CN109081064B - Processing system and material transporting method - Google Patents

Processing system and material transporting method Download PDF

Info

Publication number
CN109081064B
CN109081064B CN201810931961.2A CN201810931961A CN109081064B CN 109081064 B CN109081064 B CN 109081064B CN 201810931961 A CN201810931961 A CN 201810931961A CN 109081064 B CN109081064 B CN 109081064B
Authority
CN
China
Prior art keywords
equipment
materials
carrying
devices
processed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810931961.2A
Other languages
Chinese (zh)
Other versions
CN109081064A (en
Inventor
杨应俊
刘子敏
李景均
王胜利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Silicon electric semiconductor equipment (Shenzhen) Co.,Ltd.
Siwang Technology (Shenzhen) Co., Ltd
Original Assignee
Siwang Technology Shenzhen Co Ltd
Silicon Electric Semiconductor Equipment Shenzhen Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siwang Technology Shenzhen Co Ltd, Silicon Electric Semiconductor Equipment Shenzhen Co ltd filed Critical Siwang Technology Shenzhen Co Ltd
Priority to CN201810931961.2A priority Critical patent/CN109081064B/en
Publication of CN109081064A publication Critical patent/CN109081064A/en
Application granted granted Critical
Publication of CN109081064B publication Critical patent/CN109081064B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Factory Administration (AREA)
  • Feeding Of Workpieces (AREA)

Abstract

The invention discloses a processing system and a material transporting method. A material conveying method comprises Z equipment, wherein Z is a positive integer larger than 2 and sequentially comprises equipment 1, equipment 2 …, equipment Z-1 and equipment Z; the material is transferred from the device 1 to the device 2, and from the … device Z-1 to the device Z; the equipment Z has the capacity of continuously carrying materials; a. when at least one device in the Z-1 devices except the device Z has the processed materials; carrying the processed materials away through the equipment Z according to the priority of the equipment Z-1 … and the equipment 1; b. when Z-1 devices except the device Z have no processed materials and at least one device is short of materials, the materials for supplementing the short-material devices are sequentially transmitted to the short-material devices from the device 1 and the device 2; the feeding and discharging equipment is not required to be additionally arranged, and the related multiple equipment can realize feeding and discharging; when one or more devices need to be adjusted, the use requirements can still be met after the adjustment; simple structure, the scheme is strong adaptability according to concrete implementer's operation requirement.

Description

Processing system and material transporting method
Technical Field
The invention relates to a processing system and a material transporting method.
Background
For some manufacturers (the manufacturing includes a process of changing design form such as machining, and also includes a process of detecting and the like without changing form), in order to meet the production requirements of small batches and multiple types, and simultaneously reduce the occupied area of equipment, the equipment capable of respectively completing specific procedures needs to be connected into a production line; in order to meet the feeding and discharging requirements of a production line, special feeding and discharging equipment needs to be added, and the cost is high; meanwhile, small-batch and multi-type production means that the production line can be adjusted at any time, and the specific loading and unloading equipment can limit the adjustment of the equipment on the production line.
Disclosure of Invention
In order to solve the problems, the invention provides a processing system and a material conveying method.
The technical scheme of the invention is as follows: a material conveying method comprises Z equipment, wherein Z is a positive integer larger than 2 and sequentially comprises equipment 1, equipment 2 …, equipment Z-1 and equipment Z; the material is transferred from the device 1 to the device 2, and from the … device Z-1 to the device Z; the equipment Z has the capacity of continuously carrying materials;
a. when at least one device in the Z-1 devices except the device Z has the processed materials; carrying the processed materials away through the equipment Z according to the priority of the equipment Z-1 … and the equipment 1;
b. when Z-1 equipment except the equipment Z does not have processed materials and at least one equipment is short of materials, the materials for supplementing the short-of-materials equipment are sequentially transmitted to the short-of-materials equipment from the equipment 1 and the equipment 2.
Furthermore, any two adjacent devices in the Z-1 devices except the device Z are a device M and a device N, the device M transfers materials to the device N, the device M comprises a first material preparing part, a first carrying part, a first material transferring part and a first working part, and the device N comprises a second material preparing part, a second carrying part, a second material transferring part and a second working part;
the equipment M processes the material a, the material a is placed in the first material preparation part, the first carrying part carries the material a from the first material preparation part to the first working part, and after the first processing part finishes processing, the first carrying part carries the material a from the first working part to the first material conveying part;
the equipment N processes the material b, the material b is placed in the second material preparation part, the second carrying part carries the material b to the second working part from the second material preparation part, and the second carrying part carries the material b processed by the second processing part to the second material conveying part.
Further, when the material on the first material conveying part is the material b meeting the material shortage requirement of the equipment N, the second carrying part carries the material b to the second material preparing part.
Further, when the second material conveying part is in a material-free state, the first material conveying part is provided with a material c, the material c cannot be used for meeting the material shortage requirement of the equipment N, and the second conveying part conveys the material c to the second material conveying part.
Further, the material c is: the material processed by the equipment 1 and the equipment 2 …, and the material meeting the material shortage requirement of the equipment N +1 … and the equipment Z-1.
Further, the device Z is a material box capable of placing the materials processed by the device 1 and the device 2 … and the device Z-1.
Furthermore, at least two materials are processed by the Z-1 equipment except the equipment Z.
A processing system comprises a plurality of devices, namely a device 1, a device 2 …, a device Z-1 and a device Z, wherein the device Z has the capability of continuously carrying materials, and Z is a positive integer greater than 2; equipment 1 and equipment 2 … equipment Z-1 can process the set process respectively, equipment 1 transmits material to equipment 2, equipment 2 transmits material to equipment 3 … equipment Z-1 transmits material to equipment Z.
Further, after one or more of apparatus 1, apparatus 2 …, apparatus Z-1 is out of stock, material is transferred from apparatus 1 to the particular out-of-stock apparatus.
The invention has the beneficial effects that: the feeding and discharging equipment is not required to be additionally arranged, and the related multiple equipment can realize feeding and discharging; when one or more devices need to be adjusted, the use requirements can still be met after the adjustment; simple structure, the scheme is strong adaptability according to concrete implementer's operation requirement.
Detailed Description
In order to facilitate the understanding of the technical solutions of the present invention by those skilled in the art, the technical solutions of the present invention will be described in further detail with reference to specific examples.
A material conveying method comprises Z equipment, wherein Z is a positive integer larger than 2 and sequentially comprises equipment 1, equipment 2 …, equipment Z-1 and equipment Z; the material is transmitted to the equipment 2 by the equipment 1, and is transmitted to the equipment Z by the equipment Z-1 by the …, the sequence is not used for limiting the spatial position relation of the Z equipment, and is only used for explaining the material transmission, namely the material is transmitted to the equipment 2 by the equipment 1, and the material is transmitted to the equipment Z by the equipment 3 by the equipment 2, namely …; the equipment Z has the capability of continuously carrying materials, and the materials needing to be conveyed on the equipment Z-1 can be timely conveyed away; the material conveying fault of the Z platform equipment caused by the fact that the equipment Z-1 cannot convey materials timely to affect the material conveying of the equipment Z-2 is prevented;
a. when at least one device in the Z-1 devices except the device Z has the processed materials; carrying the processed materials away through the equipment Z according to the priority of the equipment Z-1 … and the equipment 1; therefore, the Z-1 equipment except the equipment Z can be ensured to normally process the next material, and the equipment stop working caused by the fact that the material cannot be timely conveyed away is reduced, so that the processing efficiency of the equipment is improved;
b. when Z-1 devices except the device Z have no processed materials and at least one device is short of materials, the materials for supplementing the short-material devices are sequentially transmitted to the short-material devices from the device 1 and the device 2; when a certain equipment lacks the material, just transmit the material that lacks the material equipment needs from equipment 1 to lacking the material equipment to prevent to have the transmission that influences other materials because of the material does not have equipment needs, promote the material transmission efficiency of Z platform equipment.
Any two adjacent devices in Z-1 devices except the device Z are a device M and a device N, the device M transfers materials to the device N, the device M comprises a first material preparing part, a first carrying part, a first material transferring part and a first working part, and the device N comprises a second material preparing part, a second carrying part, a second material transferring part and a second working part;
the equipment M processes the material a, the material a is placed in the first material preparation part, the first carrying part carries the material a from the first material preparation part to the first working part, and after the first processing part finishes processing, the first carrying part carries the material a from the first working part to the first material conveying part; when the first material preparation part of the equipment M is in a material-free state, the equipment M is short of materials, supplemented materials a are placed in the first material preparation part, and after the first conveying part conveys the processed materials a on the first processing part to the first material conveying part, the first conveying part can immediately convey the materials a of the first material preparation part to the first working part, so that the downtime of the first working part is reduced, and the working efficiency of the equipment M is improved; material a is used herein to mean only one of the lots of material processed by equipment M; the explanation of the material a must be combined with the machine M, the material a placed on the first stock preparation section being used only for feeding the first working section.
The equipment N is used for processing a material b, the material b is placed in the second material preparation part, the second carrying part is used for carrying the material b to the second working part from the second material preparation part, and the second carrying part is used for carrying the material b processed by the second processing part to the second material conveying part; material b is added to satisfy a feature that illustrates that apparatus N is capable of performing a process and is not intended to be limited to be interpreted relative to other materials, e.g., material b cannot be said to be different from material a; the explanation of material b must be combined with the apparatus N, material b placed on the second stock preparation being used only for feeding the second table.
When the material on the first material conveying part is the material b meeting the material shortage requirement of the equipment N, the second carrying part carries the material b to the second material preparing part. After the second stock preparation part of the apparatus N is out of stock, the material b conveyed from the apparatus 1 to meet the requirement of the second stock preparation part is finally conveyed specifically to the second stock preparation part.
When the second material conveying part is in a material-free state, the first material conveying part is provided with a material c, the material c cannot be used for meeting the material shortage requirement of the equipment N, and the second conveying part conveys the material c to the second material conveying part.
The material c is: the material processed by the equipment 1 and the equipment 2 …, and the material meeting the material shortage requirement of the equipment N +1 … and the equipment Z-1; if the material c belongs to a material meeting the material shortage requirement of a certain device from the device N to the device Z-1, when the material c reaches the first material conveying part, the device N is in a material shortage state, and the material c can meet the material shortage requirement of the device N, the material c can not be transmitted to the second material preparation part but is transmitted to the second material conveying part even if the material c can meet the material shortage requirement of the device N; starving of the plant N requires the introduction of a specific material from the plant 1.
The device Z is a material box capable of placing materials processed by the device 1 and the device 2 … and the device Z-1; all the processed materials reaching the equipment Z-1 can be timely transported away, and the transmission of other materials is influenced due to the blockage of the materials on the equipment Z-1.
At least two materials are processed by Z-1 equipment except the equipment Z; namely, the Z-1 equipment except the equipment Z does not limit the same materials before treatment and the same materials after treatment; because the materials before treatment are provided for specific equipment, and all the treated materials are uniformly transported to equipment Z; the processing requirements of various materials are met.
A processing system comprises a plurality of devices, namely a device 1, a device 2 …, a device Z-1 and a device Z, wherein the device Z has the capability of continuously carrying materials; the equipment 1 and the equipment 2 …, the equipment Z-1 can respectively process set procedures, wherein the equipment 1 transmits materials to the equipment 2, the equipment 2 transmits materials to the equipment 3 …, and the equipment Z-1 transmits materials to the equipment Z, and Z is a positive integer greater than 2; multiple devices sequentially transfer materials, so that an independent material conveying mechanism is not required to be additionally arranged, the structure is simple, and the cost is low.
After one or more of the equipment 1 and the equipment 2 … Z-1 is short of material, the material is conveyed from the equipment 1 to the specific short of material equipment; the normal material conveying of the processing system is prevented from being influenced due to the fact that the materials cannot be transmitted in time.
The above is the preferred embodiment of the present invention, and the technical solution of the present invention is not limited thereto. It should be recognized that non-inventive variations or modifications that may occur to those skilled in the art upon a reading of the present specification are also within the scope of the present invention.

Claims (7)

1. A material conveying method comprises Z equipment, wherein Z is a positive integer larger than 2 and sequentially comprises equipment 1, equipment 2 …, equipment Z-1 and equipment Z; the material is transferred from the device 1 to the device 2, and from the … device Z-1 to the device Z; the equipment Z has the capacity of continuously carrying materials; the method is characterized in that:
a. when at least one device in the Z-1 devices except the device Z has the processed material; carrying the processed materials away through the equipment Z according to the priority of the equipment Z-1 … and the equipment 1;
b. when Z-1 devices except the device Z have no processed materials and at least one device is short of materials, the materials for supplementing the short-material devices are sequentially transmitted to the short-material devices from the device 1 and the device 2;
any two adjacent devices in Z-1 devices except the device Z are a device M and a device N, the device M transmits materials to the device N, the device M comprises a first material transmitting part, and the device N comprises a second carrying part and a second material transmitting part; when the second material conveying part is in a material-free state, the first material conveying part is provided with a material c, the material c cannot be used for meeting the material shortage requirement of the equipment N, and the second conveying part conveys the material c to the second material conveying part.
2. The method of claim 1, wherein:
the equipment M further comprises a first material preparing part, a first carrying part and a first working part, and the equipment N further comprises a second material preparing part and a second working part;
the equipment M processes the material a, the material a is placed in the first material preparation part, the first carrying part carries the material a from the first material preparation part to the first working part, and after the first processing part finishes processing, the first carrying part carries the material a from the first working part to the first material conveying part;
the equipment N processes the material b, the material b is placed in the second material preparation part, the second carrying part carries the material b to the second working part from the second material preparation part, and the second carrying part carries the material b processed by the second processing part to the second material conveying part.
3. The method of claim 2, wherein:
when the material on the first material conveying part is the material b meeting the material shortage requirement of the equipment N, the second carrying part carries the material b to the second material preparing part.
4. The method of claim 2, wherein:
the material c is: the material processed by the equipment 1 and the equipment 2 …, and the material meeting the material shortage requirement of the equipment N +1 … and the equipment Z-1.
5. The method of claim 1, wherein:
the device Z is a material box capable of placing materials processed by the device 1 and the device 2 … and the device Z-1.
6. The method of claim 1, wherein:
the Z-1 equipment except the equipment Z can process at least two materials.
7. A processing system comprises a plurality of devices, namely a device 1, a device 2 …, a device Z-1 and a device Z, wherein the device Z has the capability of continuously carrying materials, and Z is a positive integer greater than 2; the apparatus 1 and the apparatus 2 …, the apparatus Z-1, respectively, are capable of processing a set process, and are characterized in that: the device 1 transmits materials to the device 2, the device 2 transmits materials to the device 3 …, and the device Z-1 transmits materials to the device Z; after one or more of the equipment 1 and the equipment 2 … Z-1 is short of material, the material is conveyed from the equipment 1 to the specific short of material equipment; any two adjacent devices in Z-1 devices except the device Z are a device M and a device N, the device M transmits materials to the device N, the device M comprises a first material transmitting part, and the device N comprises a second carrying part and a second material transmitting part; when the second material conveying part is in a material-free state, the first material conveying part is provided with a material c, the material c cannot be used for meeting the material shortage requirement of the equipment N, and the second conveying part conveys the material c to the second material conveying part.
CN201810931961.2A 2018-08-16 2018-08-16 Processing system and material transporting method Active CN109081064B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810931961.2A CN109081064B (en) 2018-08-16 2018-08-16 Processing system and material transporting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810931961.2A CN109081064B (en) 2018-08-16 2018-08-16 Processing system and material transporting method

Publications (2)

Publication Number Publication Date
CN109081064A CN109081064A (en) 2018-12-25
CN109081064B true CN109081064B (en) 2020-11-20

Family

ID=64793687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810931961.2A Active CN109081064B (en) 2018-08-16 2018-08-16 Processing system and material transporting method

Country Status (1)

Country Link
CN (1) CN109081064B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201317076A (en) * 2011-10-25 2013-05-01 Sheng-Ho Tseng Auxiliary working device for automatic manufacture system
CN106986152A (en) * 2017-03-31 2017-07-28 南通米高电子科技有限公司 A kind of timing feeding system and its method of work
CN108382874A (en) * 2018-05-07 2018-08-10 广州市致顺科技有限公司 A kind of tandem drawing-in device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201317076A (en) * 2011-10-25 2013-05-01 Sheng-Ho Tseng Auxiliary working device for automatic manufacture system
CN106986152A (en) * 2017-03-31 2017-07-28 南通米高电子科技有限公司 A kind of timing feeding system and its method of work
CN108382874A (en) * 2018-05-07 2018-08-10 广州市致顺科技有限公司 A kind of tandem drawing-in device

Also Published As

Publication number Publication date
CN109081064A (en) 2018-12-25

Similar Documents

Publication Publication Date Title
CN207971567U (en) Surface treating machine with assembly line, with removing function, automatic loading/unloading
US5443346A (en) Wafer conveying system in a clean room
CN107186903A (en) A kind of automatic production line of plate class product digital control processing
CN106355333A (en) Reconstructible production system and method
CN100501962C (en) Apparatus and method for wafer box transportation within a semiconductor fabrication facility
CN108636812A (en) A kind of box logistics level sorting system and method for sorting
TWI488793B (en) Transport systems and transport systems
CN109081064B (en) Processing system and material transporting method
CN109081069B (en) Material conveying method
CN105307469B (en) Component mounting line and element fixing apparatus and component mounting method
CN215969501U (en) Silicon wafer degumming system and production system
EP3805890B1 (en) Conveyance system
CN110039309A (en) Assembly system suitable for collector
US20030226251A1 (en) Fitting system and method of fitting substrates with components
US20230086461A1 (en) Method for controlling boat/strip type solder ball placement system
CN114518724A (en) Communication device and communication mode suitable for AMHS
CN108962804B (en) Uninterrupted film feeding and returning device and control method
JP2005093690A5 (en)
EP2955987B1 (en) Substrate conveying system of electronic component mounting device
CN109388028B (en) Off-line photoetching method and system
JP2009071120A (en) Transfer method and transfer system
CN212230403U (en) Multi-station loading and unloading system
CN208868963U (en) Gaily decorated basket automatic loading and unloading device
KR100576814B1 (en) A system for carring wafer carriers
CN219168973U (en) Intelligent 100-port sorting platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 518172 Longgang District, Shenzhen City, Guangdong Province

Applicant after: Silicon electric semiconductor equipment (Shenzhen) Co., Ltd

Address before: 518172 Longgang District, Shenzhen City, Guangdong Province

Applicant before: SHENZHEN SIDEA SEMICONDUCTOR EQUIPMENT Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201026

Address after: East District, 3rd floor, East District, 5th floor, Longcheng Industrial Park, huanggekeng community, Longcheng street, Longgang District, Shenzhen City, Guangdong Province

Applicant after: Silicon electric semiconductor equipment (Shenzhen) Co.,Ltd.

Applicant after: Siwang Technology (Shenzhen) Co., Ltd

Address before: 518172 Longgang District, Shenzhen City, Guangdong Province

Applicant before: Silicon electric semiconductor equipment (Shenzhen) Co.,Ltd.

GR01 Patent grant
GR01 Patent grant