CN109128829B - The inside and outside chamfering one-shaper that drills of aluminum pipe brush pot - Google Patents
The inside and outside chamfering one-shaper that drills of aluminum pipe brush pot Download PDFInfo
- Publication number
- CN109128829B CN109128829B CN201811052617.2A CN201811052617A CN109128829B CN 109128829 B CN109128829 B CN 109128829B CN 201811052617 A CN201811052617 A CN 201811052617A CN 109128829 B CN109128829 B CN 109128829B
- Authority
- CN
- China
- Prior art keywords
- sliding rail
- brush pot
- drill
- sliding
- main shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P23/00—Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
- B23P23/02—Machine tools for performing different machining operations
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)
Abstract
The invention discloses the chamfering one-shapers that drills inside and outside a kind of aluminum pipe brush pot, are related to a kind of brush pot drilling chamfer mechanism, it includes fuselage and the head positioned at body upper, and fuselage has the first sliding rail, has fixed station on the first sliding rail;There is rotating device on fixed station;Head includes the second sliding rail and third sliding rail;There is the second sliding block on second sliding rail, there is electric main shaft and the first camshaft bearing on the second sliding block;There is drill head in electric main shaft;Drill head includes the first chamfer drill and step drill;Third sliding rail has third sliding block, there is L-type arm on third sliding block;Second sliding rail is connected with third sliding rail, and the second sliding block is connected with third sliding block by connecting rod;Connecting rod has first sliding groove, balance pivot and second sliding slot;The present invention realizes to brush pot while carrying out drilling and chamfering, not only reduces the labor intensity of staff, also improves efficiency work.
Description
Technical field
The present invention relates to a kind of brush pot drilling chamfer mechanisms, more specifically say it is a kind of inside and outside chamfering that drills of aluminum pipe brush pot
One-shaper.
Background technique
The way of existing ground glass brush is that manually woollen is pulled in solid fishing lines in hole to, and is one very long
The continuous continuous plucking of line, all woollen strings are on single line, as long as breaking at the one of line, entire brush is scrapped;But
Current brush pot brush only has bore process, and the sharp edge in hole can cut off line, especially aluminum brush pot, can not only cut off line,
Cause woollen to loosen, the hand of worker can also be hurt, causes safety accident, and this artificial mode working efficiency is extremely low,
The quality of product is also unstable.
Therefore, it is necessary to improve.
Summary of the invention
The purpose of the invention is to overcome the shortcoming of above-mentioned background technology, and provide a kind of inside and outside brill of aluminum pipe brush pot
Hole chamfering one-shaper.
To achieve the goals above, the technical solution of the present invention is as follows: the inside and outside chamfering one-shaper that drills of aluminum pipe brush pot, packet
Fuselage and the head positioned at body upper are included, the fuselage has the first sliding rail, there is the fixed station that can be horizontally slipped on the first sliding rail;
The left part of the fixed station has rotating device;The rotating device includes first motor and the chuck positioned at first motor right end;
The chuck contact is in brush pot inner wall;It is characterized by: the head include the second sliding rail and on the right side of the second sliding rail
Three sliding rails;Can slide up and down the second sliding block on second sliding rail, there is electric main shaft and the first camshaft on the second sliding block
It holds;There is drill head in the lower end of the electric main shaft;The drill head includes the first chamfer drill and positioned at the first chamfer drill lower end
Step drill;The third sliding rail can slide up and down third sliding block, there is L-type arm on third sliding block;The L-type arm includes longitudinal
Arm and transverse arm;There is the second camshaft bearing in the vertical arms;One end of the transverse arm is connect with vertical arms, and the other end is close
Chuck;The longitudinal cylinder that vertical arms can be allowed to stretch downwards is arranged at the vertical arms lower part;The transverse arm has close to vertical arms one end
The lateral cylinder that transverse arm can be allowed to stretch to chuck side, transverse arm have pneumatic main shaft close to chuck one end;The pneumatic master
There is the second chamfer drill in axis upper end;The third sliding rail is connect by support plate with head, the first camshaft bearing and the second camshaft
It holds and is connected by connecting rod;The connecting rod successively has first sliding groove, balance pivot and second sliding slot from left to right;First cam
Bearing is in first sliding groove, and the second camshaft bearing is in second sliding slot;The balance pivot passes through on fulcrum shaft and support plate
Fixed plate connection;The electric main shaft axle center and pneumatic main shaft axle center are separated by two hole locations.
In the above-mentioned technical solutions, the fixed station has supporting device, and the support arm side of supporting device is clipped in the outer of brush pot
Wall;There is handwheel in the side for helping arm.
In the above-mentioned technical solutions, support device is arranged at the lower part of the supporting device, and support device is located at brush pot lower end.
In the above-mentioned technical solutions, on the support arm there are two stabilizer blade, there are two locating wheels on stabilizer blade.
In the above-mentioned technical solutions, organic metre hole on first chamfer drill, machine-processed rice screw are located in machine-processed rice hole, and first falls
Angular bit and step drill are fixed by machine-processed rice screw.
The present invention realizes to brush pot while carrying out drilling and chamfering, not only reduces the labor intensity of staff, keeps away
Exempt from staff's injury, also improves efficiency work.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram one of fuselage 1 and head 2.
Fig. 3 is the structural schematic diagram two of fuselage 1 and head 2.
Fig. 4 is the structural schematic diagram of head 2.
Fig. 5 is the annexation figure of the second sliding rail 21 and third sliding rail 22.
Fig. 6 .1 is the structural schematic diagram of brush pot 16.
Fig. 6 .2 is the structural schematic diagram of big inner hole 31 and small inner hole 32.
Fig. 7 .1 is the structural schematic diagram of drill head 25.
Fig. 7 .2 is the structural schematic diagram of the first chamfer drill 251.
Fig. 7 .3 is the structural schematic diagram of step drill 252.
In figure, 1- fuselage 1, the first sliding rail of 11-, 12- fixed station, 13- rotating device, 14- first motor, 15- chuck,
16- brush pot, 17- supporting device, 171- support arm, 172- handwheel, 173- stabilizer blade, 18- support device, 2- head, 21- second are sliding
Rail, 22- third sliding rail, 221- support plate, 222- fixed plate, the second sliding block of 23-, the first camshaft bearing of 231-, the electronic master of 24-
Axis, 25- drill head, the first chamfer drill of 251-, 252- step drill, 253- machine-processed rice hole, 26- third sliding block, 27-L arm, 271- are horizontal
To arm, 272- vertical arms, the second camshaft bearing of 273-, 274- longitudinal cylinder, 275- lateral cylinder, 28- pneumatic main shaft, 281-
Two chamfer drills, 29- connecting rod, 291- first sliding groove, 292- second sliding slot, 293- fulcrum shaft, the big inner hole of 31-, 311- outer chamfer,
The small inner hole of 32-, 321- inner chamfer, the first row hole drilling of A- position, the second row hole drilling of B- position, C- third gang drill hole location.
Specific implementation
The performance that the invention will now be described in detail with reference to the accompanying drawings, but they and do not constitute a limitation of the invention, only
It is for example.Advantages of the present invention is set to will become clearer and be readily appreciated that by explanation simultaneously.
Refering to known to attached drawing: the inside and outside chamfering one-shaper that drills of aluminum pipe brush pot, including fuselage 1 and it is located at 1 top of fuselage
Head 2, the fuselage 1 has the first sliding rail 11, there is the fixed station 12 that can be horizontally slipped on the first sliding rail 11;The fixed station 12
Left part have rotating device 13;The rotating device 13 includes first motor 14 and the chuck 15 positioned at 14 right end of first motor;
15 contact of chuck is in 16 inner wall of brush pot;It is characterized by:
The head 2 includes the second sliding rail 21 and the third sliding rail 22 positioned at 21 right side of the second sliding rail;Second sliding rail
Can slide up and down the second sliding block 23 on 21, there is electric main shaft 24 and the first camshaft bearing 231 on the second sliding block 23;The electricity
There is drill head 25 in the lower end of dynamic main shaft 24;The drill head 25 is including the first chamfer drill 251 and is located at 251 lower end of the first chamfer drill
Step drill 252;Step drill 252 forms big inner hole 31 and small inner hole 32 when drilling, the diameter of big inner hole 31 is greater than small inner hole 32
Diameter, the first chamfer drill 251 give big 31 chamfering of inner hole, chamfering be outer chamfer 311;
The third sliding rail 22 can slide up and down third sliding block 26, there is L-type arm 27 on third sliding block 26;The L-type
Arm 27 includes transverse arm 272 and vertical arms 271;There is the second camshaft bearing 273 in the vertical arms 271;The transverse arm 272
One end is connect with vertical arms 271, and the other end is close to chuck 15;271 lower part of vertical arms, which has, can allow vertical arms 271 flexible downwards
Longitudinal cylinder 274;The transverse arm 272 have close to 271 one end of vertical arms can allow transverse arm 272 to 15 side of chuck stretch
Lateral cylinder 275, transverse arm 272 has pneumatic main shaft 28 close to 15 one end of chuck;28 upper end of pneumatic main shaft has second to fall
Angular bit 281;Second chamfer drill 281 gives small 32 chamfering of inner hole, and chamfering is inner chamfer 321;
Second sliding rail 21 and the second sliding rail 22 are connected by support plate 221, and the second sliding block 23 and third sliding block 26 are logical
Cross the connection of connecting rod 29;The connecting rod 29 successively has first sliding groove 291, balance pivot and second sliding slot 292 from left to right;Described
One camshaft bearing 231 is in first sliding groove 291, and the second camshaft bearing 273 is in second sliding slot 292;The balance pivot passes through
Fulcrum shaft 293 is connect with the fixed plate 222 in support plate 221;
24 axle center of electric main shaft and 28 axle center of pneumatic main shaft are separated by two pitch-rows, electric main shaft 24 and pneumatic main shaft 28
On same axial line.
The fixed station 12 has supporting device 17, and 171 side of support arm of supporting device 17 is clipped in the outer wall of brush pot 16;It is described
Helping the side of arm 171 has handwheel 172;Pass through the distance between rotation adjustable support arm 171 of handwheel 172.
Support device 18 is arranged at the lower part of the supporting device 17, and support device 18 is located at 16 lower end of brush pot;It can by screw
With the height of adjusting supporting device 18;It can guarantee drilling, inner chamfer 311 by supporting device 17, support device 18 and chuck 15
Brush pot is firmly fixed on chuck 15 when 321 chamfering of chamfering and outer chamfer.
There are two stabilizer blade 173 on the support arm 171, there are two locating wheels on stabilizer blade 173.
Help the height of the distance between arm 171, support device 18 adjustable.
Organic metre hole 253 on first chamfer drill 251, machine-processed rice screw are located in machine-processed rice hole 253, the first chamfer drill 251
It is fixed with step drill 252 by machine-processed rice screw, can change the big inner bore chamfering of the first chamfer drill 251 by adjusting machine-processed rice screw
Size.
The inside and outside one-time formed processing method of chamfering that drills of aluminum pipe brush pot, includes the following steps,
Step 1: brush pot 16 being mounted on chuck 15, support device 18 is located at 16 lower end of brush pot;Adjusting handle 172, makes
171 side of support arm of supporting device 17 is clipped in the outer wall of brush pot 16;Fixed station 12 moves to the right along the first sliding rail 11, makes brush pot
16 the first row hole drilling position A is below drill head 25;Longitudinal cylinder 274 extends, and the vertical arms 271 of L-type arm 27 extends;Lateral gas
Cylinder 275 is withdrawn, and transverse arm 272 is avoided to bump against chuck 15;
Step 2: the second sliding block 23 is moved downward along the second sliding rail 21, and electric main shaft 24 drives drill head 25 to do rotation fortune
It is dynamic, complete a boring work of the first row hole drilling position A and 311 chamfering of the outer chamfer work of the first row hole drilling position A;
Meanwhile according to leverage, the second sliding block 23 drives L-type arm 27 to transport upwards along the second sliding rail 22 by connecting rod 29
Dynamic, L-type arm 27 drives pneumatic main shaft 28 to move upwards, and pneumatic main shaft 28 drives the second chamfer drill 281 to make rotating motion, due to vertical
It is extended downwards to arm 271, the second chamfer drill 281 in pneumatic main shaft 28 is not contacted with 16 inner wall of brush pot;
After completing boring work, the second sliding block 23 is moved upwards along the second sliding rail 21, and drill head 25 exits hole location;First electricity
Machine 14 drives one hole location of longitudinal rotation of brush pot 16 by chuck 15;
Step 3: step 2 is repeated, until the outer chamfer 311 that the boring work of the first row hole drilling position A is completed and work is completed
Chamfering work is completed;
Step 4: fixed station 12 moves a hole location along the first sliding rail 11 to the left, and drill head 25 is made to be located at the of brush pot 16
Above two gang drill hole location B;
Step 5: repeat step 2, until the second row hole drilling position B boring work complete and the second row hole drilling position B it is outer fall
The work of 311 chamfering of angle is completed;
Step 6: longitudinal cylinder 274 retracts, and the withdrawal of vertical arms 271 shortens;Lateral cylinder 275 stretches out, and transverse arm 272 is stretched
It is long, so that 24 axle center of electric main shaft and 28 axle center of pneumatic main shaft is separated by two row hole drilling positions, the second chamfer drill 281 is located in brush pot 16
Under first row hole drilling position A;
Step 7: the second sliding block 23 is moved downward along the second sliding rail 21, and electric main shaft 24 drives drill head 25 to do rotation fortune
It is dynamic, complete a boring work of the third gang drill hole location C of brush pot 16 and 311 chamfering of outer chamfer of third gang drill hole location C
Work;
Meanwhile according to leverage, the second sliding block 23 drives L-type arm 27 to drive pneumatically along the second sliding rail 22 by connecting rod 29
Main shaft 28 moves upwards, and pneumatic main shaft 28 drives the second chamfer drill 281 to make rotating motion, in the second chamfer drill 281 and brush pot 16
The small inner hole 32 of the first row hole drilling position A in wall contacts, and completes 321 chamfering of the inner chamfer work of the first row hole drilling position A;
Second sliding block 23 is moved upwards along the second sliding rail 21, and drill head 25 exits hole location;L-type arm 27 along the second sliding rail 22 to
Lower movement, the second chamfer drill 281 exit hole location;First motor 14 drives one hole location of longitudinal rotation of brush pot 16 by chuck 15;
Step 8: step 7 is repeated, until the drilling of 321 chamfering of inner chamfer, third gang drill hole location C of the first row hole drilling position A
After the completion of 311 chamfering of the outer chamfer work of third gang drill hole location C, fixed station 12 moves a hole along the first sliding rail 11 to the left
Position distance;
Step 9: step 7 and step 8 are repeated, until the drilling of drill head 25 and the work of 311 chamfering of outer chamfer are fully completed;This
When, 321 chamfering of inner chamfer of the gang drill hole location second from the bottom in brush pot 16 is worked and is completed by the second chamfer drill 281;
Step 10: until the second chamfer drill 281 completes the work of whole 321 chamferings of inner chamfer, at this point, the drilling of brush pot 16 and
Interior outer chamfer work is fully completed.
The present invention is suitable for the brush pot 16 of various materials, especially aluminium alloy.
Other unaccounted parts belong to the prior art.
Claims (5)
1. the inside and outside chamfering one-shaper that drills of aluminum pipe brush pot, including fuselage (1) and the head (2) being located above fuselage (1), institute
Stating fuselage (1) has the first sliding rail (11), there is the fixed station (12) that can be horizontally slipped on the first sliding rail (11);The fixed station (12)
Left part have rotating device (13);The rotating device (13) include first motor (14) and be located at first motor (14) right end
Chuck (15);Chuck (15) contact is in brush pot (16) inner wall;It is characterized by:
The head (2) includes the second sliding rail (21) and the third sliding rail (22) on the right side of the second sliding rail (21);Described second
Can slide up and down the second sliding block (23) on sliding rail (21), there is electric main shaft (24) and the first camshaft on the second sliding block (23)
Hold (231);The lower end of the electric main shaft (24) has drill head (25);The drill head (25) includes the first chamfer drill (251)
With the step drill (252) for being located at the first chamfer drill (251) lower end;
The third sliding rail (22) can slide up and down third sliding block (26), there is L-type arm (27) on third sliding block (26);It is described
L-type arm (27) includes vertical arms (271) and transverse arm (272);There are the second camshaft bearing (273) on the vertical arms (271);Institute
The one end for stating transverse arm (272) is connect with vertical arms (271), and the other end is close to chuck (15);Vertical arms (271) lower part has
The longitudinal cylinder (274) that vertical arms (271) can be allowed to stretch downwards;The transverse arm (272) has energy close to vertical arms (271) one end
The lateral cylinder (275) for making transverse arm (272) (15) side Xiang Kapan flexible, transverse arm (272) is close to chuck (15) one end
There are pneumatic main shaft (28);Pneumatic main shaft (28) upper end has the second chamfer drill (281);
The third sliding rail (22) is connect by support plate (221) with head (2), the first camshaft bearing (231) and the second cam
Bearing (273) is connected by connecting rod (29);The connecting rod (29) successively have from left to right first sliding groove (291), balance pivot and
Second sliding slot (292);First camshaft bearing (231) is in first sliding groove (291), and the second camshaft bearing (273) is second
In sliding slot (292);The balance pivot is connect by fulcrum shaft (293) with the fixed plate (222) on support plate (221);
Electric main shaft (24) axle center and pneumatic main shaft (28) axle center are separated by two hole locations.
2. the inside and outside chamfering one-shaper that drills of aluminum pipe brush pot according to claim 1, it is characterised in that: the fixed station
(12) have supporting device (17), support arm (171) side of supporting device (17) is clipped in the outer wall of brush pot (16);The support arm
(171) side has handwheel (172).
3. the inside and outside chamfering one-shaper that drills of aluminum pipe brush pot according to claim 1 or 2, it is characterised in that: described to help
The lower part for holding device (17) has support device (18), and support device (18) is located at brush pot (16) lower end.
4. the inside and outside chamfering one-shaper that drills of aluminum pipe brush pot according to claim 3, it is characterised in that: the support arm
(171) there are two on stabilizer blade (173), there are two locating wheels on stabilizer blade (173).
5. the inside and outside chamfering one-shaper that drills of aluminum pipe brush pot according to claim 4, it is characterised in that: described first falls
Organic metre hole (253) on angular bit (251), machine-processed rice screw are located in machine-processed rice hole (253), the first chamfer drill (251) and step drill
(252) it is fixed by machine-processed rice screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811052617.2A CN109128829B (en) | 2018-09-10 | 2018-09-10 | The inside and outside chamfering one-shaper that drills of aluminum pipe brush pot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811052617.2A CN109128829B (en) | 2018-09-10 | 2018-09-10 | The inside and outside chamfering one-shaper that drills of aluminum pipe brush pot |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109128829A CN109128829A (en) | 2019-01-04 |
CN109128829B true CN109128829B (en) | 2019-08-27 |
Family
ID=64824337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811052617.2A Active CN109128829B (en) | 2018-09-10 | 2018-09-10 | The inside and outside chamfering one-shaper that drills of aluminum pipe brush pot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109128829B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110385656B (en) * | 2019-07-16 | 2020-08-04 | 湖北智丰数控机械有限公司 | Polishing wheel hair planting and removing synchronous all-in-one machine and hair planting and removing method thereof |
CN112872850A (en) * | 2021-01-04 | 2021-06-01 | 东莞市劲华五金机械有限公司 | Cutting equipment is used in rocker processing with chip removal mechanism |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104647481A (en) * | 2013-11-25 | 2015-05-27 | 蔡静君 | Multi-functional full-automatic drilling and chamfering equipment |
CN205342442U (en) * | 2016-02-06 | 2016-06-29 | 福建顺景机械工业有限公司 | Chamfer drilling equipment manages in side |
CN106078214A (en) * | 2016-08-10 | 2016-11-09 | 福州创杰机械有限公司 | A kind of chamfering and equipment in hole in processing compressor piston |
CN106263500A (en) * | 2016-08-31 | 2017-01-04 | 湖北智丰数控机械有限公司 | Full-automatic steel wire brush boring line sending tangent line plants line integrated apparatus and method |
CN207695670U (en) * | 2017-11-29 | 2018-08-07 | 浙江天力机车部件有限公司 | Perforating device in full-automatic drilling Hole chamfering synchronizer |
-
2018
- 2018-09-10 CN CN201811052617.2A patent/CN109128829B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104647481A (en) * | 2013-11-25 | 2015-05-27 | 蔡静君 | Multi-functional full-automatic drilling and chamfering equipment |
CN205342442U (en) * | 2016-02-06 | 2016-06-29 | 福建顺景机械工业有限公司 | Chamfer drilling equipment manages in side |
CN106078214A (en) * | 2016-08-10 | 2016-11-09 | 福州创杰机械有限公司 | A kind of chamfering and equipment in hole in processing compressor piston |
CN106263500A (en) * | 2016-08-31 | 2017-01-04 | 湖北智丰数控机械有限公司 | Full-automatic steel wire brush boring line sending tangent line plants line integrated apparatus and method |
CN207695670U (en) * | 2017-11-29 | 2018-08-07 | 浙江天力机车部件有限公司 | Perforating device in full-automatic drilling Hole chamfering synchronizer |
Also Published As
Publication number | Publication date |
---|---|
CN109128829A (en) | 2019-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109702489B (en) | Full-automatic cutting and drilling integrated machine for aluminum wheel hub | |
CN101954502B (en) | CNC (Computerized Numerical Control) drilling machine for processing pipe fittings | |
CN109128829B (en) | The inside and outside chamfering one-shaper that drills of aluminum pipe brush pot | |
CN102091800A (en) | Automatic multi-station boring machine | |
CN106862991A (en) | A kind of automatic feeding and method for the processing of screw mandrel part | |
CN107309467A (en) | A kind of scrap motorcycle accessories process equipment easy to clean | |
CN109128705B (en) | The inside and outside one-time formed processing method of chamfering that drills of aluminum pipe brush pot | |
CN110625398A (en) | Flexible unmanned aerial vehicle machining center of aluminum wheel hub | |
CN208976890U (en) | A kind of crankshaft oil hole facing attachment | |
CN205363148U (en) | Large -scale rivet welding spare steel pipe centre frame | |
CN102699962A (en) | Multi-station numerically-controlled wood lathe | |
CN202239743U (en) | Machine special for drilling right support in front brake handle assembly of motorcycle | |
CN205764228U (en) | Hole Removing of inner burs equipment | |
CN204818721U (en) | Floor spring lateral opening processingequipment | |
CN102887638A (en) | Device for cutting high-temperature preformed rod and cutting method thereof | |
CN203610783U (en) | Double-end-face flat cutter head | |
CN106825673B (en) | Longitudinal porous drill unit and boring method on lathe bed | |
CN210818386U (en) | Flexible unmanned aerial vehicle machining center of aluminum wheel hub | |
CN209349856U (en) | A kind of multistation blower processing unit (plant) | |
CN213672871U (en) | Clamping jig for lathe machining | |
CN212286682U (en) | Column cap valve hole processingequipment | |
CN110842301B (en) | Module cutting method for wavy cutting track | |
CN110549499B (en) | Operation method of automatic special-shaped glass drilling device | |
CN207104347U (en) | Rack bolt ball datum hole Digit Control Machine Tool | |
CN206653081U (en) | Thin diamond wall drilling welding machine ring serrated knife head weld jig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |