CN109099886A - 一种用全站仪和水平仪测量顶管的方法 - Google Patents
一种用全站仪和水平仪测量顶管的方法 Download PDFInfo
- Publication number
- CN109099886A CN109099886A CN201811064178.7A CN201811064178A CN109099886A CN 109099886 A CN109099886 A CN 109099886A CN 201811064178 A CN201811064178 A CN 201811064178A CN 109099886 A CN109099886 A CN 109099886A
- Authority
- CN
- China
- Prior art keywords
- push pipe
- total station
- pipe
- jacking
- full
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C9/00—Measuring inclination, e.g. by clinometers, by levels
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明涉及城市地下管廊顶管施工技术领域,尤其是涉及一种用全站仪和水平仪测量顶管的方法,利用全站仪全时监测顶管水平方向的轴线偏差,同时,利用水平仪全时监控顶管垂直方向的高程偏差,二者相互配合可动态控制推进中顶管的运行轨迹,测量误差呈接近偶然误差分布且累计误差小,施工精度高,特别适用于长距离顶管作业、曲线顶管作业及转角处顶管作业。
Description
技术领域
本发明涉及城市地下管廊顶管施工技术领域,尤其是涉及一种用全站仪和水平仪测量顶管的方法。
背景技术
顶管施工是城市地下综合管廊工程(节点部位)施工中常用的方法。为了保证顶管按照预定的轨迹推进,确保对接处的连接质量,需要对顶管作业的全过程进行连续全时的测量、监测和控制。顶管控制测量主要包括顶管水平方向的轴线偏差控制和垂直方向的高程偏差控制。目前,施工现场一般常用的顶管测量方法是采用激光直线仪或经纬仪对顶管作业进行测量控制及监测,即把测量仪器架设在顶管轴线或轴线偏移线上。用仪器提供一条平行于顶管轴线的直线来控制顶管中心线的位置。实践证明,这种测量方法随着顶管施工长度的增加,误差也再不断的增加,其误差呈线性分布,分布图接近于***误差。另外,在对接处(尤其是在长距离顶管作业、曲线顶管作业及转角处)需要多次架设仪器反复测量,并且数据计算量大、误差积累大、不易控制其精度,同时受线形因素的影响更大。因此,传统的测量方法不能满足长距离、高精度、曲线顶管等顶进作业的测量控制。
发明内容
为克服现有技术缺陷,本发明解决的技术问题是提供一种用全站仪和水平仪测量顶管的方法,利用全站仪和水平仪分别监测顶管水平方向的轴线偏差和垂直方向的高程偏差,可动态控制推进中顶管的运行轨迹,测量误差呈接近偶然误差分布且累计误差小,施工精度高,特别适用于长距离顶管作业、曲线顶管作业及转角处顶管作业。
为了达到上述目的,本发明采用以下技术方案实现:
一种用全站仪和水平仪测量顶管的方法,其特征在于,包括以下步骤:
1)水平方向的轴线偏差控制:用全站仪全时测量顶管水平方向的右控制线与轴线的距离L1i及左控制线与轴线的距离L2i,判断其差值ΔLi=L1i-L2i是否在设定的轴线偏差ΔL范围内,即当ΔLi≤ΔL时可接受继续顶进,否则当ΔLi变化趋势接近ΔL时就需要调整推进方式使ΔLi始终落在ΔL范围内;
2)垂直方向的高程偏差控制:用水平仪全时测量顶管垂直方向的高程hi,判断其与设计的高程h的差值Δhi=h-hi是否在设定的高程偏差Δh范围内,即当Δhi≤Δh时可接受继续顶进,否则当Δhi变化趋势接近Δh时就需要调整推进方式使Δhi始终落在ΔL范围内。
进一步,所述全站仪和水平仪可与计算机联网,利用CSAA、CAD等软件进行连续测量、计算,并绘制出顶管推进轨迹图。
与现有技术相比,本发明的有益效果是:
1)利用全站仪和水平仪分别监测顶管水平方向的轴线偏差和垂直方向的高程偏差,二者相互配合可动态控制推进中顶管的运行轨迹,测量误差呈接近偶然误差分布且累计误差小,施工精度高;
2)可有效解决顶管作业测量精度低的问题,特别适用于长距离顶管作业、曲线顶管作业及转角处顶管作业;
3)可连续监测、动态控制,利用CSAA、CAD等软件进行量取、计算,并绘制出顶管推进轨迹图,直接预测下一段顶管的偏差走向;
4)与传统方法相比,计算机量取计算可大量减少内业数据计算,且采用坐标放样不受线形因素影响,如遇转角、曲线顶管此方法更为适用。
附图说明
图1是本发明之顶管水平方向轴线偏差监控的结构示意图;
图2是本发明之顶管水平方向轴线偏差ΔLi的变化折线图(误差分布图);
图3是本发明之顶管垂直方向高程偏差监控的结构示意图;
图4是本发明之顶管垂直方向高程偏差Δhi的变化折线图(误差分布图)。
图中:1-轴线 2-左控制线 3-右控制线 4-全站仪 5-顶管 6-顶管工作井 7-水平仪 8-高程基准线
具体实施方式
下面结合附图对本发明作进一步描述,但并不因此而限制本发明的保护范围。
如图1-4所示,本发明所述的一种用全站仪和水平仪测量顶管的方法,包括以下步骤:
1)见图1,水平方向的轴线偏差控制:将全站仪1架设在顶管工作井6中,用全站仪4全时(一般以顶管推进0.5米为一个测量节点)测量顶管5水平方向的右控制线3与轴线1的距离L1i及左控制线2与轴线1的距离L2i,判断其差值ΔLi=L1i-L2i是否在设定的轴线偏差ΔL范围内,即当ΔLi≤ΔL时可接受(认为轴线没有发生偏移)继续顶进施工,否则当ΔLi变化趋势接近ΔL时就需要调整推进方式使ΔLi始终落在ΔL范围内(见图2),从而动态监控顶管推进过程中水平方向移动轨迹,实现顶管水平方向的轴线偏差的动态控制。
2)见图3,垂直方向的高程偏差控制:将水平仪7架设在顶管工作井6中,用水平仪7全时(一般以顶管推进0.5米为一个测量节点)测量顶管5垂直方向的高程hi(顶管下边线距高程基准线8之间的距离),判断其与设计的高程h的差值Δhi=h-hi是否在设定的高程偏差Δh范围内,即当Δhi≤Δh时可接受(认为顶管高度方向偏差可接受)继续顶进施工,否则当Δhi变化趋势接近Δh时就需要调整推进方式使Δhi始终落在ΔL范围内(见图4),从而动态监控顶管推进过程中垂直方向移动轨迹,实现顶管垂直方向的高程偏差的动态控制。
进一步,所述全站仪4和水平仪7可与计算机联网,利用CSAA、CAD等软件进行连续测量、计算(与传统方法相比,计算机量取、计算可大大减少内业的数据计算量,且采用坐标放样不受线形因素影响,如遇转角、曲线顶管此方法更为适用),并绘制出顶管5推进轨迹图,可直接预测下一段顶管5的偏差走向。
进一步,所谓动态控制即当发现偏差(ΔLi或Δhi)较大(变化趋势接近ΔL或Δh)时可以及时纠偏。纠偏修正通过调整顶管千斤顶的使用数量、布置方式/方位及推力大小等实现。
Claims (2)
1.一种用全站仪和水平仪测量顶管的方法,其特征在于,包括以下步骤:
1)水平方向的轴线偏差控制:用全站仪全时测量顶管水平方向的右控制线与轴线的距离L1i及左控制线与轴线的距离L2i,判断其差值ΔLi=L1i-L2i是否在设定的轴线偏差ΔL范围内,即当ΔLi≤ΔL时可接受继续顶进,否则当ΔLi变化趋势接近ΔL时就需要调整推进方式使ΔLi始终落在ΔL范围内;
2)垂直方向的高程偏差控制:用水平仪全时测量顶管垂直方向的高程hi,判断其与设计的高程h的差值Δhi=h-hi是否在设定的高程偏差Δh范围内,即当Δhi≤Δh时可接受继续顶进,否则当Δhi变化趋势接近Δh时就需要调整推进方式使Δhi始终落在ΔL范围内。
2.根据权利要求1所述的一种用全站仪和水平仪测量顶管的方法,其特征在于,所述全站仪和水平仪可与计算机联网,利用CSAA、CAD等软件进行连续测量、计算,并绘制出顶管推进轨迹图。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811064178.7A CN109099886A (zh) | 2018-09-12 | 2018-09-12 | 一种用全站仪和水平仪测量顶管的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811064178.7A CN109099886A (zh) | 2018-09-12 | 2018-09-12 | 一种用全站仪和水平仪测量顶管的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109099886A true CN109099886A (zh) | 2018-12-28 |
Family
ID=64866013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811064178.7A Pending CN109099886A (zh) | 2018-09-12 | 2018-09-12 | 一种用全站仪和水平仪测量顶管的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109099886A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130916A (zh) * | 2019-05-21 | 2019-08-16 | 上海市市政工程建设发展有限公司 | 一种大断面矩形顶管姿态控制方法 |
CN115263326A (zh) * | 2022-08-29 | 2022-11-01 | 中国地质大学(武汉) | 一种基于三轴倾角传感器的顶管管道偏移实时监测方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102967293A (zh) * | 2011-09-01 | 2013-03-13 | 上海青草沙投资建设发展有限公司 | 超长距离顶管测量方法及装置 |
CN104251688A (zh) * | 2014-09-25 | 2014-12-31 | 陕西华山路桥工程有限公司 | 顶管工程中利用激光直线定向测量工法 |
CN206737925U (zh) * | 2017-05-25 | 2017-12-12 | 合肥工业大学 | 一种基于mems陀螺仪进行轨迹显示的顶管机 |
CN107747934A (zh) * | 2017-09-28 | 2018-03-02 | 中国建筑第八工程局有限公司 | 顶管轴线测量装置及顶管轴线测量方法 |
-
2018
- 2018-09-12 CN CN201811064178.7A patent/CN109099886A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102967293A (zh) * | 2011-09-01 | 2013-03-13 | 上海青草沙投资建设发展有限公司 | 超长距离顶管测量方法及装置 |
CN104251688A (zh) * | 2014-09-25 | 2014-12-31 | 陕西华山路桥工程有限公司 | 顶管工程中利用激光直线定向测量工法 |
CN206737925U (zh) * | 2017-05-25 | 2017-12-12 | 合肥工业大学 | 一种基于mems陀螺仪进行轨迹显示的顶管机 |
CN107747934A (zh) * | 2017-09-28 | 2018-03-02 | 中国建筑第八工程局有限公司 | 顶管轴线测量装置及顶管轴线测量方法 |
Non-Patent Citations (1)
Title |
---|
仲子家: "地下顶管工程导向测量", 《2007全国测绘科技信息交流会暨信息网创建30周年庆典论文汇编》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130916A (zh) * | 2019-05-21 | 2019-08-16 | 上海市市政工程建设发展有限公司 | 一种大断面矩形顶管姿态控制方法 |
CN115263326A (zh) * | 2022-08-29 | 2022-11-01 | 中国地质大学(武汉) | 一种基于三轴倾角传感器的顶管管道偏移实时监测方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101392481B (zh) | 轨排测量定位***及其测量定位方法 | |
CN107380204A (zh) | 轨道几何参数检测车及轨道几何参数检测方法 | |
CN114120785B (zh) | 一种煤矿掘进设备与地质模型、巷道设计模型的耦合*** | |
CN104101326B (zh) | 一种基于空间几何分析的盾构姿态自动测量方法及装置 | |
CN110440743B (zh) | 一种基于基线的隧道变形监测方法、***、介质及设备 | |
CN109099886A (zh) | 一种用全站仪和水平仪测量顶管的方法 | |
CN103335647A (zh) | 一种盾构机姿态测量***及其测量方法 | |
CN105091852A (zh) | 一种顶管开挖激光导向测量施工工法 | |
CN106840092B (zh) | 采用激光测距仪监测高支模的方法 | |
CN112282781A (zh) | 一种凿岩设备姿态测量***和方法 | |
CN108345318A (zh) | 一种节段梁悬臂拼装墩顶块安装测量方法 | |
CN112049648B (zh) | 一种顶管施工监测控制方法 | |
CN102680942A (zh) | 一种基于全站仪的高炉框架测量定位方法 | |
CN115199336B (zh) | 一种矿山采空区形态实时监测***及建模方法 | |
CN114964189A (zh) | 一种支撑胎架和桁架的安装测量方法 | |
CN201301422Y (zh) | 轨排测量定位*** | |
CN111947606B (zh) | 隧道中轴线辅助测量装置及其测量方法 | |
CN117029744A (zh) | 一种多机联合摊铺装置的控制***及控制方法 | |
CN105588512B (zh) | 类矩形隧道管片构件尺寸的测量装置与方法 | |
CN110686656A (zh) | 一种矩形顶管自动化测量装置及其方法 | |
CN208350077U (zh) | 一种塔柱三维定位装置 | |
CN106949886B (zh) | 地铁隧道工程线路测点点位的快速定位装置及定位方法 | |
CN110345930B (zh) | 一种基于改进的布尔莎模型的不整平自由设站方法 | |
CN113669011B (zh) | 牙轮钻机水平调平的方法 | |
CN111664832B (zh) | 一种重力异常显著地区桥梁施工独立高程***的建立方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181228 |