CN109139092A - A kind of multi-purpose construction method in a hole for administering buried Coal Seam and Gas Disaster - Google Patents

A kind of multi-purpose construction method in a hole for administering buried Coal Seam and Gas Disaster Download PDF

Info

Publication number
CN109139092A
CN109139092A CN201811149125.5A CN201811149125A CN109139092A CN 109139092 A CN109139092 A CN 109139092A CN 201811149125 A CN201811149125 A CN 201811149125A CN 109139092 A CN109139092 A CN 109139092A
Authority
CN
China
Prior art keywords
drilling
gas
coal seam
pipe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811149125.5A
Other languages
Chinese (zh)
Other versions
CN109139092B (en
Inventor
陈德任
吴志刚
王登科
吴振虎
王振刚
王卫利
鹿腾
刘建峰
焦浩
杨勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HUAKUN GEOLOGICAL ENGINEERING Co Ltd
Original Assignee
SHANDONG HUAKUN GEOLOGICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HUAKUN GEOLOGICAL ENGINEERING Co Ltd filed Critical SHANDONG HUAKUN GEOLOGICAL ENGINEERING Co Ltd
Priority to CN201811149125.5A priority Critical patent/CN109139092B/en
Publication of CN109139092A publication Critical patent/CN109139092A/en
Application granted granted Critical
Publication of CN109139092B publication Critical patent/CN109139092B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/1208Packers; Plugs characterised by the construction of the sealing or packing means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of holes for administering buried Coal Seam and Gas Disaster to be mostly used construction method, comprising the following steps: determines the spacing of wells, drilling construction determines that actual stress concentrates band, borehole sealing and gas drainage, the abundant release in coal seam and high pressure water injection.Preferably, described to block to be blocked using the first time of expanded capsule, second of complete borehole sealing is carried out with hole sealing agent again after the abundant release in coal seam.The improvement while present invention is able to achieve buried Bumping Pressure in Coal Layers and Gas Disaster, it determines that the spacing of wells and drillable length, working face drill release, the twice process procedures such as borehole sealing, gas drainage, water filling using reasonable, efficiently realizes that a hole is multi-purpose, purpose of cost efficiency.Method of the invention is simple, easily operated, can make full use of the multiple efficacies of drilling, avoids drilling construction in the prior art and there is repeatability and wasteness.

Description

A kind of multi-purpose construction method in a hole for administering buried Coal Seam and Gas Disaster
Technical field
The present invention relates to coal mine technical field of construction, more particularly to a kind of buried Coal Seam and Gas Disaster administered One hole is mostly used construction method.
Background technique
Due to lasting extensive coal mining, the superficial part coal resources in China majority mining area are gradually decreased, deep mining The new normality of the following Coal Industrial will be become.Gas bearing capacity in deep fractures is gradually increased with crustal stress, and mining conditions are disliked Bad, bump and the threat of Gas Disaster bring increasingly increase, and seriously affect mine safety production.
Bump is administered both at home and abroad and Achievements of Gas Control has carried out a large amount of research, proposition is a variety of to pass through drop Low coal seam stores the mode of energy to administer the measure of bump, as coal-bed flooding, large diameter borehole release, deep hole presplitting are quick-fried It breaks, and gas control is also formed to improve gas drainage rate as the technical measures of core, as hydraulic fracturing, waterpower are cut Seam, hydraulic flushing in hole etc..The research achievement of comparative maturity is to lay particular emphasis on some aspect at present, individually to bump or gas Disaster is administered.However, there is gas spatial abnormal feature in deep in most coal seams with bump-prone property in recent years Area, and previous coal and gas prominent coal seam then shows apparent Burst Tendency in deep regional, causes mine to need same When face the threat of two kinds of impact, gas disasters.If the threat of two kinds of disasters cannot be dealt carefully with, mine will bear huge Disaster, such as on 2 14th, 2005, bump accident had occurred in Liaoning Sun Jiawan coal mine, leads to certain driving face office Portion's blowing-out forms methane accumulation, and the gas density in return reaches explosion limit, and worker generates electrical fire in maintenance process Flower causes gas explosion, causes 214 worker's death.
The Treatment process of existing bump is mainly based upon coal rock strength reduction and subtracts and rush principle, passes through construction release Drilling is crushed coal and rock using all kinds of measures, reduces the ability of coal rock layer storage and release elasticity energy, is formed in coal and rock One reduction energy-absorbing band, realizes the purpose of erosion control.And existing gas control technology then lays particular emphasis on gas drainage, it is anti-reflection by release Measure improves gas permeability of coal seam, and all kinds of extraction boreholes are arranged in coal seam, utilizes the gas of preservation in extraction pumping plant extraction coal seam Gas reduces gas bearing capacity in coal seam, reduction gas pressure, realizes the purpose of Gas Disaster prevention and treatment.As it can be seen that two kinds of disasters To be effectively prevented using drilling (large diameter borehole).For not only there is Gas Disaster but also exist impact disaster mine and Speech, construction drill can more play the multi-purpose effect in a hole.
However, since the extraction radius of mash gas pumping drilling determines drilling arrangement distance, and the arrangement of erosion control drilling is then Only consider release radius.When extraction radius and release radius have differences, it will lead to drilling and arrange uncoordinated problem.And And in most cases, it may appear that mash gas pumping drilling length is much larger than the length of erosion control drilling, and the density of erosion control drilling is then remote Less than extraction borehole layout density, the drilling construction for impacting coal seam containing gas is made to there is repeatability and wasteness.
In current published document, the arrangement of drilling considers the improvement of single disaster, does not consider coal-bed gas and punching Press the improvement of compound disaster with hitting.As certain invention is related to one kind for deformation of the surrounding rock in tunnel, impulsion pressure, coal and gas prominent Comprehensive processing method, this method first two lane of working face use anchor pole active defense technology, strengthen Surrounding Rock Strength, then exist Every 3-3.5m construction major diameter destressing borehole between anchor pole, and sealing of hole is carried out to major diameter destressing borehole, then at a certain distance Construction firedamp taking-out discharging drilling, extraction coal-bed gas.The spacing in pressure relief vent and extraction hole does not consider practical take out in the inventive method Radius and release radius are adopted, and the length of pressure relief vent is too short, it is difficult to realize that a hole is multi-purpose, cause certain waste.
A kind of another high inclination-angle thick gassy coal seam of disclosure of the invention impacts diaster prevention and control method, A, arrangement gas drainage lane Road: according to the lithology being respectively layered in stratum, cloth top set takes out the lane Xiang Hedichou;B, drilling arrangement: along the lane the Ding Chou lane bottom plate Ji Dichou Top plate arranges bore position, arranged for interval water injecting drilling and mash gas pumping drilling on the same plumb cut in gas drainage tunnel; C, after drilling deploys, gas drainage persistently gas drainage and water filling: is carried out to entire working face coal seam;Gas drainage work After beginning, high pressure water is injected to the contact surface of coal seam and rock stratum, water filling work is successively carried out according to water injecting drilling sequence;D, terminate Water filling: when first pouring water into borehole pressure drops suddenly to low value or extraction goes out gas humidity and is substantially reduced, stop drilling note Water, and continue high pressure water injection using next water injecting drilling.The inventive method needs to arrange two stone heads, utilizes rock Tunnel construction drill into coal seam.The expense of construction stone head is high, to the biggish financial burden of mine;To remote in tunnel When locating coal body construction drill, the length of drilling is then very big, and bore inclining, curved existing necessarily occurs in actual work progress As, it is difficult to realize the accurate extraction of gas.
Therefore, it is necessary to invent it is a kind of can make full use of drilling multiple efficacies construction method, realize coal seam erosion control, watt This is administered and the coordination of depositing dust and other effects, to achieve the purpose that cost efficiency.
Summary of the invention
It is multi-purpose that the present invention for above-mentioned defect provides a kind of hole for administering buried Coal Seam and Gas Disaster Construction method.The technical problem to be solved by the present invention is to overcome erosion control drilling, mash gas pumping drilling and water filling in the prior art The problems such as spacing of drilling is unreasonable, repetition drills, drilling utilization rate is low, hazard management is inefficient.
The technical scheme is that a kind of multi-purpose construction method in a hole for administering buried Coal Seam and Gas Disaster, packet Include following steps:
(1) determine spacing of wells L1: the coal bed gas extraction effective radius R1 and erosion control drilling for measuring stope are effectively unloaded Radius R2 is pressed, the spacing L1 of two neighboring drilling is 2 times of smaller value in R1 and R2 in stope;
(2) drilling construction: along stope, drilling by the spacing of wells L1 to the direction construction concordant perpendicular to tunnel, The length of drilling is 2/3rds of stope width H;
(3) determine that actual stress concentrates band: there is the initial of bump generation omen in record in real time during drilling construction Position and final position, the drilling region between the initial position and final position are that the actual stress of stope is concentrated Band;
(4) borehole sealing and gas drainage: the drilling of the initial position of band is concentrated to block actual stress, indwelling in drilling Communicating pipe, compartment of terrain selects drilling as water injecting drilling later, dry with communicating pipe and underground extraction respectively using extraction water injection pipe Pipe connection, carries out gas drainage;It is other drilling be used as mash gas pumping drilling, using gas drainage pipe respectively with communicating pipe and underground The connection of extraction main pipe, carries out gas drainage;
(5) the abundant release in coal seam: repeating step (2) to (4), successively construct in stope, until in stope It is covered with concordant drilling;
(6) high pressure water injection:, will as the 65%-80% for measuring gas drainage total amount and reaching the total gas bearing capacity in coal seam, preferably 70% Extraction water injection pipe and gas drainage pipe are disconnected with underground extraction main pipe, and extraction water injection pipe is connect with high pressure water-injection pump, High pressure water injection is carried out to coal seam by water injecting drilling, until being discharged in the gas drainage pipe of neighbouring mash gas pumping drilling.
Specifically, the aperture of drilling is 94mm, 113mm, 133mm or 153mm in step (2).
Specifically, the bump occurs omen and is top brill, bit freezing, inhales brill or coal big gun in step (3).
Preferably, described to block to block for the first time in step (4), expanded capsule is sent into the drilling to be blocked, it is described Expansion glue cuff injects high pressure water into expanded capsule outside communicating pipe, using water injection pipe, blocks the expansion of expanded capsule water-filling Drilling, water filling pipe end connect water pressure gauge;And carry out second after step (5) and block, each pouring water into borehole of observational record The pressure gauge registration of pipe end, after some pouring water into borehole hook gauge registration no longer changes, using sealing compound to drilling orifice Region is blocked, and carries out injection hole sealing to bore inner using hole sealing agent later.Preferably, the pressure of the high pressure water is 1- 1.5MPa.Preferably, sealing compound is polyurethane, and hole sealing agent is cement mortar.
Preferably, the drilling orifice region refers to the region 1m in aperture.
Preferably, in step (4), compartment of terrain, which selects drilling as water injecting drilling, is implemented as got off: by being constructed Concordant drills successively marked as Kn, n=1,2,3 ..., and label is selected to meet the drilling of Kn=3n-1 as water injecting drilling.
Specifically, the buried coal seam is that buried depth is greater than 600m and presses and Gas Disaster with having potential impact simultaneously Coal seam.
The invention has the benefit that
1, due to having the coal seam of impact and Gas Disaster to need to consider simultaneously between mash gas pumping drilling and erosion control destressing borehole Away from, for avoid drilling repeatability, need to obtain the gas drainage effective radius and effective release radius in coal seam first.Test side Method is currently more mature, therefore can be by drilling to obtain in stope construction testing.When obtaining two radius values Afterwards, the reasonable spacing that 2 times of small radii value can be arranged as later period drilling, and with the three of stope width H / bis- be drillable length.Density appropriate and length make drilling be not only suitable for gas drainage, are also applied for erosion control release, and And the drilling for allowing that label is selected to meet Kn=3n-1 is as water injecting drilling, therefore present invention drilling while having gas drainage, height Pressure injection water, erosion control release effect avoid the later period to administer a certain disaster and need individually to supplement and bore to realize that a hole is multi-purpose The problem of hole.
2, it after obtaining the reasonable spacing of wells, can successively construct large diameter borehole in tunnel to stope, entirely Stope is required to construction drill, to realize zonal release.It can gush out in order to avoid drilling construction terminates after gas, It needs to carry out closure extraction in time to drilling.However, coal petrography stress transfer process can be right during due to adjacent drilling construction The drilling that early period, construction terminated impacts.Therefore, the drilling that early period, construction terminated is preferably formed with sufficient deformation space, for unloading Except high stress.Borehole sealing mode at this time must assure that coal petrography can deform, and gas will not also be gushed out, this means that The sealing of hole mode of traditional cements mortar is temporarily not suitable for.The closure of fixed point, and glue may be implemented by the way of expanded capsule After capsule outer wall is sufficiently coupled with drilling, coal petrography stress can be applied on capsule, and the variation of hydraulic pressure can reflect the area in capsule The actual stress in domain changes.And when hydraulic pressure is no longer changed, illustrate that coal deformation has been completed in the region, and release is imitated Fruit has been tended towards stability, and can will be drilled using modes such as cement mortar block completely at this time, to carry out gas drainage.
3, in borehole sealing link, block-up position should be the region of stress concentration in coal seam.Stress of coal seam concentrates band at present Determination generally use Method for Numerical, empirical method or theoretical analysis, but these methods are all indirect method, as a result not quasi- enough Really, actually not necessarily meet with engineering.For buried coal seam, under the conditions of high stress high methane, easily exist in drilling construction Top brill, bit freezing etc., which occur, for extending stress band can be used as the dynamic phenomenon that omen occurs for bump.Pass through these of work progress Dynamic phenomenon can realize the accurate identification of extending stress band, not need to be tested using other indirect methods again.
4, after using drilling to the abundant release in coal seam, the coal body around the group that drills obtains fully deformed, crack opens, watt Stone road is formed, and gas drainage efficiency reaches highest at this time.And gas is by after a large amount of extractions, Coal matrix shrinkage, crack passage into One step is opened.Opportunity at this time is most suitable for the injection of high pressure water, can use high pressure water-injection pump and fills the water into drilling, realizes effective While depositing dust, it can also allow and soften coal body, stress of coal seam is allowed further to be shifted.The method of the present invention makes full use of drilling to unload The best opportunity of pressure, gas drainage and coal-bed flooding efficiently realizes that the release erosion control, extraction prevention and treatment gas, water filling in coal seam are anti- Control multiple effects such as dust.
Detailed description of the invention
Fig. 1 is that the constructing structure of the multi-purpose construction method in a hole of the buried Coal Seam of improvement and Gas Disaster of the invention shows It is intended to;
Fig. 2 is the drilling and sealing schematic diagram of the method for the present invention;
Fig. 3 is the water injecting pump connection schematic diagram of the method for the present invention;
Fig. 4 is the techniqueflow chart of the method for the present invention.
In figure, 1, stope;2, tunnel;3, concordant drills;4, expanded capsule;5, water injection pipe;6, water pressure gauge;7, it takes out Adopt water injection pipe;8, communicating pipe;9, underground extraction main pipe;10, valve;11, gas drainage pipe;12, polyurethane;13, grouting pump; 14, Grouting Pipe;15, high pressure water-injection pump.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention, Technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is the present invention one Divide embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of creative work.
Embodiment 1
The present embodiment provides a kind of holes for administering buried Coal Seam and Gas Disaster to be mostly used construction method, and it is big to be included in buried depth In 600m and have in the buried coal seam of bump and Gas Disaster simultaneously and implement the steps of:
(1) it is reduced using the coal bed gas extraction effective radius R1 of conventional method test stope 1, such as gas pressure The method of the test gas drainage radius of the existing maturation such as method, gas flow method of testing.Actual mining is tested using conventional method The erosion control effective release radius R2 of drilling in face 1, such as stress reduce the mature effective release of testing bore holes such as method, electromagnetic radiation method The method of radius.The numerical values recited of R1 and R2 is compared in analysis, select 2 times of smaller value as two neighboring in stope 1 The spacing L1 of drilling.
(2) along stope 1 to the direction construction aperture perpendicular to tunnel 2 be 94mm or 113mm, 153mm etc. other Concordant drilling 3, the spacing of wells L1 of major diameter, drilling are parallel to bearing, and drillable length is 1 width H of stope 2/3rds.By the concordant constructed drilling 3 successively marked as Kn, n=1,2,3 ....
(3) there is top brill, bit freezing, the initial and stop bit for inhaling phenomena such as brill and coal big gun in real-time record during drilling construction It sets, the drilling region between two positions is that the actual stress of stope 1 concentrates band.
(4) expanded capsule 4 is sent into the initial position that actual stress concentrates band, is cased with communicating pipe 8 in expanded capsule 4.Benefit The high pressure water for injecting 1-1.5MPa into expanded capsule 4 with water injection pipe 5 expands 4 water-filling of expanded capsule, to complete to drilling First time block, 5 end of water injection pipe connect water pressure gauge 6.
(5) meet the drilling of Kn=3n-1 using label as water injecting drilling, using the company of extraction water injection pipe 7 and expanded capsule 4 Siphunculus 8 connects, and draws from drilling and connect with underground extraction main pipe 9, and extraction water injection pipe 7 is preferably steel pipe, this is because of extraction Water injection pipe 7 should be able to bear the high pressure of water filling, can be used for gas drainage, can be used for high pressure water injection;With the drilling of other labels As mash gas pumping drilling, it is all made of gas drainage pipe 11 and connects respectively with the communicating pipe 8 of expanded capsule 4 and underground extraction main pipe 9 It connects.Gas drainage pipe 11 is preferably polyethylene pipe.
(6) above step (2) to (5) are repeated, concordant of successively constructing in stope 1 drilling 3, until actual mining All it is covered with drilling in face 1, coal seam is made to obtain abundant release and deformation.
(7) registration of each 5 end water pressure gauge 6 of pouring water into borehole pipe of observational record, when the water pressure gauge of some pouring water into borehole pipe 5 After 6 registration no longer changes, the region drilling orifice about 1m is blocked using polyurethane 12, and passes through grouting pump 13 and slip casting Pipe 14 carries out injection hole sealing to the space in drilling between polyurethane 12 and expanded capsule 4 using cement mortar, while will drilling The interior valve 10 for drawing drainage tube is opened, and carries out extraction to the gas in coal seam.
(8) when monitoring that extraction total amount reaches the 70% of the total gas bearing capacity in coal seam by gas monitoring system, extraction is infused Water pipe 7 and gas drainage pipe 11 are disconnected with underground extraction main pipe 9, and extraction water injection pipe 7 is connect with high pressure water-injection pump 15, High pressure water injection is carried out to coal seam by water injecting drilling, until when water injection hole neighbouring mash gas pumping drilling water outlet.
The improvement while present invention is able to achieve buried Bumping Pressure in Coal Layers and Gas Disaster determines the spacing of wells using reasonable With drillable length, stope drilling release, the twice process procedures such as borehole sealing, gas drainage, water filling, efficiently realize Concentrate the acquisition of band, the release in coal seam, the extraction of gas, coal-bed flooding reduction and depositing dust etc. multiple beneficial coal seam actual stress Effect, realizes that a hole is multi-purpose, purpose of cost efficiency.Method of the invention is simple, easily operated, can make full use of drilling Multiple efficacies, avoid in the prior art drilling construction exist repeatability and wasteness.
The above embodiment of the present invention is only preferred embodiment, is not limited to the scope of the present invention.Ability The those of ordinary skill in domain can understand spirit of the invention according to above-described embodiment, and make a variety of different modifications and variations.? Without departing from the spirit of the invention, it is all this etc. modifications and variations it is all within the scope of the present invention.

Claims (10)

1. a kind of multi-purpose construction method in a hole for administering buried Coal Seam and Gas Disaster, which is characterized in that including following step It is rapid:
(1) determine spacing of wells L1: coal bed gas extraction effective radius R1 and the erosion control drilling of measurement stope (1) are effective Release radius R2, the spacing L1 of two neighboring drilling is 2 times of smaller value in R1 and R2 in stope (1);
(2) drilling construction: along stope (1), by the spacing of wells L1 to the direction construction concordant perpendicular to tunnel (2) It drills (3), the length of drilling is 2/3rds of stope (1) width H;
(3) determine that actual stress concentrates band: there is the initial of bump generation omen in record in real time during drilling construction Position and final position, the drilling region between the initial position and final position are the actual stresses of stope (1) Concentrate band;
(4) borehole sealing and gas drainage: the drilling of the initial position of band is concentrated to block actual stress, indwelling in drilling Communicating pipe (8), compartment of terrain selects drilling as water injecting drilling later, using extraction water injection pipe (7) respectively with communicating pipe (8) and well Lower extraction main pipe (9) connection, carries out gas drainage;Other drillings are used as mash gas pumping drilling, using gas drainage pipe (11) point It is not connect with communicating pipe (8) and underground extraction main pipe (9), carries out gas drainage;
(5) the abundant release in coal seam: repeating step (2) to (4), the successively construction in stope (1), until stope (1) it is covered with concordant drilling (3) in;
(6) high pressure water injection: when measuring gas drainage total amount and reaching the 65%-80% of the total gas bearing capacity in coal seam, by extraction water injection pipe (7) it is disconnected with gas drainage pipe (11) with underground extraction main pipe (9), and by extraction water injection pipe (7) and high pressure water-injection pump (15) it connects, high pressure water injection is carried out to coal seam by water injecting drilling, until the gas drainage pipe (11) of neighbouring mash gas pumping drilling Until interior water outlet.
2. a hole multi-purpose construction method according to claim 1 for administering buried Coal Seam and Gas Disaster, feature It is, in step (2), the aperture of drilling is 94mm, 113mm, 133mm or 153mm.
3. a hole multi-purpose construction method according to claim 1 for administering buried Coal Seam and Gas Disaster, feature It is, the bump occurs omen and is top brill, bit freezing, inhales brill or coal big gun.
4. a hole multi-purpose construction method according to claim 1 for administering buried Coal Seam and Gas Disaster, feature It is, it is described to block to block for the first time in step (4), expanded capsule (4) are sent into the drilling to be blocked, the expansion glue Capsule (4) cover communicating pipe (8) outside, using water injection pipe (5) to high pressure water is injected in expanded capsule (4), make expanded capsule (4) water-filling Drilling is blocked in expansion, and water injection pipe (5) end connects water pressure gauge (6);And carry out second after step (5) and block, observation note The pressure gauge registration for recording each pouring water into borehole pipe (5) end, after some pouring water into borehole pipe (5) pressure gauge registration no longer changes, Drilling orifice region is blocked using sealing compound, injection hole sealing is carried out to bore inner using hole sealing agent later.
5. a hole multi-purpose construction method according to claim 4 for administering buried Coal Seam and Gas Disaster, feature It is, the drilling orifice region refers to the region 1m in aperture.
6. a hole multi-purpose construction method according to claim 4 for administering buried Coal Seam and Gas Disaster, feature It is, the pressure of the high pressure water is 1-1.5MPa.
7. a hole multi-purpose construction method according to claim 4 for administering buried Coal Seam and Gas Disaster, feature It is, sealing compound is polyurethane, and hole sealing agent is cement mortar.
8. a hole multi-purpose construction method according to claim 1 for administering buried Coal Seam and Gas Disaster, feature It is, in step (4), compartment of terrain, which selects drilling as water injecting drilling, is implemented as got off: the concordant constructed is drilled (3) Successively marked as Kn, n=1,2,3 ..., label is selected to meet the drilling of Kn=3n-1 as water injecting drilling.
9. a hole multi-purpose construction method according to claim 1 for administering buried Coal Seam and Gas Disaster, feature Be, in step (6), when measuring gas drainage total amount and reaching the 70% of the total gas bearing capacity in coal seam, by extraction water injection pipe (7) and Gas drainage pipe (11) is disconnected with underground extraction main pipe (9).
10. a hole multi-purpose construction according to any one of claim 1 to 9 for administering buried Coal Seam and Gas Disaster Method, which is characterized in that the buried coal seam is that buried depth is greater than 600m and presses and Gas Disaster with having potential impact simultaneously Coal seam.
CN201811149125.5A 2018-09-29 2018-09-29 One-hole multipurpose construction method for treating impact and gas disaster of deep-buried coal seam Active CN109139092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811149125.5A CN109139092B (en) 2018-09-29 2018-09-29 One-hole multipurpose construction method for treating impact and gas disaster of deep-buried coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811149125.5A CN109139092B (en) 2018-09-29 2018-09-29 One-hole multipurpose construction method for treating impact and gas disaster of deep-buried coal seam

Publications (2)

Publication Number Publication Date
CN109139092A true CN109139092A (en) 2019-01-04
CN109139092B CN109139092B (en) 2020-04-17

Family

ID=64813671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811149125.5A Active CN109139092B (en) 2018-09-29 2018-09-29 One-hole multipurpose construction method for treating impact and gas disaster of deep-buried coal seam

Country Status (1)

Country Link
CN (1) CN109139092B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242347A (en) * 2019-07-01 2019-09-17 辽宁工程技术大学 The construction method of the compound disaster of " release-extraction-water filling " integration prevention and control coal petrography
CN110836114A (en) * 2019-11-21 2020-02-25 中煤科工集团重庆研究院有限公司 Method for treating coal mine rock burst and gas composite disaster
CN110894794A (en) * 2019-12-17 2020-03-20 大同煤矿集团有限责任公司 Comprehensive treatment method for gas on fully mechanized caving face of three-soft extra-thick coal seam
CN111594265A (en) * 2020-05-20 2020-08-28 陕西正通煤业有限责任公司 One-hole dual-purpose technology capable of meeting underground pressure relief and hydrogen sulfide treatment requirements
CN114961684A (en) * 2022-06-09 2022-08-30 中煤科工集团重庆研究院有限公司 Coal seam permeability increasing and scour prevention cooperative continuous operation method with rock burst dangerous top plate
CN115355004A (en) * 2022-09-20 2022-11-18 山东理工大学 Method for modifying and strengthening pressure relief of red mud slurry for coal bed rock burst drilling

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2278379A (en) * 1993-05-05 1994-11-30 Stanley Ball A mine pollution control unit
CN106014363A (en) * 2016-05-18 2016-10-12 中国矿业大学 Method for improving underground coal mine gas extraction efficiency
CN106351613A (en) * 2016-10-14 2017-01-25 安徽理工大学 Continuous gas extraction method under condition of multiple times of repeated blasting disturbance of coals
CN206722798U (en) * 2017-05-05 2017-12-08 西安科技大学 A kind of combined type coal-bed flooding pressure break and gas pumping one hole sealing device
CN107905834A (en) * 2017-12-20 2018-04-13 中原工学院 A kind of hypotonic high prominent coal seam architecture gas production method
CN108180035A (en) * 2018-01-30 2018-06-19 中煤科工集团重庆研究院有限公司 The gas pumping method that high gassy and low permeability coal seam drills with anti-reflection integration of operation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2278379A (en) * 1993-05-05 1994-11-30 Stanley Ball A mine pollution control unit
CN106014363A (en) * 2016-05-18 2016-10-12 中国矿业大学 Method for improving underground coal mine gas extraction efficiency
CN106351613A (en) * 2016-10-14 2017-01-25 安徽理工大学 Continuous gas extraction method under condition of multiple times of repeated blasting disturbance of coals
CN206722798U (en) * 2017-05-05 2017-12-08 西安科技大学 A kind of combined type coal-bed flooding pressure break and gas pumping one hole sealing device
CN107905834A (en) * 2017-12-20 2018-04-13 中原工学院 A kind of hypotonic high prominent coal seam architecture gas production method
CN108180035A (en) * 2018-01-30 2018-06-19 中煤科工集团重庆研究院有限公司 The gas pumping method that high gassy and low permeability coal seam drills with anti-reflection integration of operation

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242347A (en) * 2019-07-01 2019-09-17 辽宁工程技术大学 The construction method of the compound disaster of " release-extraction-water filling " integration prevention and control coal petrography
CN110836114A (en) * 2019-11-21 2020-02-25 中煤科工集团重庆研究院有限公司 Method for treating coal mine rock burst and gas composite disaster
CN110894794A (en) * 2019-12-17 2020-03-20 大同煤矿集团有限责任公司 Comprehensive treatment method for gas on fully mechanized caving face of three-soft extra-thick coal seam
CN110894794B (en) * 2019-12-17 2022-02-01 晋能控股煤业集团有限公司 Comprehensive treatment method for gas on fully mechanized caving face of three-soft extra-thick coal seam
CN111594265A (en) * 2020-05-20 2020-08-28 陕西正通煤业有限责任公司 One-hole dual-purpose technology capable of meeting underground pressure relief and hydrogen sulfide treatment requirements
CN114961684A (en) * 2022-06-09 2022-08-30 中煤科工集团重庆研究院有限公司 Coal seam permeability increasing and scour prevention cooperative continuous operation method with rock burst dangerous top plate
CN114961684B (en) * 2022-06-09 2023-06-20 中煤科工集团重庆研究院有限公司 Coal seam anti-reflection and anti-impact collaborative continuous operation method with rock burst dangerous roof
CN115355004A (en) * 2022-09-20 2022-11-18 山东理工大学 Method for modifying and strengthening pressure relief of red mud slurry for coal bed rock burst drilling
CN115355004B (en) * 2022-09-20 2024-03-19 山东理工大学 Modification and reinforcement pressure relief method for red mud slurry for rock burst drilling of coal seam

Also Published As

Publication number Publication date
CN109139092B (en) 2020-04-17

Similar Documents

Publication Publication Date Title
CN109139092A (en) A kind of multi-purpose construction method in a hole for administering buried Coal Seam and Gas Disaster
CN110145233B (en) Rock burst coal seam drilling-cutting-pressing-pumping-injecting multi-disaster cooperative prevention and control method
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN106195616B (en) A kind of liquid CO 2 bulking system
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN109252846B (en) The high pressure air pulse ripples periodically hammering anti-reflection system and method for coal body
CN104790951B (en) Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam
CN103256025B (en) A kind of composite well net type coal bed methane exploring method
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN104389559B (en) Method and device for preventing and controlling gas transfinite in thick-coal-seam mining process
CN107152303A (en) A kind of low ventilative high gas layer is by the method for the shielding efficient unloading pressure by blasting extraction in lane
CN102619552A (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN111852565B (en) Method for discharging brine in accumulated residues at bottom and communication section of salt cavity of old well cavity
CN112324337A (en) Whole-process gas extraction method for through-layer top comb-shaped drilling of bottom plate of soft coal seam
CN108756898A (en) Using the front pre-grouting construction method of HSC grouting materials
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
CN110344758A (en) A kind of construction method of high methane pole weak seam mash gas pumping drilling
WO2021082843A1 (en) Weak stratum-based reinforcement method for shield tunnel covered by shallow soil
CN113279811B (en) Reconstruction method and construction method for layered old goaf roof on super-thick coal seam
CN111535848B (en) Broken soft coal seam horizontal well air coal-drawing roadway filling support gas extraction outburst elimination method
CN107816365A (en) A kind of quick-fried pumping integration anti-burst method of coal seam drilling
CN110388206A (en) A kind of method and apparatus that coal column is left in the residual exploiting field of plasma uplink fracturing
CN110939404A (en) Hydraulic joint cutting pressure relief device and method for coal mine tunnel broken surrounding rock roof
CN104457461B (en) A kind of method of blasting seepage enhancement and its application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant