresponding with the first task When the task of stating restarts time limit coincidence, prompt whether the first terminated task to be transferred in the current task pond;
If the first terminated task is transferred to the current task pond, reacquires corresponding task emergency priority and appoint Business deadline;
If abandoning the first terminated task being transferred to the current task pond, the first terminated task is deleted;
The task restarts the timing node reactivated for the first terminated task in the time limit.
5. the method for everyday tasks management according to claim 1, which is characterized in that the method also includes:
The task important level for obtaining each task in current terminus time and the current task pond, will be in the current starting point Between time and the current terminus time and with task important level described in highest task is highlighted, and prompt is No preferential execution;
Wherein, the current terminus time is the terminal time node of each task.
6. the method for everyday tasks management according to claim 1, which is characterized in that the method also includes:
The task emergency priority and task deadline limit for obtaining each newly-increased task, by each newly-increased task and the current task Each task rearrangement in pond, also, according to the sequencing of each newly-increased task, is highlighted, and prompt one by one whether It is preferential to execute;
If preferentially executing each newly-increased task, after the completion of each newly-increased task, to remaining in the current task pond Task is resequenced;
It is each in current task pond described in the sequential processes according to rearrangement if abandoning preferentially executing each newly-increased task Item task.
7. the method for everyday tasks management according to claim 1, which is characterized in that the method also includes:
The obtaining each task in the current task pond of the task relies on grade, will be each according to the size that the task relies on grade Whether task is classified in the ranking results in the current task pond and highlights, and prompt preferentially to execute one by one;
The task relies on the number that grade is relied on other people by completion task.
8. a kind of equipment of everyday tasks management, which is characterized in that the equipment includes:
Sorting module, the task definition for obtaining all tasks form current task pond, obtain in the current task pond The task emergency priority and task deadline of each task limit, according to the corresponding task deadline limit of each task it is far and near into Row sequence;
Pushing module, for pushing ranking results.
9. a kind of storage medium, is stored thereon with computer program, which is characterized in that the computer program is executed by processor The step of Shi Shixian method as described in any one of claim 1 to 7.
10. a kind of terminal including memory, processor and stores the computer that can be run on a memory and on a processor Program, which is characterized in that the processor realizes method as described in any one of claim 1 to 7 when executing described program Step.
CN201810860445.5A 2018-08-01 2018-08-01 Method, equipment, storage medium and the terminal of everyday tasks management Withdrawn CN109214771A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810860445.5A CN109214771A (en) 2018-08-01 2018-08-01 Method, equipment, storage medium and the terminal of everyday tasks management
PCT/CN2019/097558 WO2020024862A1 (en) 2018-08-01 2019-07-24 Method and apparatus for daily task management, storage medium, and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810860445.5A CN109214771A (en) 2018-08-01 2018-08-01 Method, equipment, storage medium and the terminal of everyday tasks management

Publications (1)

Publication Number Publication Date
CN109214771A true CN109214771A (en) 2019-01-15

Family

ID=64990433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810860445.5A Withdrawn CN109214771A (en) 2018-08-01 2018-08-01 Method, equipment, storage medium and the terminal of everyday tasks management

Country Status (2)

Country Link
CN (1) CN109214771A (en)
WO (1) WO2020024862A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109886548A (en) * 2019-01-18 2019-06-14 平安科技(深圳)有限公司 Worksheet processing method, system, device and storage medium
CN109919445A (en) * 2019-02-01 2019-06-21 广州影子科技有限公司 Cultivate task management method and device, cultivation task management equipment and system
CN110348818A (en) * 2019-07-17 2019-10-18 博仕瀚道(上海)信息科技有限公司 A kind of the process intelligent processing method and system of flow engine
WO2020024862A1 (en) * 2018-08-01 2020-02-06 奇酷互联网络科技(深圳)有限公司 Method and apparatus for daily task management, storage medium, and terminal
CN111176821A (en) * 2019-12-31 2020-05-19 青岛海尔科技有限公司 Multitask scheduling method and device for operating system
CN111554367A (en) * 2020-04-26 2020-08-18 贵州精准健康数据有限公司 Data processing method and device and computer readable medium
CN112365699A (en) * 2020-09-24 2021-02-12 青岛鼎信通讯股份有限公司 Meter reading method for solving problem of uplink communication timeout of water-gas-heat meter converter
CN112967120A (en) * 2021-01-27 2021-06-15 国能大渡河大数据服务有限公司 Traceable Internet of things platform applied to financial system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112270531B (en) * 2020-10-30 2023-12-29 重庆紫光华山智安科技有限公司 Event notification method, device, server and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104335205A (en) * 2012-05-15 2015-02-04 苹果公司 Actionable reminder entries
CN104424021A (en) * 2013-08-29 2015-03-18 鸿富锦精密工业(深圳)有限公司 Task priority setting system and method
CN104731649A (en) * 2015-04-21 2015-06-24 中国建设银行股份有限公司 Multi-task processing method and multi-task processing device
CN106056362A (en) * 2016-06-21 2016-10-26 浪潮软件集团有限公司 Cooperative office APP task management method
CN107148617A (en) * 2014-09-19 2017-09-08 亚马逊科技公司 Automatically configuring for storage group is coordinated in daily record
CN107291548A (en) * 2016-03-31 2017-10-24 阿里巴巴集团控股有限公司 The resource regulating method and device of task
CN107358405A (en) * 2017-06-30 2017-11-17 胡玥莹 A kind of briefing management system and method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6567840B1 (en) * 1999-05-14 2003-05-20 Honeywell Inc. Task scheduling and message passing
CN101620550B (en) * 2009-05-27 2013-01-02 西华师范大学 Embedded real-time scheduling method based on fuzzy multiple features of task
US20170344931A1 (en) * 2016-05-27 2017-11-30 Microsoft Technology Licensing, Llc Automatic task flow management across multiple platforms
CN109214771A (en) * 2018-08-01 2019-01-15 奇酷互联网络科技(深圳)有限公司 Method, equipment, storage medium and the terminal of everyday tasks management

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104335205A (en) * 2012-05-15 2015-02-04 苹果公司 Actionable reminder entries
CN104424021A (en) * 2013-08-29 2015-03-18 鸿富锦精密工业(深圳)有限公司 Task priority setting system and method
CN107148617A (en) * 2014-09-19 2017-09-08 亚马逊科技公司 Automatically configuring for storage group is coordinated in daily record
CN104731649A (en) * 2015-04-21 2015-06-24 中国建设银行股份有限公司 Multi-task processing method and multi-task processing device
CN107291548A (en) * 2016-03-31 2017-10-24 阿里巴巴集团控股有限公司 The resource regulating method and device of task
CN106056362A (en) * 2016-06-21 2016-10-26 浪潮软件集团有限公司 Cooperative office APP task management method
CN107358405A (en) * 2017-06-30 2017-11-17 胡玥莹 A kind of briefing management system and method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020024862A1 (en) * 2018-08-01 2020-02-06 奇酷互联网络科技(深圳)有限公司 Method and apparatus for daily task management, storage medium, and terminal
CN109886548A (en) * 2019-01-18 2019-06-14 平安科技(深圳)有限公司 Worksheet processing method, system, device and storage medium
CN109886548B (en) * 2019-01-18 2024-05-07 平安科技(深圳)有限公司 Method, system, device and storage medium for dispatching order
CN109919445A (en) * 2019-02-01 2019-06-21 广州影子科技有限公司 Cultivate task management method and device, cultivation task management equipment and system
CN110348818A (en) * 2019-07-17 2019-10-18 博仕瀚道(上海)信息科技有限公司 A kind of the process intelligent processing method and system of flow engine
CN110348818B (en) * 2019-07-17 2024-01-19 博仕瀚道(上海)信息科技有限公司 Intelligent process processing method and system for process engine
CN111176821A (en) * 2019-12-31 2020-05-19 青岛海尔科技有限公司 Multitask scheduling method and device for operating system
CN111554367A (en) * 2020-04-26 2020-08-18 贵州精准健康数据有限公司 Data processing method and device and computer readable medium
CN111554367B (en) * 2020-04-26 2023-05-30 贵州精准健康数据有限公司 Data processing method, device and computer readable medium
CN112365699A (en) * 2020-09-24 2021-02-12 青岛鼎信通讯股份有限公司 Meter reading method for solving problem of uplink communication timeout of water-gas-heat meter converter
CN112365699B (en) * 2020-09-24 2022-10-14 青岛鼎信通讯股份有限公司 Meter reading method for solving uplink communication timeout of water-gas-heat meter converter
CN112967120A (en) * 2021-01-27 2021-06-15 国能大渡河大数据服务有限公司 Traceable Internet of things platform applied to financial system

Also Published As

Publication number Publication date
WO2020024862A1 (en) 2020-02-06

Similar Documents

Publication Publication Date Title
CN109214771A (en) Method, equipment, storage medium and the terminal of everyday tasks management
Rich et al. COLLAGEN: A collaboration manager for software interface agents
Cranshaw et al. Calendar. help: Designing a workflow-based scheduling agent with humans in the loop
US9767794B2 (en) Dialog flow management in hierarchical task dialogs
US5819243A (en) System with collaborative interface agent
Chang et al. A speech-act-based negotiation protocol: design, implementation, and test use
Nelson et al. Scheduling with multiple performance measures: the one-machine case
Allen et al. A problem solving model for collaborative agents
Wongwai et al. Augmented heuristic algorithm for multi-skilled resource scheduling
US6434571B1 (en) Method, apparatus and computer program product for implementing meeting functions in an electronic calendar
Oncken Jr et al. Who’s Got the Monkey?
CN110336859A (en) Task scheduling system under multi-tenant environment
Breitenmoser et al. Case management model and notation-a showcase
Lorber et al. How we successfully adapted agile for a research-heavy engineering software team
De Michelis et al. Routines and Conversations
Grandori Discovery in natural selection and knowledge processes: a commentary on ‘an agent‐based model of exaptive processes’
Wang Parallel machine scheduling with precedence constraints
Fan et al. A heuristic search algorithm for flow-shop scheduling
Mathiassen et al. The dynamics of knowledge in systems development practice
Doucette An ex-ante rational distributed resource allocation system using transfer of control strategies for preemption with applications to emergency medicine
Hekkala et al. Emotions in leadership in an IOIS project
Hulett Advanced quantitative schedule risk analysis
Fleischmann From Subject-Phase Model Based Process Specifications to an Executable Workflow
Zlokapa Real-time systems: Well-timed scheduling and scheduling with precedence constraints
Luebbe et al. Making effective team decisions with consensus building tools.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190115

WW01 Invention patent application withdrawn after publication