CN109137901A - A kind of dedicated adjustable rise buildings tubular pole of building engineering construction - Google Patents

A kind of dedicated adjustable rise buildings tubular pole of building engineering construction Download PDF

Info

Publication number
CN109137901A
CN109137901A CN201811297485.XA CN201811297485A CN109137901A CN 109137901 A CN109137901 A CN 109137901A CN 201811297485 A CN201811297485 A CN 201811297485A CN 109137901 A CN109137901 A CN 109137901A
Authority
CN
China
Prior art keywords
building
stake
lifting device
engineering construction
building stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811297485.XA
Other languages
Chinese (zh)
Inventor
董佑军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811297485.XA priority Critical patent/CN109137901A/en
Publication of CN109137901A publication Critical patent/CN109137901A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to technical field of buildings, in particular a kind of dedicated adjustable rise buildings tubular pole of building engineering construction, including the first building stake, pile top, second building stake, lifting device and bracing means, first building stake bottom is equipped with pile top, and the pile top two sides are equipped with hangnail, the first building stake inner bottom is provided with elevating lever, the second building stake is fixedly connected at the top of the elevating lever, the left and right sides is provided with lifting device inside the first building stake, center screw rod is equipped at the inside center of the lifting device, and the periphery of the center screw rod is surrounded with spring, double optical axises are equipped at left and right sides of the center screw rod, the lifting device two sides are equipped with sliding slot, and sliding block is slidably fitted with by the sliding slot, the sliding block is fixedly connected in the second building stake far from one end of lifting device.Single unit system structure is simple in the present invention, highly-safe, while meeting the use demand of user, has certain promotional value.

Description

A kind of dedicated adjustable rise buildings tubular pole of building engineering construction
Technical field
The present invention relates to technical field of buildings, specially a kind of dedicated adjustable rise buildings tubular pole of building engineering construction.
Background technique
It is well known that building stake is a kind of building appliance, it is mainly used for squeezing into progress upper part building support in soil Base apparatus, therefore be widely used in building engineering field, but existing building stake there is a problem, for example, application No. is 201520690469.2 patent, including pile body and pile top, pile body include left fission and right fission, and pile top includes left point sharp and right Divide point, a left side point point is mounted on the bottom end of left fission, and it further includes first rotating shaft, a left side point is sharp that right point of point, which is mounted on the bottom end of right fission, Further include left support, right support and casing together with being rotatably connected with the right side point point by first rotating shaft, the left end of left support and Left fission is rotatably connected, the right end of right support with it is right it is seperated be rotatably connected, the right end of left support and the left end of right support are equal It is provided with external thread structure, casing is internally provided with internal thread structure, and the right end of left support and the left end of right support are inserted into And spiral shell is filled to the inside of casing, although the broadband of pile body can be adjusted, the height of pile body can not be according to needed for building Building height be adjusted, be unable to satisfy the use demand of user, be unfavorable for promoting the use of, it is in addition to this, existing to build Stability when building its use of stake is poor, and the especially setting of pile body bottom pile top cannot firmly go deep into the bottom of building lot Portion, therefore, it is necessary to a kind of dedicated adjustable rise buildings tubular poles of building engineering construction to make improvement to the above problem.
Summary of the invention
It is above-mentioned to solve the purpose of the present invention is to provide a kind of dedicated adjustable rise buildings tubular pole of building engineering construction The problem of being proposed in background technique.
To achieve the above object, the invention provides the following technical scheme:
A kind of dedicated adjustable rise buildings tubular pole of building engineering construction, including the first building stake, pile top, the second building stake, liter Falling unit and bracing means, it is described first building stake bottom be equipped with pile top, and the pile top two sides be equipped with hangnail, described first Building stake inner bottom is provided with elevating lever, and the second building stake, the first building stake are fixedly connected at the top of the elevating lever The internal left and right sides is provided with lifting device, and center screw rod, and the central hair are equipped at the inside center of the lifting device The periphery of bar is surrounded with spring, and double optical axises are equipped at left and right sides of the center screw rod, and the lifting device two sides, which are equipped with, to be slided Slot, and sliding block is slidably fitted with by the sliding slot, the sliding block is fixedly connected on second far from one end of lifting device and builds It builds in stake, the second building stake sequentially passes through the first building stake and top plate far from one end of elevating lever and extends to the outer of top plate Portion, top plate top two sides are provided with knob, and the top plate two sides of the bottom are equipped with connecting plate, and the connecting plate bottom end is equipped with Mounting plate is fixedly connected with steadying plate between the connecting plate inside and the second building stake, and the connecting plate periphery is arranged peace Equipped with bracing means, fixed lobe is provided on the inside of the bracing means, and the bracing means is pacified by the way that clamping screw is fixed Mounted in the periphery of connecting plate, the first building two side lower part of stake is fixedly connected with stabiliser bar, fixed company at the top of the stabiliser bar It is connected to support base, the top of the support base is equipped with mounting base, and the top of the mounting base is equipped with standing screw, described solid Screw rod is determined through mounting plate and extends to the upside of mounting plate, and gear is installed on the standing screw and apart from mounting plate bottom end Block is equipped with fixture nut on the standing screw and on the upside of mounting plate.
Preferably, it is threadedly coupled between the fixture nut and standing screw.
Preferably, it is threadedly coupled between the block and standing screw.
Preferably, the hangnail is equipped with multiple groups altogether, is symmetrically installed the left and right sides of pile top.
Preferably, the center screw rod runs through the inside of entire spring.
Preferably, the lifting device is equipped with two groups altogether, and limited block is equipped on the upside of the lifting device outer wall.
Preferably, the side of the support base is fixedly connected on the outside of the first building stake.
Compared with prior art, the beneficial effects of the present invention are:
1, in the present invention, by setting barbed pile top, the concrete barb of pouring can be lived, to increase its stability.
2, in the present invention, by being equipped with the bracing means of fixed lobe, connecting plate outside can further be fixed, To improve the security performance of single unit system.
3, female by upward rotary fixing screw by the standing screw of setting, fixture nut in the present invention, by fixed spiral shell Mother removes from standing screw, while the bracing means on the outside of connecting plate is loosened by clamping screw, then pulls up knob, To which top plate drives the second building stake and steadying plate to move upwards, however the sliding block of the second building stake lower part two sides passes through sliding slot edge Lifting device upward sliding, while steadying plate drive connecting plate move upwards, connecting plate drive mounting plate on standing screw It moves upwards, when the second building stake is adjusted to suitable height, upward rotary block is contacted block with mounting plate, then Fixture nut is mounted on standing screw, mounting plate is fixed, so that the height and position mobile to the second building stake carries out It is fixed, it is ensured that the height of pile body can be adjusted according to the building height needed for building, and the use for meeting user needs It asks, there is certain promotional value.
Detailed description of the invention
Fig. 1 is overall structure of the present invention;
Fig. 2 is lifting device schematic diagram of internal structure in the present invention;
Fig. 3 is the structural schematic diagram of bracing means in the present invention;
In figure: 1- first build stake, 2- pile top, 3- hangnail, 4- elevating lever, 5- second build stake, 6- lifting device, 7- sliding block, 8- sliding slot, the center 9- screw rod, 10- spring, the bis- optical axises of 11-, 12- stabiliser bar, 13- support base, 14- standing screw, 15- installation Seat, 16- mounting plate, 17- block, 18- fixture nut, 19- connecting plate, 20- steadying plate, 21- bracing means, 22- fixed lobe, 23- clamping screw, 24- top plate, 25- knob.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments, is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution:
A kind of dedicated adjustable rise buildings tubular pole of building engineering construction, including first builds stake 1, pile top 2, second builds stake 5, Lifting device 6 and bracing means 21, the first building 1 bottom of stake is equipped with pile top 2, and 2 two sides of pile top are equipped with hangnail 3, and hangnail 3 is total Equipped with multiple groups, it is symmetrically installed the left and right sides of pile top 2, it, can be by the concrete barb of pouring by being equipped with the pile top 2 of hangnail 3 Firmly, to increase its stability, the first building 1 inner bottom of stake is provided with elevating lever 4, is fixedly connected with second at the top of elevating lever 4 Stake 5 is built, the 1 inside left and right sides of the first building stake is provided with lifting device 6, and lifting device 6 is equipped with two groups, and lifting device altogether It is equipped with limited block on the upside of 6 outer walls, center screw rod 9 is equipped at the inside center of lifting device 6, and the periphery of center screw rod 9 is surround It is provided with spring 10, center screw rod 9 runs through the inside of entire spring 10, double optical axises 11, lifting are equipped at left and right sides of center screw rod 9 6 two sides of device are equipped with sliding slot 8, and are slidably fitted with sliding block 7 by sliding slot 8, and sliding block 7 is fixed far from one end of lifting device 6 Be connected in the second building stake 5, second building stake 5 far from one end of elevating lever 4 sequentially pass through the first building stake 1 and top plate 24 and The outside of top plate 24 is extended to, 24 top two sides of top plate are provided with knob 25, and 24 two sides of the bottom of top plate are equipped with connecting plate 19, and even 19 bottom end of fishplate bar is equipped with mounting plate 16, is fixedly connected with steadying plate 20 between 19 inside of connecting plate and the second building stake 5, and connect 19 periphery of plate, which is arranged, is equipped with bracing means 21, fixed lobe 22 is provided on the inside of bracing means 21, and bracing means 21 passes through Clamping screw 23 is fixedly mounted on the periphery of connecting plate 19, can be to connecting plate by being equipped with the bracing means 21 of fixed lobe 22 19 outsides are further fixed, to improve the security performance of single unit system, first building 1 liang of side lower part of stake is fixedly connected There is stabiliser bar 12, support base 13 is fixedly connected at the top of stabiliser bar 12, the side of support base 13 is fixedly connected on the first building stake 1 Outside, the top of support base 13 is equipped with mounting base 15, and the top of mounting base 15 is equipped with standing screw 14, standing screw 14 It through mounting plate 16 and extends to the upside of mounting plate 16, block is installed on standing screw 14 and apart from 16 bottom end of mounting plate 17, it is threadedly coupled between block 17 and standing screw 14, fixed spiral shell is installed on standing screw 14 and on the upside of mounting plate 16 Mother 18, is threadedly coupled between fixture nut 18 and standing screw 14, by the standing screw 14 and fixture nut 18 of setting, passes through Upward rotary fixing screw mother 18, fixture nut 18 is removed from standing screw 14, while company is loosened by clamping screw 23 The bracing means 21 in the outside of fishplate bar 19, then pull up knob 25, thus top plate 24 drive the second building stake 5 and steadying plate 20 to Upper movement, however the sliding block 7 of the second building 5 lower part two sides of stake passes through sliding slot 8 along 6 upward sliding of lifting device, stablizes simultaneously Plate 20 drives connecting plate 19 to move upwards, and connecting plate 19 drives mounting plate 16 to move upwards on standing screw 14, builds when second When building stake 5 and adjusting to suitable height, upward rotary block 17 is contacted block 17 with mounting plate 16, then by fixture nut 18 are mounted on standing screw 14 mounting plate 16 are fixed, so that the height and position mobile to the second building stake 5 is consolidated It is fixed, it is ensured that the height of pile body can be adjusted according to the building height needed for building, meet the use demand of user, With certain promotional value.
Invention workflow: in use, the pile top 2 for being equipped with hangnail 3 to be fixedly mounted on to the inside concrete of pouring, then The height of single unit system can be adjusted according to the building height needed for building, rotary fixing screw mother 18 upward first will consolidate Determine nut 18 to remove from standing screw 14, while loosening the bracing means 21 in 19 outside of connecting plate by clamping screw 23, Knob 25 is pulled up again, so that top plate 24 drives the second building stake 5 and steadying plate 20 to move upwards, however the second building stake 5 The sliding block 7 of lower part two sides passes through sliding slot 8 along 6 upward sliding of lifting device, while steadying plate 20 drives connecting plate 19 to transport upwards Dynamic, connecting plate 19 drives mounting plate 16 to move upwards on standing screw 14, when the second building stake 5 is adjusted to suitable height When, upward rotary block 17 contacts block 17 with mounting plate 16, and it is right on standing screw 14 to be then mounted on fixture nut 18 Mounting plate 16 is fixed, so that the height and position mobile to the second building stake 5 is fixed, single unit system structure is simple, peace Quan Xinggao, and the use demand of user is met, there is certain promotional value.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of dedicated adjustable rise buildings tubular pole of building engineering construction, including the first building stake (1), pile top (2), second build Build stake (5), lifting device (6) and bracing means (21), it is characterised in that: first building stake (1) bottom is equipped with pile top (2), and the pile top (2) two sides are equipped with hangnail (3), and described first building stake (1) inner bottom is provided with elevating lever (4), institute It states and is fixedly connected with the second building stake (5) at the top of elevating lever (4), the internal left and right sides of the first building stake (1) is provided with liter Falling unit (6) is equipped with center screw rod (9) at the inside center of the lifting device (6), and the periphery of the center screw rod (9) It is surrounded with spring (10), double optical axises (11), lifting device (6) two sides is equipped at left and right sides of the center screw rod (9) Equipped with sliding slot (8), and being slidably fitted with sliding block (7) by the sliding slot (8), the sliding block (7) is far from lifting device (6) One end is fixedly connected in the second building stake (5), and second building stake (5) sequentially passes through the far from the one end of elevating lever (4) One building stake (1) and top plate (24) and the outside for extending to top plate (24), top plate (24) top two sides are provided with knob (25), top plate (24) two sides of the bottom are equipped with connecting plate (19), and the connecting plate (19) bottom end is equipped with mounting plate (16), institute It states and is fixedly connected with steadying plate (20) between the second building stake (5) on the inside of connecting plate (19), and the connecting plate (19) periphery It is arranged and is equipped with bracing means (21), be provided with fixed lobe (22) on the inside of the bracing means (21), and the bracing means (21) periphery of connecting plate (19) is fixedly mounted on by clamping screw (23), the first building (1) two side lower part of stake is fixed It is connected with stabiliser bar (12), is fixedly connected with support base (13) at the top of the stabiliser bar (12), the top of the support base (13) It is equipped with mounting base (15), the top of the mounting base (15) is equipped with standing screw (14), and the standing screw (14) is run through Mounting plate (16) and the upside for extending to mounting plate (16) are installed on the standing screw (14) and apart from mounting plate (16) bottom end Have block (17), fixture nut (18) are installed on the standing screw (14) and on the upside of mounting plate (16).
2. the dedicated adjustable rise buildings tubular pole of a kind of building engineering construction according to claim 1, it is characterised in that: It is threadedly coupled between the fixture nut (18) and standing screw (14).
3. the dedicated adjustable rise buildings tubular pole of a kind of building engineering construction according to claim 1, it is characterised in that: It is threadedly coupled between the block (17) and standing screw (14).
4. the dedicated adjustable rise buildings tubular pole of a kind of building engineering construction according to claim 1, it is characterised in that: The hangnail (3) is equipped with multiple groups altogether, is symmetrically installed the left and right sides of pile top (2).
5. the dedicated adjustable rise buildings tubular pole of a kind of building engineering construction according to claim 1, it is characterised in that: The center screw rod (9) runs through the inside of entire spring (10).
6. the dedicated adjustable rise buildings tubular pole of a kind of building engineering construction according to claim 1, it is characterised in that: The lifting device (6) is equipped with two groups altogether, and limited block is equipped on the upside of the lifting device (6) outer wall.
7. the dedicated adjustable rise buildings tubular pole of a kind of building engineering construction according to claim 1, it is characterised in that: The side of the support base (13) is fixedly connected on the outside of the first building stake (1).
CN201811297485.XA 2018-11-01 2018-11-01 A kind of dedicated adjustable rise buildings tubular pole of building engineering construction Withdrawn CN109137901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811297485.XA CN109137901A (en) 2018-11-01 2018-11-01 A kind of dedicated adjustable rise buildings tubular pole of building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811297485.XA CN109137901A (en) 2018-11-01 2018-11-01 A kind of dedicated adjustable rise buildings tubular pole of building engineering construction

Publications (1)

Publication Number Publication Date
CN109137901A true CN109137901A (en) 2019-01-04

Family

ID=64807202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811297485.XA Withdrawn CN109137901A (en) 2018-11-01 2018-11-01 A kind of dedicated adjustable rise buildings tubular pole of building engineering construction

Country Status (1)

Country Link
CN (1) CN109137901A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158576A (en) * 2019-06-04 2019-08-23 杨德银 A kind of dedicated building tubular pole convenient for adjusting height of building engineering construction
CN112591566A (en) * 2020-12-18 2021-04-02 王霞 Land surveying and mapping survey line tightening equipment based on electronic information technology

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6682267B1 (en) * 2002-12-03 2004-01-27 Robert L. Jones Piering device with adjustable helical plate
CN205503637U (en) * 2016-01-06 2016-08-24 河北鸿宇通信器材有限公司 Hold hoop
CN206428693U (en) * 2016-12-30 2017-08-22 上海三凯建设管理咨询有限公司 A kind of pre-stress hollow uplift pile
CN206956718U (en) * 2017-05-05 2018-02-02 郑兰芳 A kind of adjustable building stake
CN207092081U (en) * 2017-07-08 2018-03-13 上海弘城国际建筑设计有限公司 A kind of adjustable rise buildings stake
CN108454227A (en) * 2018-04-13 2018-08-28 海宁酷彩数码科技有限公司 A kind of stamp package post
CN207959186U (en) * 2018-01-10 2018-10-12 湖北省工程咨询股份有限公司 A kind of adjustable building stake

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6682267B1 (en) * 2002-12-03 2004-01-27 Robert L. Jones Piering device with adjustable helical plate
CN205503637U (en) * 2016-01-06 2016-08-24 河北鸿宇通信器材有限公司 Hold hoop
CN206428693U (en) * 2016-12-30 2017-08-22 上海三凯建设管理咨询有限公司 A kind of pre-stress hollow uplift pile
CN206956718U (en) * 2017-05-05 2018-02-02 郑兰芳 A kind of adjustable building stake
CN207092081U (en) * 2017-07-08 2018-03-13 上海弘城国际建筑设计有限公司 A kind of adjustable rise buildings stake
CN207959186U (en) * 2018-01-10 2018-10-12 湖北省工程咨询股份有限公司 A kind of adjustable building stake
CN108454227A (en) * 2018-04-13 2018-08-28 海宁酷彩数码科技有限公司 A kind of stamp package post

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158576A (en) * 2019-06-04 2019-08-23 杨德银 A kind of dedicated building tubular pole convenient for adjusting height of building engineering construction
CN112591566A (en) * 2020-12-18 2021-04-02 王霞 Land surveying and mapping survey line tightening equipment based on electronic information technology

Similar Documents

Publication Publication Date Title
CN203499247U (en) Cylinder shaping wooden mold construction structure
CN109137901A (en) A kind of dedicated adjustable rise buildings tubular pole of building engineering construction
CN104242158A (en) Pay-off rack
CN207092081U (en) A kind of adjustable rise buildings stake
CN204852837U (en) Cloud platform lifter
CN209261252U (en) A kind of support frame for ancient architecture wall reparation
CN207714760U (en) A kind of quick access frame that stability easy to disassemble is strong
CN207829482U (en) A kind of architectural engineering concrete structural surface apparatus for leveling
CN206220262U (en) A kind of steel construction assembled wallboard node
CN106013186B (en) A kind of building municipal works slope reinforcement device
CN205400121U (en) Vertical interim strutting arrangement who props usefulness that trades
CN204920200U (en) Fossil fragments template system
CN203639940U (en) Retaining wall for hydraulic engineering
CN208415255U (en) Pile pulling device
CN207653102U (en) A kind of tendril vegetables climbing frame
CN208704677U (en) A kind of building foundation flatness detecting device
CN109751456A (en) A kind of construction site aqueduct bracing means
CN205975315U (en) Road road surface structural layer construction height controlling means
CN110409503A (en) A kind of height-adjustable well lid
CN204433948U (en) Exploration test actinobacillus device
CN205177398U (en) Electronic organ support
CN209551680U (en) Transport device is put in a kind of combination of building steel tube
CN204007620U (en) Instrument of surveying and mapping bracing frame
CN216307458U (en) Hydraulic and hydroelectric engineering is with fixed effectual lighting device
CN204663146U (en) A kind of grafting adjustable iron skill enclosure wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190104