CN109166173A - 基于bim的多精度三维测绘数据融合方法 - Google Patents
基于bim的多精度三维测绘数据融合方法 Download PDFInfo
- Publication number
- CN109166173A CN109166173A CN201810959289.8A CN201810959289A CN109166173A CN 109166173 A CN109166173 A CN 109166173A CN 201810959289 A CN201810959289 A CN 201810959289A CN 109166173 A CN109166173 A CN 109166173A
- Authority
- CN
- China
- Prior art keywords
- precision
- curved surface
- nurbs
- dimensional
- terrain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
- G06T2207/10—Image acquisition modality
- G06T2207/10028—Range image; Depth image; 3D point clouds
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- Computer Graphics (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Remote Sensing (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Image Generation (AREA)
- Processing Or Creating Images (AREA)
Abstract
本发明涉及三维测绘领域,提出一种基于BIM的多精度三维测绘数据融合方法。针对复杂且较大范围的水电站,在三维数字化协同设计中各专业对于施工总布置地形要求为:范围大、精度高、模型轻;但通过NURBS曲面生成的地形,范围越大、精度越高,模型越重,这极大的影响了数字化设计效率和运算速度。为解决上述问题,本发明的技术方案要点为:通过对不同精度的地形曲面进行修剪与重新接合,将待测地形区中有建筑结构设计的区域对应的曲面以高精度进行显示,没有建筑结构设计的区域对应的曲面以低精度进行显示,使不同精度的地形曲面显示在同一个NURBS三维地质曲面中。本发明的有益效果是:使模型轻量化,提高了设计效率和计算速度,适用于复杂地质区域的建模。
Description
技术领域
本发明涉及三维测绘技术,特别涉及如何基于BIM进行多精度三维测绘数据融合的技术。
背景技术
三维测绘数据包含多种格式,其中通过激光点云构建、解析生成的NURBS曲面,特别适用于创建复杂的曲面造型,满足水电站设计对地形要求。
激光点云也称为点云,是利用激光在同一空间参考系下获取物体表面每个采样点的空间坐标,得到的是一系列表达目标空间分布和目标表面特性的海量点的集合,这个点集合就称之为“点云”(Point Cloud)。点云的属性包括:空间分辨率,点位精度,表面法向量等。
NURBS是非均匀有理B样条曲线(Non-Uniform Rational B-Splines)的缩写,在传统的制图领域是不存在的,是为使用计算机进行3D建模而专门建立的。
在水电站三维数字化设计中,为满足专业间的协同设计需求,最终形成完整的施工总布置模型,要求施工总布置的地形范围要足够大,包含所有专业建筑物;精度足够高,满足各专业设计规范要求;地形足够“轻”,不能影响专业设计效率和计算速度。NURBS曲面生成的地形,是通过增加面数、段数的方法构建地形,地形范围越大、精度越高,曲面个数和段数就越多,模型就会越重,这大大的影响了专业三维数字化设计效率和计算速度。
水电站三维数字化协同设计中各专业对于施工总布置地形要求为:范围大、精度高、模型轻,但通过NURBS曲面生成的地形,范围越大、精度越高,模型越重,这极大的影响了数字化设计效率和运算速度。
发明内容
本发明的目的是提供一种基于BIM的多精度三维测绘数据融合方法,解决针对复杂且较大范围的水电站,在三维数字化协同设计中各专业对于施工总布置地形要求为:范围大、精度高、模型轻;但通过NURBS曲面生成的地形,范围越大、精度越高,模型越重,极大的影响了数字化设计效率和运算速度的问题。
本发明解决其技术问题,采用的技术方案是:基于BIM的多精度三维测绘数据融合方法,其特征在于,包括如下步骤:
根据三维测绘技术生成待测地形区的NURBS三维地质曲面,通过对不同精度的地形曲面进行修剪与重新接合,将该待测地形区中有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以高精度进行显示,没有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以低精度进行显示,使不同精度的地形曲面显示在同一个NURBS三维地质曲面中。
进一步地,对不同精度的地形曲面进行修剪与重新接合具体包括以下步骤:
步骤1、将NURBS三维地质曲面定义为地形曲面A,在曲面A中,有建筑结构设计的区域对应部分曲面定义为高精度地形曲面B;
步骤2、提取高精度地形曲面B边界轮廓并将该边界轮廓沿竖直上、下两个方向拉伸一定长度,将该边界轮廓形成的侧面定义为曲面M;
步骤3、利用曲面M分割地形曲面A,得到高精度地形曲面B边界轮廓以外的低精度地形曲面C;
步骤4、将曲面M分别和地形曲面A、C进行修剪,得到低精度地形曲面C与高精度地形曲面B衔接部位的结构面Q;
步骤5、将C、B、Q三个面接合,生成一张存在不同区域不同精度的NURBS三维地质曲面。
本发明的有益效果是,通过上述基于BIM的多精度三维测绘数据融合方法,针对复杂且较大范围的地形,在待测地形区的NURBS三维地质曲面中,通过对不同精度的地形曲面进行修剪与重新接合,将有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以高精度进行显示,没有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以低精度进行显示,实现不同区域不同精度的地形在同一NURBS三维地质曲面中显示,并且,使同一NURBS三维地质曲面上不同区域存在不同精度,既满足布置设计范围、设计精度要求,又能够使得模型轻量化,大大提高了设计效率计算速度。
具体实施方式
下面接合实施例,详细描述本发明的技术方案。
本发明所述基于BIM的多精度三维测绘数据融合方法,由如下步骤组成:
首先,根据三维测绘技术生成待测地形区的NURBS三维地质曲面,其次,通过对不同精度的地形曲面进行修剪与重新接合,将该待测地形区中有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以高精度进行显示,没有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以低精度进行显示,使不同精度的地形曲面显示在同一个NURBS三维地质曲面中。
这里,使同一NURBS三维地质曲面上不同区域存在不同精度,既满足布置设计范围、设计精度要求,又能够使得模型轻量化,大大提高了设计效率计算速度。
实施例
本发明实施例基于BIM的多精度三维测绘数据融合方法,包括如下步骤:
首先,根据三维测绘技术生成待测地形区的NURBS三维地质曲面,其次,通过对不同精度的地形曲面进行修剪与重新接合,将该待测地形区中有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以高精度进行显示,没有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以低精度进行显示,使不同精度的地形曲面显示在同一个NURBS三维地质曲面中。
上述方法中,优选地,对不同精度的地形曲面进行修剪与重新接合具体包括以下步骤:
步骤1、可以将NURBS三维地质曲面定义为地形曲面A,在曲面A中,有建筑结构设计的区域对应部分曲面可以定义为高精度地形曲面B;
步骤2、提取高精度地形曲面B边界轮廓并将该边界轮廓沿竖直上、下两个方向拉伸一定长度,将该边界轮廓形成的侧面定义为曲面M,其中,竖直上、下两个方向拉伸的长度可根据实际需要进行设定;
步骤3、利用曲面M分割地形曲面A,得到高精度地形曲面B边界轮廓以外的低精度地形曲面C;
步骤4、将曲面M分别和地形曲面A、C进行修剪,得到低精度地形曲面C与高精度地形曲面B衔接部位的结构面Q;
步骤5、将C、B、Q三个面接合,生成一张存在不同区域不同精度的NURBS三维地质曲面。
Claims (2)
1.基于BIM的多精度三维测绘数据融合方法,其特征在于,包括如下步骤:
根据三维测绘技术生成待测地形区的NURBS三维地质曲面,通过对不同精度的地形曲面进行修剪与重新接合,将该待测地形区中有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以高精度进行显示,没有建筑结构设计的区域在NURBS三维地质曲面中对应的曲面以低精度进行显示,使不同精度的地形曲面显示在同一个NURBS三维地质曲面中。
2.根据权利要求1所述的基于BIM的多精度三维测绘数据融合方法,其特征在于,所述对不同精度的地形曲面进行修剪与重新接合具体包括以下步骤:
步骤1、将NURBS三维地质曲面定义为地形曲面A,在曲面A中,有建筑结构设计的区域对应部分曲面定义为高精度地形曲面B;
步骤2、提取高精度地形曲面B边界轮廓并将该边界轮廓沿竖直上、下两个方向拉伸一定长度,将该边界轮廓形成的侧面定义为曲面M;
步骤3、利用曲面M分割地形曲面A,得到高精度地形曲面B边界轮廓以外的低精度地形曲面C;
步骤4、将曲面M分别和地形曲面A、C进行修剪,得到低精度地形曲面C与高精度地形曲面B衔接部位的结构面Q;
步骤5、将C、B、Q三个面接合,生成一张存在不同区域不同精度的NURBS三维地质曲面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810959289.8A CN109166173B (zh) | 2018-08-22 | 2018-08-22 | 基于bim的多精度三维测绘数据融合方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810959289.8A CN109166173B (zh) | 2018-08-22 | 2018-08-22 | 基于bim的多精度三维测绘数据融合方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109166173A true CN109166173A (zh) | 2019-01-08 |
CN109166173B CN109166173B (zh) | 2022-04-05 |
Family
ID=64896476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810959289.8A Active CN109166173B (zh) | 2018-08-22 | 2018-08-22 | 基于bim的多精度三维测绘数据融合方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109166173B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110704916A (zh) * | 2019-09-24 | 2020-01-17 | 中水北方勘测设计研究有限责任公司 | 基于bim技术的大型复杂三维地质模型网格粗化方法 |
CN111310263A (zh) * | 2020-02-10 | 2020-06-19 | 广联达科技股份有限公司 | 装修可视面选择方法、装置、存储介质、电子设备 |
CN112818450A (zh) * | 2021-02-01 | 2021-05-18 | 中国电建集团成都勘测设计研究院有限公司 | 基于区块索引的bim模型组织方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6567087B1 (en) * | 2000-03-27 | 2003-05-20 | The United States Of America As Represented By The Secretary Of The Army | Method to create a high resolution database |
US20040027344A1 (en) * | 2002-03-27 | 2004-02-12 | Sony Corporation | Three-dimensional terrain-information generating system and method, and computer program therefor |
CN1858803A (zh) * | 2006-04-04 | 2006-11-08 | 天津大学 | 水利水电工程地质信息的三维统一模型构建方法 |
CN102880775A (zh) * | 2011-07-12 | 2013-01-16 | 北京天大天科科技发展有限公司 | 基于自遍历演变的三维采矿应压力分析方法 |
JP2013072704A (ja) * | 2011-09-27 | 2013-04-22 | Kumagai Gumi Co Ltd | トンネル切羽の不連続面の抽出方法及びその装置 |
CN105118091A (zh) * | 2015-08-26 | 2015-12-02 | 中国电建集团北京勘测设计研究院有限公司 | 一种构建多精度非均匀地质网格曲面模型的方法和*** |
-
2018
- 2018-08-22 CN CN201810959289.8A patent/CN109166173B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6567087B1 (en) * | 2000-03-27 | 2003-05-20 | The United States Of America As Represented By The Secretary Of The Army | Method to create a high resolution database |
US20040027344A1 (en) * | 2002-03-27 | 2004-02-12 | Sony Corporation | Three-dimensional terrain-information generating system and method, and computer program therefor |
CN1858803A (zh) * | 2006-04-04 | 2006-11-08 | 天津大学 | 水利水电工程地质信息的三维统一模型构建方法 |
CN102880775A (zh) * | 2011-07-12 | 2013-01-16 | 北京天大天科科技发展有限公司 | 基于自遍历演变的三维采矿应压力分析方法 |
JP2013072704A (ja) * | 2011-09-27 | 2013-04-22 | Kumagai Gumi Co Ltd | トンネル切羽の不連続面の抽出方法及びその装置 |
CN105118091A (zh) * | 2015-08-26 | 2015-12-02 | 中国电建集团北京勘测设计研究院有限公司 | 一种构建多精度非均匀地质网格曲面模型的方法和*** |
Non-Patent Citations (5)
Title |
---|
X LIN ET AL: "Acqusition of high-precision digital terrain model using P-band airborne repeat-pass SAR interferometry", 《2016 CIE INTERNATIONAL CONFERENCE ON RADAR (RADAR)》 * |
XIAO WANG ET AL: "Three Dimensional Terrain Visualization on the Internet Using NURBS Method", 《IGARSS 2008 - 2008 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM》 * |
张勇: "等几何分析方法和比例边界等几何分析方法的研究及其工程应用", 《中国优秀博硕士学位论文全文数据库(博士)工程科技Ⅱ辑》 * |
易菊平 等: "CATIA 中地形NURBS 曲面拟合精度优化研究", 《测绘》 * |
梅中义 等: "NURBS曲面的四边形网格的分割与逼近_梅中义", 《工程图学学报》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110704916A (zh) * | 2019-09-24 | 2020-01-17 | 中水北方勘测设计研究有限责任公司 | 基于bim技术的大型复杂三维地质模型网格粗化方法 |
CN110704916B (zh) * | 2019-09-24 | 2023-06-16 | 中水北方勘测设计研究有限责任公司 | 基于bim技术的大型复杂三维地质模型网格粗化方法 |
CN111310263A (zh) * | 2020-02-10 | 2020-06-19 | 广联达科技股份有限公司 | 装修可视面选择方法、装置、存储介质、电子设备 |
CN111310263B (zh) * | 2020-02-10 | 2024-04-12 | 广联达科技股份有限公司 | 装修可视面选择方法、装置、存储介质、电子设备 |
CN112818450A (zh) * | 2021-02-01 | 2021-05-18 | 中国电建集团成都勘测设计研究院有限公司 | 基于区块索引的bim模型组织方法 |
CN112818450B (zh) * | 2021-02-01 | 2022-04-15 | 中国电建集团成都勘测设计研究院有限公司 | 基于区块索引的bim模型组织方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109166173B (zh) | 2022-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109493422A (zh) | 一种基于三维激光扫描技术的变电站三维模型构建方法 | |
CN107025685B (zh) | 拓扑感知下的机载建筑屋顶点云建模方法 | |
CN101154295A (zh) | 航道三维仿真电子图 | |
CN109166173A (zh) | 基于bim的多精度三维测绘数据融合方法 | |
CN101404090B (zh) | 一种用于空间分析的地下构筑物三维数字化模型构建方法 | |
CN103217688B (zh) | 一种基于不规则三角网机载激光雷达点云平差计算方法 | |
CN103196426A (zh) | 一种全站仪联合三维激光扫描仪用于建筑测量的方法 | |
CN101154313A (zh) | 三维仿真数字信息航道***及实现方法 | |
CN103644860A (zh) | 大型空间自由曲面测量方法 | |
CN105844067B (zh) | 一种船体曲板焊接变坡口自动加工数据的获取方法 | |
CN105225266B (zh) | 一种基于异形曲面进行现实与理论交互建模的方法 | |
CN103884321A (zh) | 一种遥感影像成图工艺 | |
CN101383054A (zh) | 一种基于图像与扫描数据的混合三维重建方法 | |
CN103927788A (zh) | 基于城市竖向规划的建筑地物分层dem模型制作方法 | |
CN109558643B (zh) | 一种交通场景建模及模型单体化方法 | |
CN108765568A (zh) | 一种基于激光雷达点云的多层次建筑物快速三维重建方法 | |
CN111199064A (zh) | 一种地铁轨道面三维中心线生成方法 | |
CN106557600A (zh) | 一种输电塔长短腿及基础的仿真方法 | |
CN111986320A (zh) | 面向智慧城市应用的dem与倾斜摄影模型空间贴合优化算法 | |
CN102830960A (zh) | 航道三维仿真电子图 | |
CN100380097C (zh) | 一种无缝立体模型的量测方法 | |
CN102930176B (zh) | 大地水准面模型九网格五样条插值方法 | |
CN105182441B (zh) | 一种实测地层剖面绘制的三维投影法 | |
KR100490670B1 (ko) | 산악용 입체지도 제작방법 | |
CN107705360A (zh) | 一种山地景观断面快速生成方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |