CN109141066A - Tail gas clean-up and heat recovery system and method for Treatment of Sludge - Google Patents

Tail gas clean-up and heat recovery system and method for Treatment of Sludge Download PDF

Info

Publication number
CN109141066A
CN109141066A CN201710452211.2A CN201710452211A CN109141066A CN 109141066 A CN109141066 A CN 109141066A CN 201710452211 A CN201710452211 A CN 201710452211A CN 109141066 A CN109141066 A CN 109141066A
Authority
CN
China
Prior art keywords
heat
heat exchange
transferring medium
heat exchanger
tail gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710452211.2A
Other languages
Chinese (zh)
Other versions
CN109141066B (en
Inventor
谭玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Zhengsheng Technology Co ltd
Original Assignee
Guangzhou Xin Zhisheng Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Xin Zhisheng Environmental Protection Technology Co Ltd filed Critical Guangzhou Xin Zhisheng Environmental Protection Technology Co Ltd
Priority to CN201710452211.2A priority Critical patent/CN109141066B/en
Publication of CN109141066A publication Critical patent/CN109141066A/en
Application granted granted Critical
Publication of CN109141066B publication Critical patent/CN109141066B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D7/00Heat-exchange apparatus having stationary tubular conduit assemblies for both heat-exchange media, the media being in contact with different sides of a conduit wall
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/02Separating dispersed particles from gases, air or vapours by liquid as separating agent by passing the gas or air or vapour over or through a liquid bath
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/02Heat pumps of the compression type
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The present invention relates to the tail gas clean-ups and heat recovery system and method for Treatment of Sludge.The system includes: the first heat exchange flow path, including First Heat Exchanger and it is arranged in second heat exchanger and third heat exchanger in First Heat Exchanger downstream, first heat transferring medium recycles in the first heat exchange flow path, to heat the processing gas for being used for Treatment of Sludge in First Heat Exchanger;And second purification with heat exchange flow path, heat exchange case including accommodating second liquid heat transferring medium, tail gas after Treatment of Sludge is discharged into heat exchange case, it is cleaned by the second liquid heat transferring medium in heat exchange case and transfers heat to second liquid heat transferring medium to be cooled down, the second liquid heat transferring medium in the second heat exchanger and heat exchange case is in heat exchange relationship so that the heat transfer of second liquid heat transferring medium is to the first heat transferring medium in the second heat exchanger.The exhaust gas flow of heat exchange case is by third heat exchanger, for carrying out heat exchange with the first heat transferring medium for flowing through third heat exchanger.

Description

Tail gas clean-up and heat recovery system and method for Treatment of Sludge
Technical field
The present invention relates to the tail gas clean-ups and heat recovery system and method for Treatment of Sludge, more particularly relate to dirt The tail gas clean-up and heat recovery system and method for mud processing.
Background technique
With the continuous development of urbanization, the generated sewage quantity to be treated in industrial production and life gradually increases Add, and as the byproduct after sewage treatment --- the quantum of output of sludge is also increasing.But relative to sewage, sludge Processing seems more difficult.Currently, sludge drying processing is a kind of relatively effective method for sludge treatment.And relatively good desiccation Processing usually can all use direct-type desiccation, and carry out recycling and reusing to the desiccation medium after desiccation.
Chinese invention patent CN201010101024.8 disclose a kind of latent heat exchange formula multi-phase change sludge drying method with Equipment.This equipment is passed through steam to carry out desiccation to sludge after mainly dewatered sludge is sent into desiccation machine.Pass through Constantly stirring keeps sludge sufficiently heated and evaporates moisture therein and achieve the purpose that desiccation.It is dry that sludge is received using latent heat blowback Steam after change, and by thermal energy therein through steam generation facility generation low temperature water vapour and as supplement desiccation heat source, then use In sludge drying, and will be using the filtered tail gas harmless emission of biofilter into atmospheric environment.The patent document is adopted Device and method can carry out drying and other treatment to sludge by low temperature water vapour, and by latent heat friendship heat-exchange pump to being given birth to At tail gas in steam heat carry out heat exchange, and the heat of recycling is re-used as to the heat source of sludge drying, to realize heat Circulation.
A large amount of waste gas can be released during sludge heat drying, complicated component multiplicity, is various organic-inorganics The mixture of gas endangers seriously human habitat if direct emission can cause serious secondary pollution to ambient enviroment, And cause the loss of heat.
Therefore now with some vent gas treatment modes, such as biofiltration process, tail gas absorber, deduster etc., but at present The processing functions such as effective vent gas treatment and recuperation of heat are all difficult to realize, the tail gas after many desiccation discharges after treatment, And the heat that tail gas carries is not for recycling and reuse, to increase desiccation energy consumption cost.And even if there is recuperation of heat processing Equipment, the often low efficiency of recuperation of heat, and the sludge impurity contained in tail gas can block heat recovery equipment and cause to corrode.
The equipment of either above-mentioned patent or the equipment of the prior art are although dirt can be realized by way of heat exchange Tail gas heat quantity recycling and recycling after mud desiccation, but in mud drying process, the sludge impurity carried in tail gas can be blocked up Equipment is filled in, the efficiency of recuperation of heat is influenced.
Therefore the system and method that tail gas clean-up and recuperation of heat are effectively carried out in mud drying process are required to.
Summary of the invention
To solve the above-mentioned problems, the invention proposes a kind of tail gas clean-up for Treatment of Sludge and heat recovery system and Method.
According to an aspect of the present invention, a kind of tail gas clean-up and heat recovery system for Treatment of Sludge is provided, comprising:
First heat exchange flow path, the first heat exchange flow path include First Heat Exchanger and are arranged in First Heat Exchanger downstream Second heat exchanger and third heat exchanger, the first heat transferring medium recycles in the first heat exchange flow path, in First Heat Exchanger Middle heating is used for the processing gas of Treatment of Sludge;
Second purification and heat exchange flow path, second purification and heat exchange flow path include the heat for accommodating second liquid heat transferring medium Commuting case, the tail gas after Treatment of Sludge are discharged into the heat exchange case, are cleaned by the second liquid heat transferring medium in heat exchange case And the second liquid heat transferring medium is transferred heat to be cooled down, in second heat exchanger and the heat exchange case Second liquid heat transferring medium is in heat exchange relationship so that the heat transfer of the second liquid heat transferring medium is changed to described second First heat transferring medium in hot device;And
Wherein, the exhaust gas flow of the heat exchange case is by the third heat exchanger, for flow through third heat exchanger First heat transferring medium carries out heat exchange.
Preferably, the tail gas clean-up and heat recovery system further include gas collecting apparatus, and the gas collecting apparatus is arranged described Above heat exchange case, for collecting tail gas from the heat exchange case;
Preferably, the first heat exchange flow path includes being arranged in the compressor of First Heat Exchanger upstream and being arranged under First Heat Exchanger Trip and the throttle valve in the second heat exchanger upstream, the compressor are used to compress first heat transferring medium, and will be compressed First heat transferring medium is directed to the First Heat Exchanger, and first heat transferring medium heats the place in the First Heat Exchanger Then process gases flows into second heat exchanger via the throttle valve.
Preferably, the air inlet pipeline upstream of heat exchange case is arranged in gas distributing device, for making the tail after Treatment of Sludge Gas can be evenly into heat exchange case.
Preferably, the heat exchange case include be arranged in clear liquid import near the bottom of heat exchange case and waste liquid outlet with And the turbid outlet on the top of heat exchange case is set;When needing to feed, second liquid heat transferring medium is drawn from clear liquid import Enter heat exchange case;When the liquid level in heat exchange case reaches turbid outlet, second liquid heat transferring medium, which is just exported from turbid, to flow out; When heat exchange case needs to clean, second liquid heat transferring medium is discharged from waste liquid outlet.
Preferably, the tail gas clean-up and heat recovery system further include third compressed gas flow path, the third compressed gas Body flow path include be arranged in compressed gas entrance near heat exchange case bottom, control valve and be arranged in heat exchange case bottom it is attached Close tracheae, the control valve are configured to that compressed gas is introduced tracheae via compressed gas entrance when needed, and by setting Multiple small hole injections on tracheae are set into the second liquid heat transferring medium of heat exchange case, are then discharged together with tail gas.
Preferably, second heat exchanger is arranged in series in the upstream or downstream of the third heat exchanger.
Preferably, second heat exchanger is arranged in parallel with the third heat exchanger.
Preferably, the second liquid heat transferring medium is the one or more of water, cleaning solution and ionic liquid.
Preferably, second heat exchanger is placed in inside the heat exchange case, the tail gas in the heat exchange case The heat exchange case is discharged into below liquid level.
Preferably, the processing gas is air.
Preferably, the processing gas is sent into mud drying device from the First Heat Exchanger by ventilation device.
According to an aspect of the present invention, a kind of tail gas clean-up and heat recovery method for Treatment of Sludge is provided, comprising:
First heat exchange flow path is provided, the first heat exchange flow routing heat exchange loop is constituted, including First Heat Exchanger and It is arranged in second heat exchanger and third heat exchanger in First Heat Exchanger downstream, the first heat transferring medium is in the first heat exchange flow path Middle circulation, to heat the processing gas for being used for Treatment of Sludge in First Heat Exchanger;And
The second purification and heat exchange flow path are provided, second purification includes accommodating second liquid heat transferring medium with heat exchange flow path Heat exchange case, the tail gas after Treatment of Sludge is discharged into the heat exchange case, by the second liquid heat transferring medium in heat exchange case It cleans and transfers heat to the second liquid heat transferring medium to be cooled down, second heat exchanger and the heat exchange case In second liquid heat transferring medium be in heat exchange relationship so that the heat transfer of the second liquid heat transferring medium is to described the First heat transferring medium in two heat exchangers;
The second liquid heat transferring medium is filled to the heat exchange case;
Start the first heat exchange flow path and second purification and heat exchange flow path, so that processing gas is described the It is heated in one heat exchanger, is then delivered to mud drying device, and be entered from the tail gas that mud drying device is discharged The heat exchange case so that the tail gas by the second liquid heat transferring medium cleaning and transfer heat to described Two liquid heat transfer mediums are to be cooled down;And
Make the exhaust gas flow of the heat exchange case by the third heat exchanger, for flow through the first of third heat exchanger Heat transferring medium carries out heat exchange.
Preferably, the method also includes:
Gas collecting apparatus is provided, the gas collecting apparatus is arranged above the heat exchange case, for collecting tail from the heat exchange case Gas;And
The heat exchange case exhaust gas flow by the third heat exchanger before, make the tail gas of the heat exchange case by described Gas collecting apparatus is collected.
Preferably, the first heat exchange flow path includes being arranged in the compressor of First Heat Exchanger upstream and being arranged in the first heat exchange Device downstream and throttle valve in the second heat exchanger upstream, the compressor, and will compressions for compressing first heat transferring medium The first heat transferring medium afterwards is directed to the First Heat Exchanger, and first heat transferring medium heats institute in the First Heat Exchanger Processing gas is stated, then flows into second heat exchanger via the throttle valve.
Preferably, the method also includes: gas distributing device is arranged in the air inlet pipeline upstream of heat exchange case, is used for Enable tail gas evenly into heat exchange case.
Preferably, the method also includes: provide third compressed gas flow path, the third compressed gas flow path include set Set the compressed gas entrance near heat exchange case bottom and the tracheae near the bottom that heat exchange case is set, compressed gas warp Tracheae is entered by compressed gas entrance, and is changed by the second liquid of the multiple small hole injections to the heat exchange case that are arranged on tracheae In thermal medium, then it is discharged together with tail gas.
Preferably, second heat exchanger is arranged in series in the upstream or downstream of the third heat exchanger.
Preferably, second heat exchanger is arranged in parallel with the third heat exchanger.
The present invention is provided to the tail gas clean-up of Treatment of Sludge and heat recovery system and method, air enters from air inlet, Compressor is first passed through, First Heat Exchanger is then flowed into.First Heat Exchanger heats air, and the air heated is pressurizeed by ventilation device After be sent into mud drying device.In mud drying device, the air of heating participates in sludge drying processing as processing gas.Add It after the air of heat becomes the tail gas with sludge impurity, is discharged from mud drying device, and distributes and fill via pipeline inflow gas It sets.Tail gas collects in gas distributing device, and arranges in the second liquid heat transferring medium into heat exchange case by air inlet pipeline It puts, to give the heat transfer in tail gas to second liquid heat transferring medium, realizes solution-air heat exchange, to realize in tail gas Heat recuperation of heat.In this heat transfer process, exhaust temperature is lowered, and automatically flows up to second liquid heat exchange It more than the liquid level of medium, is then collected by gas collecting apparatus.Tail gas after collection is entered third heat exchanger, with third heat exchanger In the first heat exchange medium carry out heat exchange, be subsequently discharged in environment by the tail gas for purifying and cooling down or other processing Device.
At the same time, the first heat exchange medium of compressor compresses, and compressed first heat exchange medium is discharged to In one heat exchanger.In First Heat Exchanger, the first heat exchange medium discharges heat to the air for flowing through First Heat Exchanger and realizes Heat exchange between first heat exchange medium and air.Then, the first heat exchange medium being condensed is come by throttle valve Second heat exchanger and/or third heat exchanger.As noted above, the second liquid heat transferring medium in heat exchange case absorbs tail Heat in gas causes its temperature to rise.Therefore, the first heat exchange medium can absorb second liquid in the second heat exchanger and change Heat in thermal medium is evaporated, and realizes heat exchange between the two, to reduce the temperature of second liquid heat transferring medium Degree.Therefore second liquid heat transferring medium in heat exchange case can continue to absorb the heat for being discharged into tail gas therein.By right Tail gas heat quantity is transformed into second liquid heat transferring medium, then transfers thermal energy to the second heat exchanger by second liquid heat transferring medium, from And realize the thermal energy conversion that multiphase becomes, greatly improve the transmission efficiency of thermal energy;Pass through tail gas, second liquid heat transferring medium and The thermal energy of one heat transferring medium is converted, and heat can be sufficiently recycled, and heat loss is reduced, to reduce energy consumption.It can be with from above-mentioned process Find out, process of the present invention is ingenious, by unique heat exchange method, can quickly and effectively realize recuperation of heat, make heating energy efficiency ratio COP reaches 3.0 ~ 8.0, to improve desiccation speed, sludge drying effect is good.In addition, the present invention is situated between using second liquid heat exchange Confrontation exhaust gas is cleaned, and is washed the sludge impurity in tail gas effectively, is better ensured that equipment life, prevent tail gas Equipment is blocked or corroded in heat exchanging process, improves the efficiency of tail gas recuperation of heat.
The present invention one or more of has the following technical effects:
(1) after tail gas first passes through gas distributing device, and enter via air inlet pipeline the second liquid heat transferring medium of heat exchange case Middle cleaning, meanwhile, second liquid heat transferring medium absorbs the thermal energy in tail gas, thermal effect conversion is realized, so as to prevent in sludge Equipment is blocked and corroded in tail gas heat exchanging process, improves the efficiency of tail gas recuperation of heat.
(2) energy-saving effect is good, by tail gas clean-up processing system, realizes efficient recuperation of heat, improves the efficiency of sludge drying.
(3) in order to guarantee that heat exchange is more abundant, the present invention has additional third heat exchanger, so that the heat of gas and liquid turns Tail gas after changing carries out heat conversion with the first heat transferring medium of third heat exchanger again, improves the efficiency of heat recovery.
(4) by being transformed into second liquid heat transferring medium to tail gas heat quantity, then thermal energy is passed by second liquid heat transferring medium The second heat exchanger is passed, to realize the thermal energy conversion that multiphase becomes, greatly improves the transmission efficiency of thermal energy;Pass through tail gas, The conversion of the thermal energy of two liquid heat transfer mediums and the first heat transferring medium, can sufficiently recycle heat, heat loss be reduced, to reduce energy Consumption.
(5) process is simple, desiccation effect is good, can quickly and effectively realize recuperation of heat, improvement effect and speed.
(6) enter the second purification and the tail gas of heat exchange flow path carries out handling under closed environment simultaneously recuperation of heat, prevent Foul smell generates, and prevents secondary pollution, very environmentally friendly.
Other exemplary embodiments of the invention are described in detail obviously from provided below.It should be understood that institute It states the detailed description and specific examples and although discloses exemplary embodiment of the present invention, but be merely illustrative purpose without purport It is limiting the scope of the invention.
Detailed description of the invention
At least one embodiment will be described in conjunction with the following drawings below, wherein identical appended drawing reference indicates identical Element.
Fig. 1 is the schematic diagram of a preferred embodiment of tail gas clean-up according to the present invention and heat recovery system.
Fig. 2 is the schematic diagram of another preferred embodiment of tail gas clean-up according to the present invention and heat recovery system.
Fig. 3 is the schematic diagram of another preferred embodiment of tail gas clean-up according to the present invention and heat recovery system.
Appended drawing reference:
1 mud drying device
2 first heat exchange flow paths
3 second purifications and heat exchange flow path
4 ventilation devices
5 air inlets
6 gas collecting apparatus
21 compressors
22 First Heat Exchangers
23 throttle valves
24 second heat exchangers
25 third heat exchangers
31 heat exchange cases
311 clear liquid imports
312 control valves
313 waste liquid outlets
314 control valves
The outlet of 315 turbids
316 compressed gas entrances
317 tracheaes
318 control valves
32 gas distributing devices
321 air inlet pipelines
322 gas outlets
323 second liquid heat transferring mediums.
Specific embodiment
Illustrate below substantially exemplary only and is in no way intended to limit the present invention, its application or use.With reference to attached Figure, Fig. 1 is the schematic diagram of a preferred embodiment of tail gas clean-up according to the present invention and heat recovery system.Fig. 2 is according to this The schematic diagram of another preferred embodiment of the tail gas clean-up and heat recovery system of invention.Fig. 3 is that tail gas according to the present invention is net Change the schematic diagram with another preferred embodiment of heat recovery system.
As shown in Figure 1, tail gas clean-up according to the present invention and heat recovery system include the first heat exchange flow path 2, described the One heat exchange flow path 2 is made of heat exchange loop, including compressor 21, First Heat Exchanger 22, throttle valve 23 and is arranged in series The second heat exchanger 23 in 22 downstream of First Heat Exchanger, the first heat transferring medium recycle in the first heat exchange flow path 2, with Heating is used for the processing gas of Treatment of Sludge in First Heat Exchanger 22.The first heat exchange flow path 2 further includes third heat exchanger 25。
As shown in Figure 1, second heat exchanger 24 is arranged in series in the downstream of the third heat exchanger 25.However, institute Stating the second heat exchanger 24 can also be arranged in series in the upstream of the third heat exchanger 25, as shown in Figure 2.In addition, described Two heat exchangers 24 can also be arranged in parallel with the third heat exchanger 25, as shown in Figure 3.
First heat transferring medium recycles in the heat exchange loop.The compression of compressor 21 is in gaseous first heat transferring medium, And the first heat transferring medium of compressed high temperature and pressure is arranged to First Heat Exchanger 22.First heat transferring medium is in First Heat Exchanger Processing gas (such as from the external air) condensation flowed through from First Heat Exchanger 22 in 22, becomes liquid, handles gas Therefore body is heated.
According to one embodiment of present invention, First Heat Exchanger 22 is equivalent to condenser.Condensed first heat transferring medium Second heat exchanger 24 and/or third heat exchanger 25 are entered with the liquid form of low-temp low-pressure by throttle valve 23.It is changed second In hot device 24 and/or third heat exchanger 25, the first heat transferring medium absorbs heat with heat exchange flow path 3 from the second purification and is steamed Hair.Therefore, the second heat exchanger 24 and/or third heat exchanger 25 are equivalent to evaporator.The first heat transferring medium after evaporation is pressed The sucking of contracting machine 21 is to carry out new compression circulation.First heat transferring medium for example can be R134a, R407c, R410a etc..This field Technical staff it should be understood that First Heat Exchanger 22, the second heat exchanger 24 and third heat exchanger 25 can be it is any other The heat exchanger of suitable type, is made without departing from the scope of the present invention.
Preferred embodiment in accordance with the present invention, processing gas firstly flow through compressor 21 before flowing through First Heat Exchanger 22, It helps cooling compressor 21 and is therefore preheated, to improve the recovery efficiency of heat.
In one embodiment of the invention, the downstream of First Heat Exchanger 22 is arranged in sludge treatment equipment, for dirt Mud is handled, and tail gas is discharged.A large amount of waste gas can be released during sludge heat drying, complicated component is various, It is the mixture of various organic-inorganic gases, it is raw to the mankind if direct emission can cause serious secondary pollution to ambient enviroment Environmental hazard living is serious, and due to having waste heat in tail gas, direct emission will cause thermal loss.In a reality of the invention It applies in example, sludge treatment equipment is shown as mud drying device 1.It will be apparent to a skilled person that Treatment of Sludge fills The sludge treatment equipment for being also possible to any other suitable type is set, is made without departing from the scope of the present invention.
Tail gas clean-up according to the present invention and heat recovery system further include the second purification and heat exchange flow path 3, and described second Purification includes the heat exchange case 31 for accommodating second liquid heat transferring medium 323 with heat exchange flow path 3.Tail gas after Treatment of Sludge is arranged Enter the heat exchange case 31, cleaned by the second liquid heat transferring medium 323 in heat exchange case 31 and transferred heat to and is described Second liquid heat transferring medium 323 is to be cooled down.Second heat exchanger 24 is placed in inside the heat exchange case 31, and described second changes Hot device 24 is in heat exchange relationship so that the second liquid exchanges heat with the second liquid heat transferring medium in the heat exchange case 31 The heat transfer of medium 323 is to first heat transferring medium in second heat exchanger 24.In heat exchange case 31, tail gas is not Heat exchange is only directly carried out with second liquid heat transferring medium, but also directly carries out heat exchange with the second heat exchanger 24, and will be hot Amount passes to the first heat transferring medium;Therefore, it is converted by the thermal energy of tail gas, second liquid heat transferring medium and the first heat transferring medium, The heat in tail gas can be sufficiently recycled, heat loss is reduced, to reduce energy consumption.It certainly can be as needed in heat exchange case 31 Portion is provided with multiple second heat exchangers 24, and multiple second heat exchangers 24 can be serial or parallel connection arrangement, to improve the second liquid The heat transfer of body heat transferring medium 323 gives the efficiency of the first heat transferring medium.Exist into the second purification and the tail gas of heat exchange flow path 3 It carries out handling simultaneously recuperation of heat under closed environment, prevents foul smell from generating, prevent secondary pollution, it is very environmentally friendly.
In one embodiment of the invention, second liquid heat transferring medium is water.But second liquid heat transferring medium is not It is limited to water, other suitable liquid can be used as, such as cleaning solution, ionic liquid etc..
Tail gas is cleaned in heat exchange case 31 and transfers heat to second liquid heat transferring medium, therefore is cooled down.By This realizes the purification of tail gas and the recycling of heat.Tail gas automatically rises in second liquid heat transferring medium after cooling It more than the liquid level of second liquid heat transferring medium, and then is collected by gas collecting apparatus 6.
The second liquid heat transferring medium for obtaining heat from tail gas is transferred heat to again via the second heat exchanger 24 second The first heat transferring medium flowed in heat exchanger 24 is to evaporate the first heat transferring medium.
Tail gas clean-up according to the present invention and heat recovery system further include gas collecting apparatus 6, and the gas collecting apparatus 6 is arranged in institute 31 top of heat exchange case is stated, for collecting the tail gas for having carried out heat exchange and cleaning from the heat exchange case 31.Tail gas is handed in heat It changes in case 31 and transfers heat to second liquid heat transferring medium, to be cooled down.It is thus achieved that the recycling of heat.Tail gas is cooling down Afterwards, the liquid level of second liquid heat transferring medium or more is automatically risen in second liquid heat transferring medium, and then by the gas collection Device 6 is collected.What the gas collecting apparatus 6 was collected carried out heat exchange and the exhaust gas flow of cleaning passes through the third heat exchanger 25, for carrying out heat exchange with the first heat transferring medium for flowing through third heat exchanger 25.It certainly, can be as needed in heat exchange Multiple third heat exchangers 25 are set above case 31, and multiple third heat exchangers 25 can be serial or parallel connection arrangement, and gas collecting apparatus 6 is received The exhaust gas flow for having carried out heat exchange and cleaning of collection by carrying out heat exchange with the first heat transferring medium of the multiple heat exchanger, To improve the efficiency of heat exchange.
The first heat transferring medium for flowing through the second heat exchanger 24 and/or third heat exchanger 25 is sufficiently heated up and is vaporized, and by First Heat Exchanger 22 is led back to, with repetitive cycling process.
Preferred embodiment in accordance with the present invention, gas distributing device 32 are arranged on the air inlet pipeline 321 of heat exchange case 31 Trip, for enabling tail gas evenly into heat exchange case 31.Gas distributing device 32 by pipeline respectively with heat exchange case 31 Gas connection is formed with mud drying device 1.Particularly, the air inlet pipeline of gas distributing device 32 and heat exchange case 31 is connected The liquid level of the 321 second liquid heat transferring mediums being inserted into heat exchange case 31 is hereinafter, the depth that air inlet pipeline 321 is inserted into is enough to protect Demonstrate,prove the sufficient heat exchange between gas and liquid.According to the present invention, after tail gas first passes through gas distributing device 32, and via air inlet It is cleaned in the second liquid heat transferring medium of the entrance heat exchange case 31 of pipeline 321, meanwhile, second liquid heat transferring medium absorbs in tail gas Thermal energy, realize thermal effect conversion, so as to prevent in sludge tail gas heat exchanging process block and corrode equipment, improve tail The efficiency of gas recuperation of heat.
Preferred embodiment in accordance with the present invention, the heat exchange case 31 include being arranged near the bottom of heat exchange case 31 Clear liquid import 311 and waste liquid outlet 313 and be arranged in heat exchange case 311 top turbid outlet 315.
The heat exchange case 31 further includes control valve 312 and control valve 314.Due to containing sludge impurity in tail gas, thus During carrying out solution-air interaction in heat exchange case 31, the sludge impurity in tail gas is by second liquid heat transferring medium 323 Cleaning, and be trapped in second liquid heat transferring medium 323.In order to keep the cleaning of second liquid heat transferring medium 323 and guarantee heat The efficiency of exchange can open control valve 312, and water is introduced heat exchange case from the clear liquid import 311 of the bottom of heat exchange case 31 31, when the liquid level in heat exchange case 31 reaches turbid outlet 315, second liquid heat transferring medium 323 is just from 315 stream of turbid outlet Out.
As the sludge impurity in liquid is continuously increased, the liquid in heat exchange case 31 becomes muddy, and then influences to rear The heat exchange and cleaning of the tail gas of entrance, and certain devices are also required to overhaul or replace.For this purpose, control valve 312 can be closed, Stop water inlet, and opening control valve 314 is discharged liquid from the waste liquid outlet 313 of the bottom of heat exchange case 31, later, carries out anti- To operation, again to 31 water storage of heat exchange case.
Preferred embodiment in accordance with the present invention, the tail gas clean-up and heat recovery system further include third flow of the compressed gas Road, the third compressed gas flow path includes control valve 318, the compressed gas entrance that is arranged near 31 bottom of heat exchange case 316 and the tracheae 317 that is arranged near the bottom of heat exchange case 31.Compressed gas enters tracheae via compressed gas entrance 316 317, and through multiple small hole injections for being arranged on tracheae into the second liquid heat transferring medium of heat exchange case 31, then and tail Gas enters gas collecting apparatus 6 or third heat exchanger 25 together.
If the sludge impurity savings of the bottom of heat exchange case 31 is excessive, the heat exchange effect of the second heat exchanger 24 is influenced Rate can open control valve 318, keep compressed gas attached from the arrival setting of compressed gas entrance 316 bottom in heat exchange case 31 Close tracheae 317.Later, compressed gas passes through multiple apertures for being arranged on tracheae 317 and sprays, and by the bottom of heat exchange case 31 The sludge impurity agitation in portion is got up, to facilitate sludge impurity from 315 discharge of turbid outlet.Leave second liquid heat transferring medium 323 compressed gas is collected into the gas collecting apparatus 6 of 31 top of heat exchange case, and hot with the progress in gas collecting apparatus 6 therewith The tail gas of exchange and cleaning enters third heat exchanger 25 together, is then discharged into environment via gas outlet 322 or other processing fill It sets.
It is possible in accordance with a preferred embodiment of the present invention to be not provided with gas collecting apparatus 6, make the tail gas for having carried out heat exchange and cleaning Directly by the third heat exchanger 25, for carrying out heat exchange with the first heat transferring medium for flowing through third heat exchanger 25.
Preferred embodiment in accordance with the present invention, the second heat exchanger 24 are placed directly in heat exchange case 31, are achieved in sufficiently Heat exchange.
Preferred embodiment in accordance with the present invention, the processing gas are air.However, the processing gas is also possible to fit Together in any other gas of the invention.
Preferred embodiment in accordance with the present invention, the processing gas are sent by ventilation device 4 from the First Heat Exchanger 22 Sludge treatment equipment.The ventilation device 4 is preferably blower device and/or blower unit.
Preferred embodiment in accordance with the present invention, the sludge treatment equipment are mud drying devices 1.However, the sludge Processing unit is also possible to any other sludge treatment equipment.The exhaust gas of drying and other treatment, i.e. tail gas are completed, is filled from sludge drying 1 is set to be discharged in the second purification and heat exchange flow path 3.
When tail gas clean-up described above and heat recovery system are put into use, processing gas is derived from external environment Air generally uses following operating procedure.
Firstly, the first heat exchange flow path of starting 2 and the second purification and heat exchange flow path 3.Control valve 312 is opened, by second Liquid heat transfer medium 323, such as water inject in heat exchange case 31 from liquid-inlet 311.Under normal circumstances, second liquid changes Thermal medium 323 will reach scheduled liquid level in heat exchange case 31.Then, control valve 312 is closed.
Air enters from air inlet 5, first flows through from compressor 21, then flows into First Heat Exchanger 22.First Heat Exchanger 22 Air is heated, and heat air by ventilation device 4(such as blower device and/or air-introduced machine) pressurization after be sent into sludge drying Device 1.In mud drying device 1, the air of heating participates in sludge drying processing as processing gas.The air of heating becomes After tail gas with sludge impurity, it is discharged from mud drying device 1, and via pipeline inflow gas distributor 32.Tail gas exists Collect in gas distributing device 32, and is arranged in the second liquid heat transferring medium 323 into heat exchange case 31 by air inlet pipeline 321 It puts, so that the heat transfer in tail gas to second liquid heat transferring medium 323, is realized solution-air heat exchange, to realize to tail gas In heat recuperation of heat.In this heat transfer process, exhaust temperature is lowered, and is automatically flowed up to second liquid and changed It more than the liquid level of thermal medium 323, is then collected by gas collecting apparatus 6.The tail gas of collection is entered third heat exchanger 25, with third The first heat exchange medium in heat exchanger 25 carries out heat exchange, be subsequently discharged in environment by the tail gas for purifying and cooling down or Other processing units.
At the same time, compressor 21 compresses the first heat exchange medium, and compressed first heat exchange medium is discharged to In First Heat Exchanger 22.In First Heat Exchanger 22, the first heat exchange medium discharges heat to the air for flowing through First Heat Exchanger 22 It measures and realizes the heat exchange between the first heat exchange medium and air.Then, the first heat exchange medium being condensed is by throttling Valve 23 and come the second heat exchanger 24 and/or third heat exchanger 25.As noted above, the second liquid in heat exchange case 31 Heat transferring medium 323 absorbs the heat in tail gas, its temperature is caused to rise.Therefore, the first heat exchange medium is in the second heat exchanger The heat that can be absorbed in second liquid heat transferring medium 323 in 24 is evaporated, and realizes heat exchange between the two, to drop The low temperature of second liquid heat transferring medium 323.Therefore second liquid heat transferring medium 323 in heat exchange case 31 can continue to inhale Receive the heat for being discharged into tail gas therein.By being transformed into second liquid heat transferring medium to tail gas heat quantity, then changed by second liquid Thermal medium transfers thermal energy to the second heat exchanger, to realize the thermal energy conversion that multiphase becomes, greatly improves the transmitting effect of thermal energy Rate;It is converted by the thermal energy of tail gas, second liquid heat transferring medium and the first heat transferring medium, can sufficiently recycle heat, reduce heat Loss, to reduce energy consumption.
Due to containing sludge impurity in tail gas, thus in heat exchange case 31 during progress solution-air interaction, tail Sludge impurity in gas is cleaned by second liquid heat transferring medium 323, and is trapped in second liquid heat transferring medium 323.
Then, in order to keep the cleaning of second liquid heat transferring medium 323, it can according to need and open control valve 312, by the Two liquid heat transfer medium 323(such as water) from the clear liquid import 311 of the bottom of heat exchange case 31 introducing heat exchange case 31, when heat is handed over When the liquid level changed in case 31 reaches turbid outlet 315, second liquid heat transferring medium 323 is just from 315 outflow of turbid outlet.Normal In the case of, second liquid heat transferring medium 323 will reach scheduled liquid level in heat exchange case 31.Then, 312 quilt of control valve It closes.
As the sludge impurity in liquid is continuously increased, the liquid in heat exchange case 31 becomes muddy, and then influences to rear The heat exchange and cleaning of the tail gas of entrance, and certain devices are also required to overhaul or replace.For this purpose, control valve 312 can be closed, Stop water inlet, and opening control valve 314 is discharged liquid from the waste liquid outlet 313 of the bottom of heat exchange case 31, later, carries out anti- To operation, again to 31 water storage of heat exchange case.
If the sludge impurity savings of the bottom of heat exchange case 31 is excessive, the heat exchange effect of the second heat exchanger 24 is influenced Rate can open control valve 318, keep compressed gas attached from the arrival setting of compressed gas entrance 316 bottom in heat exchange case 31 Close tracheae 317.Later, compressed gas passes through multiple apertures for being arranged on tracheae 317 and sprays, and by the bottom of heat exchange case 31 The sludge impurity agitation in portion is got up, to facilitate sludge impurity from 315 discharge of turbid outlet.The compressed gas for leaving liquid is received Collect the gas collecting apparatus 6 of the top of heat exchange case 31, and therewith with the tail gas one for having carried out heat exchange and cleaning in gas collecting apparatus 6 It rises and enters third heat exchanger 25, be then discharged into environment or other processing units via gas outlet 322.
Certain preferred embodiments and its modification has been described in the present invention.Those skilled in the art illustrate in reading and understanding It is contemplated that other modifications and variations after book.Thus, the present invention is not limited to as optimal mode for carrying out the present invention Disclosed specific embodiment, the present invention will include all embodiments fallen within the scope of the claims.

Claims (20)

1. a kind of tail gas clean-up and heat recovery system for Treatment of Sludge, comprising:
First heat exchange flow path, the first heat exchange flow path include First Heat Exchanger and are arranged in First Heat Exchanger downstream Second heat exchanger and third heat exchanger, the first heat transferring medium recycles in the first heat exchange flow path, in First Heat Exchanger Middle heating is used for the processing gas of Treatment of Sludge;
Second purification and heat exchange flow path, second purification and heat exchange flow path include the heat for accommodating second liquid heat transferring medium Commuting case, the tail gas after Treatment of Sludge are discharged into the heat exchange case, are cleaned by the second liquid heat transferring medium in heat exchange case And the second liquid heat transferring medium is transferred heat to be cooled down, in second heat exchanger and the heat exchange case Second liquid heat transferring medium is in heat exchange relationship so that the heat transfer of the second liquid heat transferring medium is changed to described second First heat transferring medium in hot device;And
The air inlet pipeline upstream of heat exchange case is arranged in, for keeping the tail gas after Treatment of Sludge uniform in gas distributing device Ground enters heat exchange case,
Wherein, the exhaust gas flow of the heat exchange case is by the third heat exchanger, for flow through third heat exchanger First heat transferring medium carries out heat exchange.
2. tail gas clean-up according to claim 1 and heat recovery system further include gas collecting apparatus, the gas collecting apparatus setting Above the heat exchange case, for collecting tail gas from the heat exchange case.
3. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein the first heat exchange flow routes heat exchange Circuit is constituted, including being arranged in the compressor of First Heat Exchanger upstream and being arranged in First Heat Exchanger downstream and in the second heat exchanger The throttle valve of upstream, the compressor are guided for compressing first heat transferring medium, and by compressed first heat transferring medium To the First Heat Exchanger, first heat transferring medium heats the processing gas in the First Heat Exchanger, then via The throttle valve flows into second heat exchanger.
4. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein the heat exchange case includes that setting exists Clear liquid import and waste liquid outlet near the bottom of heat exchange case and be arranged in heat exchange case top turbid outlet.
5. tail gas clean-up according to claim 1 or 2 and heat recovery system further include third compressed gas flow path, described Third compressed gas flow path includes that compressed gas entrance, control valve and setting near heat exchange case bottom is arranged in heat exchange Tracheae near the bottom of case, the control valve are configured to that compressed gas is introduced gas via compressed gas entrance when needed Pipe, and through multiple small hole injections for being arranged on tracheae into the second liquid heat transferring medium of heat exchange case, then and tail gas It is discharged together.
6. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein second heat exchanger cloth in series It sets in the upstream or downstream of the third heat exchanger.
7. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein second heat exchanger and described the Three heat exchangers are arranged in parallel.
8. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein the second liquid heat transferring medium is Water, cleaning solution and ionic liquid it is one or more.
9. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein second heat exchanger is placed in described Inside heat exchange case.
10. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein the tail gas is in the heat exchange case The heat exchange case is discharged into below inherent liquid level.
11. tail gas clean-up according to claim 10 and heat recovery system, wherein heat exchange case be provided with positioned at liquid level with Under air inlet pipe.
12. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein the processing gas is air.
13. tail gas clean-up according to claim 1 or 2 and heat recovery system, wherein the processing gas is by ventilation device Mud drying device is sent into from the First Heat Exchanger.
14. a kind of tail gas clean-up and heat recovery method for Treatment of Sludge, comprising:
The first heat exchange flow path is provided, the first heat exchange flow path includes First Heat Exchanger and is arranged under First Heat Exchanger The second heat exchanger and third heat exchanger of trip, the first heat transferring medium recycles in the first heat exchange flow path, to change first Heating is used for the processing gas of Treatment of Sludge in hot device;
The second purification and heat exchange flow path are provided, second purification includes accommodating second liquid heat transferring medium with heat exchange flow path Heat exchange case, the tail gas after Treatment of Sludge is discharged into the heat exchange case, by the second liquid heat transferring medium in heat exchange case It cleans and transfers heat to the second liquid heat transferring medium to be cooled down, second heat exchanger and the heat exchange case In second liquid heat transferring medium be in heat exchange relationship so that the heat transfer of the second liquid heat transferring medium is to described the First heat transferring medium in two heat exchangers;
The second liquid heat transferring medium is filled to the heat exchange case;
Start the first heat exchange flow path and second purification and heat exchange flow path, so that processing gas is described the It is heated in one heat exchanger, is then delivered to mud drying device, and be entered from the tail gas that mud drying device is discharged The heat exchange case so that the tail gas by the second liquid heat transferring medium cleaning and transfer heat to described Two liquid heat transfer mediums are to be cooled down;And
Make the exhaust gas flow of the heat exchange case by the third heat exchanger, for flow through the first of third heat exchanger Heat transferring medium carries out heat exchange.
15. tail gas clean-up according to claim 14 and heat recovery method, further includes:
Gas collecting apparatus is provided, the gas collecting apparatus is arranged above the heat exchange case, for collecting tail from the heat exchange case Gas;And
The heat exchange case exhaust gas flow by the third heat exchanger before, make the tail gas of the heat exchange case by described Gas collecting apparatus is collected.
16. tail gas clean-up according to claim 14 or 15 and heat recovery method, wherein the first heat exchange flow path includes cloth Set First Heat Exchanger upstream compressor and be arranged in First Heat Exchanger downstream and throttle valve in the second heat exchanger upstream, institute It states compressor and is directed to first heat exchange for compressing first heat transferring medium, and by compressed first heat transferring medium Device, first heat transferring medium heat the processing gas in the First Heat Exchanger, then flow into via the throttle valve Second heat exchanger.
17. tail gas clean-up according to claim 14 or 15 and heat recovery method, further includes: gas distributing device to be arranged In the air inlet pipeline upstream of heat exchange case, for enabling tail gas evenly into heat exchange case.
18. tail gas clean-up according to claim 14 or 15 and heat recovery method, further includes: provide third flow of the compressed gas Road, the third compressed gas flow path include the compressed gas entrance being arranged near heat exchange case bottom and are arranged in heat exchange Tracheae near the bottom of case, compressed gas enter tracheae via compressed gas entrance, and multiple on tracheae by being arranged in Small hole injection is then discharged together with tail gas into the second liquid heat transferring medium of heat exchange case.
19. tail gas clean-up according to claim 14 or 15 and heat recovery method, wherein second heat exchanger is in series It is arranged in the upstream or downstream of the third heat exchanger.
20. tail gas clean-up according to claim 14 or 15 and heat recovery method, wherein second heat exchanger with it is described Third heat exchanger is arranged in parallel.
CN201710452211.2A 2017-06-15 2017-06-15 Tail gas purification and heat recovery system and method for sludge treatment Active CN109141066B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710452211.2A CN109141066B (en) 2017-06-15 2017-06-15 Tail gas purification and heat recovery system and method for sludge treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710452211.2A CN109141066B (en) 2017-06-15 2017-06-15 Tail gas purification and heat recovery system and method for sludge treatment

Publications (2)

Publication Number Publication Date
CN109141066A true CN109141066A (en) 2019-01-04
CN109141066B CN109141066B (en) 2024-06-04

Family

ID=64829920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710452211.2A Active CN109141066B (en) 2017-06-15 2017-06-15 Tail gas purification and heat recovery system and method for sludge treatment

Country Status (1)

Country Link
CN (1) CN109141066B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4949652A (en) * 1989-06-26 1990-08-21 Hadley Henry H Waste disposal system
RU2049241C1 (en) * 1992-04-10 1995-11-27 Романов Геннадий Николаевич Device for purifying exhaust gases
JPH0833826A (en) * 1994-07-25 1996-02-06 Babcock Hitachi Kk Treatment of boiler waste combustion gas for coal fired thermal power plant and device therefor
CN201186893Y (en) * 2008-03-14 2009-01-28 清华大学 Heat pump and sludge dewatering integrated system
CN101618931A (en) * 2009-07-28 2010-01-06 清华大学 Mud drying and incinerating integrated system and use method thereof
CN101774743A (en) * 2010-01-26 2010-07-14 沈阳航空工业学院 Latent heat recoverable multi-phase change sludge drying method and device
TW201039913A (en) * 2009-05-15 2010-11-16 Jg Environmental Tech Co Ltd Wet-type washing, purification and recycling apparatus and method for organic waste gas
CN101991995A (en) * 2009-08-17 2011-03-30 张文波 Washing tower
CN102022829A (en) * 2009-09-09 2011-04-20 中国科学院工程热物理研究所 Immersed condensation heat exchanger and application thereof
CN102276130A (en) * 2011-05-31 2011-12-14 陈海渊 Sludge resource treatment apparatus and sludge treatment method using the same
CN202398241U (en) * 2011-09-09 2012-08-29 上海森松新能源设备有限公司 Chlorosilane washing tower
RU2482901C1 (en) * 2012-04-19 2013-05-27 Олег Савельевич Кочетов Device for cleaning and recovery of off-gases
CN203123739U (en) * 2012-12-26 2013-08-14 成都源创环保工程有限公司 Exhaust gas spray tower with built-in heat exchange
CN105194964A (en) * 2015-10-20 2015-12-30 秦皇岛首创思泰意达环保科技有限公司 Method and device for washing and hot mass transfer of pollutants in gas
CN105819646A (en) * 2015-01-07 2016-08-03 广州新致晟环保科技机械设备有限公司 System and method thereof for recovering heat in tail gas from dried sludge
CN207335482U (en) * 2017-06-15 2018-05-08 广州新致晟环保科技机械设备有限公司 Tail gas clean-up and heat recovery system for Treatment of Sludge

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4949652A (en) * 1989-06-26 1990-08-21 Hadley Henry H Waste disposal system
RU2049241C1 (en) * 1992-04-10 1995-11-27 Романов Геннадий Николаевич Device for purifying exhaust gases
JPH0833826A (en) * 1994-07-25 1996-02-06 Babcock Hitachi Kk Treatment of boiler waste combustion gas for coal fired thermal power plant and device therefor
CN201186893Y (en) * 2008-03-14 2009-01-28 清华大学 Heat pump and sludge dewatering integrated system
TW201039913A (en) * 2009-05-15 2010-11-16 Jg Environmental Tech Co Ltd Wet-type washing, purification and recycling apparatus and method for organic waste gas
CN101618931A (en) * 2009-07-28 2010-01-06 清华大学 Mud drying and incinerating integrated system and use method thereof
CN101991995A (en) * 2009-08-17 2011-03-30 张文波 Washing tower
CN102022829A (en) * 2009-09-09 2011-04-20 中国科学院工程热物理研究所 Immersed condensation heat exchanger and application thereof
CN101774743A (en) * 2010-01-26 2010-07-14 沈阳航空工业学院 Latent heat recoverable multi-phase change sludge drying method and device
CN102276130A (en) * 2011-05-31 2011-12-14 陈海渊 Sludge resource treatment apparatus and sludge treatment method using the same
CN202398241U (en) * 2011-09-09 2012-08-29 上海森松新能源设备有限公司 Chlorosilane washing tower
RU2482901C1 (en) * 2012-04-19 2013-05-27 Олег Савельевич Кочетов Device for cleaning and recovery of off-gases
CN203123739U (en) * 2012-12-26 2013-08-14 成都源创环保工程有限公司 Exhaust gas spray tower with built-in heat exchange
CN105819646A (en) * 2015-01-07 2016-08-03 广州新致晟环保科技机械设备有限公司 System and method thereof for recovering heat in tail gas from dried sludge
CN105194964A (en) * 2015-10-20 2015-12-30 秦皇岛首创思泰意达环保科技有限公司 Method and device for washing and hot mass transfer of pollutants in gas
CN207335482U (en) * 2017-06-15 2018-05-08 广州新致晟环保科技机械设备有限公司 Tail gas clean-up and heat recovery system for Treatment of Sludge

Also Published As

Publication number Publication date
CN109141066B (en) 2024-06-04

Similar Documents

Publication Publication Date Title
CN109141065A (en) Tail gas clean-up and heat recovery system and method for Treatment of Sludge
CN101922821A (en) Method for simultaneously recovering water and latent heat in high-humidity flue gas and heat pump device
CN206970447U (en) Sludge at low temperature dehumidifying anhydration system
CN106765770B (en) A kind of efficient fresh air conditioner processing unit and method of condensation and solution fractionation dehumidifying
CN106287770A (en) System and method for recovering moisture and heat in desulfurized flue gas
CN108426426A (en) A kind of sludge dehumidification type multistage recuperation of heat anhydration system
CN106839494A (en) Heat pump double caloic coupling humidification dehumidification vapo(u)rization system and methods
CN110255855A (en) A kind of double Cooling and Heat Source heat pump sludge at low temperature anhydration systems and its application method with waste heat recycling
CN207335482U (en) Tail gas clean-up and heat recovery system for Treatment of Sludge
CN207035898U (en) Tail gas clean-up and heat recovery system for Treatment of Sludge
CN206476773U (en) A kind of thermal power plant's high content of salt wastewater zero discharge purification apparatus
CN207395523U (en) For the tail gas clean-up and heat recovery system of Treatment of Sludge
CN207391233U (en) Purification and heat recovery system for the exhaust gas of sludge drying
CN106958987A (en) A kind of air pre-dehumidified separated for air and chilldown system
CN102889776A (en) Cyclic utilization production device of waste gas and steam of dryer
CN109141066A (en) Tail gas clean-up and heat recovery system and method for Treatment of Sludge
CN202902824U (en) Waste heat steam cyclic utilization production device of drier
CN109141064A (en) Tail gas clean-up and heat recovery system and method for Treatment of Sludge
CN212842816U (en) Solar energy waste heat recovery and heat pump dewatering system
CN109133572A (en) The purification of exhaust gas for sludge drying and heat recovery system and method
CN109282272A (en) Superheated steam heat drying system and method based on absorption heat pump
CN207362027U (en) Purification and heat recovery system for the exhaust gas of sludge drying
CN207006621U (en) Heat recovery system
CN206410267U (en) A kind of air-conditioning
CN109974411A (en) A kind of furnace drying method and energy-saving drying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210611

Address after: Room 48, 13 / F, No. 733 (1), Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong 510000

Applicant after: Guangzhou Zhengsheng Technology Co.,Ltd.

Address before: 510098 room 2205, starlight Ying, 119 Shui Yin Road, Yuexiu District, Guangzhou, Guangdong.

Applicant before: SWISON CREATIVE ENVIRONMENTAL SOLUTIONS Co.,Ltd.

GR01 Patent grant
GR01 Patent grant