CN109083018A - A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door - Google Patents

A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door Download PDF

Info

Publication number
CN109083018A
CN109083018A CN201811080553.7A CN201811080553A CN109083018A CN 109083018 A CN109083018 A CN 109083018A CN 201811080553 A CN201811080553 A CN 201811080553A CN 109083018 A CN109083018 A CN 109083018A
Authority
CN
China
Prior art keywords
leg
vertical
bridge
door
bent leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811080553.7A
Other languages
Chinese (zh)
Inventor
袁攀峰
徐继华
王洋
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI DEMATGC CRANES&COMPONENTS Co Ltd
Original Assignee
ANHUI DEMATGC CRANES&COMPONENTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI DEMATGC CRANES&COMPONENTS Co Ltd filed Critical ANHUI DEMATGC CRANES&COMPONENTS Co Ltd
Priority to CN201811080553.7A priority Critical patent/CN109083018A/en
Publication of CN109083018A publication Critical patent/CN109083018A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of lower guide fixed-point sling erecting bridge machines to be moved back with back door, is related to Bridge Erector technical field.The present invention includes sequentially connected vertical leg, lower bent leg, upper bent leg;Two vertical legs, lower bent leg, upper bent leg connect and compose " C " type door leg;The bottom of vertical leg is provided with oil cylinder, the top of oil cylinder and the horizontal ends of upper bent leg are hinged by being connected with operating mechanism in vertical leg;When Bridge Erector is appeared, the operating mechanism of door leg and the rail contact being laid with;When Bridge Erector via hole, an interconnected rod is connected between two vertical legs of door leg.The present invention connects and composes " C " type door leg by vertical leg, lower bent leg, upper bent leg, and door leg only undertakes the weight bearing of Bridge Erector self weight half;When beam car packs Bridge Erector to hole outlet end, the operating mechanism and rail contact of bridge formation gate leg, door leg and front outrigger for bridge girder erection machine jack simultaneously, and the operating mechanism of door leg pushes Bridge Erector to appear, and mode of operation is simple, discharges workload when hole is effectively reduced.

Description

A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door
Technical field
The invention belongs to Bridge Erector technical fields, more particularly to a kind of lower guide fixed-point sling erecting bridge machine back door It moves back.
Background technique
Currently, Construction of Railway Passenger-Dedicated Line has become the main trend of China railways development, using the route mileage of overpass The half or more of route overall length are typically constituted from, overpass is all made of whole hole box girder structure, and the self weight of box beam is generally on the left side 900t The right side has apparent advantage to guarantee quality and duration using prefabricated full span erection construction method.
Special line for passenger trains location is mostly holy hermits, with a varied topography, the connected section of bridge tunnel of many places occurs, but existing Lower guide fixed-point sling erecting bridge machine complete machine structure is complicated, crosses tunnel and needs to disintegrate, discharges heavy workload, complicated for operation, now mentions It is moved back for a kind of lower guide fixed-point sling erecting bridge machine back door, reduction discharges workload.
Summary of the invention
The purpose of the present invention is to provide a kind of lower guide fixed-point sling erecting bridge machines to be moved back with back door, by by vertical leg, Lower song leg, upper bent leg connect and compose " C " type door leg, and when Bridge Erector is into and out of hole, vertical leg is by appearing with pin hole and lower song leg phase Even;When Bridge Erector feeding beam, vertical leg is connected by bridge formation pin hole with lower bent leg, is solved when existing Bridge Erector crosses hole and is discharged Heavy workload, problem complicated for operation.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention is moved back for a kind of lower guide fixed-point sling erecting bridge machine with back door, including vertical leg, lower bent leg, upper bent leg; The lower end of the upper bent leg is connected with the upper end of lower bent leg, and the horizontal ends of the upper bent leg and the girder of Bridge Erector connect;It is described The horizontal ends of lower song leg are connect by fastening screw axis with vertical leg;The lower bent leg, upper bent leg connect to form " C " type knot Structure, two vertical legs, lower bent leg, upper bent leg connect and compose " C " type door leg;The bottom of the vertical leg is connected by flexural pivot There is an operating mechanism, an oil cylinder is provided in the vertical leg, the top of the oil cylinder and the horizontal ends of upper bent leg are hinged;It is described When Bridge Erector is appeared, the operating mechanism of " C " the type door leg and the rail contact being laid with;It is described when the Bridge Erector via hole An interconnected rod is connected between two vertical legs of " C " type door leg.
Further, it is connected between the upper bent leg and lower bent leg by steel structure bolt, and passes through steel construction hexagonal spiral shell Mother is fixed, and with the use of there is steel construction washer.
Further, the horizontal ends of the lower bent leg are connected with a guide sleeve, the vertical leg socket by steel structure bolt In guide sleeve, the guide sleeve side is equipped with a feather key for guiding, by horizontally disposed between the guide sleeve and vertical leg Two fastening screw axis connections.
Further, the horizontal ends of the upper bent leg are in square tube type, and upper and lower two surface is respectively fixed with a connecting plate; The upper bent leg is connect by single-revolution central axis with girder, and passes through the fixed girder of positioning pin and connecting plate.
Further, one end of the oil cylinder is connected by hinged shaft with the hinged block of upper bent leg lower surface, the oil cylinder The other end be connected by hinged shaft with the bottom of vertical leg, and be provided with an oil pipe on the bottom baffle of the vertical leg and go out Mouthful.
Further, one end of the interconnected rod is hinged on the guide sleeve of bent leg by two pin shafts;The interconnected rod The other end be hinged on by a pin shaft on the guide sleeve of another lower bent leg, and junction is provided with adjusting nut;The interconnection Bar is in an open state when setting a roof beam in place work, and is 100 degree with a wherein vertical leg angulation.
Further, the vertical leg side offers bridge formation pin hole, appears and use pin hole;The Bridge Erector is into and out of hole When, the vertical leg is connected with pin hole with lower bent leg by appearing;When the Bridge Erector feeding beam, the vertical leg is used by building bridge Pin hole is connected with lower bent leg.
The invention has the following advantages:
" C " type door leg of the invention only undertakes the weight bearing of Bridge Erector self weight half, can be pressed according to box beam shape design height Contracting 2.446m is designed original;When beam car packs Bridge Erector to hole outlet end, it is laid with track, the operation of Bridge Erector " C " type door leg Mechanism and rail contact, " C " type door leg and front outrigger for bridge girder erection machine jack simultaneously, are inserted into pin shaft, and the operating mechanism of " C " type door leg pushes away Dynamic Bridge Erector is appeared, and mode of operation is simple, discharges workload when hole is effectively reduced.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is the structural schematic diagram that the lower guide fixed-point sling erecting bridge machine of the present invention is moved back with back door;
Fig. 2 is the structural schematic diagram in Fig. 1 at A;
Fig. 3 is the structural schematic diagram in Fig. 1 at B;
Fig. 4 is the structural schematic diagram in Fig. 1 at C;
Fig. 5 is the schematic cross-sectional view in Fig. 1 along H-H line;
Fig. 6 is that the schematic diagram in unfolded state is moved back at back door of the invention;
Fig. 7 is that the schematic diagram in folded state is moved back at back door of the invention;
Fig. 8 is the schematic diagram that the state in Bridge Erector via hole is moved back at back door of the invention;
In attached drawing, parts list represented by the reference numerals are as follows:
1- vertical leg, bent leg under 2-, the upper song leg of 3-, 4- rotary middle spindle, 5- oil cylinder, 6- operating mechanism, 7- track, 8- are fixed Position pin, 9- fastening screw axis, 10- feather key, 11- girder, 12- interconnected rod.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " aperture ", "upper", "lower", " horizontal ends ", "top", " in ", " contact ", "inner", " side ", " opening ", " other end ", indicating positions or the positional relationship such as " one end ", merely to just In the description present invention and simplify description, rather than the component or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
It please refers to shown in Fig. 1-8, the present invention is that a kind of lower guide fixed-point sling erecting bridge machine is moved back with back door, including two groups are in Symmetrically arranged vertical leg 1, lower bent leg 2, upper bent leg 3;The lower end of upper song leg 3 is connected with the upper end of lower bent leg 2, upper song leg 3 The connection of the girder 11 of horizontal ends and Bridge Erector;The horizontal ends of lower song leg 2 are connect by fastening screw axis 9 with vertical leg 1;Lower song leg 2, the upper bent connection of leg 3 forms " C " type structure, and two vertical legs 1, lower bent leg 2, upper bent leg 3 connect and compose " C " type door leg;It hangs down The bottom of straight legs 1 is connected with an operating mechanism 6 by flexural pivot, and an oil cylinder 5, the top of oil cylinder 5 and upper song are provided in vertical leg 1 The horizontal ends of leg 3 are hinged;When Bridge Erector is appeared, the operating mechanism 6 of " C " type door leg is contacted with the track 7 being laid with;Bridge Erector mistake Kong Shi is connected with an interconnected rod 12 between two vertical legs 1 of " C " type door leg.
Wherein as shown in Figure 1, connecting between upper song leg 3 and lower bent leg 2 by steel structure bolt, and pass through steel construction hexagonal Nut is fixed, and with the use of there is steel construction washer.
Wherein as shown in Fig. 1,4, the horizontal ends of lower song leg 2 are connected with a guide sleeve by steel structure bolt, and vertical leg 1 is socketed In guide sleeve, guide sleeve side is equipped with a feather key for guiding, positions between guide sleeve and vertical leg 1 by horizontally disposed two Bolt axle 9 connects;Wherein, 1 side of vertical leg offers bridge formation pin hole, appears and use pin hole;When Bridge Erector is into and out of hole, vertically Leg 1 is connected with pin hole with lower bent leg 2 by appearing;When Bridge Erector feeding beam, vertical leg 1 passes through bridge formation pin hole and 2 phase of lower bent leg Even.
Wherein as shown in Fig. 1,3,5, the horizontal ends of upper song leg 3 are in square tube type, and upper and lower two surface is respectively fixed with a company Fishplate bar;Upper song leg 3 is connect by single-revolution central axis 4 with girder 11, and passes through the fixed girder 11 of positioning pin 8 and connecting plate.
Wherein as shown in Figure 1, 2, one end of oil cylinder 5 is connected by hinged shaft with the hinged block of 3 lower surface of upper bent leg, oil cylinder 5 other end is connected by hinged shaft with the bottom of vertical leg 1, and oil pipe outlet is provided on the bottom baffle of vertical leg 1.
Wherein as shown in figure 8, one end of interconnected rod 12 is hinged on the guide sleeve of bent leg 2 by two pin shafts;Interconnected rod 12 other end is hinged on the guide sleeve of another lower bent leg 2 by a pin shaft, and junction is provided with adjusting nut;Interconnected rod 12 are in an open state when setting a roof beam in place work, and are 100 degree with wherein 1 angulation of a vertical leg.
" C " type door leg of the invention only undertakes the weight bearing of Bridge Erector self weight half, can be pressed according to box beam shape design height Contracting 2.446m is designed original;When beam car packs Bridge Erector to hole outlet end, it is laid with track 7, the fortune of Bridge Erector " C " type door leg Row mechanism 6 is contacted with track 7, and " C " type door leg and front outrigger for bridge girder erection machine jack simultaneously, is inserted into pin shaft, the operation machine of " C " type door leg Structure 6 pushes Bridge Erector to appear, and mode of operation is simple, discharges workload when hole is effectively reduced.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (7)

1. a kind of lower guide fixed-point sling erecting bridge machine is moved back with back door, which is characterized in that including vertical leg (1), lower bent leg (2), Upper song leg (3);
The lower end of the upper bent leg (3) is connected with the upper end of lower bent leg (2), the horizontal ends of the upper song leg (3) and Bridge Erector Girder (11) connection;
The horizontal ends of the lower bent leg (2) are connect by fastening screw axis (9) with vertical leg (1);
The lower bent leg (2), upper bent leg (3) connect and form " C " type structure, two vertical legs (1), lower bent leg (2), upper song Leg (3) connects and composes " C " type door leg;
The bottom of the vertical leg (1) is connected with an operating mechanism (6) by flexural pivot, and an oil is provided in the vertical leg (1) Cylinder (5), the top of the oil cylinder (5) and the horizontal ends of upper bent leg (3) are hinged;
When the Bridge Erector is appeared, the operating mechanism (6) of " C " the type door leg is contacted with the track (7) being laid with;
When the Bridge Erector via hole, an interconnected rod (12) are connected between two vertical legs (1) of " C " the type door leg.
2. a kind of lower guide fixed-point sling erecting bridge machine according to claim 1 is moved back with back door, which is characterized in that on described It is connect, and is fixed by steel construction hex nut, and be used cooperatively by steel structure bolt between bent leg (3) and lower bent leg (2) There is steel construction washer.
3. a kind of lower guide fixed-point sling erecting bridge machine according to claim 1 is moved back with back door, which is characterized in that under described The horizontal ends of bent leg (2) are connected with a guide sleeve by steel structure bolt, and the vertical leg (1) is socketed in guide sleeve, the guide sleeve Side is equipped with a feather key for guiding, passes through horizontally disposed two fastening screws axis between the guide sleeve and vertical leg (1) (9) it connects.
4. a kind of lower guide fixed-point sling erecting bridge machine according to claim 1 is moved back with back door, which is characterized in that on described The horizontal ends of bent leg (3) are in square tube type, and upper and lower two surface is respectively fixed with a connecting plate;The upper bent leg (3) passes through one time Turn central axis (4) to connect with girder (11), and passes through positioning pin (8) fixed girder (11) and connecting plate.
5. a kind of lower guide fixed-point sling erecting bridge machine according to claim 1 is moved back with back door, which is characterized in that the oil One end of cylinder (5) is connected by hinged shaft with the hinged block of upper bent leg (3) lower surface, and the other end of the oil cylinder (5) passes through hinge Axis is connected with the bottom of vertical leg (1), and oil pipe outlet is provided on the bottom baffle of the vertical leg (1).
6. a kind of lower guide fixed-point sling erecting bridge machine according to claim 1 is moved back with back door, it is characterised in that:
One end of the interconnected rod (12) is hinged on the guide sleeve of bent leg (2) by two pin shafts;
The other end of the interconnected rod (12) is hinged on the guide sleeve of another lower bent leg (2) by a pin shaft, and is set in junction It is equipped with adjusting nut;
The interconnected rod (12) is in an open state when setting a roof beam in place work, and is 100 with a wherein vertical leg (1) angulation Degree.
7. a kind of lower guide fixed-point sling erecting bridge machine according to claim 1 is moved back with back door, it is characterised in that:
Vertical leg (1) side offers bridge formation pin hole, appears and use pin hole;
When the Bridge Erector is into and out of hole, the vertical leg (1) is connected with pin hole with lower song leg (2) by appearing;
When the Bridge Erector feeding beam, the vertical leg (1) is connected by bridge formation pin hole with lower bent leg (2).
CN201811080553.7A 2018-09-17 2018-09-17 A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door Pending CN109083018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811080553.7A CN109083018A (en) 2018-09-17 2018-09-17 A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811080553.7A CN109083018A (en) 2018-09-17 2018-09-17 A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door

Publications (1)

Publication Number Publication Date
CN109083018A true CN109083018A (en) 2018-12-25

Family

ID=64841733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811080553.7A Pending CN109083018A (en) 2018-09-17 2018-09-17 A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door

Country Status (1)

Country Link
CN (1) CN109083018A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956369A (en) * 2009-07-20 2011-01-26 苏州大方特种车股份有限公司 Guide beam type bridge erector
CN201972096U (en) * 2010-12-30 2011-09-14 徐州徐工铁路装备有限公司 Cross-tunnel lower guide beam type fixed-point hoisting bridge girder erection machine
CN103938547A (en) * 2014-04-16 2014-07-23 河北工业大学 Fixed-point lifting type bridge erection machine and bridge erection method
CN206368329U (en) * 2016-12-29 2017-08-01 秦皇岛优益重工科技有限公司 A kind of small curve precast beam Bridge Erector
CN207121824U (en) * 2017-07-11 2018-03-20 中铁工程机械研究设计院有限公司 It is a kind of can hard and soft conversion preceding auxiliary leg
JP2018053496A (en) * 2016-09-27 2018-04-05 三井住友建設株式会社 Bridge girder erection method for multiple span continuous bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956369A (en) * 2009-07-20 2011-01-26 苏州大方特种车股份有限公司 Guide beam type bridge erector
CN201972096U (en) * 2010-12-30 2011-09-14 徐州徐工铁路装备有限公司 Cross-tunnel lower guide beam type fixed-point hoisting bridge girder erection machine
CN103938547A (en) * 2014-04-16 2014-07-23 河北工业大学 Fixed-point lifting type bridge erection machine and bridge erection method
JP2018053496A (en) * 2016-09-27 2018-04-05 三井住友建設株式会社 Bridge girder erection method for multiple span continuous bridge
CN206368329U (en) * 2016-12-29 2017-08-01 秦皇岛优益重工科技有限公司 A kind of small curve precast beam Bridge Erector
CN207121824U (en) * 2017-07-11 2018-03-20 中铁工程机械研究设计院有限公司 It is a kind of can hard and soft conversion preceding auxiliary leg

Similar Documents

Publication Publication Date Title
CN201801963U (en) Penetration node structure of space intersection circular tube truss
CN106467121A (en) Cross-saddle single-track traffic joint type five clears the way trouble
CN109083018A (en) A kind of lower guide fixed-point sling erecting bridge machine is moved back with back door
CN102937402A (en) Detection process for hole group of parallelogram web member
CN109515461A (en) A kind of articulated car transfer bridge device
CN202116984U (en) Dragging-adjustable cross-brace device for continuous beams of spatial steel pipe trusses
BR112020024195B1 (en) CONCRETE AND STEEL BAR STRUCTURE SUITABLE FOR A HEAVY TRANSPORT RAILWAY
CN208072103U (en) A kind of simple oblique pull large span suspension type monorail system
CN205742539U (en) The girder steel of a kind of band dowel unit and the connection node of Multicarity steel plate shear force wall
CN201634994U (en) Bolting-welding combined member
CN207714111U (en) Bridge before a kind of trestle of integral telescopic formula
CN105463999B (en) A kind of Segmental assembling bridge-erecting machine and curve bridging method
CN105803932A (en) Modular bridge expansion device
CN106522531B (en) The support system of one discharge plate buckle type scaffold door opening position bracket
CN205296391U (en) A baffle link up node that is used for rectangle steel core concrete column and H girder steel to connect
CN206503348U (en) The support system of one discharge plate buckle type scaffold door opening position bracket
CN202416173U (en) Wide girder bridge floor system structure with horizontal K support
CN201280692Y (en) Load bearing turning device for transporting U-shaped beam of aerial conveyer
CN209024965U (en) A kind of adjustable anticollision wall form
CN207405484U (en) A kind of bridge inspection vehicle with telescopic arm
CN206873273U (en) The steel suspension bridge of vertical rotary
CN109024267B (en) Steel truss girder structure of curved bridge floor
CN206204784U (en) Steel anchor beam
CN206337868U (en) A kind of attachment means for mechanical parking equipment middle cross beam, longeron and lift shaft
CN103437290A (en) Folding lower guide beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225

RJ01 Rejection of invention patent application after publication