CN109184757A - Small mine pillar - Google Patents
Small mine pillar Download PDFInfo
- Publication number
- CN109184757A CN109184757A CN201810990186.8A CN201810990186A CN109184757A CN 109184757 A CN109184757 A CN 109184757A CN 201810990186 A CN201810990186 A CN 201810990186A CN 109184757 A CN109184757 A CN 109184757A
- Authority
- CN
- China
- Prior art keywords
- bolt
- sleeve
- bottom plate
- loop bar
- riser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 22
- 244000309464 bull Species 0.000 claims description 12
- 230000002708 enhancing effect Effects 0.000 abstract description 2
- 239000003245 coal Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 3
- 230000001965 increasing effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000004449 solid propellant Substances 0.000 description 1
- 238000013517 stratification Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/50—Component parts or details of props
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/50—Component parts or details of props
- E21D15/54—Details of the ends of props
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of small mine pillars, including sleeve, the bottom end of the sleeve is connected with bottom plate, inserted with the first bolt at left and right sides of the upper surface of the bottom plate, the first bolt-through bottom plate, the bottom plate are connected with the first bolt thread, and the bottom end of first bolt is equipped with pedestal, the pedestal is rotatedly connected by bearing and the first bolt, is connected with riser at left and right sides of the lower surface of the bottom plate;The small mine pillar, pass through the cooperation between sleeve, loop bar, groove, bottom plate and the second bolt, small mine pillar can be made to be put into lesser space interior, to support the top in mine hole, it can replace traditional waddy, so that the stability enhancing in support mine hole, will not occur pressing from both sides dead mobile difficult situation when needing mobile, so that the safe of the absence from work without reason of operation ensures in small space, the generation of safety accident is effectively prevented.
Description
Technical field
The present invention relates to small mine mainstay field, specially a kind of small mine pillar.
Background technique
Coal mine is the proportional space that the mankind are excavated when digging is rich in the geological stratification for having coal, generally includes tunnel, well
Cave and face etc., coal are most important solid fuels, are one kind of kaustobilite.It was given birth to by certain geological epoch
Long plant in great numbers is gradually accumulated into thick-layer in suitable geological environment, and is buried in water-bed or silt, and process is very long
Geochronic geochronic natural incoalation and formed, but be possible in the mining process of coal mine to occur collapsing, general coal
Mine is all to have large-scale crane, to ensure the stability of coal mine, but is also to have in some corners or narrow space
Absence from work without reason is in operation, and large-scale crane cannot be introduced into lesser space, can not support the top in mine hole, typically take wood
Rod supports the top in mine hole, supports the stability in mine hole not strong, once folder is dead mobile difficult again, thus in small space
The absence from work without reason of interior operation is unable to get safely guarantee, is easy to happen safety accident.
Summary of the invention
The present invention overcomes the shortcomings of the prior art, technical problem to be solved are as follows: provides a kind of small mine
Pillar effectively prevents the generation of safety accident, and conveniently moving is quick.
To achieve the above object, the invention provides the following technical scheme: small mine pillar, including sleeve, the set
The bottom end of cylinder is connected with bottom plate, and the upper surface left and right sides of the bottom plate is inserted with the first bolt, first bolt-through
Bottom plate, the bottom plate are connected with the first bolt thread, and the bottom end of first bolt is equipped with pedestal, the pedestal by bearing with
First bolt is rotatedly connected, and is connected with riser at left and right sides of the lower surface of the bottom plate, is connected with slide bar between the riser,
The outer wall movable sleeve of the slide bar is connected to idler wheel, the idler wheel and riser clearance fit, the top of the sleeve inserted with loop bar,
The loop bar and sleeve clearance fit, the outer wall top left and right sides of the sleeve is inserted with the second bolt, second spiral shell
Bolt offsets through a part of sleeve with loop bar, and second bolt is connected with bush whorl, the outer wall bottom of the loop bar pair
The end left and right sides is provided with multiple grooves, and upper and lower ends are connected with cross bar, the cross bar at left and right sides of the outer wall of the sleeve
Left side be connected with vertical bar, the top of the loop bar is connected with the second rubber pad.
Preferably, the first convex block, the left side of first convex block are connected at left and right sides of the outer wall top of the loop bar
Equipped with transverse slat, the transverse slat is rotatedly connected by the first pin shaft and the first convex block, and the is connected on the left of the lower surface of the transverse slat
The bottom end of two convex blocks, second convex block is equipped with bull stick, and the bull stick is rotatedly connected by the second pin shaft and the second convex block, described
The bottom end of bull stick is connected with riser, the left-hand face of the riser inserted with third bolt, the third bolt-through riser with
Loop bar screw thread is connected.
Preferably, the top of the transverse slat is connected with the first rubber pad.
Preferably, the outer wall of the vertical bar is fixedly attached rubber sleeve.
Preferably, the lower surface of the pedestal is connected with non-slip mat.
Compared with prior art, the beneficial effects of the present invention are: the small mine pillar, by sleeve, loop bar, recessed
Cooperation between slot, bottom plate and the second bolt, can make small mine pillar be put into lesser space interior, to support
The top in mine hole can replace traditional waddy, so that the stability enhancing in support mine hole, it is dead folder will not occur when needing mobile
Mobile difficult situation effectively prevents safety so that the safe of the absence from work without reason of operation ensures in small space
The generation of accident can make the movement of small mine pillar by the cooperation between bottom plate, the first bolt, bearing and pedestal
Enhanced convenience is quick.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the partial enlarged view of Fig. 1;
Fig. 3 is the attachment structure schematic diagram of loop bar, the first convex block, transverse slat and third pin shaft in the present invention.
In figure: 1, sleeve, the 2, first rubber pad, the 3, first bolt, 4, pedestal, 5, bearing, 6, riser, 7, idler wheel, 8, cunning
Bar, 9, bottom plate, 10, loop bar, 11, groove, the 12, second bolt, 13, cross bar, 14, vertical bar, the 15, second rubber pad, 16, first is convex
Block, 17, transverse slat, the 18, first pin shaft, the 19, second convex block, 20, bull stick, the 21, second pin shaft, 22, riser, 23, rubber sleeve, 24,
Non-slip mat, 25, third bolt.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiments of the present invention, instead of all the embodiments;Based on the embodiments of the present invention, ordinary skill people
Member's every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of scheme: small mine pillar, including sleeve 1, and the bottom end of sleeve 1 is solid
It is connected to bottom plate 9, inserted with the first bolt 3 at left and right sides of the upper surface of bottom plate 9, the first bolt 3 runs through bottom plate 9, bottom plate 9 and the
One bolt, 3 screw thread is connected, and the bottom end of the first bolt 3 is equipped with pedestal 4, and pedestal 4 is rotatedly connected by bearing 5 with the first bolt 3, axis
The inner ring and the first bolt 3 for holding 5 are fixedly linked, and outer ring and the pedestal 4 of bearing 5 are fixedly linked, at left and right sides of the lower surface of bottom plate 9
It is connected with riser 6, slide bar 8 is connected between riser 6, the outer wall movable sleeve of slide bar 8 is connected to idler wheel 7, between idler wheel 7 and riser 6
Gap cooperation, the first bolt 3 is rotated counterclockwise, and the first bolt 3 rotates counterclockwise so that pedestal 4 rises, and pedestal 4, which rises to, to be made
After idler wheel 7 and ground offset, stop operating the first bolt 3, at this moment small mine pillar can be shifted onto what needs supported
Below mine hole, the first bolt 3 is being rotated clockwise, stop operating the first bolt 3 after so that pedestal 4 and ground is offseted, sleeve 1
Top is inserted with loop bar 10, loop bar 10 and 1 clearance fit of sleeve, and the outer wall top left and right sides of sleeve 1 is inserted with the second spiral shell
Bolt 12, the second bolt 12 offset through a part of sleeve 1 with loop bar 10, and the second bolt 12 is connected with 1 screw thread of sleeve, loop bar
Multiple grooves 11 are provided at left and right sides of 10 pairs of outer wall bottom end, upper and lower ends are connected with cross at left and right sides of the outer wall of sleeve 1
Bar 13, the left side of cross bar 13 are connected with vertical bar 14, rotate counterclockwise the second bolt 12, rotating counterclockwise for the second bolt 12 can
So as to generate gap between the second bolt 12 and groove 11, second is stopped operating until groove 11 and the second bolt 12 are kept completely separate
Then bolt 12 is moving up loop bar 10 according to the height in mine hole, the loop bar 10 made offsets with mine hole, then stops upward
Mobile loop bar 10, is rotating clockwise the second bolt 12, so that the second bolt 12 is offseted with groove 11, that is, which can support required branch
The mine hole of support, the top of loop bar 10 are connected with the second rubber pad 15, and the second rubber pad 15 is made of General Purpose Rubber material, under room temperature
There is certain toughness, surface is more coarse, is connected with the first convex block 16, the first convex block at left and right sides of the outer wall top of loop bar 10
16 left side is equipped with transverse slat 17, and transverse slat 17 is rotatedly connected by the first pin shaft 18 with the first convex block 16, and the lower surface of transverse slat 17 is left
Side is connected with the second convex block 19, and the bottom end of the second convex block 19 is equipped with bull stick 20, and bull stick 20 passes through the second pin shaft 21 and the second convex block
19 are rotatedly connected, and the bottom end of bull stick 20 is connected with riser 22, and the left-hand face of riser 22 is inserted with third bolt 25, third bolt
25 are connected through riser 22 with 10 screw thread of loop bar, and transverse slat 17 is rotated, and transverse slat 17 can be rotated centered on the first pin shaft 18, bull stick
20 can be rotated centered on the second pin shaft 21, and the top of transverse slat 17 and loop bar 10 is made to rotate clockwise third bolt 25 simultaneously,
So that offseting between third bolt 25 and riser 22, the bearing area of small mine pillar, the top of transverse slat 17 can be increased
End is connected with the first rubber pad 2, and the outer wall of vertical bar 14 is fixedly attached rubber sleeve 23, and the lower surface of pedestal 4 is connected with non-slip mat
24, the first rubber pad 2, rubber sleeve 23 and non-slip mat 24 are that General Purpose Rubber material is made, and have certain toughness, surface under room temperature
It is more coarse.
Before using small mine pillar, the first bolt 3 is rotated counterclockwise first, the first bolt 3 turns counterclockwise
It moves so that pedestal 4 rises, pedestal 4 rises to after so that idler wheel 7 and ground is offseted, and stop operating the first bolt 3, and then both hands are sealed
Small mine pillar is shifted onto below the mine hole for needing to support, is rotating clockwise the first bolt 3, making pedestal 4 by firmly vertical bar 14
Stop operating the first bolt 3 after offseting with ground, is then rotating counterclockwise the second bolt 12, the second bolt 12 it is counterclockwise
Rotation, can make to generate gap between the second bolt 12 and groove 11, until groove 11 and the second bolt 12 are kept completely separate stopping
The second bolt 12 is rotated, loop bar 10 is then being moved up according to the height in mine hole, the loop bar 10 made offsets with mine hole, then
Stopping moves up loop bar 10, is rotating clockwise the second bolt 12, the second bolt 12 is made to offset with groove 11, by transverse slat
17 rotations, transverse slat 17 can be rotated centered on the first pin shaft 18, and bull stick 20 can be rotated centered on the second pin shaft 21, make transverse slat 17
Simultaneously with the top of loop bar 10, third bolt 25 is being rotated clockwise, so that offset between third bolt 25 and riser 22, energy
The bearing area for enough increasing small mine pillar, to ensure that the stability in mine hole.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (5)
1. small mine pillar, including sleeve (1), it is characterised in that: the bottom end of the sleeve (1) is connected with bottom plate (9), institute
It states inserted with the first bolt (3) at left and right sides of the upper surface of bottom plate (9), first bolt (3) runs through bottom plate (9), described
Bottom plate (9) is connected with the first bolt (3) screw thread, and the bottom end of first bolt (3) is equipped with pedestal (4), and the pedestal (4) passes through
Bearing (5) is rotatedly connected with the first bolt (3), is connected with riser (6) at left and right sides of the lower surface of the bottom plate (9), described
It is connected between riser (6) slide bar (8), the outer wall movable sleeve of the slide bar (8) is connected to idler wheel (7), the idler wheel (7) and riser
(6) clearance fit, the top of the sleeve (1) is inserted with loop bar (10), the loop bar (10) and sleeve (1) clearance fit, institute
It states inserted with the second bolt (12) at left and right sides of the outer wall top of sleeve (1), second bolt (12) is through sleeve (1)
A part offsets with loop bar (10), and second bolt (12) is connected with sleeve (1) screw thread, the outer wall of the loop bar (10) pair
It is provided with multiple grooves (11) at left and right sides of bottom end, upper and lower ends are connected with cross bar at left and right sides of the outer wall of the sleeve (1)
(13), it is connected with vertical bar (14) on the left of the cross bar (13), the top of the loop bar (10) is connected with the second rubber pad (15).
2. small mine pillar according to claim 1, it is characterised in that: the outer wall top or so of the loop bar (10)
Two sides are connected with the first convex block (16), and the left side of first convex block (16) is equipped with transverse slat (17), and the transverse slat (17) passes through
First pin shaft (18) is rotatedly connected with the first convex block (16), is connected with the second convex block on the left of the lower surface of the transverse slat (17)
(19), the bottom end of second convex block (19) is equipped with bull stick (20), and the bull stick (20) is convex by the second pin shaft (21) and second
Block (19) is rotatedly connected, and the bottom end of the bull stick (20) is connected with riser (22), the left-hand face of the riser (22) inserted with
Third bolt (25), the third bolt (25) are connected through riser (22) with loop bar (10) screw thread.
3. small mine pillar according to claim 2, it is characterised in that: the top of the transverse slat (17) is connected with
One rubber pad (2).
4. small mine pillar according to claim 1, it is characterised in that: the outer wall of the vertical bar (14) is fixedly attached
Rubber sleeve (23).
5. small mine pillar according to claim 1, it is characterised in that: the lower surface of the pedestal (4) is connected with
Non-slip mat (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810990186.8A CN109184757A (en) | 2018-08-28 | 2018-08-28 | Small mine pillar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810990186.8A CN109184757A (en) | 2018-08-28 | 2018-08-28 | Small mine pillar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109184757A true CN109184757A (en) | 2019-01-11 |
Family
ID=64916607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810990186.8A Pending CN109184757A (en) | 2018-08-28 | 2018-08-28 | Small mine pillar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109184757A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110017158A (en) * | 2019-04-26 | 2019-07-16 | 天地科技股份有限公司上海分公司 | Tunnel safety protective cradle |
CN112780073A (en) * | 2020-12-21 | 2021-05-11 | 山西建筑职业技术学院 | Prefabricated wallboard strutting arrangement is used in room construction |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE882973A (en) * | 1979-05-03 | 1980-10-24 | Evans & Sons Ltd C | BUILDING SCAFFOLDING IMPROVEMENTS |
CN103758543A (en) * | 2014-01-21 | 2014-04-30 | 中国矿业大学 | Temporary advanced support device |
CN104005778A (en) * | 2014-06-10 | 2014-08-27 | 乳山市日晟机械制造有限公司 | Roof pillar device |
CN204875529U (en) * | 2015-07-04 | 2015-12-16 | 齐齐哈尔工程学院 | Public road bridge heel post for roof beam |
CN205099227U (en) * | 2015-11-17 | 2016-03-23 | 曾远山 | Automatic tower crane of leveling |
CN205543831U (en) * | 2016-04-11 | 2016-08-31 | 江苏海事职业技术学院 | Light current case installation crane span structure |
CN206668292U (en) * | 2017-04-14 | 2017-11-24 | 湖南理工职业技术学院 | A kind of lift-moving type linked roof bar hydraulic support |
CN107597552A (en) * | 2017-09-19 | 2018-01-19 | 芜湖挺优机电技术有限公司 | A kind of seed impurity, which screens out, uses mechanical device |
CN107725077A (en) * | 2017-10-27 | 2018-02-23 | 邹城市唯彩智能科技有限公司 | A kind of hydraulic prop with top support |
CN107790690A (en) * | 2017-10-09 | 2018-03-13 | 铜陵安东铸钢有限责任公司 | A kind of complicated large-scale steel-casting hot shake-out annealing device |
CN107968357A (en) * | 2017-12-23 | 2018-04-27 | 姜舒旻 | A kind of railway tunnel construction cable supporting rack |
CN207297046U (en) * | 2017-10-24 | 2018-05-01 | 黑龙江科技大学 | A kind of underground engineering construction support device |
CN207583402U (en) * | 2017-11-27 | 2018-07-06 | 山东科技大学 | A kind of cross temporary support device for coal mine roadway |
-
2018
- 2018-08-28 CN CN201810990186.8A patent/CN109184757A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE882973A (en) * | 1979-05-03 | 1980-10-24 | Evans & Sons Ltd C | BUILDING SCAFFOLDING IMPROVEMENTS |
CN103758543A (en) * | 2014-01-21 | 2014-04-30 | 中国矿业大学 | Temporary advanced support device |
CN104005778A (en) * | 2014-06-10 | 2014-08-27 | 乳山市日晟机械制造有限公司 | Roof pillar device |
CN204875529U (en) * | 2015-07-04 | 2015-12-16 | 齐齐哈尔工程学院 | Public road bridge heel post for roof beam |
CN205099227U (en) * | 2015-11-17 | 2016-03-23 | 曾远山 | Automatic tower crane of leveling |
CN205543831U (en) * | 2016-04-11 | 2016-08-31 | 江苏海事职业技术学院 | Light current case installation crane span structure |
CN206668292U (en) * | 2017-04-14 | 2017-11-24 | 湖南理工职业技术学院 | A kind of lift-moving type linked roof bar hydraulic support |
CN107597552A (en) * | 2017-09-19 | 2018-01-19 | 芜湖挺优机电技术有限公司 | A kind of seed impurity, which screens out, uses mechanical device |
CN107790690A (en) * | 2017-10-09 | 2018-03-13 | 铜陵安东铸钢有限责任公司 | A kind of complicated large-scale steel-casting hot shake-out annealing device |
CN207297046U (en) * | 2017-10-24 | 2018-05-01 | 黑龙江科技大学 | A kind of underground engineering construction support device |
CN107725077A (en) * | 2017-10-27 | 2018-02-23 | 邹城市唯彩智能科技有限公司 | A kind of hydraulic prop with top support |
CN207583402U (en) * | 2017-11-27 | 2018-07-06 | 山东科技大学 | A kind of cross temporary support device for coal mine roadway |
CN107968357A (en) * | 2017-12-23 | 2018-04-27 | 姜舒旻 | A kind of railway tunnel construction cable supporting rack |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110017158A (en) * | 2019-04-26 | 2019-07-16 | 天地科技股份有限公司上海分公司 | Tunnel safety protective cradle |
CN112780073A (en) * | 2020-12-21 | 2021-05-11 | 山西建筑职业技术学院 | Prefabricated wallboard strutting arrangement is used in room construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109184757A (en) | Small mine pillar | |
CN203383842U (en) | Three-column-type paste-filling hydraulic support used for underground thin coal seam | |
CN110318791B (en) | Mine roof supporting device used under shallow mine | |
CN207177340U (en) | A kind of building support | |
CN211053609U (en) | Mine equipment maintenance strutting arrangement | |
CN212225287U (en) | Coal mine underground tunneling working face temporary support | |
CN208486900U (en) | Adjustable supporting is used in a kind of support of coal mine roadway | |
CN206477872U (en) | A kind of mine support device | |
CN106481352B (en) | A kind of lock tool up and down for reclaiming type anchor bar lockset | |
CN207484978U (en) | A kind of civil construction support device | |
CN203213110U (en) | Root key pushing device applicable to root pipe pile foundation | |
CN206753641U (en) | A kind of coal mine hydraulic supporting column | |
CN208563340U (en) | A kind of water conservancy and hydropower foundation grouting bracket | |
CN205838451U (en) | A kind of novel architecture lowering or hoisting gear | |
CN208502813U (en) | A kind of coal mine down-hole tunnel anchor rod drilling device | |
CN209444359U (en) | A kind of hydraulic support stand equipment of coal mining | |
CN204041722U (en) | A kind of universal hinging stand apparatus | |
CN205477696U (en) | Supplementary strutting arrangement of coal face support | |
CN208280975U (en) | Leading chock for drift equipped with big magnification cylindricality stabilizing mechanism | |
CN103670424B (en) | The bracing or strutting arrangement of top technique of hanging down for the vertical delivery pipe construction of heavy caliber | |
CN206987858U (en) | Five degree of freedom parallel hydraulic support | |
CN202483625U (en) | Suspension type waste filling mechanism | |
CN208416537U (en) | One kind is removable can to fix mining lifting support | |
CN207064005U (en) | Four-degree-of-freedom parallel hydraulic support | |
CN215057481U (en) | Novel coal underground supporting bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190111 |
|
RJ01 | Rejection of invention patent application after publication |