CN109115536A - A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device and test method - Google Patents

A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device and test method Download PDF

Info

Publication number
CN109115536A
CN109115536A CN201811212469.6A CN201811212469A CN109115536A CN 109115536 A CN109115536 A CN 109115536A CN 201811212469 A CN201811212469 A CN 201811212469A CN 109115536 A CN109115536 A CN 109115536A
Authority
CN
China
Prior art keywords
tunnel
simulation
seam
jurisdiction
duct piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811212469.6A
Other languages
Chinese (zh)
Other versions
CN109115536B (en
Inventor
漆泰岳
晋智毅
梁孝
覃少杰
钱王苹
于洋洋
冀维都
龚雨晨
易海洋
雷波
李延
李宗阳
蒲炳荣
陈桂龙
张劲
赵晴
黄晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201811212469.6A priority Critical patent/CN109115536B/en
Publication of CN109115536A publication Critical patent/CN109115536A/en
Application granted granted Critical
Publication of CN109115536B publication Critical patent/CN109115536B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/007Subject matter not provided for in other groups of this subclass by applying a load, e.g. for resistance or wear testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention discloses a kind of shallow embedding pin-connected panel tunnel seam waterproof durability test devices, and including the simulation box being made of bottom plate and side plate, the upper surface of simulation box is provided with reaction frame;It is provided with simulated formation in simulation box, simulation tunnel duct piece is provided in simulated formation;Simulating tunnel duct piece includes upper section of jurisdiction and lower section of jurisdiction, and upper section of jurisdiction and lower section of jurisdiction seam crossing are provided with displacement sensor;The vibration excitor that each lane position is provided with simulating vehicle dynamic load is corresponded in simulation tunnel duct piece;The actuator of reaction frame top beam position setting simulation surface car load, actuator lower part connects separation loading device;Separation loading device lower part is arranged in simulated formation upper surface, and load sharing point corresponds to vibration excitor position;Displacement sensor connects data acquisition device;The present invention can reflect the deformation of practical seam, and test result is made more to tally with the actual situation, and provide reliable demonstration for the waterproof durability of Practical Project.

Description

A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device and test method
Technical field
The present invention relates to tunnel seam waterproof durability test device and methods, and in particular to a kind of shallow embedding pin-connected panel tunnel Seam waterproof durability test device and test method.
Background technique
Percolating water is the first big persistent ailment built industry and be known as Tunnel Engineering, or even has the saying of " leakage of ten tunnels nine ";Water Evil is often difficult to eradicate once being formed, and treatment cost is also larger;Traditional urban district under-traverse tunnel takes the mode of excavation and cast-in-place more Construction, the construction method construction speed is slow, and the network of communication lines influence time of anxiety original to urban district is long;And since urban transportation is fast Speed development, lead to construction quality to work to tight deadlines it is difficult to ensure that, leave numerous construction joints, according to statistics 60% Tunnel Water Leakage From construction joint and subsiding crack.
Take element factory prefabricated, the street crossing tunneling method of assembled in situ assembly has obtained the generally favor of industry; It since structure section is larger, is influenced by size and weight, structure must take precast block.Fabricated construction leak and shield Tunnel is similar, is related to the various aspects such as environmental condition, segment conformation, sealing material, Construction Condition, but the leak of seam crossing rises mainly Effect, therefore the waterproof of section of jurisdiction seam is research emphasis.
Such as a kind of test method (2017101379767) of shield tunnel segment joint percolating water, disclose by over the ground Pre-buried water inlet pipe in the calibrated bolck of iron duct pieces of shield tunnel, to duct piece connector surface along gasket slot, perpendicular to gasket slot into Row cutting is aided with hollow gasket, and being directly bolted using standard, carries out duct piece connector infiltration to form hollow water stopping trough Leak test;It is vertically opened with horizontal direction hydraulic jack top power, simulation tunnel stress and connector by Controlling model;The test Method has following obvious shortcoming: (1) pertaining only to the percolating water situation between two calibrated bolcks, rather than study entire shield tunnel Deformation and percolating water behavior of the structure under self weight and external force, result and the actual percolating water behavior of shield tunnel have one Make into;(2) percolating water behavior of the shield duct piece under action of static load is only simulated;(3) under-traverse tunnel shape in urban district is general For rectangle, generally it is attached by way of through-hole bolt additional steel plates between piecemeal, or by the pre- of block margin Steel plate is buried to be welded with additional steel plates;So this percolating water test method between two section of jurisdiction of shield tunnel is difficult to transport Prefabricated assembled under-traverse tunnel is used in vehicular load leakage water test, and effective evaluation is carried out to it.
A kind of experimental rig (2018101957282) for simulating duct pieces of shield tunnel seam waterproof under seismic (seismal, it is public The device opened, by the component laterally with the simulation section of jurisdiction changing of the relative positions of vertical servo actuator, is simulated each when earthquake using servo actuator Kind segment joint opens and the waterproof test under changing of the relative positions form;The device is removed as follows: (1) using the two boards for having annular groove Simulate tunnel duct piece seam, simulation be tunnel part situation;(2) earthquake load is the dynamic load of short time, and Load mode and car load have significant difference.
Existing test method and device are concentrated mainly on duct pieces of shield tunnel seam for the research of tunnel seam waterproof The waterproof performance under the effect of static load, seismic loading condition and short-term power, and model mainly considers the part of tunnel structure.It is main Want defect to be: (1) partial model of seam is difficult to reflect stress deformation situation of the tunnel overall structure in practical structures, only Joint open, magnitude of misalignment can artificially be adjusted by experimental provision, be differed farther out with the actual deformation of seam, is difficult anti- The practical distortion of seam is reflected, and then is difficult true abutment joint waterproof performance and is tested and evaluated.(2) examining in loading condition Consider aspect, only considers static load or earthquake load.For urban district shallow embedding pin-connected panel tunnel in ground and tunnel internal car load The research for acting on lower seam waterproof durability is also seldom.
Summary of the invention
The present invention relates to one kind can really be reflected in ground and tunnel internal it is vehicle-mounted under, the deformation of tunnel seam, dislocation, The basic condition of percolating water, and evaluate the shallow embedding pin-connected panel tunnel seam waterproof durability test dress of the waterproof durability of the structure It sets and test method.
The technical solution adopted by the present invention is that: a kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device, including The upper surface of the simulation box being made of bottom plate and side plate, simulation box is provided with reaction frame;Simulated formation, mould are provided in simulation box Simulation tunnel duct piece is provided in quasi- stratum;Simulation tunnel duct piece includes upper section of jurisdiction and lower section of jurisdiction, upper section of jurisdiction and lower segment joint Place is provided with displacement sensor;The exciting that each lane position is provided with simulating vehicle dynamic load is corresponded in simulation tunnel duct piece Device;The actuator of reaction frame top beam position setting simulation surface car load, actuator lower part connects separation loading device;Separation loading device lower part It is arranged in simulated formation upper surface, load sharing point corresponds to vibration excitor position;Displacement sensor connects data acquisition device.
Further, the upper section of jurisdiction and the interior outside of lower section of jurisdiction seam crossing are provided with displacement sensor.
Further, observation is provided with on two opposite flanks of simulation tunnel duct piece vertical direction on the simulation box Window.
Further, the observation window bezel locations are provided with U-type groove steel.
Further, the actuator and vibration excitor are all connected to control device.
Further, the installation in the middle part of seam direction of institute's displacement sensors is horizontal is arranged with vertical direction.
A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test method, comprising the following steps:
Step 1: reduced scale being determined according to prototype size and testing stand size, simulation tunneltron is set according to reduced scale Piece;
Step 2: simulation tunnel duct piece analog material and simulated formation analog material being determined according to similarity relation, pour simulation Tunnel duct piece;
Step 4: configuration simulated formation, assembly simulation tunnel duct piece;Displacement sensor is mounted on seam crossing, simulated formation Backfill, compacting are filled up;
Step 5: installation actuator and separation loading device simulate surface car load by actuator;
Step 6: installation vibration excitor, for simulating tunnel internal dynamic vehicle load;
Step 7: opening actuator and vibration excitor, actuator and vibration excitor power loading method are sine wave;
Step 8: seam crossing changing of the relative positions amount being acquired by data acquisition device, completes waterproof durability evaluation.
Further, the maximum value for determining changing of the relative positions amount in the step 8 in collected changing of the relative positions amount information, with shield tunnel Road " shield method tunnel construction and acceptance criteria " compares;The structurally waterproof durability if changing of the relative positions amount maximum value is above standard value It is undesirable;Structurally waterproof durability meets the requirements if changing of the relative positions amount maximum value is less than standard value.
The beneficial effects of the present invention are:
(1) present invention studies the waterproof durability of pin-connected panel tunnel seam using entire tunnel cross-section model, can be anti- The deformation for reflecting practical seam, makes test result more tally with the actual situation, and provides reliably for the waterproof durability of Practical Project Demonstration;
(2) present invention is carried by using power loading device simulating vehicle for ground and tunnel internal dynamic vehicle load Lotus is capable of the true load of maximum model configuration, therefore the available result for meeting Practical Project as far as possible;
(3) it is able to reflect actual loading situation of the structure under self weight, stratum and inside and outside vehicular load, and can be really anti- Reflect the opening/closing and changing of the relative positions situation of seam crossing;
Detailed description of the invention
Fig. 1 is experimental rig structural schematic diagram in the present invention.
Fig. 2 is test method flow diagram in the present invention.
In figure: 1- simulation box, 2- simulated formation, the upper section of jurisdiction 3-, 4- actuator, 5- separation loading device, section of jurisdiction under 6-, 7- exciting Device, 8- displacement sensor.
Specific embodiment
The present invention will be further described in the following with reference to the drawings and specific embodiments.
Unless otherwise specified, term mentioned in the present invention is explained as follows:
Pin-connected panel tunnel: prefabricated tunnel is influenced since size is larger by transport limit, freight weight limit, can not be carried out whole pre- System, and then carry out precast block;After precast plant makes piecemeal, piecemeal is transported into foundation pit scene, takes bolt or welding etc. Mode is assembled one by one, after forming tunnel, carries out side soil and earthing backfills, restore traffic above-ground.
Ground on-vehicle: dead load and dynamic load as caused by tunnel upper road vehicle traveling.
It is internal vehicle-mounted: tunnel internal driving dead load and dynamic load caused by tunnel.
Percolating water tries durability test method: under self weight and ground on-vehicle long term, the waterproof performance of tunnel seam Test method.
As shown in Figure 1, a kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device, including by bottom plate and side plate structure At simulation box 1, the upper surface of simulation box 1 is provided with reaction frame;Simulated formation 2 is provided in simulation box 1, in simulated formation 2 It is provided with simulation tunnel duct piece;Simulating tunnel duct piece includes upper section of jurisdiction 3 and lower section of jurisdiction 6, and upper section of jurisdiction 3 and lower 6 seam crossing of section of jurisdiction are set It is equipped with displacement sensor 8;Outside is provided with displacement sensor 8 in upper section of jurisdiction 3 and lower 6 seam crossing of section of jurisdiction;And displacement sensing The installation in the middle part of seam direction of device 8 is horizontal to be arranged with vertical direction;It is inside and outside and horizontal and vertical convenient for collecting simulation tunnel duct piece The upward changing of the relative positions amount of histogram;The vibration excitor 7 that each lane position is provided with simulating vehicle dynamic load is corresponded in simulation tunnel duct piece; The actuator 4 of reaction frame top beam position setting simulation surface car load, 4 lower part of actuator connects separation loading device 5;Under separation loading device 5 Portion is arranged in 2 upper surface of simulated formation, and load sharing point corresponds to 7 position of vibration excitor;Displacement sensor 8 connects data acquisition device.
Observation window is provided with on two opposite flanks of simulation tunnel duct piece vertical direction on simulation box 1;Observation window side Frame position is provided with U-type groove steel;It is specific to be reinforced using No. 20 U-type groove steel, to increase its rigidity.Actuator 4 and vibration excitor 7 It is all connected to control device.
Actual tunnel is two-tube in the present invention, and every pipe is three lanes, and single tube span is 10m;One work is set on each pipe Dynamic device 4 simulates surface car load;Separation loading device 5 is arranged in each 4 lower part of actuator, and there are three load sharing point, simulations three for separation loading device 5 Vehicular load on a lane;It is corresponding to install three vibration excitors 7 respectively on each pipe inner tunnel bottom plate, simulate tunnel internal Dynamic vehicle load.
In the present invention tunnel developed width be 22m (include two abutment walls and interval wall thickness, two sidewall thicknesses are 0.75m, For mid-board with a thickness of 0.6m, unidirectional tunnel inner width is 22/2-0.75-0.6/2=9.95m), highly (include top for 8.2m Base plate thickness, thickness are 1m, and tunnel internal height is 8.2-1-1=6.2m);Tunnel upper thickness of earth covering is 3m;Simulate tunnel Road section of jurisdiction is divided into section of jurisdiction 3 and lower section of jurisdiction 6, intermediate to be attached with to wearing bolt.Simulation box 1 and reaction frame width are 3m, several What likelihood ratio takes 10:1;Tunnels mimic size are as follows: long 2.2m, high 0.82m, longitudinal direction are to eliminate boundary effect, and be conducive to Load balance takes 1m.
Tunnel duct piece is practical uses C50 concrete for simulation, and mechanics parameter is as shown in Table 3 and Table 4;Section of jurisdiction analog material uses Gypsum base material show that the similarity relation of analog material and concrete need to meet the condition of table 3 according to the similarity relation of table 2;Most The match ratio for obtaining the section of jurisdiction analog material of table 3 afterwards is water: gypsum: diatomite=1:1.2:0.1 (mass ratio);Formation parameter and Analog material compares as shown in table 5 and table 6, finally show that stratum analog material match ratio is river sand: quartz sand: flyash: machine Oil=1.0:0.8:0.8:0.3 (mass ratio).
Table 2.C50 concrete mechanics parameter
The mechanics parameter of table 3. section of jurisdiction prototype and model
4. parameter equivalent of table and the material likelihood ratio design
The mechanics parameter of table 5. stratum prototype and model
6. parameter equivalent of table and the material likelihood ratio design
The determination of dynamic load(loading) amplitude: be to top road quality classification be city I grade, maximum load vehicle be 70T, according to The similarity relation of power in table 1 is 1000:1, show that the amplitude of each lane load in ground is 700N;Tunnel internal forbids goods Vehicle is current, and only quasi- car traveling, the car biggest quality are 2T;It is 1000:1 by the similarity relation of the power in table 1, show that ground is every The amplitude of a lane load is 20N;Loading frequency calculates: car speed 80km/h, and tunnel width is 22 meters, by being practiced as 1s, actual frequency 1Hz;According to the frequency similarity relation in table 1 it is found that test loading frequency is 3.3Hz, 4Hz is actually taken.
The similarity relation of each physical quantity of table 1.
1 length direction of model casing is 3m, and longitudinal direction size consistent with tunnel model is 1m, is highly 0.82+0.18 + 0.3=1.3m (0.82m is model height, and 0.18 is tunnel floor stratum, and 0.3 is thickness of earth covering);Using steel plate (bottom plate iron Plate thickness is 6mm, side wall thicknesses 2mm) it is fabricated to 3m × 1m × 1.3m uncovered cube;1 two pieces of front and back of test model case The rectangular viewing aperture of plate cutting 205cm × 62cm;It is reinforced using No. 20 U-type groove steel;To increase its rigidity, entire model Case 1 is connected by the way of welding.
7 range simulation tunnel duct piece abutment wall of vibration excitor is 0.15m, and the distance between adjacent vibration excitor 7 is 0.32m;Simulation Six vibration excitors 7 are installed altogether inside tunnel duct piece;The power lotus of six, ground lane vehicle is provided using two actuator 4 It carries, 4 lower part of actuator is connect with separation loading device 5;There are three contact point, each each moulds in contact point with 2 top of stratum for each separation loading device 5 Vehicular load on a quasi- lane;Three contact points of separation loading device 5 carry out with the position of vibration excitor 7 corresponding respectively.
Using mold, material mixture ratio is according to gypsum: diatomite=1:1.2:0.1 (mass ratio) carries out section of jurisdiction and pours, and simulates Tunnel duct piece longitudinal length is 1m;Upper section of jurisdiction 3 and lower section of jurisdiction 6 pour simultaneously, are demoulded within 24 hours after the completion of model pours, and take off It is put into incubator after the completion of mould, drying 72 hours is carried out under conditions of 45 DEG C.
Using blender according to river sand: quartz sand: flyash: the proportion of machine oil=1.0:0.8:0.8:0.3 (mass ratio) It carries out simulated formation 2 to configure, configuration amount 2.2m2.In place by the lifting of 1 bottom plate of model casing, being first welded into side plate height is 20cm Steel tank, simulated formation 2 is laid in slot, is successively compacted in process of deployment, is flattened after being paved with;Lower section of jurisdiction 6 is hung It is attached at each 1 side 40cm of distance model case in two sides, lower section of jurisdiction 6 lifts upper section of jurisdiction 3 after being installed in place, by seam link position It is aligned with lower section of jurisdiction 6;After section of jurisdiction 3 and lower section of jurisdiction 6 are aligned on tunnel, it is attached with clamping plate and to bolt is worn;In simulation tunnel The middle part of segment joint along the longitudinal direction is installed by horizontal and vertical direction displacement sensor 8.
1 positive and negative of model casing are welded with two sides, after welding, are backfilled with configured simulated formation 2, compacting It fills up;Two actuator 4 are separately mounted at the 0.9m of reaction frame side, spacing is 1m between two actuator 4, then 4 piston stroke of actuator is retracted to 0, separation loading device 5 is connect with actuator 4.
Respectively arrange that three vibration excitors 7 simulate tunnel internal dynamic vehicle loads, exciting inside tunnel duct piece in each pipe simulating Device 7 is arranged in tunnel axis middle position;The front and back that the centre distance model of vibration excitor 7 is thought is 0.5m, apart from side wall 0.15m, at a distance of 0.32m between adjacent vibration excitor 7.
Displacement sensor 8 is connect with data acquisition device, data acquisition device can connect computer;Actuator 4 and swash Vibration device 7 connect with control device respectively, and when use, which carries out debugging first, ensures that performance is normal;Actuator 4 and vibration excitor 7 it is dynamic Power loading method is sine wave, and the load amplitude of actuator 4 is 700N;The load amplitude of vibration excitor 7 is 20N, and frequency is 4Hz;If loading number according to this frequency than calculating, the load time should be the 1/4 of the practical active time in tunnel, Tunnel Design Active time is 100 years, then the load time is 25 years, unrealistic;In experiment, load number 200 is determined according to fatigue test Ten thousand times, calculating the load time accordingly is 5.8 days;Actuator 4 and vibration excitor 7 are opened, upper section of jurisdiction is carried out by displacement sensor 8 3 and lower 6 opening/closing of section of jurisdiction, the record of changing of the relative positions amount;Record opening/closing, the maximum value of changing of the relative positions amount, with shield tunnel " shield Method constructing tunnel and acceptance criteria " it compares, and successively evaluation structure waterproof and durability.
In actual use, installation following steps operation:
S1: reduced scale is determined according to prototype size and testing stand size, actual tunnel is two-tube in the present invention, and every pipe is Three lanes, single tube span are 10m;
S2: according to similarity relation, tunnel duct piece analog material and stratum analog material and its proportion are determined;
S3: according to similarity relation, ground dynamic vehicle load and tunnel internal dynamic vehicle load amplitude and frequency are determined;
S4: the material of model casing 1 is determined according to rigidity requirement;
S5: pouring simulation tunnel duct piece using high-precision mold, carries out demoulding after pouring, is conserved according to standard;
S6: during simulation tunnel duct piece is poured, conserved, simulated formation 2 is carried out according to the proportion of 2 material of simulated formation and is matched It sets;
S7: after the maintenance of tunnels mimic section of jurisdiction is up to standard, being lifted, and carries out assembly after being lifted into model casing 1;
S8: check that seam contacts situation, can carry out in next step after up to standard after assembled;
S9: 1 plate-side plate welding of model casing is carried out;
S10: the displacement sensor 8 in outside in installation seam connects control device and is debugged after installation;
S11: simulated formation 2, including side soil and earthing are laid with;
S12: installing the actuator 4 of simulation surface car load in reaction frame top beam position, connection control equipment after installation It is debugged;
S13: connecting separation loading device 5 below actuator 4, and there are three load sharing points for each separation loading device 5, simulate on three lanes Vehicular load;
S14: three vibration excitors 7 are installed respectively on simulation tunnel duct piece bottom plate, simulate tunnel internal dynamic vehicle load;
S15: opening actuator 4 and vibration excitor 7 loads, while recording data;
S16: it is compared, evaluation structure according to test result and shield tunnel " shield method tunnel construction and acceptance criteria " Waterproof durability.
The present invention is suitable for the waterproof endurance issues of drive under-traverse tunnel, is suitable for street crossing tunnel model test, The examination that waterproof durability of the seam of the shallow embedding assembled tunnel piecemeal of proposition under surface car load long term proposes Experiment device and test method;It can directly, really be reflected in seam under ground and tunnel internal car load long term It opens, the relationship of the changing of the relative positions, the joint open and changing of the relative positions amount of seam under different load numbers is recorded in, further according to " shield method tunnel construction Acceptance specification and standard " allow joint open and changing of the relative positions amount, shallow embedding pin-connected panel tunnel seam waterproof durability is evaluated.
No matter the size of practical pin-connected panel tunnel structure, is rationally contracted according to actual size and testing stand size Ruler does not use the partial model in structure transverse face, can reflect reality of the structure under self weight, stratum and inside and outside vehicular load Stress condition also can really reflect the opening/closing and changing of the relative positions situation of seam crossing.It is dynamic on tunnel top and internal setting simultaneously Power device simulates surface car load with actuator to apply the dynamic loading of simulating vehicle load, can be with if lane is on the high side It is corresponding ground vehicle by installing the position that load distributor load distributor lower part is contacted with stratum below actuator Physical location saves experimentation cost to reduce the quantity of actuator;In tunnel internal using vibration excitor come simulating vehicle load, Put a vibration excitor in each lane center position.(equipment of other similar simulating vehicle dynamic load(loading) also this patent protection it Column).

Claims (8)

1. a kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device, which is characterized in that including by bottom plate and side plate structure At simulation box (1), the upper surface of simulation box (1) is provided with reaction frame;It is provided with simulated formation (2), simulates in simulation box (1) Simulation tunnel duct piece is provided in stratum (2);Simulation tunnel duct piece includes upper section of jurisdiction (3) and lower section of jurisdiction (6), upper section of jurisdiction (3) and Lower section of jurisdiction (6) seam crossing is provided with displacement sensor (8);Each lane position, which is corresponded to, in simulation tunnel duct piece is provided with simulation The vibration excitor (7) of dynamic vehicle load;The actuator (4) of reaction frame top beam position setting simulation surface car load, under actuator (4) Portion connects separation loading device (5);Separation loading device (5) lower part is arranged in simulated formation (2) upper surface, and load sharing point corresponds to vibration excitor (7) position It sets;Displacement sensor (8) connects data acquisition device.
2. a kind of shallow embedding pin-connected panel tunnel according to claim 1 seam waterproof durability test device, which is characterized in that Outside is provided with displacement sensor (8) in the upper section of jurisdiction and lower section of jurisdiction seam crossing.
3. a kind of shallow embedding pin-connected panel tunnel according to claim 1 seam waterproof durability test device, which is characterized in that Observation window is provided with on two opposite flanks of simulation tunnel duct piece vertical direction on the simulation box (1).
4. a kind of shallow embedding pin-connected panel tunnel according to claim 3 seam waterproof durability test device, which is characterized in that The observation window bezel locations are provided with U-type groove steel.
5. a kind of shallow embedding pin-connected panel tunnel according to claim 1 seam waterproof durability test device, which is characterized in that The actuator (4) and vibration excitor (7) are all connected to control device.
6. a kind of shallow embedding pin-connected panel tunnel according to claim 1 seam waterproof durability test device, which is characterized in that Institute's displacement sensors (8) installation in the middle part of seam direction is horizontal to be arranged with vertical direction.
7. a kind of a kind of test side of shallow embedding pin-connected panel tunnel as described in claim 1 seam waterproof durability test device Method, which comprises the following steps:
Step 1: reduced scale being determined according to prototype size and testing stand size, simulation tunnel duct piece is set according to reduced scale;
Step 2: simulation tunnel duct piece analog material and simulated formation (2) analog material being determined according to similarity relation, pour simulation Tunnel duct piece;
Step 4: configuration simulated formation (2), assembly simulation tunnel duct piece;Displacement sensor (8) is mounted on seam crossing, simulation ground Layer (2) backfill, compacting are filled up;
Step 5: installation actuator (4) and separation loading device (5) simulate surface car load by actuator (4);
Step 6: installation vibration excitor (7), for simulating tunnel internal dynamic vehicle load;
Step 7: opening actuator (4) and vibration excitor (7), actuator (4) and vibration excitor (7) power loading method are sine wave;
Step 8: seam crossing changing of the relative positions amount being acquired by data acquisition device, completes waterproof durability evaluation.
8. a kind of shallow embedding pin-connected panel tunnel seam waterproof durability test method according to claim 1, which is characterized in that institute State in step 8 and to determine the maximum value of changing of the relative positions amount in collected changing of the relative positions amount information, with shield tunnel " shield method tunnel construction with Acceptance criteria " it compares;Structurally waterproof durability is undesirable if changing of the relative positions amount maximum value is above standard value;If changing of the relative positions amount Maximum value is less than standard value, and then structurally waterproof durability meets the requirements.
CN201811212469.6A 2018-10-18 2018-10-18 Shallow-buried spliced tunnel joint waterproof durability test device and test method Active CN109115536B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811212469.6A CN109115536B (en) 2018-10-18 2018-10-18 Shallow-buried spliced tunnel joint waterproof durability test device and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811212469.6A CN109115536B (en) 2018-10-18 2018-10-18 Shallow-buried spliced tunnel joint waterproof durability test device and test method

Publications (2)

Publication Number Publication Date
CN109115536A true CN109115536A (en) 2019-01-01
CN109115536B CN109115536B (en) 2023-10-17

Family

ID=64855039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811212469.6A Active CN109115536B (en) 2018-10-18 2018-10-18 Shallow-buried spliced tunnel joint waterproof durability test device and test method

Country Status (1)

Country Link
CN (1) CN109115536B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109709034A (en) * 2019-02-26 2019-05-03 西南交通大学 A kind of section of jurisdiction-railway roadbed minimum bonding force measurement device and test method
CN115762314A (en) * 2022-09-08 2023-03-07 防灾科技学院 Assembled section of jurisdiction tunnel structure destruction device under fault macroseism effect is striden in simulation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3402519B2 (en) * 1994-07-12 2003-05-06 西松建設株式会社 Shield excavation model test method and apparatus
CN206504840U (en) * 2017-02-23 2017-09-19 天津大学 The shield tunnel pipe ring anti-permeability performance experimental rig of simulation water, native load action
CN108333036A (en) * 2017-12-29 2018-07-27 浙江科技学院 Highly dense area's cross-over tunnel operation causes the bath scaled model experimental device of ground long-term settlement
CN108332710A (en) * 2017-12-29 2018-07-27 浙江科技学院 Simulate the bath scaled model experimental device of intensive building area ground long-term settlement
CN108362856A (en) * 2017-12-29 2018-08-03 浙江科技学院 The bath scaled model experimental device of the highly dense area ground long-term settlement in simcity
CN208847494U (en) * 2018-10-18 2019-05-10 西南交通大学 A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3402519B2 (en) * 1994-07-12 2003-05-06 西松建設株式会社 Shield excavation model test method and apparatus
CN206504840U (en) * 2017-02-23 2017-09-19 天津大学 The shield tunnel pipe ring anti-permeability performance experimental rig of simulation water, native load action
CN108333036A (en) * 2017-12-29 2018-07-27 浙江科技学院 Highly dense area's cross-over tunnel operation causes the bath scaled model experimental device of ground long-term settlement
CN108332710A (en) * 2017-12-29 2018-07-27 浙江科技学院 Simulate the bath scaled model experimental device of intensive building area ground long-term settlement
CN108362856A (en) * 2017-12-29 2018-08-03 浙江科技学院 The bath scaled model experimental device of the highly dense area ground long-term settlement in simcity
CN208847494U (en) * 2018-10-18 2019-05-10 西南交通大学 A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109709034A (en) * 2019-02-26 2019-05-03 西南交通大学 A kind of section of jurisdiction-railway roadbed minimum bonding force measurement device and test method
CN109709034B (en) * 2019-02-26 2024-02-09 西南交通大学 Minimum adhesion force measuring device and method for duct piece-track bed
CN115762314A (en) * 2022-09-08 2023-03-07 防灾科技学院 Assembled section of jurisdiction tunnel structure destruction device under fault macroseism effect is striden in simulation
CN115762314B (en) * 2022-09-08 2023-10-03 防灾科技学院 Assembled section of jurisdiction tunnel structure destruction device under simulated cross fault strong shock effect

Also Published As

Publication number Publication date
CN109115536B (en) 2023-10-17

Similar Documents

Publication Publication Date Title
CN110184950B (en) Construction method for rebuilding and expanding new bridge at original site of bridge under condition of ensuring communication
CN109914456B (en) Design and construction method for adjacent and simultaneous construction of bridge and subway tunnel
CN106226112A (en) A kind of multi-functional reduced scale tunnel structure force model response characteristic laboratory test system and method
CN208847494U (en) A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device
CN104880396A (en) Soil body two-direction seepage model device under external load action and testing method
CN108535451B (en) Box culvert type subway station and ground crack crossing experiment system and method for adjacent surface structures
CN211505504U (en) Test device for simulating tunnel crossing water-rich fault gushing water
CN110512583B (en) Full-transparent three-dimensional adjustable assembled multifunctional geotechnical engineering model box
CN106018736A (en) Device for testing surface collapse caused by urban underground pipeline leakage
CN112881166B (en) Device and method for testing stability of foundation in mining overall process and mining subsidence area
CN109115536A (en) A kind of shallow embedding pin-connected panel tunnel seam waterproof durability test device and test method
CN108643247A (en) Soft clay area rectangle foundation pit bottom soil body reinforced model testing device and test method
CN109537617A (en) A kind of construction method pouring hanging cushion cap using suspension type bed die bracket
CN107142948A (en) A kind of highway wears high ferro viaduct system and construction method without pre- leave
CN112257162A (en) Railway underpass frame box culvert jacking construction method based on BIM technology
CN111188355B (en) Super-gravity type anchorage shallow-buried foundation and construction method
CN115615821A (en) Underground diaphragm wall model test device and test method
CN107142965B (en) A kind of porous preforming box culvert construct method run above metro shield interval structure
CN210797516U (en) Fully transparent assembled multifunctional geotechnical engineering model box capable of three-dimensionally adjusting size
CN109406759A (en) A kind of multi-functional geotechnical engineering test model case of assembled
CN206593990U (en) A kind of multi-functional roadbed model experimental rig of calcareous sand traffic loading
CN209231334U (en) A kind of multi-functional geotechnical engineering test model case of assembled
CN104297447A (en) Physical simulation method for influences of surface subsidence on subway tunnel
CN106706454A (en) Calcareous sand traffic load multifunctional roadbed model testing device
Komolov et al. Assessment of the impact of the construction of semi-buried structures on the surrounding buildings and the road system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Jin Zhiyi

Inventor after: Lei Bo

Inventor after: Li Yan

Inventor after: Li Zongyang

Inventor after: Pu Bingrong

Inventor after: Chen Guilong

Inventor after: Zhang Jin

Inventor after: Zhao Qing

Inventor after: Huang Xiaodong

Inventor after: Qi Taiyue

Inventor after: Liang Xiao

Inventor after: Qin Shaojie

Inventor after: Qian Wangping

Inventor after: Yu Yangyang

Inventor after: Ji Weidu

Inventor after: Gong Yuchen

Inventor after: Yi Haiyang

Inventor before: Qi Taiyue

Inventor before: Lei Bo

Inventor before: Li Yan

Inventor before: Li Zongyang

Inventor before: Pu Bingrong

Inventor before: Chen Guilong

Inventor before: Zhang Jin

Inventor before: Zhao Qing

Inventor before: Huang Xiaodong

Inventor before: Jin Zhiyi

Inventor before: Liang Xiao

Inventor before: Qin Shaojie

Inventor before: Qian Wangping

Inventor before: Yu Yangyang

Inventor before: Ji Weidu

Inventor before: Gong Yuchen

Inventor before: Yi Haiyang