CN109113059A CN201811008918.5A CN201811008918A CN109113059A CN 109113059 A CN109113059 A CN 109113059A CN 201811008918 A CN201811008918 A CN 201811008918A CN 109113059 A CN109113059 A CN 109113059A
Authority
CN
China
Prior art keywords
hole
interlayer
grouting pipe
concrete
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811008918.5A
Other languages
Chinese (zh)
Inventor
林威
苏利群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co Ltd
Original Assignee
TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co Ltd filed Critical TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co Ltd
Priority to CN201811008918.5A priority Critical patent/CN109113059A/en
Publication of CN109113059A publication Critical patent/CN109113059A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to bored concrete pile technology fields more particularly to a kind of cast-in-situ bored pile to break a processing method, comprising the following steps: Step 1: verifying the interlayer position of bored concrete pile;Step 2: the depth in hole is up to the position of interlayer in one hole of centre drill of bored concrete pile;Step 3: going deep into a Grouting Pipe into hole, it is equipped with a sealing ring, the inner wall tight fit of sealing ring and the hole front ring week of the Grouting Pipe, Grouting Pipe is deep into interlayer, high pressure concrete is injected into interlayer, high pressure concrete squeezes out mud from interlayer;Step 4: being lifted up Grouting Pipe, while high pressure concrete is injected into hole, the final solidifying soil of high nip drum seals hole.It this method effective solution the problem of interlayer is broken in the prior art, is not influenced by pile diameter, so that it may complete the work of piling.

Description

Cast-in-situ bored pile breaks a processing method
Technical field
The present invention relates to anchor pole clearance technique fields more particularly to a kind of cast-in-situ bored pile to break a processing method.
Background technique
Currently, bored concrete pile usually carries out in the following way in production, first makes a hole on the ground, place into reinforcing bar Concrete is driven into steel reinforcement cage finally by Grouting Pipe, Grouting Pipe is usually first deep into the bottommost in hole, slowly by cage Mention upwards, for the concrete in Grouting Pipe from the bottom in hole as Grouting Pipe promotion is injected into hole, the mud in hole can quilt Concrete is upward out.But in practice of construction, if Grouting Pipe promotion is too fast, mud will be mixed between concrete, Or Grouting Pipe is broken in lifting process, can all mud be caused to enter between concrete, there have been the folders of concrete for this Layer, which is mud, leads to the weakened of entire bored concrete pile, and such case occurs in general unit in charge of construction, is all weight A stake is newly played, this cost is relatively high, and also a kind of mode is to make a hole on bored concrete pile after solidification, then be put into hole A piece reinforcing bar, reinjects concrete, to play the role of connecting two parts above and below interlayer, this mode to diameter compared with Small bored concrete pile is also possible that but bored concrete pile more than one meter in diameter is not appropriate for that must need very thick reinforcing bar, because And the program and unrealistic.
Summary of the invention
It is an object of the invention to overcome the shortcomings of above-mentioned technology, and provide a kind of cast-in-situ bored pile drawing broken pile treatment side Method.
To achieve the above object, using following technical scheme: a kind of cast-in-situ bored pile breaks a processing method to the present invention, It is characterized in that: the following steps are included:
Step 1: verifying the interlayer position of bored concrete pile;
Step 2: the depth in hole is up to the position of interlayer in one hole of centre drill of bored concrete pile;
Step 3: go deep into a Grouting Pipe into hole, be equipped with a sealing ring front ring week of the Grouting Pipe, sealing ring with The inner wall in the hole is fitted close, and Grouting Pipe is deep into interlayer, injects high pressure concrete into interlayer, and high pressure concrete is by mud Slurry is squeezed out from interlayer;
Step 4: being lifted up Grouting Pipe, while high pressure concrete is injected into hole, final high nip drum is solidifying native by Kong Mi Envelope.
Preferably, the diameter in the hole is 110mm-120mm.
Preferably, in step 1, using the position of ultrasonic equipment detection interlayer.
Preferably, the sealing ring is rubber material.
The beneficial effects of the present invention are: compared with the existing technology, interlayer is disconnected in the prior art for this method effective solution The problem of splitting, by making a hole on bored concrete pile, the diameter in the hole is very small, can be adapted for diameter at one meter or more The effect for acting on hole in the prior art of the work of bored concrete pile piling, hole is different, and the application mesoporous is as connection interlayer Channel, and one sealing ring, the side wall tight fit of the sealing ring and hole are set in the front of Grouting Pipe, such interlayer is exactly The space of one sealing, then high pressure concrete is injected into Grouting Pipe, high pressure concrete enters backward in interlayer from Grouting Pipe Surrounding squeezes mud, and the originally position of mud will be accounted for by high pressure concrete into mud is expressed into the sky of surrounding from interlayer Between, after high pressure concrete fills full interlayer, realize the pile extension of upper and lower ends bored concrete pile, finally as Grouting Pipe is lifted up, High pressure concrete fills hole.
Detailed description of the invention
Fig. 1 is that the structural schematic diagram of interlayer occurs in bored concrete pile in the present invention;
Fig. 2 is the structural schematic diagram for injecting high pressure concrete in the present invention into interlayer;
Fig. 3 is state diagram when Grouting Pipe is lifted up in the present invention.
Specific embodiment
With reference to the accompanying drawing and the preferred embodiment specific embodiment that the present invention will be described in detail.As shown in Figure 1-3, a kind of Cast-in-situ bored pile breaks a processing method, comprising the following steps:
Step 1: verifying 1 position of interlayer of bored concrete pile;Using the position of ultrasonic equipment detection interlayer.
Step 2: the depth in hole is up to the position of interlayer in one hole 2 of centre drill of bored concrete pile;In the straight of the hole Diameter is 110mm-120mm.The diameter of mesoporous of the present invention can be beaten very small, not limited by pile diameter, and cost is very It is low.
Step 3: going deep into a Grouting Pipe 3 into hole, the front ring week of the Grouting Pipe is equipped with a sealing ring 4, described close Seal ring is rubber material.Sealing ring and the inner wall in the hole are fitted close, and Grouting Pipe is deep into interlayer, are injected into interlayer high Concrete 5 is pressed, high pressure concrete squeezes out mud 6 from interlayer;Due to all loosening the soil around general bored concrete pile, so high pressure is mixed Mud can be easily extruded into the loosening the soil of surrounding by solidifying soil.
Step 4: being lifted up Grouting Pipe, while high pressure concrete is injected into hole, final high nip drum is solidifying native by Kong Mi Envelope.This method can be linked together the bored concrete pile of fracture with the concrete of same specification, and intensity was with being identical in the past 's.
By making a hole on bored concrete pile, the diameter in the hole is very small, can be adapted for diameter at one meter or more The effect for acting on hole in the prior art of the work of bored concrete pile piling, hole is different, and the application mesoporous is as connection interlayer Channel, and one sealing ring, the side wall tight fit of the sealing ring and hole are set in the front of Grouting Pipe, such interlayer is exactly The space of one sealing, then high pressure concrete is injected into Grouting Pipe, high pressure concrete enters backward in interlayer from Grouting Pipe Surrounding squeezes mud, and the originally position of mud will be accounted for by high pressure concrete into mud is expressed into the sky of surrounding from interlayer Between, after high pressure concrete fills full interlayer, realize the pile extension of upper and lower ends bored concrete pile, finally as Grouting Pipe is lifted up, High pressure concrete fills hole.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (4)

1. a kind of cast-in-situ bored pile breaks a processing method, it is characterised in that: the following steps are included:
Step 1: verifying the interlayer position of bored concrete pile;
Step 2: the depth in hole is up to the position of interlayer in one hole of centre drill of bored concrete pile;
Step 3: go deep into a Grouting Pipe into hole, be equipped with a sealing ring front ring week of the Grouting Pipe, sealing ring with it is described The inner wall in hole is fitted close, and Grouting Pipe is deep into interlayer, injects high pressure concrete into interlayer, high pressure concrete by mud from It is squeezed out in interlayer;
Step 4: being lifted up Grouting Pipe, while high pressure concrete is injected into hole, the final solidifying soil of high nip drum seals hole.
2. cast-in-situ bored pile according to claim 1 breaks a processing method, it is characterised in that: the diameter in the hole is 110mm-120mm。
3. cast-in-situ bored pile according to claim 1 breaks a processing method, it is characterised in that: in step 1, use The position of ultrasonic equipment detection interlayer.
4. cast-in-situ bored pile according to claim 1 breaks a processing method, it is characterised in that: the sealing ring is rubber Material.
CN201811008918.5A 2018-08-31 2018-08-31 Cast-in-situ bored pile breaks a processing method Pending CN109113059A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811008918.5A CN109113059A (en) 2018-08-31 2018-08-31 Cast-in-situ bored pile breaks a processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811008918.5A CN109113059A (en) 2018-08-31 2018-08-31 Cast-in-situ bored pile breaks a processing method

Publications (1)

Publication Number Publication Date
CN109113059A true CN109113059A (en) 2019-01-01

Family

ID=64861721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811008918.5A Pending CN109113059A (en) 2018-08-31 2018-08-31 Cast-in-situ bored pile breaks a processing method

Country Status (1)

Country Link
CN (1) CN109113059A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016941A (en) * 2019-04-23 2019-07-16 谢定茂 The reinforcement means of pile foundation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413266A (en) * 2008-11-28 2009-04-22 广东省长大公路工程有限公司 Processing method of interlayer defect injection concrete of drill filling pile
CN102041814A (en) * 2010-12-31 2011-05-04 郭红军 Novel composite pile (ground) foundation and application method thereof
KR20170040602A (en) * 2015-10-05 2017-04-13 김동욱 Grouting device using a reinforced network is equipped with a small steel pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413266A (en) * 2008-11-28 2009-04-22 广东省长大公路工程有限公司 Processing method of interlayer defect injection concrete of drill filling pile
CN102041814A (en) * 2010-12-31 2011-05-04 郭红军 Novel composite pile (ground) foundation and application method thereof
KR20170040602A (en) * 2015-10-05 2017-04-13 김동욱 Grouting device using a reinforced network is equipped with a small steel pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016941A (en) * 2019-04-23 2019-07-16 谢定茂 The reinforcement means of pile foundation
CN110016941B (en) * 2019-04-23 2021-01-26 武汉科诚基础工程有限责任公司 Pile foundation reinforcing method

Similar Documents

Publication Publication Date Title
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN104389314B (en) A kind of shallow clay grouting and reinforcing device and method
CN105386433B (en) A kind of microorganism soil-fixing CFG pile composite foundations and construction method
CN102926770A (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN110258538B (en) Soil nail reinforced buffer type manual hole digging pile and construction method thereof
CN104131556A (en) Soft-and-hard interlayer alternation foundation drainage prestressed pipe pile and construction method
CN106761918A (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN203200746U (en) High-pressure jet grouting hollow reinforced tubular pile
CN210562157U (en) Post-grouting composite pile
CN109083135A (en) Miniature steel pipe pile construction method
CN106907157B (en) A kind of shield machine normal pressure opens the cabin operation construction method
CN102852141A (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN109680675A (en) A kind of Stabilizing Grout method that can dynamically control grouting amount and harden opportunity
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN103498478B (en) Rock curtain grouting in foundation of dam construction method
CN103161151A (en) Construction method of high pressure jet grouting hollow strengthening tubular pile and high pressure jet grouting hollow strengthening tubular pile
CN109113059A (en) Cast-in-situ bored pile breaks a processing method
CN110230314A (en) A kind of piling strtucture and its construction method
CN206753653U (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction
CN206289627U (en) A kind of post jacking pile tube
CN110685272B (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN107938640A (en) A kind of microorganism fixing the handles device and its construction technology for sand-layer foundation
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN202430728U (en) Water blocking equipment for water bursting control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190101

RJ01 Rejection of invention patent application after publication