CN109173360A - A kind of separable ring water conservation suction dredge - Google Patents
A kind of separable ring water conservation suction dredge Download PDFInfo
- Publication number
- CN109173360A CN109173360A CN201811323979.0A CN201811323979A CN109173360A CN 109173360 A CN109173360 A CN 109173360A CN 201811323979 A CN201811323979 A CN 201811323979A CN 109173360 A CN109173360 A CN 109173360A
- Authority
- CN
- China
- Prior art keywords
- pipe
- tube
- suction
- sedimentation tank
- connecting tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/24—Feed or discharge mechanisms for settling tanks
- B01D21/245—Discharge mechanisms for the sediments
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Treatment Of Sludge (AREA)
- Cleaning In General (AREA)
Abstract
The invention discloses a kind of separable rings to be retained suction dredge, including primary sedimentation tank, hold-down support and fixing pipe, locating slot is offered at the top center of the primary sedimentation tank, and service bridge is fixedly installed on primary sedimentation tank, the hold-down support is set to work pars basilaris pontis, and the end of hold-down support is fixed with casing, the waterproof case is internally provided with rotary electric machine, connecting tube is provided on the outside of the vertical bar, mud scraping rod and fixed link are connected separately on the fixing piece, one end of screwed hose is connected on the lower end inner wall of the connecting tube, the other end of the screwed hose is connected with each other by slurry pipe with pulp absorbing pump, and pulp absorbing pump is located on the outer wall of primary sedimentation tank, the fixing pipe is set in fixed link, turbine is provided in first suction tube.The separable ring is retained suction dredge, does not need to scrape the silt in sedimentation basin by mud scraper before use, convenient to use, and the residual after capable of reducing silt cleaning avoids the blocking of pipeline.
Description
Technical field
The present invention relates to environmentally friendly technical field of water treatment equipment, specially a kind of separable ring is retained suction dredge.
Background technique
Suction dredge is to accumulate the dirty equipment and instrument absorbed of silt in water in environmentally friendly water process, is mainly used for spoke
Streaming is just heavy, the spoil disposal of secondary settling tank, it can also be used to which the spoil disposal of concentration basin is a kind of ideal soil discharging facility, and structure is simple, transmission
Steadily, power consumption is low, and it is good to desilt effect, is applied to the industries such as steel, metallurgy, mine, water process, but existing mud scraper
Following problems are still had when in use:
1, it needs to realize before inhaling mud and scrapes the silt in sedimentation basin, silt is otherwise be easy to cause to draw motionless situation hair
It is raw, while the existing cotton-shaped impurity that suspends in water, it cannot be absorbed, will cause and inhale the incomprehensive of mud processing;
2, since the diameter of section in dredging tube road is arranged, so that suction dredge easily causes pipe when absorbing block-like large-scale silt
The absorption blockage problem in road occurs, to cause the use existing defects of suction dredge, increases the economy of suction dredge use and maintenance
Output;
In view of the above-mentioned problems, to innovation is designed on the basis of existing suction dredge.
Summary of the invention
The purpose of the present invention is to provide a kind of separable rings to be retained suction dredge, existing to solve above-mentioned background technique proposition
Suction dredge, use is cumbersome, not comprehensive to the cleaning of silt, while being easy to happen line clogging problem when use.
To achieve the above object, it the invention provides the following technical scheme: a kind of separable ring is retained suction dredge, including just sinks
Pond, hold-down support and fixing pipe offer locating slot at the top center of the primary sedimentation tank, and are fixedly installed with work on primary sedimentation tank
Make bridge, and be provided with waterproof case at the top center of service bridge, the hold-down support is set to work pars basilaris pontis, and fixed
The end of support is fixed with casing, and bearing is equipped on the inner wall of casing, and the waterproof case is internally provided with rotation electricity
Machine, and controller is installed, and the driving end of rotary electric machine is coaxially connected with vertical bar, the outside of the vertical bar on rotary electric machine
It is provided with connecting tube, and fixing piece is installed on the outside of connecting tube, and the lower end of connecting tube is set to positioning by position-limiting tube
In slot, mud scraping rod and fixed link are connected separately on the fixing piece, and the bottom of mud scraping rod is equipped with cleaning shoe, and scrapes mud
It is vertically connected with stirring rod at the top of bar, one end of screwed hose is connected on the lower end inner wall of the connecting tube, and screw thread is soft
Positioning ring is installed on pipe, and is provided with fixed spring between positioning ring and position-limiting tube, the other end of the screwed hose is logical
It crosses slurry pipe to be connected with each other with pulp absorbing pump, and pulp absorbing pump is located on the outer wall of primary sedimentation tank, the fixing pipe is set in fixed link, and
Fixing pipe is connected by communicating pipe and fixing piece perforation, and the first suction tube and the second suction are separately installed in fixing pipe
It manages, is provided with turbine in first suction tube, and be fixedly connected with crushing rod in the middle part of turbine, and set on the outside of crushing rod
It is equipped with broken cone.
Preferably, the connecting tube is formed by the first sectional pipe and the second sectional pipe both ends butt welding respectively, and first
The end of sectional pipe and the second sectional pipe is not mutually communicated, and the length phase of the length of the second sectional pipe and the first sectional pipe
Deng.
Preferably, the cleaning shoe spaced set is on mud scraping rod, and mud scraping rod is symmetrical about fixing piece central axis
2 are provided with, and the cleaning shoe relative dislocation distribution on 2 mud scraping rods.
Preferably, the end of the screwed hose and connecting tube be that the integral structure of welding is arranged, and screwed hose with
Connecting tube is mutually communicated, and screwed hose and position-limiting tube constitute relative telescopic structure.
Preferably, first suction tube and the second suction tube and fixing pipe constitute disassembly mounting structure, and first inhales
Expects pipe and the second suction tube shape same size are equal.
Preferably, the bottom of the crushing rod is located at the outside of the first suction tube, and crushing rod is set in " Y " font structure
It sets.
Preferably, the inside and outside wall of first sectional pipe is connect with the inside thread of the outer wall of vertical bar and bearing respectively, and
First sectional pipe and vertical bar, which are constituted, is threadedly coupled sliding lifting structure.
Preferably, the inner wall of the lower end position-limiting tube of second sectional pipe is affixed, and the length and limit of the second sectional pipe
Pipe deep within the space is equal.
Compared with prior art, it the beneficial effects of the present invention are: the separable ring is retained suction dredge, is not needed before use
The silt in sedimentation basin is scraped by mud scraper, convenient to use, the residual after capable of reducing silt cleaning avoids
The blocking of pipeline;
1, it only needs to rotate by forward and reverse work of rotary electric machine, revolving lifting can be made with connecting tube in rotary electric machine
Movement, by the lifting of connecting tube, facilitates the mixing of silt scraped with floccule in water, so that suction dredge be avoided to absorb mud
Sha Shiyin does not reach cotton-shaped impurity, influences the dirty absorption in water;
2, in the collective effect of the first suction tube and the second suction tube that are separately provided, the first suction tube is absorbing silt and water
Meanwhile, it is capable to which carrying out second-time breakage to large-size massive silt avoids pipe plugging, simultaneously so that the absorption of silt is more convenient
Second suction tube is separately installed when cotton-shaped impurity is excessive in water, avoid the winding of cotton-shaped impurity influence pipeline suction bricklayer's make into
Row.
Detailed description of the invention
Fig. 1 is positive structure schematic of the present invention;
Fig. 2 is connecting tube mounting structure schematic diagram of the present invention;
Fig. 3 is screwed hose mounting structure schematic diagram of the present invention;
Fig. 4 is fixing pipe mounting structure schematic diagram of the present invention;
Fig. 5 is the first suction tube structural schematic diagram of the invention;
Fig. 6 is the second suction tube structural schematic diagram of the invention.
In figure: 1, primary sedimentation tank;2, locating slot;3, service bridge;4, waterproof case;5, hold-down support;6, casing;7, bearing;
8, rotary electric machine;9, controller;10, vertical bar;11, connecting tube;12, fixing piece;13, mud scraping rod;14, cleaning shoe;15, fixed
Bar;16, position-limiting tube;17, stirring rod;18, screwed hose;19, positioning ring;20, fixed spring;21, slurry pipe;22, pulp absorbing pump;
23, fixing pipe;24, communicating pipe;25, the first suction tube;26, turbine;27, crushing rod;28, it is crushed cone;29, the second suction tube;
30, the first sectional pipe;31, the second sectional pipe.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-6 is please referred to, the present invention provides a kind of technical solution: a kind of separable ring water conservation suction dredge, including primary sedimentation tank
1, locating slot 2, service bridge 3, waterproof case 4, hold-down support 5, casing 6, bearing 7, rotary electric machine 8, controller 9, vertical bar 10, company
Adapter tube 11, fixing piece 12, mud scraping rod 13, cleaning shoe 14, fixed link 15, position-limiting tube 16, stirring rod 17, screwed hose 18, positioning
Ring 19, fixed spring 20, slurry pipe 21, pulp absorbing pump 22, fixing pipe 23, communicating pipe 24, the first suction tube 25, turbine 26, crushing rod
27, it is crushed the 28, second suction tube 29 of cone, the first sectional pipe 30 and the second sectional pipe 31, is offered at the top center of primary sedimentation tank 1
Locating slot 2, and service bridge 3 is fixedly installed on primary sedimentation tank 1, and waterproof case 4 is provided at the top center of service bridge 3,
Hold-down support 5 is set to 3 bottom of service bridge, and the end of hold-down support 5 is fixed with casing 6, and installs on the inner wall of casing 6
There is bearing 7, waterproof case 4 is internally provided with rotary electric machine 8, and controller 9 is equipped on rotary electric machine 8, and rotary electric machine 8
Driving end be coaxially connected with vertical bar 10, the outside of vertical bar 10 is provided with connecting tube 11, and the outside of connecting tube 11 be equipped with it is solid
Determine part 12, and the lower end of connecting tube 11 is set in locating slot 2 by position-limiting tube 16, is connected separately on fixing piece 12 and is scraped mud
Bar 13 and fixed link 15, and the bottom of mud scraping rod 13 is equipped with cleaning shoe 14, and the top of mud scraping rod 13 is vertically connected with and stirs
Bar 17 is mixed, one end of screwed hose 18 is connected on the lower end inner wall of connecting tube 11, and positioning ring is installed on screwed hose 18
19, and fixed spring 20 is provided between positioning ring 19 and position-limiting tube 16, the other end of screwed hose 18 by slurry pipe 21 with
Pulp absorbing pump 22 is connected with each other, and pulp absorbing pump 22 is located on the outer wall of primary sedimentation tank 1, and fixing pipe 23 is set in fixed link 15, and solid
Determine pipe 23 to connect by communicating pipe 24 and the perforation of fixing piece 12, and is separately installed with the first suction tube 25 and the in fixing pipe 23
Two suction tubes 29 are provided with turbine 26 in first suction tube 25, and the middle part of turbine 26 is fixedly connected with crushing rod 27, and breaks
The outside of broken bar 27 is provided with broken cone 28;
Connecting tube 11 is formed by the first sectional pipe 30 and the 31 both ends butt welding of the second sectional pipe respectively, and 30 He of the first sectional pipe
The end of second sectional pipe 31 is not mutually communicated, and the equal length of the length of the second sectional pipe 31 and the first sectional pipe 30,
The inside and outside wall of first sectional pipe 30 is connect with the inside thread of the outer wall of vertical bar 10 and bearing 7 respectively, and 30 He of the first sectional pipe
Vertical bar 10, which is constituted, is threadedly coupled sliding lifting structure, and the inner wall of the lower end position-limiting tube 16 of the second sectional pipe 31 is affixed, and second point
Section pipe 31 length it is equal with 16 deep within the space of position-limiting tube, the connecting tube 11 of subsection setup, when vertical bar 10 is rotated forward due to
The rotation of bearing 7 is skidded, so that vertical bar 10 is directly rotated with connecting tube 11, by mud scraping rod 13 and cleaning shoe 14 to primary sedimentation tank
The silt of 1 bottom is scraped, and does not need to carry out scraping the individually operated of mud, and in 10 backwards rotation of vertical bar, to mud scraping rod 13
It is limited, due to the rotary spacing of bearing 7, is rotated so that the first sectional pipe 30 is done on vertical bar 10 with the second sectional pipe 31
The rising of formula is mobile, while the second sectional pipe 31 is while absorbing silt by screwed hose 18 and fixing pipe 23, additionally it is possible to
Floated cotton-shaped impurity in water is absorbed, it is easy to use and operate quick, the use of mud scraper is reduced, is turned positive again
When dynamic vertical bar 10, mud scraping rod 13 is limited, so that it may so that the first sectional pipe 30 is with the second sectional pipe 31 in vertical bar 10
On do revolving decline movement, convenient to use, the operation for realizing that silt absorbs is comprehensive;
14 spaced set of cleaning shoe is on mud scraping rod 13, and mud scraping rod 13 is symmetrically arranged with 2 about 12 central axis of fixing piece
It is a, and 14 relative dislocation of the cleaning shoe distribution on 2 mud scraping rods 13, the setting of cleaning shoe 14, so that mud scraping rod 13 is rotating
During, the working efficiency scraped to 1 bottom sediment of primary sedimentation tank is improved, the residual silt of 1 bottom of primary sedimentation tank is reduced;
The end of screwed hose 18 is arranged with the integral structure that connecting tube 11 is welding, and 11 phase of screwed hose 18 and connecting tube
Mutually perforation, and screwed hose 18 and position-limiting tube 16 constitute relative telescopic structure, the setting of screwed hose 18, in the second sectional pipe
31 make raising and lowering it is mobile when, can maintain well to be fixedly connected with relationship with the second sectional pipe 31, to greatly mention
The absorption working efficiency of high silt avoids the connection between the second sectional pipe 31 and screwed hose 18 from being broken;
First suction tube 25 and the second suction tube 29 are constituted with fixing pipe 23 dismantles mounting structure, and the first suction tube 25 and the
Two suction tubes, 29 shape same size is equal, and the common setting of the first suction tube 25 and the second suction tube 29 facilitates the first suction
Replacement setting between pipe 25 and the second suction tube 29, applies the first different suction tubes in the dirty different sedimentation basin of water quality
25 and second suction tube 29, the absorption working efficiency of silt is improved, the blockage problem of suction dredge pipeline is reduced;
The bottom of crushing rod 27 is located at the outside of the first suction tube 25, and crushing rod 27 is arranged in " Y " font structure, crushing rod 27
Setting, rotate below water flow and the collective effect of turbine 26, to block-like silt carry out second-time breakage, facilitate silt
Absorption, while avoid bulk silt block pipeline;
Working principle: when using separable ring water conservation suction dredge, first according to Fig. 1-3, in primary sedimentation tank 1 to the silt in water
After being precipitated, the 8 forward direction work of rotary electric machine of model IHSS57-36-20 is controlled by the controller 9 of model MAM-330
It rotates, due to the rotary action of bearing 7 itself, so that the coaxially connected vertical bar 10 of 8 driving end of rotary electric machine is with connecting tube
11 occur the rotation that works caused by bearing 7 skids in casing 6, by connecting tube 11 with the rotation of fixing piece 12 and mud scraping rod 13
Turn, so that the cleaning shoe 14 of 13 bottom of mud scraping rod scrapes the silt of 1 bottom of primary sedimentation tank, after a period of operation, by turning
Dynamic motor 8 rotates backward, while using extraneous barrier obstruction mud scraping rod 13, so that the outer wall of the first sectional pipe 30 and vertical bar 10
The rotary rising movement being threadedly coupled is done, with the second sectional pipe 31 and fixing piece 12 and mud scraping rod 13 to the float type in water
Floccule carries out mixing agitation, positive again to open rotation electricity when needing that mud scraping rod 13 is set to 1 bottom of primary sedimentation tank again
Machine 8, and limit rotating freely for mud scraping rod 13;
According to Fig. 1 and Fig. 4-6, when the outer wall of the first sectional pipe 30 and vertical bar 10 does the rotary lifting movement being threadedly coupled,
Pulp absorbing pump 22 is opened, by the suction of pulp absorbing pump 22, so that slurry pipe 21 and screwed hose 18 are sequentially communicated, in communicating pipe 24 and the
Under the collective effect of one suction tube 25 and the second suction tube 29, in water silt and floccule absorb, reduce water in
Impurity residual silt, and the first suction tube 25 can suck the water in primary sedimentation tank 1 when absorbing silt simultaneously, water is in impulse turbine
When 26, turbine 26 can be made to be freely rotated in the first suction tube 25, be worked and rotated with crushing rod 27 by turbine 26, energy
It is enough that second-time breakage is carried out to the large-size massive silt in water under the collective effect of crushing rod 27 and broken cone 28, facilitate the first suction
The absorption of expects pipe 25 avoids the effect of large-size massive silt from blocking.The pipeline of the suction dredge, when the floccule in water is excessive,
The property of can choose disassembles the first suction tube 25, installs the second suction tube 29, avoids the flocculent substance in water excessive and twines
Around turbine 26, is hindered so that the rotation of turbine 26 is met with, influence the normal operation of suction dredge.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art,
It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc.
With replacement, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this
Within the protection scope of invention.
Claims (8)
1. a kind of separable ring is retained suction dredge, including primary sedimentation tank (1), hold-down support (5) and fixing pipe (23), feature exists
In: it is offered locating slot (2) at the top center of the primary sedimentation tank (1), and is fixedly installed with service bridge (3) on primary sedimentation tank (1),
And waterproof case (4) are provided at the top center of service bridge (3), the hold-down support (5) is set to service bridge (3) bottom
Portion, and the end of hold-down support (5) is fixed with casing (6), and bearing (7), the waterproof are equipped on the inner wall of casing (6)
Shell (4) is internally provided with rotary electric machine (8), and controller (9) are equipped on rotary electric machine (8), and rotary electric machine (8)
Driving end is coaxially connected with vertical bar (10), is provided with connecting tube (11) on the outside of the vertical bar (10), and connecting tube (11) is outer
Side is equipped with fixing piece (12), and the lower end of connecting tube (11) is set in locating slot (2) by position-limiting tube (16), described solid
Determine to be connected separately with mud scraping rod (13) and fixed link (15) on part (12), and the bottom of mud scraping rod (13) is equipped with cleaning shoe
(14), it and at the top of mud scraping rod (13) is vertically connected with stirring rod (17), is connected on the lower end inner wall of the connecting tube (11)
There is one end of screwed hose (18), and positioning ring (19) are installed on screwed hose (18), and positioning ring (19) and position-limiting tube
(16) it is provided between fixed spring (20), the other end of the screwed hose (18) passes through slurry pipe (21) and pulp absorbing pump (22) phase
It connecting, and pulp absorbing pump (22) is located on the outer wall of primary sedimentation tank (1), the fixing pipe (23) is set on fixed link (15), and
Fixing pipe (23) is connected by communicating pipe (24) and fixing piece (12) perforation, and is separately installed with the first suction in fixing pipe (23)
Expects pipe (25) and the second suction tube (29), first suction tube (25) is interior to be provided with turbine (26), and the middle part of turbine (26)
It is fixedly connected with crushing rod (27), and is provided with broken cone (28) on the outside of crushing rod (27).
2. a kind of separable ring according to claim 1 is retained suction dredge, it is characterised in that: the connecting tube (11) is respectively
It is formed by the first sectional pipe (30) and the second sectional pipe (31) both ends butt welding, and the first sectional pipe (30) and the second sectional pipe
(31) end is not mutually communicated, and the equal length of the length of the second sectional pipe (31) and the first sectional pipe (30).
3. a kind of separable ring according to claim 1 is retained suction dredge, it is characterised in that: between described cleaning shoe (14) etc.
Away from being set on mud scraping rod (13), and mud scraping rod (13) is symmetrically arranged with 2, and 2 about fixing piece (12) central axis
Cleaning shoe (14) relative dislocation distribution on mud scraping rod (13).
4. a kind of separable ring according to claim 1 is retained suction dredge, it is characterised in that: the screwed hose (18)
End and connecting tube (11) they are the integral structure setting of welding, and screwed hose (18) and connecting tube (11) are mutually communicated, and
And screwed hose (18) and position-limiting tube (16) constitute relative telescopic structure.
5. a kind of separable ring according to claim 1 is retained suction dredge, it is characterised in that: first suction tube (25)
Disassembly mounting structure, and the first suction tube (25) and the second suction tube are constituted with the second suction tube (29) and fixing pipe (23)
(29) shape same size is equal.
6. a kind of separable ring according to claim 1 is retained suction dredge, it is characterised in that: the bottom of the crushing rod (27)
Portion is located at the outside of the first suction tube (25), and crushing rod (27) is arranged in " Y " font structure.
7. a kind of separable ring according to claim 2 is retained suction dredge, it is characterised in that: first sectional pipe (30)
Inside and outside wall connect respectively with the inside thread of the outer wall of vertical bar (10) and bearing (7), and the first sectional pipe (30) and vertical bar
(10) it constitutes and is threadedly coupled sliding lifting structure.
8. a kind of separable ring according to claim 2 is retained suction dredge, it is characterised in that: second sectional pipe (31)
The inner wall of lower end position-limiting tube (16) be affixed, and the length of the second sectional pipe (31) is equal with position-limiting tube (16) deep within the space.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811323979.0A CN109173360B (en) | 2018-11-08 | 2018-11-08 | Combined environment-friendly water suction dredge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811323979.0A CN109173360B (en) | 2018-11-08 | 2018-11-08 | Combined environment-friendly water suction dredge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109173360A true CN109173360A (en) | 2019-01-11 |
CN109173360B CN109173360B (en) | 2020-12-11 |
Family
ID=64942361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811323979.0A Active CN109173360B (en) | 2018-11-08 | 2018-11-08 | Combined environment-friendly water suction dredge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109173360B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110102088A (en) * | 2019-05-17 | 2019-08-09 | 深圳市海洁达环保技术有限公司 | A kind of sewage treatment auxiliary system |
CN111233117A (en) * | 2019-03-04 | 2020-06-05 | 凌海峰 | Flocculation precipitation control method applied to sewage treatment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201823352U (en) * | 2010-09-17 | 2011-05-11 | 江苏金山环保工程集团有限公司 | Novel mud scraper |
CN102397714A (en) * | 2010-09-09 | 2012-04-04 | 上海宝钢化工有限公司 | Central torsional force type mud scrape dredge machine |
CN205965150U (en) * | 2016-08-19 | 2017-02-22 | 天津市安宝利亨环保工程技术有限公司 | Be applied to peripheral transmission mud scraper in industrial wastewater treatment system |
CN208003507U (en) * | 2018-02-28 | 2018-10-26 | 广东乾开环保股份有限公司 | Single tube scraping and sucking machine |
-
2018
- 2018-11-08 CN CN201811323979.0A patent/CN109173360B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102397714A (en) * | 2010-09-09 | 2012-04-04 | 上海宝钢化工有限公司 | Central torsional force type mud scrape dredge machine |
CN201823352U (en) * | 2010-09-17 | 2011-05-11 | 江苏金山环保工程集团有限公司 | Novel mud scraper |
CN205965150U (en) * | 2016-08-19 | 2017-02-22 | 天津市安宝利亨环保工程技术有限公司 | Be applied to peripheral transmission mud scraper in industrial wastewater treatment system |
CN208003507U (en) * | 2018-02-28 | 2018-10-26 | 广东乾开环保股份有限公司 | Single tube scraping and sucking machine |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111233117A (en) * | 2019-03-04 | 2020-06-05 | 凌海峰 | Flocculation precipitation control method applied to sewage treatment |
CN110102088A (en) * | 2019-05-17 | 2019-08-09 | 深圳市海洁达环保技术有限公司 | A kind of sewage treatment auxiliary system |
CN110102088B (en) * | 2019-05-17 | 2021-04-06 | 深圳市海洁达环保技术有限公司 | Sewage treatment auxiliary system |
Also Published As
Publication number | Publication date |
---|---|
CN109173360B (en) | 2020-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108939628A (en) | A kind of sewage precipitation device convenient for spoil disposal | |
CN109173360A (en) | A kind of separable ring water conservation suction dredge | |
CN109019739A (en) | A kind of water process air floatation machine | |
CN212467235U (en) | High-density paste type thickener | |
CN112237785A (en) | Sludge cleaning device for sewage treatment tank | |
CN113153187A (en) | Drilling circulation sand pumping device with spiral sand discharge structure | |
CN108643259A (en) | A kind of dredging device for water conservancy projects and its dredging method with agitating function | |
CN209575852U (en) | A kind of thickener for the concentration of wastewater zero discharge magma | |
CN208049553U (en) | A kind of filter device of connection municipal sewers | |
CN204550164U (en) | For the contact flocculation reaction unit of water treatment coagulation process | |
CN207988010U (en) | A kind of environment-protective desilting dredger floating clearly | |
CN203417499U (en) | Hammer-carrier-type central transmission sludge scraper | |
CN208097486U (en) | A kind of hydraulic reciprocating type mud scraper | |
CN206121244U (en) | Novel mud scraper | |
CN204699459U (en) | A kind of central transmission concentrator | |
CN211338878U (en) | Shallow air floatation equipment | |
CN204337846U (en) | A kind of center driving Hhigh-efficient thickener | |
CN209260804U (en) | A kind of hydraulic engineering channel cleanout device | |
CN211056948U (en) | Double-barrel type integrated rotary drum thickener | |
CN209076119U (en) | The detention tank of lift mud scraper is installed | |
CN106830470A (en) | A kind of sewage-treatment plant of strong applicability | |
CN203417497U (en) | Peripheral transmission-type scraping suction dredge | |
CN207002317U (en) | A kind of glass post-processing sewage disposal device | |
CN108176085B (en) | High-efficiency clarifier for green liquor | |
CN202016891U (en) | Full-automatic auger delivery type suspended matter scooping and concentration device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201126 Address after: No. 188, Daiwang Road, Chengdong high tech Industrial Park, Taixing City, Taizhou City, Jiangsu Province Applicant after: JIANGSU HEHAI SUPPLY AND DRAINAGE WHOLE SET EQUIPMENT Co.,Ltd. Address before: 237000 Dalishu Formation, Jinqiao Village, Dongqiao Town, Jinan District, Luan City, Anhui Province Applicant before: Wen Zhi |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |