CN109139060A CN201811295546.9A CN201811295546A CN109139060A CN 109139060 A CN109139060 A CN 109139060A CN 201811295546 A CN201811295546 A CN 201811295546A CN 109139060 A CN109139060 A CN 109139060A
Authority
CN
China
Prior art keywords
construction
support
steel grating
pin
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811295546.9A
Other languages
Chinese (zh)
Inventor
刘石
孙坤玲
张荣福
关宏生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd filed Critical ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201811295546.9A priority Critical patent/CN109139060A/en
Publication of CN109139060A publication Critical patent/CN109139060A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of piping lane boring construction support construction and construction methods, the perpendicular support of the steel grating, just branch and steel grating horizontal support are interconnected to constitute a Pin steel grating, and several Pin steel gratings spaced apart constitute the steel grating support construction of entire tunneling pilot tunnel;The bracing members, non-woven fabrics, bottom splash guard and waterproof outer plate are interconnected to constitute Pin replacement support, the replacement support construction that several Pin constitute entire tunneling pilot tunnel is corresponded to steel grating, steel grating support construction is replaced after completing just lining construction, by converting supporting way, it can solve the problems, such as waterproof construction hardly possible, structure is simple, it is easy for construction, both tunneling pilot tunnel and existing road traffic safety be can guarantee, the probability of water leakage can be reduced again, construction quality is improved, the maintenance maintenance cost of subsequent piping lane engineering is reduced.

Description

A kind of piping lane boring construction support construction and construction method
Technical field
The present invention relates to piping lane Mined field, more particularly, to a kind of piping lane boring construction support construction and Construction method.
Background technique
With society be constantly progressive, urban construction rapid development, underground pipe gallery engineering using more and more common. Certain city's underground pipe gallery engineering uses boring construction by existing section.Since surrounding enviroment limit, tunneling pilot tunnel top is flat It pushes up, in work progress, has vehicles and pedestrians that must not interrupt above road.According to construction process requirement, just two after the completion of lining Before lining construction, it is necessary to carry out waterproof construction.Existing piping lane boring construction support generallys use steel grating structure, and tradition is applied In work two lining construction complete before, in order to guarantee construction safety forbid remove steel barrier support, this to waterproof construction bring it is many not Just, especially steel grating and first branch contact surface water-proofing treatment is more difficult.Currently, at steel barrier and first branch contact surface waterproof it is logical Normal way is directly glued on steel barrier with splash guard.Splash guard and steel barrier contact surface are not easy to paste integral, not only handle Difficulty, and seam crossing is easy to seep water.In reality, the piping lane engineering leak infiltration case after the completion of constructing in this way is compared It is all to not only increase subsequent maintenance maintenance cost, and seriously affect construction quality.
Summary of the invention
To overcome prior art defect, the technical problem to be solved by the present invention is to provide a kind of piping lane boring construction support knots Structure and construction method can solve the problems, such as waterproof construction hardly possible by conversion supporting way, and structure is simple, easy for construction, can both protect Tunneling pilot tunnel and existing road traffic safety are demonstrate,proved, and the probability of water leakage can be reduced, construction quality is improved, reduces subsequent piping lane The maintenance maintenance cost of engineering.
In order to achieve the above object, the present invention is implemented with the following technical solutions:
A kind of piping lane boring construction support construction, including bracing members, non-woven fabrics, bottom splash guard, waterproof outer plate, steel The perpendicular support of grid, just branch/first lining and steel grating horizontal support, which is characterized in that the just tunneling pilot tunnel cross section the Zhi Weiyu matching Rectangle steel construction piece, the perpendicular support of steel grating is two, and upper and lower ends connects with first branch respectively, and steel grating horizontal support is three, Two both ends of side are connected with first branch and the perpendicular support of steel grating respectively, an intermediate both ends are perpendicular with two steel gratings respectively Support connects and composes a Pin steel grating, and several Pin steel gratings spaced apart constitute the steel grating support of entire tunneling pilot tunnel Structure;The non-woven fabrics, bottom splash guard and waterproof outer plate be two sets successively paving is in the upper and lower surface just served as a contrast respectively, steel Support, which is vertically withstood on waterproof outer plate, constitutes Pin replacement support, corresponds to several Pin with steel grating and constitutes entire tunneling pilot tunnel Replacement support construction, complete just lining construction after replace steel grating support construction.
Distance t1 >=100mm of the outer on the bracing members chassis away from waterproof outer plate ragged edge.
Distance t2 >=150mm between the bottom splash guard and waterproof outer plate outer edge.
Distance t3 >=100mm between the non-woven fabrics and bottom splash guard outer edge.
A kind of construction method of piping lane boring construction support construction, which comprises the following steps:
1) tunneling pilot drive sets up the first Pin steel grating and the 2nd Pin steel grating to designed distance;
2) reinforcing rib is set up between the first Pin steel grating and the 2nd Pin steel grating, air placed concrete completes just lining construction;
3) continue to excavate tunneling pilot tunnel to designed distance, the 3rd Pin steel grating is set up, in the 2nd Pin steel grating and the 3rd Pin Reinforcing rib is set up between steel grating, air placed concrete completes just lining construction;
4) step 3) is repeated until entire tunneling pilot tunnel just serves as a contrast construction and finishes;
5) in tunneling pilot tunnel center and a certain Pin steel grating corresponding position successively paving non-woven fabrics, bottom splash guard and outer layer Splash guard composition overlays waterproof;
6) the steel grating horizontal support among steel grating is removed, bracing members is set up and completes Pin replacement support;
7) step 5) is repeated, 6) until completing the replacement support construction of entire tunneling pilot tunnel;
8) remove steel grating support construction, support perpendicular to steel grating at first Zhi Jiedian and steel grating horizontal support and first detail Grinding process is carried out at point;
9) waterproof construction is carried out, it is whole at closure with waterproof is overlay, complete construction of waterproof layer;
10) after completing two lining constructions, replacement support construction is removed.
Compared with prior art, the beneficial effects of the present invention are:
1) by conversion supporting way, steel grating support construction is replaced using replacement support construction, had both ensured that tunneling was led The safety in hole and existing road travel pedestrian, and waterproof construction is made to become simple, conveniently, effectively, solve previous waterproof construction Difficult, easy to leak problem;
2) structure is simple, easy to operate, and construction cost is cheap, in practice it has proved that using effect is good;
3) probability that can reduce water leakage, improves the construction quality of engineering, reduces the maintenance dimension of subsequent piping lane engineering Protect cost.
Detailed description of the invention
Fig. 1 is the tunneling pilot tunnel cross-sectional structure schematic front view of the present invention;
Fig. 2 is the portion I partial enlargement diagram in Fig. 1;
Fig. 3 is the steel grating structural schematic diagram (tunneling pilot tunnel cross section) of the present invention;
Fig. 4 is A-A the schematic diagram of the section structure in Fig. 3;
Fig. 5 is the replacement support construction schematic diagram (tunneling pilot tunnel cross section) of the present invention.
In figure: at the beginning of the perpendicular support 6- of 1- bracing members 2- non-woven fabrics 3- bottom splash guard 4- waterproof outer plate 5- steel grating Branch/just serve as a contrast 7- steel grating horizontal support 8- waterproof layer
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings, but protection scope not thereby limiting the invention.
As shown in Figs. 1-5, a kind of piping lane boring construction support construction of the present invention, including bracing members 1, non-woven fabrics 2, the perpendicular support 5 of bottom splash guard 3, waterproof outer plate 4, steel grating, just branch/first lining 6 and steel grating horizontal support 7, the just branch 6 are With the matched rectangle steel construction piece in tunneling pilot tunnel cross section, the perpendicular support 5 of steel grating is two, and upper and lower ends connect with first branch 6 respectively It connects, steel grating horizontal support 7 is three, and two both ends of side connects with first branch 6 and steel grating perpendicular support 5 respectively, centre A piece both ends connect and compose a Pin steel grating, several Pin steel gratings spaced apart with the perpendicular support 7 of two steel gratings respectively Constitute the steel grating support construction of entire tunneling pilot tunnel;The non-woven fabrics 2,3 plate of bottom waterproof and waterproof outer plate 4 are two sets points Successively in the upper and lower surface of first lining 6, bracing members 1, which are vertically withstood on waterproof outer plate 4, does not constitute Pin replacement support for paving, with Steel grating corresponds to the replacement support construction that several Pin constitute entire tunneling pilot tunnel, replaces steel lattice after completing just 6 construction of lining Grid support construction.
The outer on 1 chassis of bracing members is away from distance t1 >=100mm of 4 ragged edge of waterproof outer plate.
Distance t2 >=150mm between 4 outer edge of the bottom splash guard 3 and waterproof outer plate.
Distance t3 >=100mm between 3 outer edge of the non-woven fabrics 2 and bottom splash guard.
A kind of construction method of piping lane boring construction support construction, comprising the following steps:
1) tunneling pilot drive sets up the first Pin steel grating and the 2nd Pin steel grating to designed distance;
2) reinforcing rib is set up between the first Pin steel grating and the 2nd Pin steel grating, air placed concrete completes just 6 construction of lining;
3) continue to excavate tunneling pilot tunnel to designed distance, the 3rd Pin steel grating is set up, in the 2nd Pin steel grating and the 3rd Pin Reinforcing rib is set up between steel grating, air placed concrete completes just 6 construction of lining;
4) step 3) is repeated until entire tunneling pilot tunnel just serves as a contrast 6 constructions and finishes;
5) in tunneling pilot tunnel center and a certain Pin steel grating corresponding position successively paving non-woven fabrics 2, bottom splash guard 3 and outer The layer composition of splash guard 4 overlays waterproof;
6) the steel grating horizontal support 7 among steel grating is removed, bracing members 1 is set up and completes Pin replacement support;
7) step 5) is repeated, 6) until completing the replacement support construction of entire tunneling pilot tunnel;
8) remove steel grating support construction, support 5 perpendicular to steel grating at just 6 nodes of branch and steel grating horizontal support 7 and just Grinding process is carried out at 6 nodes of branch, so that just 6 surfacings of lining, are convenient for waterproof construction;
9) waterproof construction is carried out, it is whole at closure with waterproof is overlay, the probability of water leakage can be reduced, waterproof layer 8 is completed Construction;
10) after completing two lining constructions, replacement support construction storage keeping is removed, can be reused.

Claims (5)

1. a kind of piping lane boring construction support construction, including bracing members, non-woven fabrics, bottom splash guard, waterproof outer plate, steel lattice The perpendicular support of grid, just branch/first lining and steel grating horizontal support, which is characterized in that the just Zhi Weiyu tunneling pilot tunnel cross section is matched Rectangle steel construction piece, the perpendicular support of steel grating is two, and upper and lower ends are connect with first branch respectively, and steel grating horizontal support is three, side Two both ends on side respectively with first branch and the perpendicular support connection of steel grating, an intermediate both ends respectively with two steel gratings perpendicular Support connects and composes a Pin steel grating, and several Pin steel gratings spaced apart constitute the steel grating support knot of entire tunneling pilot tunnel Structure;The non-woven fabrics, bottom splash guard and waterproof outer plate be two sets successively paving is in the upper and lower surface just served as a contrast respectively, steel branch Support, which is vertically withstood on waterproof outer plate, constitutes replacement support, corresponds to the replacement that several Pin constitute entire tunneling pilot tunnel with steel grating Support construction replaces steel grating support construction after completing just lining construction.
2. a kind of piping lane boring construction support construction according to claim 1, which is characterized in that the bracing members chassis Distance t1 >=100mm of the outer away from waterproof outer plate ragged edge.
3. a kind of piping lane boring construction support construction according to claim 1, which is characterized in that the bottom splash guard Distance t2 >=150mm between waterproof outer plate outer edge.
4. a kind of piping lane boring construction support construction according to claim 1, which is characterized in that the non-woven fabrics and bottom Distance t3 >=100mm between layer splash guard outer edge.
5. realizing a kind of construction method of piping lane boring construction support construction described in claims 1, which is characterized in that packet Include following steps:
1) tunneling pilot drive sets up the first Pin steel grating and the 2nd Pin steel grating to designed distance;
2) reinforcing rib is set up between the first Pin steel grating and the 2nd Pin steel grating, air placed concrete completes just lining construction;
3) continue to excavate tunneling pilot tunnel to designed distance, the 3rd Pin steel grating is set up, in the 2nd Pin steel grating and the 3rd Pin steel lattice Reinforcing rib is set up between grid, air placed concrete completes just lining construction;
4) step 3) is repeated until entire tunneling pilot tunnel just serves as a contrast construction and finishes;
5) in tunneling pilot tunnel center and a certain Pin steel grating corresponding position successively paving non-woven fabrics, bottom splash guard and waterproof outer Plate composition overlays waterproof;
6) the steel grating horizontal support among steel grating is removed, bracing members is set up and completes Pin replacement support;
7) step 5) is repeated, 6) until completing the replacement support construction of entire tunneling pilot tunnel;
8) steel grating support construction is removed, at the perpendicular support of steel grating and first Zhi Jiedian and at steel grating horizontal support and first Zhi Jiedian Carry out grinding process;
9) waterproof construction is carried out, it is whole at closure with waterproof is overlay, complete construction of waterproof layer;
10) after completing two lining constructions, replacement support construction is removed.
CN201811295546.9A 2018-11-01 2018-11-01 A kind of piping lane boring construction support construction and construction method Pending CN109139060A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811295546.9A CN109139060A (en) 2018-11-01 2018-11-01 A kind of piping lane boring construction support construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811295546.9A CN109139060A (en) 2018-11-01 2018-11-01 A kind of piping lane boring construction support construction and construction method

Publications (1)

Publication Number Publication Date
CN109139060A true CN109139060A (en) 2019-01-04

Family

ID=64807155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811295546.9A Pending CN109139060A (en) 2018-11-01 2018-11-01 A kind of piping lane boring construction support construction and construction method

Country Status (1)

Country Link
CN (1) CN109139060A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523784A (en) * 2020-11-30 2021-03-19 杭州市市政工程集团有限公司 Waterproof node structure for temporary support of soft soil underground excavation tunnel and construction method of waterproof node structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1126786A (en) * 1994-09-24 1996-07-17 北京市城建设计研究院 Hidden construction process of large underground engineering with flat roof and vertical walls
US20110011018A1 (en) * 2009-07-15 2011-01-20 Frank Johnson Modular construction mold apparatus and method for constructing concrete buildings and structures
CN103590841A (en) * 2012-08-13 2014-02-19 上海市政工程设计研究总院(集团)有限公司 Supporting method for primary support of underground excavated chamber
CN103742173A (en) * 2013-12-26 2014-04-23 北京市轨道交通设计研究院有限公司 Method for underground engineering construction for controlling overlying existing structure sedimentation
CN203702164U (en) * 2013-11-04 2014-07-09 北京城建设计发展集团股份有限公司 Subsurface excavation tunnel top bracing device adopting lifting jacks for movable support
CN107905798A (en) * 2017-11-01 2018-04-13 中国建筑第八工程局有限公司 The method that flat top wall boring construction is carried out using central drift method
CN209293811U (en) * 2018-11-01 2019-08-23 鞍山三冶建筑工程有限公司 A kind of piping lane boring construction support construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1126786A (en) * 1994-09-24 1996-07-17 北京市城建设计研究院 Hidden construction process of large underground engineering with flat roof and vertical walls
US20110011018A1 (en) * 2009-07-15 2011-01-20 Frank Johnson Modular construction mold apparatus and method for constructing concrete buildings and structures
CN103590841A (en) * 2012-08-13 2014-02-19 上海市政工程设计研究总院(集团)有限公司 Supporting method for primary support of underground excavated chamber
CN203702164U (en) * 2013-11-04 2014-07-09 北京城建设计发展集团股份有限公司 Subsurface excavation tunnel top bracing device adopting lifting jacks for movable support
CN103742173A (en) * 2013-12-26 2014-04-23 北京市轨道交通设计研究院有限公司 Method for underground engineering construction for controlling overlying existing structure sedimentation
CN107905798A (en) * 2017-11-01 2018-04-13 中国建筑第八工程局有限公司 The method that flat top wall boring construction is carried out using central drift method
CN209293811U (en) * 2018-11-01 2019-08-23 鞍山三冶建筑工程有限公司 A kind of piping lane boring construction support construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
韩卫东: "平顶直墙倾斜通道暗挖施工技术", 《山西建筑》, vol. 33, no. 26, pages 202 - 203 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523784A (en) * 2020-11-30 2021-03-19 杭州市市政工程集团有限公司 Waterproof node structure for temporary support of soft soil underground excavation tunnel and construction method of waterproof node structure

Similar Documents

Publication Publication Date Title
US11319690B2 (en) Assembled recyclable rectangular working well with preset detachable door opening and construction method thereof
CN103016029B (en) Grouped second liner construction method for large cross-section tunnel
CN109555540B (en) Tunnel type prestressed pipe curtain structure and construction method
CN102094649B (en) Method for constructing underground space by shield-shallow buried covered excavation composite method
CN103256052B (en) Construction method for integral straight middle wall type double-arch tunnel
CN104213514B (en) A kind of earthing corrugated steel-concrete combination arch bridge add strong method
CN103953351B (en) Enlarging construction method is dug under existing tunnel in the case of a kind of uninterrupted traffic
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
CN106284106A (en) A kind of double curvature arch bridge arch compound sleeve arch reinforcement means
CN103290847A (en) Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method
CN109555535B (en) Lower-way truss type prestressed pipe curtain structure and construction method
CN206888990U (en) A kind of Shallow Covered Metro Station separates open type structure
CN209293811U (en) A kind of piping lane boring construction support construction
CN103741597B (en) A kind of without transition section concrete bridge expansion joint installation and mounting method thereof
CN203284808U (en) Bearing protection plate for wellhead of road inspection well
CN109139060A (en) A kind of piping lane boring construction support construction and construction method
CN208380578U (en) Precast construction in a kind of roads and tunnels
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN206521696U (en) A kind of bridge drainage system
CN205990921U (en) Double-deck lining cutting special defects circular cross section Tunneling by mining method structure
CN107587521A (en) Reserve the construction method of municipal tunnel node in subway station
CN104313993B (en) A kind of highway bridge and construction method thereof
CN111502748A (en) Construction method for backfilling foundation of railway crossing giant karst cave
CN2937300Y (en) FRP vinyl glass fibre reinfroced plastic strengthening rib cage
CN102518458B (en) Construction method of top beam part of underground bus stop

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104