Prior art keywords
prefabricated subsection
connection structure
slip casting
uhpc
tenon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811240404.2A
Other languages
Chinese (zh)
Other versions
CN109162199B (en
Inventor
张阳
陈泉宏
李星亮
朱平
邵旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201811240404.2A priority Critical patent/CN109162199B/en
Publication of CN109162199A publication Critical patent/CN109162199A/en
Application granted granted Critical
Publication of CN109162199B publication Critical patent/CN109162199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of assembling-type precast pier connection structure and its construction method, connection structure are the component for connecting each prefabricated subsection of precast assembly bridge pier;Prefabricated subsection both ends are equipped with wet seam cavity, and inside is equipped with several slip casting channels of the connection wet seam cavity in both ends;Connection structure includes upper prefabricated subsection, lower prefabricated subsection and UHPC tenon, the wet seam cavity of upper and lower prefabricated subsection and slip casting channel are enclosed for pouring the chamber to form UHPC tenon, steel reinforcement cage is provided in the UHPC tenon, the both ends of steel reinforcement cage are located in the slip casting channel of upper and lower prefabricated subsection.The invention also includes the construction methods that precast assembly bridge pier is carried out using the connection structure, technical solution of the present invention not only increases resistance to compression and the pull resistance of precast pier segment junction, and the stress, simple structure, short construction period and the anti-seismic performance that improve bridge pier entirety are strong.

Description

Assembling-type precast pier connection structure and its construction method
Technical field
The invention belongs to science of bridge building fields, and in particular to a kind of assembling-type precast pier connection structure and its construction party Method.
Background technique
With flourishing for Bridges in Our Country construction, the construction environment of bridge is increasingly by the attention of various circles of society, especially It is the bridge in urban construction.Section assembling bridge pier has short time limit, Ke Yi relative to traditional cast-in-place concrete bridge Precasting yard prefabricated components are interfered the advantages that few by ambient outside.The wherein intersegmental connection type of precast assembly bridge pier and connection Quality directly influences the stress performance and anti-seismic performance of bridge pier entirety.Therefore, reliable and simplicity segment connection type is pre- Make the key of assembled bridge pier application.Existing precast assembly bridge pier segment connection type is also less, and specific embodiment is more Cumbersome, quality of connection is difficult to be guaranteed.
CN107675610A discloses the construction and the practice of a kind of connection of precast assembly bridge pier segment, by by very-high performance Concrete UHPC is applied between precast pier segment, using the resistance to compression and tensile property of ultra-high performance concrete UHPC, with solution The certainly weak problem of precast pier segment connection.But it realizes the connection of prefabricated subsection using cast-in-place UHPC connector, adopts Although being obtained with the resistance to compression of the connecting structure of the precast assembly bridge pier segment and practice precast pier segment junction and tensile property Enhancing is arrived, but its construction is complicated, long construction period, and the Stress distribution of junction is uneven, the whole stress of bridge pier It is poor with anti-seismic performance.
Summary of the invention
The technical problem to be solved by the present invention is overcoming the deficiencies of the prior art and provide a kind of assembling-type precast pier company Binding structure and its construction method can substantially reduce on-site construction time, reduce interference of the construction to surrounding traffic, structure stress Stable and reliable for performance, anti-seismic performance is strong.
The technical solution adopted by the present invention to solve the technical problems is: a kind of assembling-type precast pier connection structure, should Connection structure is the component for connecting each prefabricated subsection of precast assembly bridge pier;The prefabricated subsection both ends are equipped with wet seam cavity 13, inside is equipped with several slip casting channels 1 of the connection wet seam cavity 3 in both ends;The connection structure include upper prefabricated subsection 2, under Prefabricated subsection 7 and UHPC tenon 3, the wet seam cavity 13 of prefabricated subsection and the slip casting channel 1 up and down are enclosed for pouring shape At the chamber of UHPC tenon 3, steel reinforcement cage 12 is provided in the UHPC tenon 3, the both ends of the steel reinforcement cage 12 are located at prefabricated up and down In the slip casting channel 1 of segment.Preferably, the rounded gear-like of the cavity.
Further, the UHPC tenon 3 is to pour HESUHPC(ungauged regions rapid hardening early strong UHPC) it forms.
Further, several plant slots 6 and vertical muscle are equipped at the top of the prefabricated subsection, the vertical muscle stretches out prefabricated subsection pier bottom Part is anchorage inserted bar 4.
Further, the vertical muscle and plant 6 interlaced arrangement of slot.
Further, several pre-buried connection reinforcing bars 8 and interface reinforcing bar 9 are disposed in the cavity 13.
Beneficial effects of the present invention: the present invention connect the pre- of prefabricated subsection with reinforcing bar straight cutting combined type using cast-in-place UHPC tenon Assembled bridge pier is made, resistance to compression and pull resistance, simple structure, the short construction period of precast pier segment junction is enhanced, passes through note The steel reinforcement cage of certain length is arranged in slurry channel in UHPC tenon, and the slip casting that the both ends of steel reinforcement cage are located at upper and lower prefabricated subsection is logical In road, the ratio of reinforcement of seam crossing is not only increased, also improves the bridge pier entirety ratio of reinforcement, and makes prefabricated subsection junction up and down Stress distribution it is uniform, improve anti-seismic performance, while ensure that the holistic resistant behavior of structure is reliable and stable.
Detailed description of the invention
Fig. 1 is the vertical section structure schematic diagram of single prefabricated subsection in the present invention;
Fig. 2 is upper and lower prefabricated subsection connection type vertical section structure schematic diagram in the present invention;
Fig. 3 is B-B cross section structure schematic diagram in Fig. 2 of the present invention;
The cast-in-place UHPC tenon cross section structure schematic diagram of Fig. 4 present invention.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and embodiments.
Referring to Fig.1 ~ 4, a kind of assembling-type precast pier connection structure and its construction method, the connection structure are pre- for connecting Make each prefabricated subsection of assembled bridge pier;The plant slot 6 and vertical muscle that the top of prefabricated subsection is equipped with several interlaced arrangements are (in the present embodiment It is not drawn into), indulging muscle to stretch out prefabricated subsection pier bottom part is anchorage inserted bar 4, and prefabricated subsection both ends are equipped with wet seam cavity 13.It is preferred that , the rounded gear-like of cavity 13 is arranged in prefabricated subsection both ends kernel of section.
Several pre-buried connection reinforcing bars 8 and interface reinforcing bar 9 are disposed in cavity 13, bottom is equipped with 4 slip casting channels 1;Connection Structure includes upper prefabricated subsection 2, lower prefabricated subsection 7, UHPC tenon 3, the wet seam cavity 13 of upper and lower prefabricated subsection and slip casting channel 1 encloses for pouring the chamber to form UHPC tenon 3, and steel reinforcement cage 12 is arranged in UHPC tenon 3 by slip casting channel, steel reinforcement cage 12 Both ends are located in the slip casting channel 1 of upper and lower prefabricated subsection.By being respectively arranged pre-buried connection in 13 inherent laws of cavity Reinforcing bar 8 and interface reinforcing bar 9 can further enhance the cohesive force of cast-in-place UHPC tenon 3 and normal concrete inside prefabricated subsection.
The making step of prefabricated subsection:
1) first in the reserved plant slot 6 in the top of prefabricated subsection, and vertical muscle is set, slot 6 and vertical muscle interlaced arrangement are planted, by vertical muscle Prefabricated subsection pier bottom part is stretched out as anchorage inserted bar 4;
2) wet seam cavity 13 is hollowed out out at the kernel of section of prefabricated subsection both ends, several pre-buried connection reinforcing bars of arrangement in cavity 13 8 and interface reinforcing bar 9, the slip casting channel 1 of logical both ends cavity 13 is set in prefabricated subsection.
The site operation detailed process of precast pier:
After first upper prefabricated subsection 2 is sling, one layer of epoxy glue is smeared to upper and lower prefabricated subsection connection contact position 5, it is prefabricated still further below A certain amount of HESUHPC grouting material 11 of injection in the plant slot 6 of segment 7, later, all by the anchorage inserted bar 4 of upper prefabricated subsection It is inserted into the plant slot 6 of lower prefabricated subsection 7, until the HESUHPC grouting material 11 planted in slot 6 overflows just, with iron sheet package pair Upper and lower prefabricated subsection cavity seam crossing is sealed processing, and steel reinforcement cage 12, steel reinforcement cage are arranged into UHPC tenon by slip casting channel 1 12 both ends are located at the slip casting channel 1 of upper and lower prefabricated subsection, inject HESUHPC by the slip casting channel 1 of upper prefabricated subsection 2 (ungauged regions rapid hardening early strong UHPC) 10 forms cast-in-place UHPC tenon 3 until overflowing slip casting channel 1 after filling up, repeat above-mentioned step Suddenly the assembly of entire precast pier is completed.Preferably, iron sheet package can be used in encapsulation process.
The working principle of the invention: arranging the steel reinforcement cage of certain length by slip casting channel in UHPC tenon, steel reinforcement cage Both ends are located in the slip casting channel of upper and lower prefabricated subsection, not only increase the ratio of reinforcement of seam crossing, it is whole to also improve bridge pier The body ratio of reinforcement, and make the Stress distribution of upper and lower prefabricated subsection junction uniform, anti-seismic performance is improved, ensure that simultaneously The holistic resistant behavior of structure is reliable and stable.Since HESUHPC grouting material can reach higher-strength in a short time, by anchor Gu having formd between prefabricated subsection and being reliably connected to, without waiting for cast-in-place after surrounding plant slot connection is inserted into bar planting The final age of UHPC tenon can continue next stage of constructing, and be very beneficial for practice of construction use.In addition, being compared to routine The early strong UHPC of UHPC, HESUHPC(ungauged regions rapid hardening) it is not necessarily to steam curing, room temperature is sprinkled water epiphragma maintenance, and after conserving 1 day Compression strength can reach 40Mpa, and compression strength can reach 70Mpa after maintenance 3 days, substantially increases construction efficiency, shortens Construction period.

Claims (9)

1. a kind of assembling-type precast pier connection structure, which is characterized in that the connection structure is for connecting precast assembly bridge pier The component of each prefabricated subsection;The prefabricated subsection both ends are equipped with wet seam cavity (13), and it is empty that inside is equipped with the wet seam in connection both ends Several slip casting channels (1) of chamber (3);The connection structure includes upper prefabricated subsection (2), lower prefabricated subsection (7) and UHPC tenon (3), the wet seam cavity (13) of prefabricated subsection and slip casting channel (1) up and down enclose to form UHPC tenon (3) for pouring Chamber, is provided with steel reinforcement cage (12) in the UHPC tenon (3), the both ends of the steel reinforcement cage (12) are located at prefabricated subsection up and down Slip casting channel (1) in.
2. a kind of assembling-type precast pier connection structure according to claim 1, which is characterized in that the UHPC tenon (3) is HESUHPC is poured to form.
3. a kind of assembling-type precast pier connection structure according to claim 2, which is characterized in that at the top of the prefabricated subsection Equipped with several plant slots (6) and vertical muscle, it is anchorage inserted bar (4) that the vertical muscle, which stretches out prefabricated subsection pier bottom part,.
4. a kind of assembling-type precast pier connection structure according to claim 3, which is characterized in that the vertical muscle and plant slot (6) interlaced arrangement.
5. any one a kind of assembling-type precast pier connection structure according to claim 1 ~ 4, which is characterized in that the cavity (13) several pre-buried connection reinforcing bars (8) and interface reinforcing bar (9) are disposed in.
6. using a kind of assembling-type precast pier connection structure assembly precast pier recorded in one claim of any of the above Construction method characterized by comprising
Step 1: the production of prefabricated subsection;
Step 2: upper prefabricated subsection (2) is sling;
Step 3: upper and lower prefabricated subsection is located by connecting, the arrangement of steel reinforcement cage;
Step 4: it pours to form UHPC tenon by slip casting channel (1);
Step 5: repeating Step 2: three, four complete the assembly of entire precast pier.
7. a kind of construction method of precast pier according to claim 6, which is characterized in that the concrete operations of step 1 are as follows:
1) first in reserved plant slot (6) in the top of prefabricated subsection, and vertical muscle is set, plants slot (6) and vertical muscle interlaced arrangement, it will Vertical muscle stretches out prefabricated subsection pier bottom part as anchorage inserted bar (4);
2) wet seam cavity (13) is hollowed out out at the kernel of section of prefabricated subsection both ends, several pre-buried connections of arrangement in cavity (13) Reinforcing bar (8) and interface reinforcing bar (9) set the slip casting channel (1) of connection both ends cavity (13) in prefabricated subsection.
8. a kind of construction method of precast pier according to claim 6, which is characterized in that the concrete operations of step 3 are as follows:
1) the plant slot (6) of prefabricated subsection (7) downward first injects a certain amount of HESUHPC grouting material (11), then will be upper prefabricated The anchorage inserted bar (4) of segment is entirely insertable in the plant slot (6) of lower prefabricated subsection (7), until the HESUHPC planted in slot (6) is filled Slurry (11) overflows just;
2) processing is sealed to upper and lower prefabricated subsection cavity seam crossing;
3) steel reinforcement cage (12) are arranged to UHPC tenon by slip casting channel (1), is located at the both ends of steel reinforcement cage (12) pre- up and down In the slip casting channel (1) of segment processed;
4) HESUHPC(10 is injected by the slip casting channel (1) of upper prefabricated subsection (2) again), be up to overflowing slip casting channel (1) Only, cast-in-place UHPC tenon (3) is formed after filling up.
9. a kind of construction method of precast pier according to claim 8, which is characterized in that the prefabricated subsection up and down connects It connects contact position (5) and smears one layer of epoxy glue, the encapsulation process is to be wrapped up with iron sheet.
CN201811240404.2A 2018-10-24 2018-10-24 Combined prefabricated bridge pier connecting structure and construction method thereof Active CN109162199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811240404.2A CN109162199B (en) 2018-10-24 2018-10-24 Combined prefabricated bridge pier connecting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811240404.2A CN109162199B (en) 2018-10-24 2018-10-24 Combined prefabricated bridge pier connecting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109162199A true CN109162199A (en) 2019-01-08
CN109162199B CN109162199B (en) 2020-01-07

Family

ID=64878877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811240404.2A Active CN109162199B (en) 2018-10-24 2018-10-24 Combined prefabricated bridge pier connecting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109162199B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722984A (en) * 2019-01-18 2019-05-07 福建工程学院 Half assembled thin-wall piers of one kind and its assembly method
CN109783985A (en) * 2019-02-22 2019-05-21 湖南大学 The building and application method of a kind of inertia device with epoxy glue constitutive model
CN110029570A (en) * 2019-04-26 2019-07-19 重庆锦森腾建筑工程咨询有限公司 Precast Concrete Segmental Bridges concrete pier and its assembling method
CN110080093A (en) * 2019-06-12 2019-08-02 重庆锦森腾建筑工程咨询有限公司 A kind of assembled bridge pier and its construction method
CN110396918A (en) * 2019-07-22 2019-11-01 长安大学 A kind of equivalent cast-in-place assembled hollow pier system and its construction method
CN110924595A (en) * 2019-12-31 2020-03-27 湖南大学 Steel bar anchoring joint and construction method thereof
CN111827095A (en) * 2020-06-29 2020-10-27 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with built-in rib plates and construction method
CN113481870A (en) * 2021-08-11 2021-10-08 柳州欧维姆机械股份有限公司 Prestressed anchoring structure system for assembling multi-segment bridge pier and assembling construction method of multi-segment bridge pier

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110008752A (en) * 2009-07-21 2011-01-27 한국건설기술연구원 Precast concrete segments for constructing bridge piers with elongated round holes surrounding reinforcing bars and the method using the same
KR101339946B1 (en) * 2011-09-05 2013-12-10 주식회사 동호 Precast bridge post
CN206109970U (en) * 2016-08-31 2017-04-19 南京理工大学 Prefabricated assembled pier suitable for well meizoseismal area
CN206408515U (en) * 2016-12-30 2017-08-15 河南省交通规划设计研究院股份有限公司 Precast pier section assembling structure
CN107060216A (en) * 2017-02-16 2017-08-18 沈阳建筑大学 Assembled FRP strengthens steel core concrete column
CN207537895U (en) * 2017-11-24 2018-06-26 深圳市交运工程集团有限公司 A kind of connection structure of packaged type bridges

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110008752A (en) * 2009-07-21 2011-01-27 한국건설기술연구원 Precast concrete segments for constructing bridge piers with elongated round holes surrounding reinforcing bars and the method using the same
KR101339946B1 (en) * 2011-09-05 2013-12-10 주식회사 동호 Precast bridge post
CN206109970U (en) * 2016-08-31 2017-04-19 南京理工大学 Prefabricated assembled pier suitable for well meizoseismal area
CN206408515U (en) * 2016-12-30 2017-08-15 河南省交通规划设计研究院股份有限公司 Precast pier section assembling structure
CN107060216A (en) * 2017-02-16 2017-08-18 沈阳建筑大学 Assembled FRP strengthens steel core concrete column
CN207537895U (en) * 2017-11-24 2018-06-26 深圳市交运工程集团有限公司 A kind of connection structure of packaged type bridges

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722984A (en) * 2019-01-18 2019-05-07 福建工程学院 Half assembled thin-wall piers of one kind and its assembly method
CN109722984B (en) * 2019-01-18 2024-02-06 福建工程学院 Semi-assembled thin-wall pier and assembly method thereof
CN109783985A (en) * 2019-02-22 2019-05-21 湖南大学 The building and application method of a kind of inertia device with epoxy glue constitutive model
CN110029570A (en) * 2019-04-26 2019-07-19 重庆锦森腾建筑工程咨询有限公司 Precast Concrete Segmental Bridges concrete pier and its assembling method
CN110080093A (en) * 2019-06-12 2019-08-02 重庆锦森腾建筑工程咨询有限公司 A kind of assembled bridge pier and its construction method
CN110396918A (en) * 2019-07-22 2019-11-01 长安大学 A kind of equivalent cast-in-place assembled hollow pier system and its construction method
CN110396918B (en) * 2019-07-22 2024-03-12 长安大学 Assembled hollow pier system equivalent to cast-in-situ and construction method thereof
CN110924595A (en) * 2019-12-31 2020-03-27 湖南大学 Steel bar anchoring joint and construction method thereof
CN111827095A (en) * 2020-06-29 2020-10-27 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with built-in rib plates and construction method
CN113481870A (en) * 2021-08-11 2021-10-08 柳州欧维姆机械股份有限公司 Prestressed anchoring structure system for assembling multi-segment bridge pier and assembling construction method of multi-segment bridge pier

Also Published As

Publication number Publication date
CN109162199B (en) 2020-01-07

Similar Documents

Publication Publication Date Title
CN109162199A (en) Assembling-type precast pier connection structure and its construction method
CN105862538B (en) The oblique bond-retarded prestressed concrete pavement structure of assembled
CN109487686A (en) A kind of unit construction bridge panel transverse joint using UHPC grouting material
CN207905121U (en) Precast concrete constraint slurry anchor overlaps connection structure
CN107060117A (en) The continuous construction method of seam crossing fiber is realized in concrete gradation casting process
CN108316131A (en) A kind of precast block formula full prestressing pier structure and its method of construction
CN105926771B (en) A kind of the interior joint connection structure and its construction method of prefabricated integral frame column beam
CN106760054A (en) Precast reinforced concrete shear wall
CN206570955U (en) A kind of prefabricated post single hole provisions for grouting
CN106638486A (en) Stage construction method for diaphragm wall and gallery of high-core rock-fill dam
CN105881733A (en) Prefabricated reinforced concrete component and manufacturing method thereof
CN106088412A (en) L-type steel beam column
CN205917717U (en) Transmission line basis
CN110409283A (en) It is a kind of based on retarded adhesive prestressed UHPC permanent template without the rib prestressed Self-curing combination beam of abdomen and construction method
CN108468379A (en) A kind of novel precast prestressed continuous beam connecting node of assembly concrete
CN103147438A (en) Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN202831388U (en) Small beam high pre-stress pre-cast beam
CN209323688U (en) Prefabricated assembling type reinforced concrete column splices node structure
CN204715223U (en) A kind of abutment prestressed reinforcement structure
CN109989478A (en) A kind of precast prestressed concrete frame structure
CN206873665U (en) A kind of prefabricated shear wall and overlapping plate node
CN105625571B (en) The precast concrete bean column node of strength prestressed muscle in a kind of use
CN207032010U (en) A kind of assembled solid steel tube constrains armored concrete pillar height pier
CN210917342U (en) Pretensioned prestressed concrete pipe pile
CN106087881B (en) A kind of precast concrete box-structure and cast-in-place concrete convolution Sluice Pier structure and its construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant