CN109184731A - Tube coupling structure and its construction method at combined type push pipe hole - Google Patents
Tube coupling structure and its construction method at combined type push pipe hole Download PDFInfo
- Publication number
- CN109184731A CN109184731A CN201811004114.8A CN201811004114A CN109184731A CN 109184731 A CN109184731 A CN 109184731A CN 201811004114 A CN201811004114 A CN 201811004114A CN 109184731 A CN109184731 A CN 109184731A
- Authority
- CN
- China
- Prior art keywords
- tube coupling
- splice
- push pipe
- ontology
- main tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000008878 coupling Effects 0.000 title claims abstract description 211
- 238000010168 coupling process Methods 0.000 title claims abstract description 211
- 238000005859 coupling reaction Methods 0.000 title claims abstract description 211
- 238000010276 construction Methods 0.000 title claims abstract description 52
- 238000000034 method Methods 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 24
- 239000010959 steel Substances 0.000 claims description 24
- 238000012946 outsourcing Methods 0.000 claims description 4
- 230000008014 freezing Effects 0.000 abstract description 5
- 238000007710 freezing Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 6
- 238000003466 welding Methods 0.000 description 6
- 239000007787 solid Substances 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 229910000679 solder Inorganic materials 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to tube coupling structure and construction methods at a kind of combined type push pipe hole, the tube coupling structure includes: tube coupling ontology, and the interconnecting piece for protruding out and being located in main tunnel outside towards the service channel is each formed at the top and bottom of the end face in corresponding main tunnel;And it is removably attachable to the splice of the tube coupling ontology, the splice fits with corresponding end face on the tube coupling ontology, and the splice and the interconnecting piece be connected after to be formed by end surface shape identical as the end surface shape of the tube coupling ontology.The invention proposes a kind of first and last tube coupling structures of separate type, ensure that the smooth of tube coupling section, sufficiently contact with push-bench jacking block, can satisfy construction jacking requirement and guarantee going on smoothly for tube coupling assembling construction.The problem of after Freezing Method for Cross-passage Construction is good, splice is removed, hinders the normal operation of vehicle so as to avoid splice intrusion vehicle gauge.The present invention both can guarantee non-intrusion edge of workplace or be able to satisfy construction jacking requirement.
Description
Technical field
The present invention relates to constructing tunnel engineering fields, refer in particular to tube coupling structure and its construction party at a kind of combined type push pipe hole
Method.
Background technique
With the continuous expansion of city size, urban transportation is faced with increasingly heavier pressure.Subway is undoubtedly carrying capacity
Maximum, most quick, most convenient, most green transit trip mode, helps the significant stress for mitigating urban transportation.Therefore,
City underground engineering fully under way in domestic each big city.In subway engineering, the service channel between upper and lower line is usual
Construction is manually dug through using building method.And in research recently, have get in touch with using the mechanical equipment of push-bench etc and lead to
The formation of the construction technology in road.Such technique manually to dig through rear cast-in-place service channel outer wall originally, becomes by push pipe
The shell mechanism of tube coupling composition.Service channel and the node of subway uplink and downlink main line junction, which have, is similar to two sections of round tube phases
The special handover cambered surface handed over.If first, last tube coupling (also referred to as tube coupling at push pipe hole) also uses structure identical with general tube coupling,
The vehicle gauge that main line tunnel can be invaded hinders the normal operation of vehicle, need to be to first, last to guarantee that vehicle is normally run
On tube coupling invade vehicle gauge occupy-place part knock out, but do so destroy tube coupling and influence tube coupling structural integrity and its
Intensity, and then bring security risk;According to the different structure of general tube coupling, then will make the jacking block of push-bench can not be with
The non-universal first, last tube coupling comes into full contact with, and influences tube coupling assembling construction.
Summary of the invention
It is an object of the invention to overcome the deficiencies of existing technologies, provide at a kind of combined type push pipe hole tube coupling structure and
Its construction method solves that main line tunnel can be invaded when tube coupling uses structure identical with general tube coupling at existing push pipe hole
Vehicle gauge and hinder the normal operation of vehicle, the way that knocks out the occupy-place part at push pipe hole on tube coupling produces tube coupling
It destroys and brings security risk and the problem using influence tube coupling assembling construction etc. when different tube coupling structure.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides tube coupling structures at a kind of combined type push pipe hole, for the service channel of construction by pipeline jacking method, institute
Stating first and last tube coupling structure includes:
Tube coupling ontology is each formed at the top and bottom of the end face in corresponding main tunnel towards outside the service channel
The interconnecting piece for protruding out and being located in corresponding main tunnel;And
It is removably attachable to the splice of the tube coupling ontology, the splice and corresponding end on the tube coupling ontology
Face fits, and the splice and the interconnecting piece be connected after be formed by the end of end surface shape Yu the tube coupling ontology
Face shape is identical.
The invention proposes tube coupling structures at a kind of combined type push pipe hole, including the spelling being detachably connected with tube coupling ontology
Fitting, using being detachably connected for splice and tube coupling ontology, so that in assembled tube coupling, splice group together with tube coupling ontology
At the identical structure with general tube coupling, it ensure that the smooth of tube coupling section, sufficiently contacted with push-bench jacking block, can satisfy and apply
Work jacking requires to guarantee going on smoothly for tube coupling assembling construction.After installing, splice is as the vehicle limit for invading main tunnel
Occupy-place part in boundary can remove splice after Freezing Method for Cross-passage Construction is good, invade vehicle gauge so as to avoid splice
And the problem of hindering the normal operation of vehicle.Since tube coupling ontology and splice are using detachably connected, splice is being removed
When can guarantee the intact of tube coupling ontology, reduce the generation of security risk.Tube coupling knot at combined type push pipe hole of the invention
Structure both can guarantee non-intrusion edge of workplace or be able to satisfy construction jacking requirement.
At combined type push pipe of the present invention hole tube coupling structure further improvement lies in that, the splice and the tube coupling sheet
The junction of corresponding end face is located at the junction of the service channel and corresponding main tunnel on body.
At combined type push pipe of the present invention hole tube coupling structure further improvement lies in that, the splice include end plates and
The multiple floors being fixedly connected with the end plates, the end of the floor fit with corresponding end face on the tube coupling ontology
And it is detachably connected, the end plates and corresponding interconnecting piece are detachably connected.
At combined type push pipe of the present invention hole tube coupling structure further improvement lies in that, on the tube coupling ontology correspondence be located at
Junction steel plate is surrounded by outside part in the main tunnel.
The present invention also provides the construction methods of tube coupling structure at a kind of combined type push pipe hole, include the following steps:
When using service channel between the main tunnel of construction by pipeline jacking method two, provide at push pipe hole as described in claim 1
Tube coupling structure, and by tube coupling structure assembly at the push pipe hole at the stem of service channel and tail portion;
After the completion of tube coupling in the service channel is assembled, it will be detachably connected in tube coupling structure at the push pipe hole
Building block removed;And
The jointing constructed at the push pipe hole between tube coupling structure and corresponding main tunnel, to complete service channel
Construction.
Construction method of the invention further improvement lies in that, when the stem of assembled service channel and tube coupling at tail portion,
The junction of corresponding end face on the building block in tube coupling structure at the push pipe hole and the tube coupling ontology is set to institute
State the junction of service channel with corresponding main tunnel.
Construction method of the invention further improvement lies in that, the splice includes end plates and solid with the end plates
Surely the multiple floors connected;
When the splice is removably attachable to the tube coupling ontology, by the end of the floor and the tube coupling
Corresponding end face is detachably connected on ontology, and the end plates and corresponding interconnecting piece are detachably connected.
Construction method of the invention further improvement lies in that, further includes:
In the part outsourcing junction steel plate being located in the main tunnel corresponding on the tube coupling ontology;
When constructing jointing, jointing is connected and fixed with corresponding junction steel plate.
Detailed description of the invention
Fig. 1 is the section view that the service channel of tube coupling structure application at combined type push pipe of the present invention hole is connect with main tunnel
Figure.
Fig. 2 is the front view of tube coupling structure at combined type push pipe of the present invention hole.
Fig. 3 is the side view of splice in tube coupling structure at combined type push pipe of the present invention hole.
Fig. 4 is the cross-sectional view of tube coupling ontology in tube coupling structure at combined type push pipe of the present invention hole.
Fig. 5 is the transverse sectional view at combined type push pipe of the present invention hole in the middle part of tube coupling structure.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
Referring to Fig.2, being applied to connection the present invention provides tube coupling structure and its construction method at a kind of combined type push pipe hole
The stem in network channel and tail portion, stem tube coupling and tail portion tube coupling as service channel are attached with main tunnel.Of the invention
Tube coupling structure is detachably connected using splice and tube coupling ontology at combined type push pipe hole, the tube coupling at installation push pipe hole
When structure, splice is set in main tunnel, thus during Freezing Method for Cross-passage Construction, the setting of the splice, Neng Goubao
The section for demonstrate,proving tube coupling structure is smooth, sufficiently contacts with the jacking block of push-bench, guarantees going on smoothly for construction, in Freezing Method for Cross-passage Construction
After the completion, the problem of splice being removed, hindering vehicle to operate normally to avoid the vehicle gauge invaded in main tunnel.This hair
Bright first and last tube coupling structure can either guarantee that non-intrusion edge of workplace is also able to satisfy the requirement of construction jacking.With reference to the accompanying drawing to of the present invention group
Tube coupling structure and its construction method are illustrated at box-like push pipe hole.
Refering to fig. 1, it is shown that the service channel and main tunnel that tube coupling structure is applied at combined type push pipe of the present invention hole connect
The cross-sectional view connect.Referring to Fig.2, showing the front view of tube coupling structure at combined type push pipe of the present invention hole.Below with reference to Fig. 1 and
Fig. 2 is illustrated tube coupling structure at combined type push pipe of the present invention hole.
As depicted in figs. 1 and 2, contact of the tube coupling structure 20 for construction by pipeline jacking method at combined type push pipe hole of the invention
Channel 12, the service channel 12 are connected between two main tunnels 11, for being connected to two main tunnels 11, the head of communication passage 12
The tube coupling of portion and tail portion connects with the section of jurisdiction in corresponding main tunnel 11, and the first, last tube coupling (tube coupling at hole) of push pipe has
It partially protrudes into main tunnel 11, is formed with vehicle gauge 111 in main tunnel 11, which is in main tunnel 11
The current required range of subway, however the part being extend into main tunnel 11 on first, last tube coupling can invade vehicle gauge 111
It is interior, to be impacted to vehicle pass-through.Tube coupling structure 20 is for solving service channel at combined type push pipe hole of the invention
Tube coupling invades the problem of vehicle gauge 111 at push pipe hole in 12.
Tube coupling structure 20 is installed at stem and the tail portion of service channel 11 at push pipe hole of the invention, logical as contact
The stem tube coupling and tail portion tube coupling in road 11, tube coupling structure 20 includes tube coupling ontology 21 and is removably attachable at the push pipe hole
The splice 22 of tube coupling ontology 21, as shown in connection with fig. 4, tube coupling ontology 21 therein close to corresponding main tunnel 11 end face (
That is the anchor ring of tube coupling ontology 21) top 213 and bottom 214 be each formed with towards protruding out outside contact logical 12 and be located at corresponding
Interconnecting piece 211 in main tunnel 11.Splice 22 fits with corresponding end face on tube coupling ontology 21, and splice and interconnecting piece
211 be connected after be formed by end face be formed in tube coupling ontology 21 end surface shape it is identical.Two end surface shapes are annulus
Shape.
The interconnecting piece 211 that tube coupling ontology 21 is arranged by top 213 and bottom 214, and make the end face of pipe fitting ontology 21
Two sides form sunk structure, when connecting splice 22, by splice 22 be set to sunk structure at, so that the recess be tied
Structure fills up, then splice 22 and tube coupling ontology 21 is detachably connected.Tube coupling structure 20 at push pipe hole assembled in this way
Planform it is identical as general tube coupling planform, to ensure that the smooth of section, can sufficiently with the top of push-bench
Block contact, it is ensured that construction is gone on smoothly.And after the completion of service channel 12 is constructed, splice 22 is removed, so as to avoid
The problem of splice invades vehicle gauge and hinders the normal operation of vehicle.Since tube coupling ontology and splice are using removably
Connection, can guarantee the intact of tube coupling ontology when removing splice, reduce the generation of security risk.
Part in the vehicle gauge 111 for intruding into main tunnel 11 on tube coupling at push pipe hole is designed as to divide by the present invention
From splice 22, the splice 22 and tube coupling ontology 21 is detachably connected, thus realize both can guarantee non-intrusion edge of workplace or
It is able to satisfy construction jacking requirement.
It is as shown in Figures 1 to 4, corresponding on splice 22 and tube coupling ontology 21 as a better embodiment of the invention
The junction of end face be located at the junction of service channel 12 with corresponding main tunnel 11.Make removing splice 22 in this way
Afterwards, the end face that splice 22 is corresponded on tube coupling ontology 21 corresponds in the section for being located at the section of jurisdiction in main tunnel 11 namely tube coupling ontology
21 outer surface has part corresponding with the section of jurisdiction in main tunnel 11.
As another better embodiment of the invention, as shown in Figure 3 and Figure 5, splice 22 include end plates 221 and with
Multiple floors 222 that end plates 221 are fixedly connected, as shown in connection with fig. 4, the end of floor 222 are corresponding on tube coupling ontology 21
End face be affixed merge it is detachably connected, end plates 221 and corresponding interconnecting piece 211 are detachably connected.
Preferably, splice 22 includes three floors 222, three floors 222 are vertically connected at end plates 221.It is therein
Two floors 222 are set to the both ends of end plates 221, another floor 222 is set to the middle part of end plates 221.As shown in connection with fig. 2,
End plates 221 are arc panel, and the radian of the arc panel adapts to the radian of the segmental arc of 21 upper lateral part of tube coupling ontology, which is
Part between top 213 and bottom 214.And two floors 222 for being located at 221 end of end plates adapt to tube coupling ontology
21 surfaces externally and internally, two floors 222 connect with corresponding surfaces externally and internally and form complete annular surface.As shown in connection with fig. 3,
Trapezoidal shape, reality are the plate with radian to floor 222 from the side.
Again goodly, splice 22 is steel construction piece, and end plates 221 and floor 222 are steel plate.Can with tube coupling ontology 21
It when releasably connecting, can be connected by screw bolts, by staying the hand hole set to install bolt with junction steel plate on tube coupling ontology 21
With tube coupling ontology 21.
Further, the end of floor 222 is equipped with connecting pin 2221, and the connecting pin 2221 is corresponding on tube coupling ontology 21
It is detachably connected that end face is affixed merging.
As another better embodiment of the invention, the corresponding part outsourcing being located in main tunnel 11 on tube coupling ontology 21
There is junction steel plate 212.The junction steel plate 212 is for the company at connecting jacking pipe hole between tube coupling structure 20 and corresponding main tunnel 11
Connector.
Preferably, junction steel plate 212 covers the part in the outer surface of tube coupling ontology 21, covers above tube coupling ontology 21
It end face to main tunnel 11 and covers in the part of the inner surface of tube coupling ontology 21.
Further, when being detachably connected splice 22, splice 22 and the junction steel plate being affixed 212 can be welded solid
It is fixed, in welding, spot welding may be selected, only need to meet splice 22 is fixed on tube coupling ontology 21.It is subsequent in this way to remove spelling
When fitting 22, the solder joint of welding need to only be cut open.
Tube coupling ontology 21 of the invention is concrete structure, and is integrated the structure for pouring and being formed.On tube coupling ontology 21
The interconnecting piece 211 positioned at top and bottom being formed together plays the role of positioning to the installation of splice 22, enables to
The accurately contraposition installation of splice 22.And interconnecting piece 211 is set in corresponding main tunnel 11, will not invade the vehicle in main tunnel 11
Limit 111, so the interconnecting piece 211 after the completion of service channel 12 is constructed, without removing, stays in main tunnel 11.
After the tube coupling of service channel 12 all splices well, it is logical to be located at contact for tube coupling structure 20 at push pipe hole of the invention
The stem in road 12 and tail portion, and the splice 22 at push pipe hole in tube coupling structure 20 is located in corresponding main tunnel 11, at this time
Splice 22 can be removed, and weld steel plate for sealing water on the junction steel plate of tube coupling structure 20 at the main tunnel 11 and push pipe hole,
And final jointing of constructing, to complete the construction of service channel.
In a better embodiment, the width of tube coupling structure 20 is 900mm at push pipe hole, which refers to push pipe hole
The width of 20 outer surface of tube coupling structure at mouthful, the width of splice 22 are 240mm;At push pipe hole tube coupling structure 20 with a thickness of
250mm, the thickness are the width of the end face of tube coupling structure 20 at push pipe hole, and the thickness of splice 22 is also 250mm.Push pipe hole
The overall diameter of tube coupling structure 20 is 3100mm at mouthful, and the length of splice 22 is 2600mm.Using the push pipe hole of above-mentioned size
When locating the construction of tube coupling structure 20, the width for the part that tube coupling structure 20 enters in main tunnel 11 at the push pipe hole is about
240mm namely splice 22 are located in main tunnel 11, to remove splice 22 and solve after the completion of Freezing Method for Cross-passage Construction
Determined the occupy-place to main tunnel the problem of.
Preferably, being provided on end face at the push pipe hole on the tube coupling ontology 21 of tube coupling structure 20 far from splice 22
Multiple recesses, those recesses tube coupling structure adjacent for location and installation, are equipped on the adjacent corresponding end face of tube coupling structure
Protrusion compatible with recess completes the docking of two tunnel segment structures by the way that protrusion to be caught in recess.
The construction method of tube coupling structure at combined type push pipe provided by the invention hole is illustrated below.
The construction method of tube coupling structure, includes the following steps: at a kind of combined type push pipe hole of the invention
When as depicted in figs. 1 and 2, using the service channel 12 between the main tunnel 11 of construction by pipeline jacking method two, above-mentioned top is provided
Tube coupling structure 20 at pipe hole, and by the assembly of tube coupling structure 20 at push pipe hole at the stem of service channel 12 and tail portion to make
For stem tube coupling and tail portion tube coupling;
After the completion of tube coupling in service channel 12 is assembled, the spelling that will be detachably connected in tube coupling structure 20 at push pipe hole
Piece installing 22 is removed;And
Jointing at construction push pipe hole between tube coupling structure 20 and corresponding main tunnel 11, to complete service channel
12 construction.
Service channel 12 is connected between two main tunnels 11, for being connected to two main tunnels 11, the head of communication passage 12
The tube coupling of portion and tail portion connects with the section of jurisdiction in corresponding main tunnel 11, and the first, last tube coupling of push pipe has and partially protrudes into master
In tunnel 11, it is formed with vehicle gauge 111 in main tunnel 11, which is the current institute of subway in main tunnel 11
The range needed, however the part being extend into main tunnel 11 on first, last tube coupling can invade in vehicle gauge 111, thus to vehicle
Passage impacts.The present invention is used to solve the first, last tube coupling in service channel 12 using tube coupling structure 20 at push pipe hole
The problem of invading vehicle gauge 111.
Tube coupling structure 20 and tube coupling knot at combinations of the above formula push pipe hole at push pipe hole in construction method of the present invention
The structure of structure 20 is identical, specifically refers to above-mentioned structure description, details are not described herein.
The interconnecting piece 211 that tube coupling ontology 21 is arranged by top 213 and bottom 214, and make the end face of pipe fitting ontology 21
Two sides form sunk structure, when connecting splice 22, by splice 22 be set to sunk structure at, so that the recess be tied
Structure fills up, then splice 22 and tube coupling ontology 21 is detachably connected.Tube coupling structure 20 at push pipe hole assembled in this way
Planform it is identical as general tube coupling planform, to ensure that the smooth of section, can sufficiently with the top of push-bench
Block contact, it is ensured that construction is gone on smoothly.And after the completion of service channel 12 is constructed, splice 22 is removed, so as to avoid
The problem of splice invades vehicle gauge and hinders the normal operation of vehicle.Since tube coupling ontology and splice are using removably
Connection, can guarantee the intact of tube coupling ontology when removing splice, reduce the generation of security risk.
Part in the vehicle gauge 111 for intruding into main tunnel 11 on tube coupling at push pipe hole is designed as to divide by the present invention
From splice 22, the splice 22 and tube coupling ontology 21 is detachably connected, thus realize both can guarantee non-intrusion edge of workplace or
It is able to satisfy construction jacking requirement.
As a better embodiment of the invention, when the stem of assembled service channel and tube coupling at tail portion, by push pipe
At hole in tube coupling structure 20 on building block 22 and tube coupling ontology 21 junction of corresponding end face be set to service channel 12 with it is right
The junction in the main tunnel 12 answered.Make to correspond to the end face of splice 22 on tube coupling ontology 21 after removing splice 22 in this way
There is the section of jurisdiction phase of part with main tunnel 11 in the section of the corresponding section of jurisdiction for the being located at main tunnel 11 namely outer surface of tube coupling ontology 21
It is corresponding.
As another better embodiment of the invention, as shown in figure 5, splice 22 includes end plates 221 and and end face
Multiple floors 222 that plate 221 is fixedly connected;
It, will be on the end of floor 222 and tube coupling ontology 21 when splice 22 is removably attachable to tube coupling ontology 21
Corresponding end face is detachably connected, and end plates 221 and corresponding interconnecting piece 211 are detachably connected.
Preferably, splice 22 includes three floors 222, three floors 222 are vertically connected at end plates 221.It is therein
Two floors 222 are set to the both ends of end plates 221, another floor 222 is set to the middle part of end plates 221.As shown in connection with fig. 2,
End plates 221 are arc panel, and the radian of the arc panel adapts to the radian of the segmental arc of 21 upper lateral part of tube coupling ontology, which is
Part between top 213 and bottom 214.And two floors 222 for being located at 221 end of end plates adapt to tube coupling ontology
21 surfaces externally and internally, two floors 222 connect with corresponding surfaces externally and internally and form complete annular surface.As shown in connection with fig. 3,
Trapezoidal shape, reality are the plate with radian to floor 222 from the side.
Again goodly, splice 22 is steel construction piece, and end plates 221 and floor 222 are steel plate.Can with tube coupling ontology 21
It when releasably connecting, can be connected by screw bolts, by staying the hand hole set to install bolt with junction steel plate on tube coupling ontology 21
With tube coupling ontology 21.
Further, the end of floor 222 is equipped with connecting pin 2221, and the connecting pin 2221 is corresponding on tube coupling ontology 21
It is detachably connected that end face is affixed merging.
As another better embodiment of the invention, further includes:
In the part outsourcing junction steel plate 212 being located in main tunnel 11 corresponding on tube coupling ontology 21;
When constructing jointing, jointing is connected and fixed with corresponding junction steel plate 212.
Preferably, junction steel plate 212 covers the part in the outer surface of tube coupling ontology 21, covers above tube coupling ontology 21
It end face to main tunnel 11 and covers in the part of the inner surface of tube coupling ontology 21.
Further, when being detachably connected splice 22, splice 22 and the junction steel plate being affixed 212 can be welded solid
It is fixed, in welding, spot welding may be selected, only need to meet splice 22 is fixed on tube coupling ontology 21.It is subsequent in this way to remove spelling
When fitting 22, the solder joint of welding need to only be cut open.
Tube coupling ontology 21 of the invention is concrete structure, and is integrated the structure for pouring and being formed.On tube coupling ontology 21
The interconnecting piece 211 positioned at top and bottom being formed together plays the role of positioning to the installation of splice 22, enables to
The accurately contraposition installation of splice 22.And interconnecting piece 211 is set in corresponding main tunnel 11, will not invade the vehicle in main tunnel 11
Limit 111, so the interconnecting piece 211 after the completion of service channel 12 is constructed, without removing, stays in main tunnel 11.
After the tube coupling of service channel 12 all splices well, it is logical to be located at contact for tube coupling structure 20 at push pipe hole of the invention
The stem in road 12 and tail portion, and the splice 22 at push pipe hole in tube coupling structure 20 is located in corresponding main tunnel 11, at this time
Splice 22 can be removed, and weld steel plate for sealing water on the junction steel plate of tube coupling structure 20 at the main tunnel 11 and push pipe hole,
And final jointing of constructing, to complete the construction of service channel.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper
It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this
Invention will be using the range that the appended claims define as protection scope of the present invention.
Claims (8)
1. tube coupling structure at a kind of combined type push pipe hole, the service channel for construction by pipeline jacking method, which is characterized in that the top
Tube coupling structure includes: at pipe hole
Tube coupling ontology is each formed at the top and bottom of the end face in corresponding main tunnel towards the service channel evagination
The interconnecting piece stretched and be located in corresponding main tunnel;And
It is removably attachable to the splice of the tube coupling ontology, the splice and corresponding end face phase on the tube coupling ontology
Fitting, and the splice and the interconnecting piece be connected after be formed by the end face shape of end surface shape Yu the tube coupling ontology
Shape is identical.
2. tube coupling structure at combined type push pipe as described in claim 1 hole, which is characterized in that the splice and the pipe
The junction of corresponding end face is located at the junction of the service channel and corresponding main tunnel on abridged edition body.
3. tube coupling structure at combined type push pipe as described in claim 1 hole, which is characterized in that the splice includes end face
Plate and the multiple floors being fixedly connected with the end plates, the end of the floor and corresponding end face phase on the tube coupling ontology
It is bonded and detachably connected, the end plates and corresponding interconnecting piece are detachably connected.
4. tube coupling structure at combined type push pipe as described in claim 1 hole, which is characterized in that corresponding on the tube coupling ontology
Junction steel plate is surrounded by outside the part in the main tunnel.
5. the construction method of tube coupling structure at a kind of combined type push pipe hole, which comprises the steps of:
When using service channel between the main tunnel of construction by pipeline jacking method two, tube coupling at push pipe hole as described in claim 1 is provided
Structure, and by tube coupling structure assembly at the push pipe hole at the stem of service channel and tail portion;
After the completion of tube coupling in the service channel is assembled, the spelling that will be detachably connected in tube coupling structure at the push pipe hole
Piece installing is removed;And
The jointing constructed at the push pipe hole between tube coupling structure and corresponding main tunnel, to complete applying for service channel
Work.
6. construction method as claimed in claim 5, which is characterized in that the stem of assembled service channel and the tube coupling at tail portion
When, the junction of corresponding end face on the building block in tube coupling structure at the push pipe hole and the tube coupling ontology is set to
The junction of the service channel and corresponding main tunnel.
7. construction method as claimed in claim 5, which is characterized in that the splice include end plates and with the end plates
The multiple floors being fixedly connected;
When the splice is removably attachable to the tube coupling ontology, by the end of the floor and the tube coupling ontology
Upper corresponding end face is detachably connected, and the end plates and corresponding interconnecting piece are detachably connected.
8. construction method as claimed in claim 5, which is characterized in that further include:
In the part outsourcing junction steel plate being located in the main tunnel corresponding on the tube coupling ontology;
When constructing jointing, jointing is connected and fixed with corresponding junction steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811004114.8A CN109184731B (en) | 2018-08-30 | 2018-08-30 | Combined pipe joint structure at pipe jacking hole and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811004114.8A CN109184731B (en) | 2018-08-30 | 2018-08-30 | Combined pipe joint structure at pipe jacking hole and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109184731A true CN109184731A (en) | 2019-01-11 |
CN109184731B CN109184731B (en) | 2020-05-12 |
Family
ID=64916907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811004114.8A Active CN109184731B (en) | 2018-08-30 | 2018-08-30 | Combined pipe joint structure at pipe jacking hole and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109184731B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05249002A (en) * | 1992-03-03 | 1993-09-28 | Ishikawajima Harima Heavy Ind Co Ltd | Cooling apparatus of gas of ark heating wind tunnel |
CN102644467A (en) * | 2012-04-27 | 2012-08-22 | 上海隧道工程股份有限公司 | Tunnel connecting passage construction method for directly cutting segment rings through pipe jacking machine |
CN104500094A (en) * | 2014-12-23 | 2015-04-08 | 上海市城市建设设计研究总院 | Lining connecting structure applicable to jacking pipe for implementing connection passage |
CN205778883U (en) * | 2016-05-13 | 2016-12-07 | 中煤第三建设(集团)有限责任公司广州分公司 | Jacking construction and the connection transfer device of shield-tunneling construction in a kind of tunnel |
CN106948833A (en) * | 2017-04-05 | 2017-07-14 | 宁波大学 | Pin-connected panel service channel structure and its construction method |
CN108005686A (en) * | 2018-01-12 | 2018-05-08 | 中铁上海工程局集团有限公司 | With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method |
-
2018
- 2018-08-30 CN CN201811004114.8A patent/CN109184731B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05249002A (en) * | 1992-03-03 | 1993-09-28 | Ishikawajima Harima Heavy Ind Co Ltd | Cooling apparatus of gas of ark heating wind tunnel |
CN102644467A (en) * | 2012-04-27 | 2012-08-22 | 上海隧道工程股份有限公司 | Tunnel connecting passage construction method for directly cutting segment rings through pipe jacking machine |
CN104500094A (en) * | 2014-12-23 | 2015-04-08 | 上海市城市建设设计研究总院 | Lining connecting structure applicable to jacking pipe for implementing connection passage |
CN205778883U (en) * | 2016-05-13 | 2016-12-07 | 中煤第三建设(集团)有限责任公司广州分公司 | Jacking construction and the connection transfer device of shield-tunneling construction in a kind of tunnel |
CN106948833A (en) * | 2017-04-05 | 2017-07-14 | 宁波大学 | Pin-connected panel service channel structure and its construction method |
CN108005686A (en) * | 2018-01-12 | 2018-05-08 | 中铁上海工程局集团有限公司 | With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN109184731B (en) | 2020-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104088295B (en) | The embedded connecting structure of enclosure wall and middle plate and construction method thereof in covered back-digging | |
KR100789697B1 (en) | Interlocking socket typed concrete conduit | |
CN112031819B (en) | L-shaped shield tunnel segment and assembling method | |
CN104947714A (en) | End sealing door structure for immersed tube tunnel | |
CN211081875U (en) | Connecting node of sleeved subway station and underground excavation structure tunnel portal | |
KR101613466B1 (en) | Concrete pipe structural repair reinforcement construction method and structure constructed by the same | |
CN107780437A (en) | The prefabricated assembled tube coupling of pipe gallery | |
CN113294166A (en) | Large-section rectangular jacking pipe oblique starting method | |
CN106812131B (en) | A kind of permanent sheet pile underground structure and its construction method | |
CN109184731A (en) | Tube coupling structure and its construction method at combined type push pipe hole | |
JP4434022B2 (en) | Steel shell element joint structure and tunnel construction method using the same | |
CN204738309U (en) | Immersed tube tunnel is with holding structure of sealing up a door | |
KR101193216B1 (en) | Structure of spreading fireproof material continuously for improving fireproof function of connection of variable undersea structure | |
CN108442413A (en) | Prefabricated assembled tunnel wall horizontal joint reinforcement structure and joining method | |
JP2016079660A (en) | Open shield method | |
CN213776657U (en) | Multiple sealed reinforced concrete pipe culvert with steel joint at socket end | |
KR102129587B1 (en) | New Messer Shield engineering method | |
CN113898010A (en) | Fabricated concrete prefabricated part joint and application thereof | |
JP6039734B1 (en) | Open shield method | |
CN108561138B (en) | Shield interval connecting channel top pipe entering sealed cabin and construction method thereof | |
EP2364399A1 (en) | Modular lining for tunnels | |
CN209908514U (en) | Inverted arch assembled tunnel | |
CN106480875B (en) | For constructing the rectangular concrete pile of piping lane side wall | |
CN213837088U (en) | Extension joint for water-cape | |
JPH11229785A (en) | Joint structure for segment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |