CN109139105A - A kind of hangers victory assembling device and its installation method - Google Patents

A kind of hangers victory assembling device and its installation method Download PDF

Info

Publication number
CN109139105A
CN109139105A CN201811014072.6A CN201811014072A CN109139105A CN 109139105 A CN109139105 A CN 109139105A CN 201811014072 A CN201811014072 A CN 201811014072A CN 109139105 A CN109139105 A CN 109139105A
Authority
CN
China
Prior art keywords
hangers
bolt
sliding slot
assembling device
external sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811014072.6A
Other languages
Chinese (zh)
Inventor
彭健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811014072.6A priority Critical patent/CN109139105A/en
Publication of CN109139105A publication Critical patent/CN109139105A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/02Suspension devices for tubes or the like, e.g. for ventilating ducts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/04Distributing means for power supply in mines
    • E21F17/06Distributing electric power; Cable networks; Conduits for cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Power Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of hangers victory assembling device and its installation method, which includes: hangers, external sliding slot and bolt assembly;Wherein, hangers includes: pendant groove, and the U-type groove and auricle of pendant groove bottom is arranged in;Angle between auricle and the upper surface of pendant groove is acute angle;External sliding slot nesting is mounted in pendant groove;Bolt assembly passes through U-type groove, and hangers and external sliding slot are connected and fixed.The Fast Installation of Shield-bored tunnels electromechanical equipment and pipeline is realized through the invention.

Description

A kind of hangers victory assembling device and its installation method
Technical field
The invention belongs to shield tunnel construction technology field more particularly to a kind of hangers victory assembling devices and its installation method.
Background technique
As various regions large- and-medium size cities metro project starts successively, shield method has determined absolutely in city tunnel construction Dominant position, someone is referred to as city tunnel engineering method.Original subway pipeline, mechanical and electric equipment installation mostly use chemically-planted steel bar or Person beats the mode of expansion bolt, but these assembled architecture modes are relatively easy in design, and systematicness is of less demanding, and has Have significant limitation: chemically-planted steel bar or expansion bolt require to drill on existing structure, are likely to be encountered during drilling Structure reinforcing bars cause certain damage to structure itself, influence structure durability;Chemically-planted steel bar or expansion bolt itself the service life have Limit, easily corrodes, generally using no more than 15 years will be maintained or replaced, and subway is much not achieved under metro environment Life requirement in 100 years;The reinforcing bar or expansion bolt of implantation are contacted with steel mesh, are easily caused structure reinforcing bars corrosion, are influenced to tie Structure safety.The construction of underground tunnel period how is reduced, construction quality is improved, extends tunnel service life, reduces complete period synthesis Cost, prevent dust, noise pollution, mitigate construction labor intensity the problems such as will become industry project urgently to be solved.How to subtract Few construction of underground tunnel period, improve construction quality, extend tunnel service life, reduce complete period overall cost, prevent dust, The problems such as noise pollution, mitigation construction labor intensity, will become industry project urgently to be solved.
Summary of the invention
Technology of the invention solves the problems, such as: overcoming the deficiencies of the prior art and provide a kind of hangers victory assembling device and its installation Method, to realize the Fast Installation of Shield-bored tunnels electromechanical equipment and pipeline.
In order to solve the above-mentioned technical problem, the invention discloses a kind of hangers victory assembling devices, comprising: hangers (1-1), external Sliding slot (2-1) and bolt assembly (3-0);Wherein, hangers (1-1), comprising: pendant groove (1-4) is arranged at the bottom pendant groove (1-4) The U-type groove (1-3) and auricle (1-5) in face;
Angle between auricle (1-5) and the upper surface of pendant groove (1-4) is acute angle;
External sliding slot (2-1) nesting is mounted in pendant groove (1-4);
Bolt assembly (3-0) passes through U-type groove (1-3), and hangers (1-1) and external sliding slot (2-1) are connected and fixed.
In above-mentioned hangers victory assembling device, the bolt assembly (3-0), comprising: T-bolt (3-1), flat shim (3-2) With nut (3-3);
It after fastening bolt (3-1) passes through auricle (1-5), is fastened by nut (3-3), external sliding slot (2-1) is connected It is fixed;Wherein, the bolt head of fastening bolt (3-1) is located in the conduit of external sliding slot (2-1);
Flat shim (3-2) is mounted between fastening bolt (3-1) and external sliding slot (2-1).
In above-mentioned hangers victory assembling device, the hangers (1-1), further includes: earhole (1-2);
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0).
In above-mentioned hangers victory assembling device, the shield tunnel concrete pipe sheet (4-0), comprising: shield duct piece left member (4- 1), shield duct piece right member (4-2), anchor rod bolt (4-3), segment bolt fastening nut left member (4-4) and segment bolt fasten spiral shell Female right member (4-5);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and pass through section of jurisdiction Bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
In above-mentioned hangers victory assembling device, earhole (1-2) across anchor rod bolt (4-3) left end, by segment bolt it is tight Gu nut left member (4-4) is connected and fixed with shield duct piece left member (4-1).
In above-mentioned hangers victory assembling device, earhole (1-2) across anchor rod bolt (4-3) right end, by segment bolt it is tight Gu nut right member (4-5) is connected and fixed with shield duct piece right member (4-2).
In above-mentioned hangers victory assembling device, the angle between auricle (1-5) and the upper surface of pendant groove (1-4) is 45 °.
Correspondingly, the invention also discloses a kind of installation methods of hangers victory assembling device, comprising:
External sliding slot (2-1) is placed in the pendant groove (1-4) of hangers (1-1);
Bolt assembly (3-0) is passed through into U-type groove (1-3), hangers (1-1) and external sliding slot (2-1) are connected and fixed;Its In, the angle between auricle (1-5) and the upper surface of pendant groove (1-4) is acute angle.
In the installation method of above-mentioned hangers victory assembling device, further includes:
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), so that hangers (1-1) It is fitted closely with shield duct piece left member (4-1) or shield duct piece right member (4-2);And hangers (1-1) is adjusted to design position;
Pipeline suspension and support is installed by external sliding slot (2-1), and tunnel pipeline and other equipment are installed on bracket.
The invention has the following advantages that
(1) not damaged, it is opposite to be not necessarily to the steel planting in structure with traditional anchor bolt technique or beat expansion bolt, to structure without Destroy, the integrality and durability of shield tunnel itself is greatly improved, prevent because intensively punch caused by section of jurisdiction crack, infiltration, etc. Security risk.
(2) it is not necessarily to the aperture on conduit, ensure that the integrality and intensity of conduit.
(3) installation tool and mounting process are simple, install fixing bolt and nut is unified, be easy to normal process and be turned into industry.
(4) flexible for installation, it is ensured that the installation accuracy of equipment in tunnel, it is circumferential easy to adjust.
(5) at low cost, prevent 30% or more waste of material low cost without 360 degree of arrangements relative to built-in sliding chute technique, The operation maintenance expense of equipment is also significantly reduced simultaneously, and equipment installation and maintenance are more single, and maintenance cost is greatly reduced.
(6) short time limit, equipment installation effectiveness significantly improve, and can at least contract relative to traditional anchor bolt technique hydromechanical installer phase It is short by 50% or more.
(7) environmentally friendly, pipeline and mechanical and electric equipment installation process are without dust, the noiseless very big construction ring for improving equipment installation Border reduces labor intensity of workers, belongs to typical " green construction ".
(8) highly integrated, each professional equipment in tunnel it is mountable on the chute, convenient for the operation phase replace and increase various Equipment.
(9) maintenance is simple, and the component of external part is replaceable, and maintenance cost is low.
(10) applicability is wide, can use in concrete compression area and tensile region.
(11) have a wide range of application, could be applicable to city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of build Build electromechanical equipment and pipeline installation in object.
Detailed description of the invention
Fig. 1 is a kind of schematic perspective view of hangers victory assembling device in the embodiment of the present invention;
Fig. 2 is a kind of schematic perspective view of hangers in the embodiment of the present invention;
Fig. 3 is a kind of front view of hangers in the embodiment of the present invention;
Fig. 4 is a kind of left view of hangers in the embodiment of the present invention;
Fig. 5 is a kind of three-dimensional assembling schematic diagram of hangers victory assembling device in the embodiment of the present invention;
Fig. 6 is a kind of mounting structure schematic diagram of shield tunnel concrete pipe sheet in present example;
Hangers 1-1;Earhole 1-2;U-type groove 1-3;Pendant groove 1-4;Auricle 1-5;External sliding slot 2-1;Bolt assembly 3-0;T Type bolt 3-1;Flat shim 3-2;Nut 3-3;Shield tunnel concrete pipe sheet 4-0;Shield duct piece left member 4-1;Shield duct piece is right Part 4-2;Anchor rod bolt 4-3;Segment bolt fastening nut left member 4-4;Segment bolt fastening nut right member 4-5.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to disclosed by the invention Embodiment is described in further detail.
The invention discloses a kind of hangers victory assembling devices, can be used for the prompt dress of subway tunnel electromechanical equipment and pipeline, specifically The part combined for shield duct piece on component.The earhole opened on hangers can directly connect with the anchor rod bolt that concrete pipe sheet uses It connects, this smoothly installs external sliding slot to reach it is ensured that install hangers under the premise of not destroying concrete pipe sheet Effect.The U-type groove being arranged on the conduit and pendant groove that T-bolt passes through external sliding slot is fastenedly connected, and is screwed by nut It is fixed, it is fixed on external sliding slot in the pendant groove of hangers, improves the integrality and durability of shield tunnel, realize subway tunnel The Fast Installation of electromechanical equipment and pipeline.
Such as Fig. 1~6, in the present embodiment, the hangers victory assembling device, comprising: hangers 1-1, external sliding slot 2-1 and bolt group Part 3-0.Wherein, hangers 1-1 can specifically include: pendant groove 1-4, and the U-type groove 1-3, Yi Jier of the bottom surface pendant groove 1-4 is arranged in Piece 1-5.
In the present embodiment, the angle theta between auricle 1-5 and the upper surface of pendant groove 1-4 is acute angle;External sliding slot 2-1 Nesting is mounted in pendant groove 1-4;Bolt assembly 3-0 passes through U-type groove 1-3, and hangers 1-1 and external sliding slot 2-1 are connected and fixed.
Preferably, bolt assembly 3-0 can specifically include: T-bolt 3-1, flat shim 3-2 and nut 3-3.Wherein, Fastening bolt 3-1 is fastened after passing through auricle 1-5 by nut 3-3, and external sliding slot 2-1 is connected and fixed, fastening bolt 3-1's Bolt head is located in the conduit of external sliding slot 2-1;Flat shim 3-2 is mounted between fastening bolt 3-1 and external sliding slot 2-1.Letter It is single convenient, rapidly and effectively complete construction task.
Preferably, hangers 1-1 can also include: earhole 1-2.Wherein, earhole 1-2 and shield tunnel concrete pipe sheet 4- 0 anchor rod bolt 4-3 connection.For increasing the stability of hangers 1-1 Yu shield tunnel concrete pipe sheet 4-0, can guarantee not Hangers 1-1 is installed under the premise of destruction shield tunnel concrete pipe sheet, to achieve the effect that smoothly to install external sliding slot.
Preferably, shield tunnel concrete pipe sheet 4-0 includes: shield duct piece left member 4-1, shield duct piece right member 4-2, anchor Bar bolt 4-3, segment bolt fastening nut left member 4-4 and segment bolt fastening nut right member 4-5;Shield duct piece left member 4-1 and Shield duct piece right member 4-2 is connected by anchor rod bolt 4-3, and tight by segment bolt fastening nut left member 4-4 and segment bolt Gu nut right member 4-5 is connected and fixed.
One is preferred, and earhole 1-2 passes through the left end of anchor rod bolt 4-3, passes through segment bolt fastening nut left member 4-4 and shield Structure section of jurisdiction left member 4-1 is connected and fixed.
It is another preferred, earhole 1-2 across anchor rod bolt 4-3 right end, by segment bolt fastening nut right member 4-5 with Shield duct piece right member 4-2 is connected and fixed.
Wherein, the angle theta between auricle 1-5 and the upper surface of pendant groove 1-4 can with but be not limited only to as 45 °.
On the basis of the above embodiments, the invention also discloses a kind of installation methods of hangers victory assembling device, comprising: will External sliding slot 2-1 is placed in the pendant groove 1-4 of hangers 1-1;By bolt assembly 3-0 pass through U-type groove 1-3, by hangers 1-1 with External sliding slot 2-1 is connected and fixed.
Preferably, the installation method of the hangers victory assembling device can also include: by earhole 1-2 and shield tunnel pipe of concrete The anchor rod bolt 4-3 connection of piece 4-0, so that hangers 1-1 and shield duct piece left member 4-1 or shield duct piece right member 4-2 are fitted closely; And hangers 1-1 is adjusted to design position;Pipeline suspension and support is installed by external sliding slot 2-1, and tunnel pipeline is installed on bracket With other equipment.
Wherein, it should be noted that the size of anchor pole notch can be reserved according to concrete pipe sheet to determine the outer of hangers Size and shape is seen, guarantees that conduit can be close to the installation of section of jurisdiction surface.The installation of hangers, installation is hung while section of jurisdiction is installed Ear guarantees that construction is primary and completes, and does not need to unclamp anchor pole again and installs hangers again.Conduit is put into pendant according to the position of hangers Slot.Conduit is fixed by T-bolt corresponding with hangers U-type groove, and bolt requires to be longer than nut+conduit thickness+plate thickness. The dismounting of this mounting means is simple and convenient, can rapidly and effectively complete construction task.External conduit and shield duct piece can also be enhanced Structural stability, moreover it is possible to ensure to collide with tunnel gut line etc..
In conclusion the prompt assembling device and its installation method of a kind of novel hangers disclosed by the invention, specially on component The part that shield duct piece combines.The anchor pole connection that the earhole opened on hangers can be used directly with concrete pipe sheet, this can be protected Card installs hangers under the premise of not destroying concrete pipe sheet, to achieve the effect that smoothly to install conduit.Conduit is put in advance Enter pendant groove convenient for conduit fine tuning, facilitates bolt to pass through connection, have flat shim between bolt and hangers, revolved by rear with nut It fastens.It is fixed on external conduit in the pendant groove of hangers, improves the integrality and durability of shield tunnel, realize subway tunnel The Fast Installation of road electromechanical equipment and pipeline.
Various embodiments are described in a progressive manner in this explanation, the highlights of each of the examples are with its The difference of his embodiment, the same or similar parts between the embodiments can be referred to each other.
The above, optimal specific embodiment only of the invention, but scope of protection of the present invention is not limited thereto, In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by anyone skilled in the art, It should be covered by the protection scope of the present invention.
The content that description in the present invention is not described in detail belongs to the well-known technique of professional and technical personnel in the field.

Claims (9)

1. a kind of hangers victory assembling device characterized by comprising hangers (1-1), external sliding slot (2-1) and bolt assembly (3- 0);Wherein, hangers (1-1), comprising: U-type groove (1-3) and auricle in the bottom surface pendant groove (1-4) is arranged in pendant groove (1-4) (1-5);
Angle between auricle (1-5) and the upper surface of pendant groove (1-4) is acute angle;
External sliding slot (2-1) nesting is mounted in pendant groove (1-4);
Bolt assembly (3-0) passes through U-type groove (1-3), and hangers (1-1) and external sliding slot (2-1) are connected and fixed.
2. hangers victory assembling device according to claim 1, which is characterized in that the bolt assembly (3-0), comprising: T-type spiral shell Bolt (3-1), flat shim (3-2) and nut (3-3);
After fastening bolt (3-1) passes through auricle (1-5), is fastened by nut (3-3), external sliding slot (2-1) is connected and fixed; Wherein, the bolt head of fastening bolt (3-1) is located in the conduit of external sliding slot (2-1);
Flat shim (3-2) is mounted between fastening bolt (3-1) and external sliding slot (2-1).
3. hangers victory assembling device according to claim 1, which is characterized in that the hangers (1-1), further includes: earhole (1- 2);
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0).
4. hangers victory assembling device according to claim 3, which is characterized in that the shield tunnel concrete pipe sheet (4-0), It include: shield duct piece left member (4-1), shield duct piece right member (4-2), anchor rod bolt (4-3), segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and pass through segment bolt Fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
5. hangers victory assembling device according to claim 4, which is characterized in that earhole (1-2) is across anchor rod bolt (4-3) Left end is connected and fixed by segment bolt fastening nut left member (4-4) with shield duct piece left member (4-1).
6. hangers victory assembling device according to claim 4, which is characterized in that earhole (1-2) is across anchor rod bolt (4-3) Right end is connected and fixed by segment bolt fastening nut right member (4-5) with shield duct piece right member (4-2).
7. hangers victory assembling device according to claim 1, which is characterized in that the upper table of auricle (1-5) and pendant groove (1-4) Angle between face is 45 °.
8. a kind of installation method of hangers victory assembling device characterized by comprising
External sliding slot (2-1) is placed in the pendant groove (1-4) of hangers (1-1);
Bolt assembly (3-0) is passed through into U-type groove (1-3), hangers (1-1) and external sliding slot (2-1) are connected and fixed;Wherein, Angle between auricle (1-5) and the upper surface of pendant groove (1-4) is acute angle.
9. the installation method of hangers victory assembling device according to claim 8, which is characterized in that further include:
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), so that hangers (1-1) and shield Structure section of jurisdiction left member (4-1) or shield duct piece right member (4-2) fit closely;And hangers (1-1) is adjusted to design position;
Pipeline suspension and support is installed by external sliding slot (2-1), and tunnel pipeline and other equipment are installed on bracket.
CN201811014072.6A 2018-08-31 2018-08-31 A kind of hangers victory assembling device and its installation method Pending CN109139105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811014072.6A CN109139105A (en) 2018-08-31 2018-08-31 A kind of hangers victory assembling device and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811014072.6A CN109139105A (en) 2018-08-31 2018-08-31 A kind of hangers victory assembling device and its installation method

Publications (1)

Publication Number Publication Date
CN109139105A true CN109139105A (en) 2019-01-04

Family

ID=64826209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811014072.6A Pending CN109139105A (en) 2018-08-31 2018-08-31 A kind of hangers victory assembling device and its installation method

Country Status (1)

Country Link
CN (1) CN109139105A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332660A (en) * 2006-06-15 2007-12-27 Nisshin Tekku:Kk Fixture for fixing plate body to tunnel lining
CN104131821A (en) * 2014-07-17 2014-11-05 江苏华彤新能源科技有限公司 Shield tunnel external groove sheathing groove structure and fixing method of shield tunnel external groove sheathing groove structure
CN204677233U (en) * 2015-02-13 2015-09-30 维机轨道交通科技(镇江)有限公司 The plug-in conduit erecting device in tunnel and hanger device thereof
CN205387956U (en) * 2016-02-03 2016-07-20 维机轨道交通科技(镇江)有限公司 Open hangers
CN107859533A (en) * 2017-12-06 2018-03-30 浙江皓特节能***工程有限公司 A kind of plug-in conduit of shield tunnel hides support node and its installation method
CN207728391U (en) * 2017-12-08 2018-08-14 康元轨道交通科技(福建)有限公司 A kind of assembled hangers pendant and prompt assembling device
CN209510390U (en) * 2018-08-31 2019-10-18 彭健 A kind of hangers victory assembling device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332660A (en) * 2006-06-15 2007-12-27 Nisshin Tekku:Kk Fixture for fixing plate body to tunnel lining
CN104131821A (en) * 2014-07-17 2014-11-05 江苏华彤新能源科技有限公司 Shield tunnel external groove sheathing groove structure and fixing method of shield tunnel external groove sheathing groove structure
CN204677233U (en) * 2015-02-13 2015-09-30 维机轨道交通科技(镇江)有限公司 The plug-in conduit erecting device in tunnel and hanger device thereof
CN205387956U (en) * 2016-02-03 2016-07-20 维机轨道交通科技(镇江)有限公司 Open hangers
CN107859533A (en) * 2017-12-06 2018-03-30 浙江皓特节能***工程有限公司 A kind of plug-in conduit of shield tunnel hides support node and its installation method
CN207728391U (en) * 2017-12-08 2018-08-14 康元轨道交通科技(福建)有限公司 A kind of assembled hangers pendant and prompt assembling device
CN209510390U (en) * 2018-08-31 2019-10-18 彭健 A kind of hangers victory assembling device

Similar Documents

Publication Publication Date Title
CN108590757A (en) A kind of victory assembling device and its installation method
CN107882591B (en) Assembled hanging piece, rapid mounting device and mounting method
WO2021088717A1 (en) Hanging structure, tunnel rail hanging robot, and tunnel
CN109159275A (en) Metro shield section section of jurisdiction pre-buried channel flow fixed structure and pre-embedded construction method
CN108590759A (en) A kind of hangers victory assembling device and its installation method
CN209510390U (en) A kind of hangers victory assembling device
CN109458221A (en) A kind of hangers victory assembling device and installation method
CN208456667U (en) A kind of hangers victory assembling device
CN108915769A (en) A kind of hangers victory assembling device and its installation method
CN109139105A (en) A kind of hangers victory assembling device and its installation method
CN109252893A (en) A kind of hangers victory assembling device and its installation method
CN209510389U (en) A kind of hangers victory assembling device
CN208456666U (en) A kind of victory assembling device
CN108825624A (en) A kind of section of jurisdiction built-in turnbuckle component and its application
CN109458219A (en) A kind of hangers victory assembling device and installation method
CN109736888A (en) A kind of hangers victory assembling device and installation method
CN209687544U (en) A kind of hangers victory assembling device
CN208935561U (en) A kind of door-shaped hanging bracket
CN207728391U (en) A kind of assembled hangers pendant and prompt assembling device
CN209687545U (en) A kind of hangers victory assembling device
CN209413944U (en) A kind of hangers victory assembling device
CN209413945U (en) A kind of hangers victory assembling device
CN209369828U (en) A kind of tunnel pre-buried channel flow device
CN108625867A (en) A kind of victory assembling device and its installation method
CN108590758A (en) A kind of victory assembling device and its installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination