CN109184734A - A kind of assembled protective case liner structure for the rectangle underground space and apply method - Google Patents

A kind of assembled protective case liner structure for the rectangle underground space and apply method Download PDF

Info

Publication number
CN109184734A
CN109184734A CN201811232416.0A CN201811232416A CN109184734A CN 109184734 A CN109184734 A CN 109184734A CN 201811232416 A CN201811232416 A CN 201811232416A CN 109184734 A CN109184734 A CN 109184734A
Authority
CN
China
Prior art keywords
protective case
underground space
lining cutting
filling material
rectangle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811232416.0A
Other languages
Chinese (zh)
Other versions
CN109184734B (en
Inventor
王洪涛
刘璐瑶
刘平
王军
王德超
门燕青
张欣
李晓静
陈云娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201811232416.0A priority Critical patent/CN109184734B/en
Publication of CN109184734A publication Critical patent/CN109184734A/en
Application granted granted Critical
Publication of CN109184734B publication Critical patent/CN109184734B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/157Laggings making use of fluid cushions, e.g. the fluid containing a hardenable material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of assembled protective case liner structure for the rectangle underground space and apply method, including the protective case lining cutting main unit being arranged by rectangle underground space profile head, bottom and both sides and protective case lining cutting angle body unit, it is connected along the splicing of section circumferential direction and forms.Protective case lining cutting main unit includes protective case I, is filling material I inside protective case I;Protective case lining cutting angle body unit includes protective case II, is filling material II inside protective case II.The strength of materials that protective case II, the strength of materials for filling material II are respectively greater than protective case I, fill material I.Protective case I, the outer ring of protective case II and inner peripheral surface pass through along same position site of perforation and are equipped with prestressed bolt.Prestressed bolt is applied with prestressing force, radial compression can be generated to protective case I and filling material I, protective case II and filling material II, prestressed bolt is set to form composite bearing structure with protective case I and filling material I, protective case II and filling material II respectively, it is common to resist external Rock And Soil pressure effect.

Description

A kind of assembled protective case liner structure for the rectangle underground space and apply method
Technical field
The present invention relates to underground space engineering support technical field more particularly to a kind of assembly for the rectangle underground space Formula protective case liner structure and apply method.
Background technique
Currently, with the continuous propulsion of Urbanization in China, various types of urban underground space engineerings, as subway, Piping lane, underground utilities etc. obtain huge opportunity to develop in China's Process of Urban Development.By taking Urban Metro Construction as an example, Shield method is a kind of currently used most common construction method.Traditional shield tunnel section is mostly circle, but disconnected with rectangle Face tunnel is compared, and but there is the deficiencies of scetion utilization is low, earthwork excavated volume is big.For example, in view of the above-mentioned problems, in December, 2016 Shanghai Tunnel Engineering Co., Ltd successfully has developed class rectangle complete-section tunnel boring machine the biggest in the world " bright number of sun " shield machine, has Effect solves the wasting of resources phenomenon of traditional two single line circular cross section schemes in double track tunnel digging process, realizes underground sky Between resource efficient utilization.In addition, City Subway Station, Pipe rack section are also mostly rectangle.Therefore, in following China underground During space development, the underground space engineering of rectangular cross section will possess broader Popularization And Development prospect.
According to whether excavating earth surface, the construction method of urban underground space engineering mainly includes that cut and cover method and subsurface excavation method two are big Class, it is whether cast-in-place according to underground engineering support liner structure, prefabricated assembled and cast-in-place monoblock type two major classes can be divided into.With it is cast-in-place Formula underground structure is compared, and prefabricated assembled Underground Construction speed is fast, is also obtained in the underground space engineering construction of current city Huge popularization and application were obtained, such as prefabricated assembled Pipe rack, duct pieces of shield tunnel etc..Meanwhile for traditional underground engineering Liner supporting structure, mostly uses armored concrete formula structure, and applying for such underground structure is both needed to by assembling reinforcement, formwork erection Plate pours the processes such as maintenance, demoulding, and reinforcing bar binding relies primarily on worker and carries out by hand, and there are complicated construction techniques, binding essence The disadvantages of spending low, large labor intensity.Moreover, also easily there is face checking, breaks in traditional reinforced concrete lining layer supporting construction It phenomena such as damage, chip off-falling, has seriously affected used in Underground Engineering Lining and has applied quality, brought risk and unfavorable shadow to underground engineering construction It rings.In addition, the underground liner supporting structure of rectangular cross section is also easily generated stress in four edges of rectangular cross section and is concentrated Phenomenon, lining cutting connection and processing about 4 edges are a difficult points of such cross-section underground space control, also disconnected to rectangle The liner structure of face form proposes higher design requirement.For above-mentioned series of problems, the invention proposes one kind to be used for rectangle The assembled protective case liner structure of the underground space and method is applied, can effectively solved.
Summary of the invention
For circular cross section space utilization rate present in underground space engineering, low, rectangular cross section liner structure is also easy to produce side At angle stress concentrate, reinforced concrete structure it is easy to crack it is damaged, apply cumbersome technique, large labor intensity, quality and be difficult to precisely control The problems such as processed, for efficient utilization and the safe construction for realizing the underground space, the invention proposes one kind to be used for the rectangle underground space Assembled protective case liner structure and apply method, be prefabricated construction, can effectively avoid conventional steel bar concrete lining cutting The cracking destruction problem that structure occurs improves lining cutting bearing strength, ensures the safety and stablization construction of the rectangular cross section underground space, Lining cutting can also be reduced and apply labor intensity, lining cutting is promoted and apply quality, while there is reduction dead load, avoid corrosion and environmental protection The advantages such as efficient.
To achieve the above object, the specific technical solution of the present invention is as follows:
A kind of assembled protective case liner structure for the rectangle underground space, including at the top of the rectangular cross section underground space, bottom And the respectively arranged protective case lining cutting main unit in both sides, the protective case lining cutting main unit is in the rectangular cross section underground space four A edge carries out splicing using protective case lining cutting angle body unit and is connected;Each protective case lining cutting main unit includes protective case I, It is filling material I inside the protective case I;Each protective case lining cutting angle body unit includes protective case II, the protective case II Inside is filling material II;The outer peripheral surface side of the protective case I, protective case II is contacted with formation rock soil body surface, inner peripheral surface Towards inside the rectangle underground space, the outer ring of protective case I and protective case II, inner peripheral surface uniform intervals offer multiple same positions for side Perforation, along outer ring, inner peripheral surface same position site of perforation pass through prestressed bolt is installed;The prestressed bolt with Protective case I, the inner ring of protective case II, outer peripheral surface are vertical, and are applied with prestressing force, can be to protective case I and internal filling material I, protective case II and internal filling material II generate radial compression, make prestressed bolt respectively with protective case I and filling material I, protective case II and fill Composite bearing structure is collectively formed in note material II, common to resist Rock And Soil pressure effect around the rectangle underground space.
Further, the protective case I, protective case II and prestressed bolt material include but is not limited to GFRP material, steel.
Further, the filling material I, filling material II are poured by filling inside protective case I and protective case II respectively The mode built is made, and filling material I, the material for filling material II include but is not limited to that concrete, rubble+cement grout fill Infuse material.
Further, the protective case II, fill material II the strength of materials be respectively greater than protective case I, fill material I material Expect intensity, to guarantee that the integral strength of protective case lining cutting angle body unit is greater than protective case lining cutting main unit, makes rectangular cross section lining cutting knot Structure in four edges local bearing strength with higher, prevent edge due to stress concentration phenomenon failure damage.
Further, it is answered positioned at the outer ring of the protective case I of each protective case lining cutting main unit, the pre- of inner peripheral surface centre The power anchor bolt body of rod is hollow form, can after the completion of the multiple protective case lining cutting main units in scene and the splicing of protective case lining cutting angle body unit Lining cutting grouting behind shaft or drift lining is carried out using the prestressed bolt in centre, is filled between lining cutting outer peripheral surface and formation rock soil body surface Gap, the Rock And Soil pressure for making to act on lining cutting outer peripheral surface more evenly, avoid generating stress concentration phenomenon, also can avoid underground Water immerses inside the rectangle underground space.
Further, the prestressed bolt body of rod of the hollow form is installed in the inner peripheral surface side end close to protective case I There is charging valve, slip casting can be carried out by the prestressed bolt outer end position in centre when opening charging valve, after lining wall It after the completion of slip casting, can be turned off, avoid generating grouting serous fluid outer-flowing phenomenon.
Further, the connecting method of multiple protective case lining cutting main units and protective case lining cutting angle body unit include but It is not limited to be bolted, bolt-type connection, feather joint mode, each unit is along rectangle underground space circumferential direction and axial splicing junction Place is equipped with waterstop.
Further, the protective case I, protective case II production method include but is not limited to the direct pouring molding of mold, weldering Connect assembled, mechanical connection assembling mode.
Further, the protective case I, protective case II along the circumferential a certain end surface side of the rectangle underground space or along square Axially a certain end surface side is equipped with an opening to the shape underground space;The opening cooperates with a sealing cover;The sealing cover Material it is identical as the material of protective case I, protective case II respectively.
Method specifically is applied the present invention also provides a kind of assembled protective case liner structure for the rectangle underground space, The following steps are included:
Step 1, prefabricated to apply the stage:
Step (1-1), according to the design of rectangle underground space cross dimensions, integrated carrying intensity and edge part bearing strength It is required that processing and fabricating protective case I and protective case II, and respectively at it along the circumferential a certain end surface side of the rectangle underground space or along rectangle Axially opening processing is done in a certain end surface side to the underground space;
Step (1-2), respectively along protective case I, the outer peripheral surface of protective case II and inner peripheral surface same position site of perforation, installation is answered in advance Power anchor bolt, and once pre-tightened;
Step (1-3), the side of protective case I and protective case II opening position, is utilized respectively filling material I, filling along step (1-1) Material II carries out the filling inside protective case I and protective case II;
Step (1-4), after filling material I, the filling material II inside protective case I and protective case II solidify, in its position side that is open Plastering leveling is carried out, and is utilized respectively sealing cover and closes the side opening;
Step (1-5) carries out secondary preload to the prestressed bolt of protective case I and protective case II respectively, applies prestressing force, keeps its right Protective case I and internal filling material I, protective case II and internal filling material II generate effective radial compression respectively;
Step (1-6), repeat the above steps (1-1) ~ (1-5), completes multiple protective case lining cutting main units and protective case lining cutting angle body The production of unit;
Step 2, the on-site consolidation stage:
The intact multiple protective case lining cutting main units of above-mentioned production and protective case lining cutting angle body unit are moved into engineering site, if underground Space engineering uses shallow mining method, then after rectangle underground space tunneling Rock And Soil excavation, is directly carried out splicing and be connected; If underground space engineering uses cut and cover tunneling, is spliced after open cut Rock And Soil excavation and be connected, and carry out liner structure The backfill and compaction treatment of exterior circumferential Rock And Soil;
Step 3, the grouting behind shaft or drift lining stage:
Step (3-1) carries out lining wall using the prestressed bolt in protective case lining cutting main unit outer ring, inner peripheral surface centre Grouting behind shaft or drift lining fills gap between lining cutting outer peripheral surface and surrounding Rock And Soil;
Step (3-2), after the completion of slip casting, the charging valve of the prestressed bolt at closing center position;
Step 4, after lining cutting grouting behind shaft or drift lining grout cures, applying for this kind of liner structure of the present invention is completed.
The invention has the benefit that
1) this kind of assembled protective case lining cutting of the invention is in the subway station of rectangular cross section, underground pipe gallery, underground utilities, underground The engineering fields such as tunnel can be applied, while this kind of lining cutting had both been applicable to the cut and cover tunneling underground space, be equally applicable to dark The digging method construction underground space, therefore the present invention has the wider scope of application;
2) this kind of assembled protective case lining cutting of the invention, provides a kind of effective support technology for rectangle underground space engineering excavation Means have ensured the excavation safety and stablization construction of the rectangle underground space, have realized the efficient utilization of the underground space, while also big The construction speed of underground space engineering is improved greatly;
3) the protective case lining cutting angle body unit of four edges is set in this kind of liner structure of the invention, using with higher-strength Protective case and filling material, it is ensured that protective case lining cutting angle body unit bearing strength be greater than protective case lining cutting main unit, avoid rectangle There is the problem of local failure due to stress concentration phenomenon in four edges in cross-section underground structure;
4) the protective case material of this kind of assembled protective case lining cutting of the invention can be the materials such as steel or GFRP, and selection range is wider, together When such Tensile strength it is higher, can to inside filling material carry out cuff constraint, realize both power symbiosis, show compared with High-mechanic intensity can avoid conventional steel bar concrete body structure surface cracking destruction phenomenon, while when material is GFRP material, also It can effectively reduce composite structure self weight, save transport and apply cost, avoid scene from meeting water and generate corrosion;
5) components such as protective case, prestressed bolt used by this kind of assembled protective case lining cutting of the invention can mass directly produce, Can strict control each section scantling specification, preferably underground space section molding effect is realized, simultaneously because this kind of lining cutting To be prefabricated assembled, can also solve conventional steel bar concrete structure apply during occur reinforcing bar binding precision it is low, apply matter Amount difference and phenomenon of using inferior materials and turning out substandard goods, effectively improve underground liner structure applies quality;
6) filling material used by this kind of assembled protective case lining cutting of the present invention can directly utilize underground space engineering excavation debris Material is made.Specifically, can such as use directly inside protective case, " debris is excavated in primary filling, secondary cement grout fills Note solidification " mode is made the secondary use, it can be achieved that Underground Engineering Excavation debris, and high-efficiency environment friendly can also reduce supporting material Expect cost.
Detailed description of the invention
Specific embodiments of the present invention are further described in detail with reference to the accompanying drawing, the schematic reality of the application Example and its explanation are applied for explaining the application, is not constituted an undue limitation on the present application.
Fig. 1 is the cross-sectional configuration after the completion of the splicing of rectangle of embodiment of the present invention underground space assembled protective case liner structure Schematic diagram;
Fig. 2 is the left view of C-C section in Fig. 1;
Fig. 3 be Fig. 1 in 7(B) at prestressed bolt position partial enlargement structural representation;
Fig. 4 be Fig. 1 in 7(A) at prestressed bolt position partial enlargement structural representation;
Fig. 5 is the cross-sectional configuration schematic diagram of top protective case lining cutting main unit in Fig. 1;
Fig. 6 is the cross-sectional configuration schematic diagram of left upper protective case lining cutting angle body unit in Fig. 1;
Fig. 7 is the cross-sectional configuration schematic diagram of left side protective case lining cutting main unit in Fig. 1;
Wherein: 1- protective case lining cutting main unit;2- protective case lining cutting angle body unit;3- protective case I;4- fills material I;5- protective case II; 6- fills material II;7- prestressed bolt;8- charging valve;9- Rock And Soil;10- grouting filling layer.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As background technique is introduced, compared with the rectangular cross section underground space, that there are space utilization rates is low for circular cross section, The deficiencies of earthwork excavated volume is big, the rectangular cross section underground space should have broader practice prospect, but the lining cutting of rectangular cross section underground Structure is in four edges since stress concentration phenomenon is also also easy to produce local failure.Meanwhile traditional underground reinforced concrete lining It builds structure and cracking destruction easily occurs, and there are reinforcing bar binding casting craft is complicated and large labor intensity, applies quality and is difficult to precisely The problems such as control.In view of the above-mentioned problems, the invention proposes a kind of assembled protective case liner structures for the rectangle underground space And method is applied, it is prefabricated construction, the cracking destruction that can effectively avoid the appearance of conventional steel bar concrete liner structure is asked Topic improves lining cutting bearing strength, ensures the safety and stablization construction of the rectangular cross section underground space, can also reduce lining cutting and apply labour Intensity promotes lining cutting and applies quality, while having reduction dead load, avoiding the advantages such as corrosion and environment-friendly high-efficiency.Below with one For kind is used for the specific structure of the assembled protective case liner structure of the GFRP material of the rectangle underground space and applies technique, below In conjunction with attached drawing, the present invention will be further described with embodiment.
As shown in Figure 1, a kind of assembled protective case liner structure of the GFRP material for the rectangle underground space, including along square Shape cross-section underground top of space, the respectively arranged protective case lining cutting main unit 1 in bottom and both sides, the protective case lining cutting main body Unit 1 carries out splicing using protective case lining cutting angle body unit 2 in four edges of the rectangular cross section underground space and is connected;Described in each Protective case lining cutting main unit 1 includes protective case I 3, and I 3 inside of protective case is filling material I 4;Each protective case lining cutting angle Body unit 2 includes protective case II 5, and II 5 inside of protective case is filling material II 6.
The outer peripheral surface side of the protective case I 3, protective case II 5 is contacted with 9 surface of stratum Rock And Soil, inner peripheral surface side direction Inside the rectangle underground space, protective case I 3 offers wearing for multiple same positions with 5 outer rings of protective case II, inner peripheral surface uniform intervals Hole passes through along outer ring, inner peripheral surface same position site of perforation and is equipped with prestressed bolt 7;The prestressed bolt 7 and shield Shell I 3, the inner ring of protective case II 5, outer peripheral surface are vertical, and are applied with prestressing force, can be to protective case I 3 and internal filling material I 4, shield Shell II 5 and filling material II 6 generate radial compression, make prestressed bolt 7 respectively with protective case I 3 and filling material I 4, protective case II 5 And composite bearing structure is collectively formed in filling material II 6, it is common to resist 9 pressure of Rock And Soil effect around the rectangle underground space.
Further, the protective case I 3, protective case II 5 and 7 material of prestressed bolt are GFRP material, in addition to this, shield Shell I 3, protective case II 5 and 7 body of rod of prestressed bolt and matching nut material can also be steel etc..The filling material I 4 fills Note material II 6 is made by way of filling pour inside protective case I 3 and protective case II 5 respectively, filling material I 4, filling The material of material II 6 is concrete, can also fill material etc. for rubble+cement grout.Protective case I 3, the protective case II 5 of this kind of lining cutting Material be GFRP material or steel, have compared with high-tensile, and its internal filling material I 4, the resistance to compression for filling material II 6 Intensity is higher, and protective case I 3, protective case II 5 can carry out cuff constraint, both realizations power to inside filling material I 4, filling material II 6 Symbiosis, have compared with high-mechanic intensity, can also effectively solve the cracking destruction etc. that conventional rebar concrete lining structure easily occurs Problem;Meanwhile by prestressed bolt 7, apply prestressing force, it can be to protective case I 3, protective case II 5 and internal filling material I 4, filling Material II 6 carries out radial compression, and three can be made to form compound carrying entirety, compared with conventional rebar concrete lining structure, It can further improve the bearing strength of lining cutting and the safety and stability degree of the rectangle underground space.In addition, when above-mentioned component material is When GFRP material, composite structure self weight also can effectively reduce, save transport and apply cost, avoid scene from meeting water and generate corrosion.
Further, if above-mentioned filling material I 4, filling material II 6 directly utilize rectangle Underground Space Excavation debris material It when being made, can be directly respectively adopted inside protective case I 3, protective case II 5 and " once fill and excavate debris, secondary cement grout fills Note solidification " mode is made the secondary use, it can be achieved that underground space engineering excavation debris, and high-efficiency environment friendly can also reduce branch Protective material cost.
Further, the protective case II 5, fill material II 6 the strength of materials be respectively greater than protective case I 3, filling material I 4 The strength of materials, with guarantee protective case lining cutting angle body unit 2 integral strength be greater than protective case lining cutting main unit 1, make rectangular cross section Liner structure prevents edge from failing brokenly due to stress concentration phenomenon in four edges local bearing strength with higher It is bad.
Further, positioned at the outer ring of the protective case I 3 of each protective case lining cutting main unit 1, inner peripheral surface centre it is pre- Stress anchor bolt 7(B) body of rod is hollow form, splices to the multiple protective case lining cutting main units 1 in scene and protective case lining cutting angle body unit 2 Cheng Hou, using the prestressed bolt 7(B in centre) lining cutting grouting behind shaft or drift lining is carried out, fill lining cutting outer peripheral surface and formation rock Gap between 9 surface of the soil body, 9 pressure of Rock And Soil for making to act on lining cutting outer peripheral surface more evenly, avoid generating stress concentrate it is existing As also can avoid inside the underground water intrusion rectangle underground space.Specifically see the 7(B in attached drawing 1) at the prestressed bolt body of rod Specific structure for hollow structure, the body of rod is shown in Fig. 3;At (7(A of example as shown in figure 1) of other positions) the prestressed bolt body of rod is The specific structure of solid construction, the body of rod is shown in Fig. 4;
Further, the prestressed bolt 7(B of the hollow form) body of rod close to protective case I 3 inner peripheral surface side end install Have charging valve 8, the prestressed bolt 7(B in centre can be passed through when opening charging valve 8) the progress slip casting of outer end position, wait serve as a contrast It after the completion of building grouting behind shaft or drift lining, can be turned off, avoid generating grouting serous fluid outer-flowing phenomenon.
Further, the protective case I 3, protective case II 5 production method be the direct pouring molding of mold, if protective case I 3, shield The material of shell II 5 is steel, can also be made by modes such as welding assembly, mechanical connection assemblings.
Further, the connecting method of multiple protective case lining cutting main units 1 and protective case lining cutting angle body unit 2 is spiral shell It tethers and connects, can be also attached by modes such as bolt-type connection, feather joints;Meanwhile each unit is along rectangle underground space ring It is equipped with waterstop at junction to splicing with axial direction, to prevent underground water in stratum from invading rectangle underground space inner space.
Further, the protective case I 3, protective case II 5 along the circumferential a certain end surface side of the rectangle underground space or edge Axially a certain end surface side is equipped with an opening to the rectangle underground space, can be used for protective case I 3, II 5 inside of protective case fills material I 4 Filling with filling material II 6 pours;The opening cooperates with a sealing cover;The material of the sealing cover respectively with protective case I 3, the material of protective case II 5 is identical.
Method specifically is applied the present invention also provides a kind of assembled protective case liner structure for the rectangle underground space, The following steps are included:
Step 1, prefabricated to apply the stage:
Step (1-1), according to the design of rectangle underground space cross dimensions, integrated carrying intensity and edge part bearing strength It is required that processing and fabricating protective case I 3 and protective case II 5, and respectively at it along the circumferential a certain end surface side of the rectangle underground space or along square Axially opening processing is done in a certain end surface side to the shape underground space;
Step (1-2), respectively along protective case I 3, the outer peripheral surface of protective case II 5 and inner peripheral surface same position site of perforation, installation is pre- Stress anchor bolt 7, and once pre-tightened;
Step (1-3), the side of protective case I 3 and protective case II 5 is open position along step (1-1), be utilized respectively filling material I 4, It fills material II 6 and carries out protective case I 3 and the filling inside protective case II 5;
Step (1-4), after filling material I 4, the filling material II 6 inside protective case I 3 and protective case II 5 solidify, in its opening portion Position side carries out plastering leveling, and is utilized respectively sealing cover and closes the side opening;
Step (1-5) carries out secondary preload to the prestressed bolt 7 of protective case I 3 and protective case II 5 respectively, applies prestressing force, makes it Effective radial compression is generated respectively to protective case I 3 and internal filling material I 4, protective case II 5 and internal filling material II 6;
Step (1-6), repeat the above steps (1-1) ~ (1-5), completes multiple protective case lining cutting main units 1 and protective case lining cutting angle body The production of unit 2;
Step 2, the on-site consolidation stage:
The intact multiple protective case lining cutting main units 1 of above-mentioned production and protective case lining cutting angle body unit 2 are moved into engineering site, if ground Down space engineering uses shallow mining method, then after the excavation of rectangle underground space tunneling Rock And Soil 9, is directly carried out splicing phase Even;If underground space engineering uses cut and cover tunneling, is spliced after the excavation of open cut Rock And Soil 9 and be connected, and carry out lining cutting The backfill and compaction treatment of Rock And Soil 9 around structural outer;
Step 3, the grouting behind shaft or drift lining stage:
Step (3-1) utilizes the prestressed bolt 7(B of 1 outer ring of protective case lining cutting main unit, inner peripheral surface centre) it carries out Lining cutting grouting behind shaft or drift lining fills gap between lining cutting outer peripheral surface and surrounding Rock And Soil 9, forms lining cutting grouting behind shaft or drift lining filling layer 10;
Step (3-2), after the completion of slip casting, the prestressed bolt 7(B at closing center position) charging valve 8;
Step 4, after lining cutting grouting behind shaft or drift lining grout cures, applying for this kind of liner structure of the present invention is completed.
Protective case I 3, protective case II 5 and the prestressed bolt 7 used in above-mentioned construction technology can mass directly produce, can be tight Lattice control each section scantling specification, can strict control each section scantling specification, realize preferably underground space section Molding effect, while when carrying out this kind of lining cutting and manufacturing, it is only necessary to it can be poured after assembly installation, it is mixed that conventional rebar can be solved Solidifying soil liner structure is manufactured cumbersome large labor intensity caused by the artificial banding steel cage of process, technique, reinforcement fabrication and is tied up It pricks precision and is difficult to the deficiencies of being precisely controlled, also can avoid the problems such as conventional rebar concrete lining needs mold to pour, can effectively drop Low labor intensity of workers promotes the lining cutting quality of production.
This kind of assembled protective case lining cutting of the present invention the subway station of rectangular cross section, underground pipe gallery, underground utilities, The engineering fields such as lower tunnel, can apply, while this kind of lining cutting had both been applicable to the cut and cover tunneling underground space, was equally applicable to The shallow mining method underground space, therefore the present invention has the wider scope of application;Meanwhile this kind of assembled protective case lining of the present invention It builds, provides a kind of effective support technology means for rectangle underground space engineering excavation, ensured opening for the rectangle underground space Safety and stablization construction is dug, realizes the efficient utilization of the underground space, while also substantially increasing the construction of underground space engineering Progress.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (10)

1. a kind of assembled protective case liner structure for the rectangle underground space, which is characterized in that including along rectangular cross section underground Top of space, the respectively arranged protective case lining cutting main unit in bottom and both sides, the protective case lining cutting main unit is in rectangle Four, cross-section underground space edge carries out splicing using protective case lining cutting angle body unit and is connected;Each protective case lining cutting main body Unit includes protective case I, is filling material I inside the protective case I;Each protective case lining cutting angle body unit includes protective case II, it is filling material II inside the protective case II;The outer peripheral surface side of the protective case I, protective case II and stratum Rock And Soil table Face contact, towards inside the rectangle underground space, protective case I and the outer ring of protective case II, inner peripheral surface are evenly-spaced for inner peripheral surface side Perforation equipped with multiple same positions passes through along outer ring, inner peripheral surface same position site of perforation and is equipped with prestressed bolt;Institute The prestressed bolt stated is vertical with protective case I, the inner ring of protective case II, outer peripheral surface, and is applied with prestressing force, can be to protective case I and interior Portion fills material I, protective case II and internal filling material II and generates radial compression, make prestressed bolt respectively with protective case I and filling Composite bearing structure is collectively formed in material I, protective case II and filling material II, common to resist Rock And Soil pressure around the rectangle underground space Power effect.
2. a kind of assembled protective case liner structure for the rectangle underground space as described in claim 1, which is characterized in that institute The material of protective case I, protective case II and the prestressed bolt stated includes but is not limited to GFRP material, steel.
3. a kind of assembled protective case liner structure for the rectangle underground space as described in claim 1, which is characterized in that institute The material of the filling material I, filling material II stated includes but is not limited to concrete, rubble+cement grout filling material.
4. a kind of assembled protective case liner structure for the rectangle underground space as described in claim 1, which is characterized in that institute The strength of materials that the strength of materials of the protective case II, filling material II stated is respectively greater than protective case I, fills material I, to guarantee that protective case serves as a contrast The integral strength for building angle body unit is greater than the integral strength of protective case lining cutting main unit.
5. a kind of assembled protective case liner structure for the rectangle underground space as described in claim 1, which is characterized in that position The prestressed bolt body of rod in the outer ring of the protective case I of each protective case lining cutting main unit, inner peripheral surface centre is hollow form; The prestressed bolt body of rod of the hollow form is equipped with charging valve in the inner peripheral surface side end close to protective case I.
6. a kind of assembled protective case liner structure for the rectangle underground space as described in claim 1, which is characterized in that institute The connecting method of multiple protective case lining cutting main units for stating and protective case lining cutting angle body unit include but is not limited to be bolted, bolt Formula connection, feather joint mode.
7. a kind of assembled protective case liner structure for the rectangle underground space as described in claim 1, which is characterized in that institute The multiple protective case lining cutting main units and protective case lining cutting angle body unit stated are along rectangle underground space circumferential direction and axial splicing junction Place is equipped with waterstop.
8. a kind of assembled protective case liner structure for the rectangle underground space as described in claim 1, which is characterized in that The protective case I, protective case II it is axially a certain along the circumferential a certain end surface side of the rectangle underground space or along the rectangle underground space End surface side is equipped with an opening;The opening cooperates with a sealing cover;The material of the sealing cover respectively with protective case I, The material of protective case II is identical.
9. a kind of side of applying of assembled protective case liner structure for the rectangle underground space a method as claimed in any one of claims 1-8 Method, which comprises the following steps:
Step 1, prefabricated to apply the stage:
Step (1-1), according to the design of rectangle underground space cross dimensions, integrated carrying intensity and edge part bearing strength It is required that processing and fabricating protective case I and protective case II, and respectively at it along the circumferential a certain end surface side of the rectangle underground space or along rectangle Axially opening processing is done in a certain end surface side to the underground space;
Step (1-2), respectively along protective case I, the outer peripheral surface of protective case II and inner peripheral surface same position site of perforation, installation is answered in advance Power anchor bolt, and once pre-tightened;
Step (1-3), the side of protective case I and protective case II opening position, is utilized respectively filling material I, filling along step (1-1) Material II carries out the filling inside protective case I and protective case II;
Step (1-4), after filling material I, the filling material II inside protective case I and protective case II solidify, in its position side that is open Plastering leveling is carried out, and is utilized respectively sealing cover and closes the side opening;
Step (1-5) carries out secondary preload to the prestressed bolt of protective case I and protective case II respectively, applies prestressing force, keeps its right Protective case I and internal filling material I, protective case II and internal filling material II generate effective radial compression respectively;
Step (1-6), repeat the above steps (1-1) ~ (1-5), completes multiple protective case lining cutting main units and protective case lining cutting angle body The production of unit;
Step 2, the on-site consolidation stage:
The intact multiple protective case lining cutting main units of above-mentioned production and protective case lining cutting angle body unit are moved into engineering site, if underground Space engineering uses shallow mining method, then after rectangle underground space tunneling Rock And Soil excavation, is directly carried out splicing and be connected; If underground space engineering uses cut and cover tunneling, is spliced after open cut Rock And Soil excavation and be connected, and carry out liner structure The backfill and compaction treatment of exterior circumferential Rock And Soil;
Step 3, the grouting behind shaft or drift lining stage:
Step (3-1) carries out lining wall using the prestressed bolt in protective case lining cutting main unit outer ring, inner peripheral surface centre Grouting behind shaft or drift lining fills gap between lining cutting outer peripheral surface and surrounding Rock And Soil;
Step (3-2), after the completion of slip casting, the charging valve of the prestressed bolt at closing center position;
Step 4, after lining cutting grouting behind shaft or drift lining grout cures, applying for this kind of liner structure of the present invention is completed.
10. a kind of assembled protective case liner structure for the rectangle underground space as claimed in claim 9 applies method, Be characterized in that, the protective case I, protective case II production method include but is not limited to that the direct pouring molding of mold, welding be assembled, machine Tool assembles mode.
CN201811232416.0A 2018-10-22 2018-10-22 Assembled protective shell lining structure for rectangular underground space and construction method Active CN109184734B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811232416.0A CN109184734B (en) 2018-10-22 2018-10-22 Assembled protective shell lining structure for rectangular underground space and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811232416.0A CN109184734B (en) 2018-10-22 2018-10-22 Assembled protective shell lining structure for rectangular underground space and construction method

Publications (2)

Publication Number Publication Date
CN109184734A true CN109184734A (en) 2019-01-11
CN109184734B CN109184734B (en) 2023-12-29

Family

ID=64942633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811232416.0A Active CN109184734B (en) 2018-10-22 2018-10-22 Assembled protective shell lining structure for rectangular underground space and construction method

Country Status (1)

Country Link
CN (1) CN109184734B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113505428A (en) * 2021-08-17 2021-10-15 中国电建集团成都勘测设计研究院有限公司 Comprehensive quantitative design method for circular water-passing tunnel lining structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB350467A (en) * 1930-02-20 1931-05-26 Guy Felix Kotrbaty Improvements relating to construction units for building purposes
JPH0953396A (en) * 1995-08-11 1997-02-25 Shimizu Corp Covering structure of underground cavity, and covering method thereof
CN101392654A (en) * 2008-10-30 2009-03-25 上海大学 Shield tunnel segment lining-anchor rod structure system
KR20090132033A (en) * 2008-06-20 2009-12-30 주식회사 스마텍엔지니어링 The support material for a tunnel and tunnel support structure
JP2014058861A (en) * 2012-08-22 2014-04-03 Shimizu Corp Segment and lining structure
CN105041337A (en) * 2015-08-12 2015-11-11 河海大学 Seam splicing structure of underground shield tunnel lining segments and waterproof method
CN105862990A (en) * 2016-03-24 2016-08-17 上海市机械施工集团有限公司 Prefabricated assembly well wall structure and construction method thereof
CN107740700A (en) * 2017-10-26 2018-02-27 吕连勋 A kind of novel subway tunnel fill-type liner structure
CN211598677U (en) * 2018-10-22 2020-09-29 山东建筑大学 External hoop internal injection type rectangular assembly lining for underground engineering

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB350467A (en) * 1930-02-20 1931-05-26 Guy Felix Kotrbaty Improvements relating to construction units for building purposes
JPH0953396A (en) * 1995-08-11 1997-02-25 Shimizu Corp Covering structure of underground cavity, and covering method thereof
KR20090132033A (en) * 2008-06-20 2009-12-30 주식회사 스마텍엔지니어링 The support material for a tunnel and tunnel support structure
CN101392654A (en) * 2008-10-30 2009-03-25 上海大学 Shield tunnel segment lining-anchor rod structure system
JP2014058861A (en) * 2012-08-22 2014-04-03 Shimizu Corp Segment and lining structure
CN105041337A (en) * 2015-08-12 2015-11-11 河海大学 Seam splicing structure of underground shield tunnel lining segments and waterproof method
CN105862990A (en) * 2016-03-24 2016-08-17 上海市机械施工集团有限公司 Prefabricated assembly well wall structure and construction method thereof
CN107740700A (en) * 2017-10-26 2018-02-27 吕连勋 A kind of novel subway tunnel fill-type liner structure
CN211598677U (en) * 2018-10-22 2020-09-29 山东建筑大学 External hoop internal injection type rectangular assembly lining for underground engineering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵德深;陈枫;朱训国;: "盾构双隧道衬砌结构应力与变形的数值模拟", 金属矿山, no. 06 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113505428A (en) * 2021-08-17 2021-10-15 中国电建集团成都勘测设计研究院有限公司 Comprehensive quantitative design method for circular water-passing tunnel lining structure
CN113505428B (en) * 2021-08-17 2023-11-07 中国电建集团成都勘测设计研究院有限公司 Comprehensive quantitative design method for circular water passing tunnel lining structure

Also Published As

Publication number Publication date
CN109184734B (en) 2023-12-29

Similar Documents

Publication Publication Date Title
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN106703828B (en) The construction method of subway station is built using prefabricated assembled lining cutting combination PBA
CN109184737A (en) The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN109026026B (en) Construction method of large-section multi-line multi-arch underground excavation tunnel group penetrating existing pipe gallery
CN206189455U (en) Piping lane
CN105909268B (en) Prestressing combination formula well tunnel modular structure construction method and modular structure
CN109555540A (en) Tunnel form prestressed pipe curtain structure and construction method
CN109630127A (en) A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft
CN104695963A (en) Construction method for subway tunnel penetrating through building in fractured rock stratum
CN112727466A (en) Construction method for support-free prefabricated assembled type shield tunnel air shaft structure
CN106014456A (en) Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof
CN104612696A (en) Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method
CN207033463U (en) Mine shield handing-over tunnel folded type joint design in the middle part of marine site
CN109555535A (en) The purlin Xia Lu form prestressed pipe curtain structure and construction method
CN102286982A (en) Deep foundation pit precast building enclosure for constructing in low environment
CN108374674A (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN109184734A (en) A kind of assembled protective case liner structure for the rectangle underground space and apply method
CN104863613A (en) High-side-wall anchored primary support structure for rock strata underground excavation underground structure, and construction method of high-side-wall anchored primary support structure
CN108756932B (en) Tunnel construction method comprising supporting structure
CN207597406U (en) For the slope reinforcement system of foundation construction engineering
CN110080798A (en) Sandwich-type steel compound tube piece making method suitable for shield formula TBM
CN113202106B (en) Deep foundation pit excavation method
CN206189456U (en) Three cabin piping lanes
CN206189458U (en) Multi -deck formula piping lane
CN211598677U (en) External hoop internal injection type rectangular assembly lining for underground engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant