CN109098336A - A kind of construction method of dome device - Google Patents
A kind of construction method of dome device Download PDFInfo
- Publication number
- CN109098336A CN109098336A CN201810977919.4A CN201810977919A CN109098336A CN 109098336 A CN109098336 A CN 109098336A CN 201810977919 A CN201810977919 A CN 201810977919A CN 109098336 A CN109098336 A CN 109098336A
- Authority
- CN
- China
- Prior art keywords
- component
- dome
- construction method
- stainless steel
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/08—Vaulted roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/16—Roof structures with movable roof parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of construction methods of dome device, comprising the following steps: pre-assembled: purchasing automatic opening system in advance;Load calculates: conservative estimation roof load in advance establishes Analytic Models For Structures, carries out Internal Forces Analysis, checking computations component section;Deepen Design: reinforcement members cross-sectional stability determines component model;Model trial-production: it carries out realistic model analysis and is debugged with automatic opening system, check blank size, examine welding quality and automatic opening system stability;Production: component production is carried out, it is ensured that quality of materials, blanking be accurate and welding quality.The present invention: by this construction method, it can effectively realize the ornamental beautiful scenerys of 360 degree of tourist's energy, and ensure cloud aigret celestial being boat DOME STRUCTURE SYSTEM stable structure, safety, meet the short time limit effect few with long service life and late maintaining expense, economical rationality, appearance keep traditional style.
Description
Technical field
The present invention relates to technical field of building construction, it particularly relates to a kind of construction method of dome device.
Background technique
Tenth Jiangsu Province Horticulture Exposition Review Garden overall floorage is about 1200000 ㎡, is located at the main road Han Jin west side,
Jujube woods gulf north side, entire Review Garden is divided into impression Yangzhou section, section is enjoied the sights in shore lake wetland section, the interest section language Lin Yin, tableland
Deng five big sections.Section, gardening review area are enjoied the sights in impression Yangzhou section, riverside wetland section, the interest section language Lin Yin, tableland.
The garden Yuan Ye, the project is by the unique academician Meng Zhaozhen of classical Chinese garden circle according to " garden smelting " landscape architecture Theoretical Design, choosing
Location is located in the lake Yun Lu on a maximum island, and about 90 mu of occupied area.In design concept, conception be " Qinghua celestial being pearl not exactly round in shape ", from bright purport,
Conception, Xiang Di, layout, each scape, reason are micro- etc. to carry out the planning and designing of the garden Yuan Ye, to excavate Yangzhou, Yizheng characteristic as starting point,
Rare flower culture, scenery with hills and waters shape victory, garden architecture element are dissolved into design.In design layout, from a scenery with hills and waters structure of an essay, scenery with hills and waters at border,
Because border peace scape angularly constructs park integral layout form, Zhe Ting is respected in inside setting, cloud aigret celestial being boat, Eight Immortals waterside pavilion, Qiong Tai stop cloud
Main building everywhere forms departure and turns to build jointly to build arrangement form.On plants landscape, manually imitative Natural plant community is established, with Qiao
Wood is skeleton, and shrub putting scape, various plants type combines, garden smelting skill is applied in this landscape architecture, shows the present age to biography
The inheritance and development in system gardens." great master garden " engineering-Qinghua celestial being pearl not exactly round in shape-cloud aigret celestial being boat is one of Important building of this engineering.And mesh
Preceding ancient building, which does not have, automatically opens Functions of Roofs, and traditional ancient building cloud aigret celestial being boat dome is fail to open, and originally can open automatically
The cloud aigret celestial being boat dome structure engineering beyond example opened, therefore also without similar construction experience.Be badly in need of research and formulate science, it is reliable,
It is suitble to the arrangement and method for construction of this engineering, to ensure " great master garden " engineering-Qinghua celestial being pearl not exactly round in shape-cloud aigret celestial being boat dome construction quality, safety
And the duration, as previously mentioned, this engineering dome scale of construction is larger.Cloud aigret celestial being boat dome needs automatically open, the decoration of the so big scale of construction
How safe and reliable accessory is, is scientifically and rationally installed in place, which kind of automatic-opening cloud aigret celestial being boat dome structure to be this using
Engineering urgent problem to be solved.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Summary of the invention
For the problems in the relevant technologies, the present invention proposes a kind of construction method of dome device, to overcome existing correlation
Above-mentioned technical problem present in technology.
The technical scheme of the present invention is realized as follows:
A kind of construction method of dome device, comprising the following steps:
Pre-assembled: automatic opening system is purchased in advance;
Load calculates: conservative estimation roof load in advance establishes Analytic Models For Structures, carries out Internal Forces Analysis, checking computations component
Section;
Deepen Design: reinforcement members cross-sectional stability determines component model;
Model trial-production: carry out realistic model analysis with automatic opening system debug, check blank size, examine welding quality and
Automatic opening system stability;
Production: component production is carried out, it is ensured that quality of materials, blanking be accurate and welding quality;
Splicing: it is pre-assembled to carry out component, then carries out contraposition drilling and disassembly;
Installation: component assembly and automatic opening system assembly are carried out, is debugged;
It is beautiful: to carry out completing matrix spray paint to assembly, carry out wood grain printing, component is covered with thin bamboo strips used for weaving seat, carries out spray oil
Paint.
Further, the automatic opening system includes: pre-assembled unit installation walking belt gear, bracket tensioning
Wheel, pulley motor, pulley belt, pulley limiter, fixed device connector, system controller remote control transmitter, infrared sense
Answer device, manual inductor switch.
Further, the load calculates the load are as follows: dead load: the wooden rafter 0.1KN/M2, sheathing tile 0.12KN/M2, sand
Starch 0.51KN/M2, glazed tiles 1.0KN/M2, mobile load: 0.5KN/M2, the downward concentrated force F in corridor purlin are 23.7(KN) ↓, sets of brackets on top of the columns is to H-type
The load of steel is 1KN/M.
Further, the Deepen Design stability includes modification and wind resistance, and component carries out increasing toughness strip steel and pressure
Plate.
Further, model trial-production the following steps are included:
Component puts full size full-page proof by design requirement;
Cast material wood material and Steel material are by design requirement one to one entity of production;
Sawing sheet is carried out by full size full-page proof;
Sawing sheet, which is carried out, by full size full-page proof makes Tenon;
By full size full-page proof carry out sawing sheet production Tenon to component match Tenon drilling blending bolt pre-assembled unit, pass through iron
Part is attached to form entirety;
Assembly automatic opening system is debugged, and outside carries out covering decoration.
Further, the installation includes roof truss primary structure member system and track primary structure member system.
Further, the roof truss primary structure member system, comprising the following steps:
Full size full-page proof component is put in pre- trial-production;
Member upper dome is 4mm stainless steel plate with thickness, is crossed on stainless steel materials by full size full-page proof, be cut by laser with
Curvature is drawn, then is welded into special-shaped square, intermediate ribbed panel forms dome mesh shape;
Component match Tenon drilling blending bolt pre-assembled unit;
Pre-install the thick stainless steel materials of component units top covering 4.
Further, the track primary structure member system, comprising the following steps:
In advance with thick 1 centimeter of 304 stainless steel part plate, cross on stainless steel materials by full size full-page proof, after being cut by laser, then
It is welded into U-shaped primary structure member;
Cornice track primary structure member be connected be equipped at U-shaped primary structure member 304 stainless steel parts that match connector connection it is former
The wooden a tree, used in making timber for boats and pin;
Component is equipped with the 304 stainless steel plate thickness connection envelope that matches along plate in cornice stress track connection;
Cornice bearing member track connection is equipped with the thick 1 centimeter of 304 stainless steel part plate connection envelope every side along plate that matches and opens down
Water pipe hole, sets water pipe.
Further, the beauty, comprising the following steps:
It include chemistry using stainless steel part surface treatment after the installation of component matrix pre-assembled unit is installed with all accessories
Preparation cleaning, fine grinding and polishing grinding;
Component matrix and in its appearance spray paint, carries out wood grain printing;
The appearance of component is decorated, and the appearance with thin bamboo strips used for weaving seat in cloud aigret celestial being boat dome component carries out covering decorative appearance spray oil
Paint, appearance keep traditional style.
Beneficial effects of the present invention: by this construction method, can effectively realize the ornamental beautiful scenerys of 360 degree of tourist's energy, and
It ensures cloud aigret celestial being boat DOME STRUCTURE SYSTEM stable structure, safety, meets short time limit and long service life and late maintaining expense are few
Effect, economical rationality bears the load of dome roofing using stainless steel structure system enough, resists the natural item such as wind load
Influence of the part to dome roofing, there is enough safety coefficients and durability, and securely and reliably, power transmission is clear, reasonable stress, constructs just
Prompt, sizing stabilization and duration are shorter, and synchronous toothed belt is used to walk, and not only walking is safe and reliable, and water-resistant performance is good and super
Sound is small, later period maintenance easy maintenance, and good and cheap and appearance keeps traditional style.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings
Obtain other attached drawings.
Fig. 1 is a kind of flow diagram of the construction method of dome device according to an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected
Range.
According to an embodiment of the invention, providing a kind of construction method of dome device.
As shown in Figure 1, the construction method of dome device according to an embodiment of the present invention, comprising the following steps:
Pre-assembled: step S101 purchases automatic opening system in advance;
Step S103, load calculate: conservative estimation roof load in advance establishes Analytic Models For Structures, carry out Internal Forces Analysis,
Check component section;
Step S105, Deepen Design: reinforcement members cross-sectional stability determines component model;
Model trial-production: step S107 carries out realistic model analysis and debugs with automatic opening system, check blank size, examine weldering
Connect quality and automatic opening system stability;
Production: step S109 carries out component production, it is ensured that quality of materials, blanking be accurate and welding quality;
Step S111, splicing: it is pre-assembled to carry out component, then carries out contraposition drilling and disassembly;
Installation: step S113 carries out component assembly and automatic opening system assembly, is debugged;
Step S115 is beautiful: it carries out completing matrix spray paint to assembly, carries out wood grain printing, component is covered with thin bamboo strips used for weaving seat, into
Row spray paint.
In addition, in one embodiment, the automatic opening system includes: pre-assembled unit installation walking belt teeth
Wheel, bracket tensioning wheel, pulley motor, pulley belt, pulley limiter, fixed device connector, system controller remote control hair
Emitter, infrared inductor, manual inductor switch.
In addition, in one embodiment, dead load: the wooden rafter 0.1KN/M2, sheathing tile 0.12KN/M2, mortar 0.51KN/M2,
Glazed tiles 1.0KN/M2, mobile load: 0.5KN/M2, the downward concentrated force F in corridor purlin are 23.7(KN) ↓, sets of brackets on top of the columns is to the load of H profile steel
1KN/M。
In addition, in one embodiment, the Deepen Design stability includes modification and wind resistance, and component is increased
Toughness strip steel and pressing plate.
In addition, in one embodiment, the model trial-production the following steps are included:
Component puts full size full-page proof by design requirement;
Cast material wood material and Steel material are by design requirement one to one entity of production;
Sawing sheet is carried out by full size full-page proof;
Sawing sheet, which is carried out, by full size full-page proof makes Tenon;
By full size full-page proof carry out sawing sheet production Tenon to component match Tenon drilling blending bolt pre-assembled unit, pass through iron
Part is attached to form entirety;
Assembly automatic opening system is debugged, and outside carries out covering decoration.
In addition, in one embodiment, the installation includes roof truss primary structure member system and track primary structure member system.
In addition, in one embodiment, the roof truss primary structure member system, comprising the following steps:
Full size full-page proof component is put in pre- trial-production;
Member upper dome is 4mm stainless steel plate with thickness, is crossed on stainless steel materials by full size full-page proof, be cut by laser with
Curvature is drawn, then is welded into special-shaped square, intermediate ribbed panel forms dome mesh shape;
Component match Tenon drilling blending bolt pre-assembled unit;
Pre-install the thick stainless steel materials of component units top covering 4.
In addition, in one embodiment, comprising the following steps:
In advance with thick 1 centimeter of 304 stainless steel part plate, cross on stainless steel materials by full size full-page proof, after being cut by laser, then
It is welded into U-shaped primary structure member;
Cornice track primary structure member be connected be equipped at U-shaped primary structure member 304 stainless steel parts that match connector connection it is former
The wooden a tree, used in making timber for boats and pin;
Component is equipped with the 304 stainless steel plate thickness connection envelope that matches along plate in cornice stress track connection;
Cornice bearing member track connection is equipped with the thick 1 centimeter of 304 stainless steel part plate connection envelope every side along plate that matches and opens down
Water pipe hole, sets water pipe.
In addition, in one embodiment, the beauty, comprising the following steps:
It include chemistry using stainless steel part surface treatment after the installation of component matrix pre-assembled unit is installed with all accessories
Preparation cleaning, fine grinding and polishing grinding;
Component matrix and in its appearance spray paint, carries out wood grain printing;
The appearance of component is decorated, and the appearance with thin bamboo strips used for weaving seat in cloud aigret celestial being boat dome component carries out covering decorative appearance spray oil
Paint, appearance keep traditional style.
In conclusion, by this construction method, can effectively realize tourist's energy by means of above-mentioned technical proposal of the invention
360 degree of ornamental beautiful scenerys, and ensure cloud aigret celestial being boat DOME STRUCTURE SYSTEM stable structure, safety, meet short time limit and service life
The long and few effect of late maintaining expense, economical rationality bear the load of dome roofing using stainless steel structure system enough,
The influence of the natural conditions to dome roofing such as wind load is resisted, there is enough safety coefficients and durability, it is safe and reliable, power transmission is bright
Really, reasonable stress, convenient, sizing stabilization of constructing and duration are shorter, and synchronous toothed belt is used to walk, and not only walking safety can
It leans on, water-resistant performance is good and Supersonic is small, later period maintenance easy maintenance, and good and cheap and appearance keeps traditional style.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (9)
1. a kind of construction method of dome device, which comprises the following steps:
Pre-assembled: automatic opening system is purchased in advance;
Load calculates: conservative estimation roof load in advance establishes Analytic Models For Structures, carries out Internal Forces Analysis, checking computations component
Section;
Deepen Design: reinforcement members cross-sectional stability determines component model;
Model trial-production: carry out realistic model analysis with automatic opening system debug, check blank size, examine welding quality and
Automatic opening system stability;
Production: component production is carried out, it is ensured that quality of materials, blanking be accurate and welding quality;
Splicing: it is pre-assembled to carry out component, then carries out contraposition drilling and disassembly;
Installation: component assembly and automatic opening system assembly are carried out, is debugged;
It is beautiful: to carry out completing matrix spray paint to assembly, carry out wood grain printing, component is covered with thin bamboo strips used for weaving seat, carries out spray oil
Paint.
2. the construction method of dome device according to claim 1, which is characterized in that the automatic opening system includes:
Pre-assembled unit installation walking belt gear, bracket tensioning wheel, pulley motor, pulley belt, pulley limiter, fixed dress
Set connector, system controller remote control transmitter, infrared inductor, manual inductor switch.
3. the construction method of dome device according to claim 1, which is characterized in that the load calculates the load
Are as follows: dead load: the wooden rafter 0.1KN/M2, sheathing tile 0.12KN/M2, mortar 0.51KN/M2, glazed tiles 1.0KN/M2, mobile load: 0.5KN/
M2, the downward concentrated force F in corridor purlin are 23.7(KN) ↓, sets of brackets on top of the columns is 1KN/M to the load of H profile steel.
4. the construction method of dome device according to claim 1, which is characterized in that the Deepen Design stability includes
Modification and wind resistance, component carry out increasing toughness strip steel and pressing plate.
5. the construction method of dome device according to claim 1, which is characterized in that the model trial-production includes following step
It is rapid:
Component puts full size full-page proof by design requirement;
Cast material wood material and Steel material are by design requirement one to one entity of production;
Sawing sheet is carried out by full size full-page proof;
Sawing sheet, which is carried out, by full size full-page proof makes Tenon;
By full size full-page proof carry out sawing sheet production Tenon to component match Tenon drilling blending bolt pre-assembled unit, pass through iron
Part is attached to form entirety;
Assembly automatic opening system is debugged, and outside carries out covering decoration.
6. the construction method of dome device according to claim 1, which is characterized in that the installation includes roof truss stress structure
Part system and track primary structure member system.
7. the construction method of dome device according to claim 6, which is characterized in that the roof truss primary structure member system,
The following steps are included:
Full size full-page proof component is put in pre- trial-production;
Member upper dome is 4mm stainless steel plate with thickness, is crossed on stainless steel materials by full size full-page proof, be cut by laser with
Curvature is drawn, then is welded into special-shaped square, intermediate ribbed panel forms dome mesh shape;
Component match Tenon drilling blending bolt pre-assembled unit;
Pre-install the thick stainless steel materials of component units top covering 4.
8. the construction method of dome device according to claim 6, which is characterized in that the track primary structure member system,
The following steps are included:
In advance with thick 1 centimeter of 304 stainless steel part plate, cross on stainless steel materials by full size full-page proof, after being cut by laser, then
It is welded into U-shaped primary structure member;
Cornice track primary structure member be connected be equipped at U-shaped primary structure member 304 stainless steel parts that match connector connection it is former
The wooden a tree, used in making timber for boats and pin;
Component is equipped with the 304 stainless steel plate thickness connection envelope that matches along plate in cornice stress track connection;
Cornice bearing member track connection is equipped with the thick 1 centimeter of 304 stainless steel part plate connection envelope every side along plate that matches and opens down
Water pipe hole, sets water pipe.
9. the construction method of dome device according to claim 1, which is characterized in that the beauty, comprising the following steps:
It include chemistry using stainless steel part surface treatment after the installation of component matrix pre-assembled unit is installed with all accessories
Preparation cleaning, fine grinding and polishing grinding;
Component matrix and in its appearance spray paint, carries out wood grain printing;
The appearance of component is decorated, and the appearance with thin bamboo strips used for weaving seat in cloud aigret celestial being boat dome component carries out covering decorative appearance spray oil
Paint, appearance keep traditional style.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810977919.4A CN109098336B (en) | 2018-08-27 | 2018-08-27 | Construction method of dome device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810977919.4A CN109098336B (en) | 2018-08-27 | 2018-08-27 | Construction method of dome device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109098336A true CN109098336A (en) | 2018-12-28 |
CN109098336B CN109098336B (en) | 2020-04-17 |
Family
ID=64851046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810977919.4A Active CN109098336B (en) | 2018-08-27 | 2018-08-27 | Construction method of dome device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109098336B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102839747A (en) * | 2012-09-24 | 2012-12-26 | 中国建筑第八工程局有限公司 | Construction method for steel structure truss of super high-rise special structure |
CN103061506A (en) * | 2012-12-28 | 2013-04-24 | 中国华冶科工集团有限公司 | Construction method of steel structure dome |
RU2546703C1 (en) * | 2013-12-23 | 2015-04-10 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Дальневосточный Федеральный Университет" (Двфу) | Dome |
CN105040882A (en) * | 2015-08-03 | 2015-11-11 | 南通苏驰建设工程有限公司 | Symmetric rotary opening and closing roof |
US20150354197A1 (en) * | 2013-02-25 | 2015-12-10 | Xiaoping Sun | Dome Structure |
CN105275122A (en) * | 2014-07-24 | 2016-01-27 | 冯玉廷 | Large-scale venue instant movable curtain top |
-
2018
- 2018-08-27 CN CN201810977919.4A patent/CN109098336B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102839747A (en) * | 2012-09-24 | 2012-12-26 | 中国建筑第八工程局有限公司 | Construction method for steel structure truss of super high-rise special structure |
CN103061506A (en) * | 2012-12-28 | 2013-04-24 | 中国华冶科工集团有限公司 | Construction method of steel structure dome |
US20150354197A1 (en) * | 2013-02-25 | 2015-12-10 | Xiaoping Sun | Dome Structure |
RU2546703C1 (en) * | 2013-12-23 | 2015-04-10 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Дальневосточный Федеральный Университет" (Двфу) | Dome |
CN105275122A (en) * | 2014-07-24 | 2016-01-27 | 冯玉廷 | Large-scale venue instant movable curtain top |
CN105040882A (en) * | 2015-08-03 | 2015-11-11 | 南通苏驰建设工程有限公司 | Symmetric rotary opening and closing roof |
Also Published As
Publication number | Publication date |
---|---|
CN109098336B (en) | 2020-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ragheb et al. | Green architecture: A concept of sustainability | |
CN104773023B (en) | The close net of barricade adhesion type steelframe now moulds GRC artificial hillocks and its construction method | |
CN201952898U (en) | Detachable and movable dwelling with single layer of flat roof | |
CN101851987B (en) | Roof garden device with standard combination system and construction method thereof | |
CN109098336A (en) | A kind of construction method of dome device | |
CN204774343U (en) | Barricade adheres to close net of formula steelframe and moulds GRC artificial hillock at present | |
CN2809102Y (en) | Car parking roof using climbing vine | |
CN202017292U (en) | Connecting structure for wooden element and concrete element of pseudo-classic building eave | |
McLean et al. | Environmental Design Sourcebook: Innovative Ideas for a Sustainable Built Environment | |
CN209114690U (en) | A kind of decoration plane system | |
CN107114153A (en) | Cold ground ecological health-care house and assemble method | |
CN2632183Y (en) | Normalized assembled house | |
CN203008246U (en) | Slope tile femerell structure | |
CN111962920A (en) | Construction method of indoor exploration cave body | |
CN204953222U (en) | Style fountain based on PLC control | |
CN205511327U (en) | Gardens afforesting and maintenance device | |
CN102691458B (en) | Large-scale archaistic metal combined moon gate and construction method thereof | |
CN219794794U (en) | Concrete petal rest pavilion | |
CN201605695U (en) | Unit assembled-type curved surface daylighting roof | |
CN219864279U (en) | Corridor frame structure | |
CN205563166U (en) | Scenic spot fountain intelligence control system | |
CN219909550U (en) | Greening building roof structure | |
CN217054660U (en) | Building construction foundation encloses fender | |
CN201400960Y (en) | Archaizing lu roof connecting body tile | |
CN214246337U (en) | Emulation ecological landscape roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |