CN109190962A - Project process supervision control system - Google Patents

Project process supervision control system Download PDF

Info

Publication number
CN109190962A
CN109190962A CN201810975247.3A CN201810975247A CN109190962A CN 109190962 A CN109190962 A CN 109190962A CN 201810975247 A CN201810975247 A CN 201810975247A CN 109190962 A CN109190962 A CN 109190962A
Authority
CN
China
Prior art keywords
project
information
module
unit
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810975247.3A
Other languages
Chinese (zh)
Inventor
肖长胜
李政
张建
刘备
李直明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhonglian Environmental Construction Management Co Ltd
Original Assignee
Beijing Zhonglian Environmental Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhonglian Environmental Construction Management Co Ltd filed Critical Beijing Zhonglian Environmental Construction Management Co Ltd
Priority to CN201810975247.3A priority Critical patent/CN109190962A/en
Publication of CN109190962A publication Critical patent/CN109190962A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of project process supervision control systems, belong to supervision control systems technology field;The main points of its technical scheme are that including database module, data input module, artificial progress plans as a whole module, BIM models contrast module and information issuing module;Artificial progress plans as a whole module, for inputting relevant item nodes information;BIM models contrast module, and the project data information for being inputted according to data input module carries out modeling using BIM technology and the project of realtime construction compares, and obtains project completeness information;Information issuing module, for issuing the item nodes information and project completeness information that artificial progress plans as a whole module and BIM modeling contrast module;It solves existing project process supervision control system Items in order personnel and reads and analyze the performance that can just obtain corresponding item nodes progress and whole project, the problem of project management low efficiency;Project personnel can be made conveniently to get information about the completeness of project and the nodal information of project.

Description

Project process supervision control system
Technical field
The present invention relates to supervision control technical field more particularly to a kind of project process supervision control systems.
Background technique
At present when supervising to project under construction, usually a supervisor needs while managing multiple projects, and The most of process of current project management still needs between management side and construction party each verbal communication or meeting Form exchanged so that management side can be monitored the overall progress of construction party, and supervised and carried out every Can the examination of a node, supervisor directly affect project for the examination of item destination node and normally continue.Current Management system, for supervisor, project is more and will cause the cumbersome of various data to arrange, and supervisor be often difficult to and When the urgency level for judging be responsible for project, reasonable control usually needs supervisor to have working experience abundant, but It is according to supply and demand ratio, it is not especially sufficient supervisor that many projects, which still need to distribute to some experiences, at present, is managed When it is very cumbersome and inconvenient, reasonable adjustment is difficult in the control of project, gently then causes prolonging for a project It is phase, heavy then cause the imbalance to supervising between multiple projects, the examination progress of multiple projects is influenced, immeasurable damage is brought It loses, the space that could be improved.
Application publication number is that the Chinese invention patent application file of CN108197909A discloses a kind of project process management Control system includes according to unique identifying information to obtain the login module of corresponding administration authority, be incited somebody to action according to administration authority The corresponding node schedule data input of the node schedule of practice of construction is simultaneously stored to the typing of project process database Module, according to node schedule information to carry out the analysis module of project pressing degree analysis, in response to analysis module and root The distribution module being allocated according to reception time of the project pressing degree to item nodes.
Above-mentioned project process supervision control system, analysis module and distribution module carry out point that cooperation carries out multiple projects The distribution of analysis and reception time, so that the careless omission occurred when achieving the purpose that supervisor is avoided to manage causes the extension of project, but It is or mainly by manually carrying out typing, and item to the corresponding node schedule information of the node schedule of practice of construction Mesh personnel, which read and analyze there is still a need for a large amount of time to the data of typing, can just obtain corresponding item nodes progress With the performance of whole project, project management low efficiency.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of project process supervision control system, Project personnel can be made conveniently to get information about the completeness of project and the nodal information of project.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of project process supervision control System, including database module, data input module, artificial progress plan as a whole module, BIM modeling contrast module and information and issue mould Block;
The database module is used to stored items history item information material;
The data input module is used to input the project data information, project personnel's information and project planning section of current project Point information;
The artificial progress plans as a whole module and is used to the relevant item nodes information of project personnel's input;
The project data information that the BIM modeling contrast module is inputted according to data input module is modeled using BIM technology It is compared with the project of realtime construction, obtains project completeness information;
The information issuing module be used to issue artificial progress plan as a whole module and BIM modeling contrast module item nodes information and Project completeness information.
Through the above technical solutions, project process supervision control system, including database module, data input module, people Work progress plans as a whole module, BIM modeling contrast module and information issuing module;The item of current project is inputted by data input module Mesh data information, project personnel's information and project planning nodal information, so that convenient integrate the data of off-the-shelf item Statistics, and then conveniently project process is assessed;Plan as a whole module by artificial progress and is used to the relevant item of project personnel's input Mesh nodal information so that item nodes information is counted and be concluded, and then facilitates relevant item personnel according to item nodes It carries out an acceptance inspection to the process to project;Contrast module is modeled by BIM to adopt the project data information that data input module inputs Modeling is carried out with BIM technology and the project of realtime construction compares, and obtains the completeness of project so as to convenience and high-efficiency Information;It is used to issue the item nodes information that artificial progress plans as a whole module and BIM models contrast module by information issuing module With project completeness information to facilitate project personnel to understand project process in time, so that project management process is more orderly high Effect, improves the efficiency of management of project manager.
Preferably, the BIM modeling contrast module includes three-dimensional information acquisition unit, BIM modeling unit and comparative analysis Unit;
The three-dimensional information acquisition unit carries out three-dimensional image acquisition to the building body of project;
The BIM modeling unit carries out BIM modeling according to the project data information that data input module inputs;
The 3-D image of the project building that the comparative analysis unit acquires three-dimensional information acquisition unit and BIM buildings model into Row comparison, calculates the completeness of project.
Through the above technical solutions, BIM modeling contrast module includes three-dimensional information acquisition unit, BIM modeling unit and ratio Compared with analytical unit, three-dimensional image acquisition, BIM modeling unit root are carried out by building body of the three-dimensional information acquisition unit to project BIM modeling is carried out according to the project data information of data input module input, and then adopts three-dimensional information by comparing analytical unit The 3-D image and BIM buildings model of the project building of collection unit acquisition carry out analysis comparison, so as to calculate project Completeness eliminates complicated critical-path analysis work so that project personnel be facilitated to understand project performance from whole, It is convenient and efficient.
Preferably, the three-dimensional information acquisition unit, which builds project using satellite radio remote sensing technology, carries out main body three-dimensional Image data acquiring;The three-dimensional information acquisition unit, which photographs to build project using unmanned plane, carries out partial 3d image information Acquisition.
Through the above technical solutions, three-dimensional information acquisition unit leads project building using satellite radio remote sensing technology The acquisition of body 3 d image data builds project using unmanned plane photography and carries out partial 3d image information acquisition, thus comprehensive Two methods obtain the three-dimensional image information of careful accurate project building, and then the comparing result for exporting comparative analysis unit Information is more accurate.
Preferably, it includes ID authentication unit and information input unit, the information input that the artificial progress, which plans as a whole module, Unit includes several information input areas;The corresponding login ID of each administrative staff, different login ID corresponding informance inputs One or more information input area in unit, the ID authentication unit verify login ID, and it is defeated to open corresponding information Enter area.
Through the above technical solutions, leading to artificial progress pool module includes ID authentication unit and information input unit, pass through ID authentication unit is managed the input permission of administrative staff, and then administrative staff believe item nodes according to the permission of oneself Breath is input in the corresponding information input area of information input unit, thus keep cuit nodal information more clean and tidy orderly, and And guarantee the validity of information input by the setting of input permission.
Preferably, it further includes node prewarning unit that the artificial progress, which plans as a whole module, the node prewarning unit includes inspection Cable elements and calculating comparison unit;The project data information and project personnel that the retrieval unit is inputted according to data input module Information in database module search most like project, and is extracted most like the item nodes information of project;The calculating comparison unit By artificial progress plan as a whole module input item nodes information with most compared like the deadline of the nodal information of project, obtain The probability that next item node is timely completed out.
Through the above technical solutions, it further includes node prewarning unit that artificial progress, which plans as a whole module, node prewarning unit includes Retrieval unit and calculating comparison unit;The project data information and project personnel that retrieval unit is inputted according to data input module are believed Breath in database module search most like project, and extracts most like the item nodes information of project, and then calculating comparison unit will Artificial progress is planned as a whole the item nodes information of module input and is most compared like the deadline of the nodal information of project, thus Judged by the probability that comparative analysis is timely completed next item node, to make project personnel in time to project construction Speed is adjusted, and then guarantees that project can be completed in time.
Preferably, the information issuing module includes display terminal, the display terminal is used to show that artificial progress is planned as a whole The item nodes information and project completeness information of module and BIM modeling contrast module output.
Through the above technical solutions, information issuing module includes display terminal, artificial progress is planned as a whole by display terminal The item nodes information and project completeness information of module and BIM modeling contrast module output are shown, to facilitate correlation Technical staff intuitively understands the completeness information of item nodes situation and project.
Preferably, the information issuing module further includes wireless communication module, the wireless communication module is stored with project The phone number of personnel checks and accepts progress according to project process and sends short message alert notification to relevant item personnel.
Through the above technical solutions, information issuing module further includes wireless communication module, and wireless communication module is stored with The case where phone number of project personnel, information issuing module is according to item nodes, when need relevant item personnel to project When node carries out an acceptance inspection, short message is issued to relevant item personnel by wireless communication module, so as in time to the project acceptance inspection Personnel notify.
Preferably, project process supervision control system further includes cloud memory module, the cloud memory module is by information The item nodes information and project completeness information of release module publication are stored to internet cloud.
Through the above technical solutions, project process supervision control system further includes cloud memory module, stored by cloud The item nodes information and project completeness information that module issues information issuing module are stored to internet cloud, thus to this The item nodes information and project completeness information of Xiang Mo carries out storage backup, prevents corresponding item nodes information and project complete It is lost at degree information.
In conclusion the invention has the following advantages:
1. project process supervision control system, including database module, data input module, artificial progress plan as a whole module, BIM is built Mould contrast module and information issuing module;Project data information, the project personnel of current project are inputted by data input module Information and project planning nodal information, so that the convenient data to off-the-shelf item carries out comprehensive statistics, and then conveniently to project Process is assessed;Plan as a whole module by artificial progress and be used to the relevant item nodes information of project personnel's input, thus to item Mesh nodal information is counted and is concluded, and then relevant item personnel is facilitated to be tested according to item nodes the process to project It receives;By BIM model project data information that contrast module input data input module using BIM technology carry out modeling in fact When the project constructed compare, so as to the completeness information for obtaining project of convenience and high-efficiency;Pass through information issuing module For issuing, artificial progress plans as a whole module and BIM models item nodes information and the project completeness information of contrast module to side Just project personnel understand project process in time, so that project management process is more orderly efficient, improve the pipe of project manager Manage efficiency.
2. three-dimensional information acquisition unit builds project using satellite radio remote sensing technology and carries out main body 3 d image data Acquisition builds project using unmanned plane photography and carries out partial 3d image information acquisition, so that comprehensive two methods obtain carefully The three-dimensional image information of accurate project building is caused, and then the comparing result information for exporting comparative analysis unit is more accurate;
3. it further includes node prewarning unit that artificial progress, which plans as a whole module, node prewarning unit includes that retrieval unit and calculating comparison are single Member;The project data information and project personnel's information that retrieval unit is inputted according to data input module are searched in database module It most like project, and extracts most like the item nodes information of project, then calculates comparison unit artificial progress pool module is defeated The item nodes information entered with most compared like the deadline of the nodal information of project, thus by comparative analysis to next The probability that item nodes are timely completed is judged, to make project personnel be adjusted in time to project construction speed, in turn Guarantee project can be completed in time.
Detailed description of the invention
Fig. 1 is the functional block diagram of project process supervision control system;
Fig. 2 is that the internal information of project process supervision control system flows to figure.
Appended drawing reference: 1, database module;2, data input module;3, artificial progress plans as a whole module;31, ID verifying is single Member;32, information input unit;33, node prewarning unit;331, retrieval unit;332, comparison unit is calculated;4, BIM modeling pair Compare module;41, three-dimensional information acquisition unit;42, BIM modeling unit;43, comparative analysis unit;5, information issuing module;51, Display terminal;52, wireless communication module;6, cloud memory module.
Embodiment: a kind of project process supervision control system, referring to Figures 1 and 2, including database module 1, data input Module 2, artificial progress plan as a whole module 3, BIM modeling contrast module 4 and information issuing module 5.
Referring to Figures 1 and 2, database module 1 is used to stored items history item information material, by using database mould 1 stored items history item information material of block so that convenient inquire the information material of history item, and then passes through history Project information data carries out program evaluation to existing project, so that the control ability to off-the-shelf item be turned up, reduces mistake, mentions Height construction and project management efficiency.
Data input module 2 is used to input the project data information, project personnel's information and project planning of current project Nodal information.Pass through 2 cuit data information of data input module, project personnel's information and project planning nodal information, root According to the speed of application of item object time and project capable of being predicted and be judged with project data information and project personnel's information, And then project management and speed of application are adjusted by project planning node.
It includes three-dimensional information acquisition unit 41, BIM modeling unit 42 and comparative analysis unit 43 that BIM, which models contrast module 4,. Three-dimensional information acquisition unit 41 is used to carry out three-dimensional image acquisition to the building body of project.Three-dimensional information acquisition unit 41 uses Satellite radio remote sensing technology to project build carry out main body 3 d image data acquisition using unmanned plane photography to project build into The acquisition of row partial 3d image information.Cooperate unmanned plane photography accurately and fast to project by satellite radio remote sensing Building body carries out 3-D graphic acquisition.BIM modeling unit 42 is carried out according to the project data information that data input module 2 inputs BIM modeling, and then project data information is converted into BIM model, it is carried out so as to the building plans to project convenient intuitive Carry out read.Comparative analysis unit 43 builds the 3-D image for the project building that three-dimensional information acquisition unit 41 acquires with BIM It builds model to compare, calculates the completeness of project.
It includes ID authentication unit 31 and information input unit 32 that artificial progress, which plans as a whole module 3, and information input unit 32 includes Several information input areas.The corresponding login ID of each administrative staff, in different login ID corresponding informance input units 32 One or more information input areas.When entering supervision control system using project, project personnel are united using artificial progress When raising module 3 and inputting relevant item nodes information, the login ID of oneself is inputted when logging in, ID authentication unit 31 is to login ID It is verified, and corresponding information input area is opened according to ID number.By to project personnel be arranged corresponding login ID into Row authentication, to guarantee the authenticity of data input, by giving different ID with different input administration authorities, thus making Manually progress is planned as a whole more efficient when the progress item nodes information of module 3 is planned as a whole, and use information is more clear and has conditioning.
It further includes node prewarning unit 33 that artificial progress, which plans as a whole module 3, and node prewarning unit 33 includes 331 He of retrieval unit Calculate comparison unit 332.The project data information and project personnel's information that retrieval unit 331 is inputted according to data input module 2, In the search of database module 1 most like project, and extract most like the item nodes information of project;Comparison unit 332 is calculated by people Work progress plan as a whole module 3 input item nodes information with most compared like the deadline of the nodal information of project, obtain The probability that next item node is timely completed.Big such as current project is M1 on a small scale, and project number is N1, most like project Item size scale is M2, and project number is N2, and completion node time is T2, then the Estimated Time Of Completion of current project is T1 =K*M1*N1*T2/M2*N2, wherein K is project impact factor, and numerical values recited is set according to practice of construction situation.So should Node is timely completed probability P=T/T1, and T represents the project planning deadline, and P maximum value takes 1.
Information issuing module 5 includes display terminal 51 and wireless communication module 52.Display terminal 51 can be shown using PC Device, a variety of display equipment such as liquid crystal display.Display terminal 51 is used to show that artificial progress plans as a whole module 3 and BIM modeling comparison The item nodes information and project completeness information that module 4 exports.3 He of module is planned as a whole to artificial progress by display terminal 51 BIM models the item nodes information and project completeness information that contrast module 4 exports, and carries out intuitive data and shows, thus side Just project personnel observe, so that project personnel be facilitated to carry out supervision control to project process.
Wireless communication module 52 is stored with the phone number of project personnel, and wireless communication module 52 is checked and accepted according to project process Progress sends short message alert notification to relevant item personnel, so that corresponding project manager be notified to test project in time It receives, carries out the efficiency for improving the project management of project personnel.
Project process supervision control system further includes cloud memory module 6, and cloud memory module 6 is by information issuing module 5 The item nodes information and project completeness information of publication are stored to internet cloud.Information is sent out by cloud memory module 6 The item nodes information and project completeness information that cloth module 5 is issued are stored, thus complete to item nodes information and project Cloud backup is carried out at degree information, prevents the item nodes information of the project and project completeness information from losing because unexpected.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (8)

1. a kind of project process supervision control system, it is characterised in that: including database module (1), data input module (2), Artificial progress plans as a whole module (3), BIM modeling contrast module (4) and information issuing module (5);
The database module (1) is used to stored items history item information material;
The data input module (2) is used to input project data information, project personnel's information and the project rule of current project Draw nodal information;
The artificial progress plans as a whole module (3) and is used to the relevant item nodes information of project personnel's input;
BIM modeling contrast module (4) according to the project data information that data input module (2) input use BIM technology into Row modeling and the project of realtime construction compare, and obtain project completeness information;
The information issuing module (5) is used to issue the project that artificial progress plans as a whole module (3) and BIM modeling contrast module (4) Nodal information and project completeness information.
2. project process supervision control system according to claim 1, it is characterised in that: the BIM models contrast module It (4) include three-dimensional information acquisition unit (41), BIM modeling unit (42) and comparative analysis unit (43);
The three-dimensional information acquisition unit (41) carries out three-dimensional image acquisition to the building body of project;
The BIM modeling unit (42) carries out BIM modeling according to the project data information that data input module (2) inputs;
The comparative analysis unit (43) builds the 3-D image for the project building that three-dimensional information acquisition unit (41) acquires with BIM It builds model to compare, calculates the completeness of project.
3. project process supervision control system according to claim 2, it is characterised in that: the three-dimensional information acquisition unit (41) project is built using satellite radio remote sensing technology and carries out the acquisition of main body 3 d image data;The three-dimensional information acquisition is single First (41), which photograph to build project using unmanned plane, carries out partial 3d image information acquisition.
4. project process supervision control system according to claim 1, it is characterised in that: the artificial progress plans as a whole module It (3) include ID authentication unit (31) and information input unit (32), the information input unit (32) includes that several information are defeated Enter area;Each administrative staff correspond to a login ID, one or more in different login ID corresponding informance input units (32) Information input area, the ID authentication unit (31) verifies login ID, opens corresponding information input area.
5. project process supervision control system according to claim 4, it is characterised in that: the artificial progress plans as a whole module It (3) further include node prewarning unit (33), the node prewarning unit (33) includes retrieval unit (331) and calculating comparison unit (332);The project data information and project personnel's information that the retrieval unit (331) inputs according to data input module (2), Database module (1) search is extracted most like project most like the item nodes information of project;The calculating comparison unit (332) by artificial progress plan as a whole module (3) input item nodes information with most like the deadline of the nodal information of project into Row comparison, obtains the probability that next item node is timely completed.
6. project process supervision control system according to claim 1, it is characterised in that: the information issuing module (5) Including display terminal (51), the display terminal (51) is used to show that artificial progress plans as a whole module (3) and BIM modeling contrast module (4) the item nodes information and project completeness information exported.
7. project process supervision control system according to claim 6, it is characterised in that: the information issuing module (5) It further include wireless communication module (52), the wireless communication module (52) is stored with the phone number of project personnel, according to project Progress checks and accepts progress and sends short message alert notification to relevant item personnel.
8. project process supervision control system according to claim 1, it is characterised in that: project process supervision control system It further include cloud memory module (6), the item nodes information that the cloud memory module (6) issues information issuing module (5) With project completeness information storage to internet cloud.
CN201810975247.3A 2018-08-24 2018-08-24 Project process supervision control system Pending CN109190962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810975247.3A CN109190962A (en) 2018-08-24 2018-08-24 Project process supervision control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810975247.3A CN109190962A (en) 2018-08-24 2018-08-24 Project process supervision control system

Publications (1)

Publication Number Publication Date
CN109190962A true CN109190962A (en) 2019-01-11

Family

ID=64919831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810975247.3A Pending CN109190962A (en) 2018-08-24 2018-08-24 Project process supervision control system

Country Status (1)

Country Link
CN (1) CN109190962A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110119774A (en) * 2019-05-08 2019-08-13 中铁八局集团建筑工程有限公司 A kind of contrast difference's method based on Building Information Model 4D progress Yu outdoor scene progress
CN110275708A (en) * 2019-06-06 2019-09-24 江西理工大学 A kind of visual software modeling method of computer software view
CN110472858A (en) * 2019-08-10 2019-11-19 浙江同洲项目管理有限公司 A kind of Project Supervision approaches to IM
CN110599007A (en) * 2019-08-28 2019-12-20 西安市创新人才研究院 Project progress management system
CN111062679A (en) * 2019-10-28 2020-04-24 中船重工海鑫工程管理(北京)有限公司 Overall process intelligent engineering supervision information management and control system
CN111126939A (en) * 2019-11-22 2020-05-08 河北瑞池工程项目管理有限公司 Project progress supervision control system
CN111125810A (en) * 2019-11-25 2020-05-08 重庆建工机电安装工程有限公司 BIM-based electromechanical project comprehensive information management system and method
CN111192093A (en) * 2020-01-04 2020-05-22 重庆西恒工程咨询有限公司 Engineering cost management system based on BIM
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision
CN112085623A (en) * 2020-09-18 2020-12-15 中铁济南工程建设监理有限公司 Engineering supervision method based on artificial intelligence mode
CN112884444A (en) * 2021-03-10 2021-06-01 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN113361909A (en) * 2021-06-03 2021-09-07 杭州推啊网络科技有限公司 Internet project management method and system
CN113642996A (en) * 2021-08-13 2021-11-12 安徽博达项目管理咨询有限公司 Project supervision management informatization system
CN113869851A (en) * 2021-09-22 2021-12-31 福建互华土木工程管理有限公司 Intelligent supervision and control method, system, device and medium based on digital model
CN115857474A (en) * 2022-12-23 2023-03-28 青岛市工程建设监理有限责任公司 Supervision monitoring method based on project progress auxiliary robot

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150269617A1 (en) * 1999-11-22 2015-09-24 Accenture Global Services Limited Increased Visibility During Order Management in a Network-Based Supply Chain Environment
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN107516165A (en) * 2017-08-15 2017-12-26 南通市交通建设咨询监理有限公司 A kind of project supervision KXG based on BIM
CN108197909A (en) * 2018-03-24 2018-06-22 浙江鼎力工程项目管理有限公司 A kind of project process supervision control system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150269617A1 (en) * 1999-11-22 2015-09-24 Accenture Global Services Limited Increased Visibility During Order Management in a Network-Based Supply Chain Environment
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN107516165A (en) * 2017-08-15 2017-12-26 南通市交通建设咨询监理有限公司 A kind of project supervision KXG based on BIM
CN108197909A (en) * 2018-03-24 2018-06-22 浙江鼎力工程项目管理有限公司 A kind of project process supervision control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张海岸等: ""BIM+无人机"技术在城市轨道交通工程监理中的应用", 《建设管理》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110119774A (en) * 2019-05-08 2019-08-13 中铁八局集团建筑工程有限公司 A kind of contrast difference's method based on Building Information Model 4D progress Yu outdoor scene progress
CN110275708A (en) * 2019-06-06 2019-09-24 江西理工大学 A kind of visual software modeling method of computer software view
CN110472858A (en) * 2019-08-10 2019-11-19 浙江同洲项目管理有限公司 A kind of Project Supervision approaches to IM
CN110599007A (en) * 2019-08-28 2019-12-20 西安市创新人才研究院 Project progress management system
CN111062679A (en) * 2019-10-28 2020-04-24 中船重工海鑫工程管理(北京)有限公司 Overall process intelligent engineering supervision information management and control system
CN111126939B (en) * 2019-11-22 2023-10-03 河北瑞池工程项目管理有限公司 Project progress supervision control system
CN111126939A (en) * 2019-11-22 2020-05-08 河北瑞池工程项目管理有限公司 Project progress supervision control system
CN111125810A (en) * 2019-11-25 2020-05-08 重庆建工机电安装工程有限公司 BIM-based electromechanical project comprehensive information management system and method
CN111192093A (en) * 2020-01-04 2020-05-22 重庆西恒工程咨询有限公司 Engineering cost management system based on BIM
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision
CN112085623A (en) * 2020-09-18 2020-12-15 中铁济南工程建设监理有限公司 Engineering supervision method based on artificial intelligence mode
CN112085623B (en) * 2020-09-18 2023-11-24 中铁济南工程建设监理有限公司 Engineering supervision method based on artificial intelligence mode
CN112884444A (en) * 2021-03-10 2021-06-01 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN112884444B (en) * 2021-03-10 2023-07-18 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN113361909A (en) * 2021-06-03 2021-09-07 杭州推啊网络科技有限公司 Internet project management method and system
CN113642996A (en) * 2021-08-13 2021-11-12 安徽博达项目管理咨询有限公司 Project supervision management informatization system
CN113869851A (en) * 2021-09-22 2021-12-31 福建互华土木工程管理有限公司 Intelligent supervision and control method, system, device and medium based on digital model
CN115857474A (en) * 2022-12-23 2023-03-28 青岛市工程建设监理有限责任公司 Supervision monitoring method based on project progress auxiliary robot

Similar Documents

Publication Publication Date Title
CN109190962A (en) Project process supervision control system
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN109543992B (en) Intelligent inspection method and device, intelligent terminal and server
CN103824340B (en) Unmanned plane power transmission line intelligent cruising inspection system and method for inspecting
US20210349476A1 (en) Method and apparatus for controlling cruise of unmanned air vehicle based on prefabricated construction platform
CN108874919B (en) Automatic checking method for planned land, electronic equipment, storage medium and system
Liu et al. Automatically updating maintenance information from a BIM database
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN114140999B (en) Project supervision system based on communication of Internet of things
CN110648085B (en) Operation and maintenance method and system for comprehensive energy park
CN112462696A (en) Intelligent manufacturing workshop digital twin model construction method and system
CN110648422A (en) Standardized inspection method, system and platform
CN112734370A (en) BIM-based project supervision information management method and system
CN108154340A (en) Prefabricated component informationization management system based on BIM cloud platforms
CN109829693A (en) One kind being used for Construction Schedule management system and management method
CN113011832A (en) Engineering cost system based on BIM
CN110855012A (en) Real-time line loss intelligent analysis system for transformer area
CN107862451A (en) Underground utilities quality judging method and system based on Shape data
CN114298343A (en) Management method and device for equipment inspection process, electronic equipment and storage medium
CN110941558B (en) Intelligent office remote operation and maintenance method and system
CN110728548B (en) VR tourism product evaluation system
CN106462875A (en) Air quality metrology system
CN114282824B (en) Building engineering informatization management system
CN107527148A (en) The building site project management system of power network wisdom building site control platform
CN110956444A (en) Infrastructure distribution network engineering data management mobile system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication