CN109078900A - A kind of cementing truck pipeline-cleaning process - Google Patents

A kind of cementing truck pipeline-cleaning process Download PDF

Info

Publication number
CN109078900A
CN109078900A CN201811050606.0A CN201811050606A CN109078900A CN 109078900 A CN109078900 A CN 109078900A CN 201811050606 A CN201811050606 A CN 201811050606A CN 109078900 A CN109078900 A CN 109078900A
Authority
CN
China
Prior art keywords
densitometer
cleaning
circulating pump
mixing tank
mixer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811050606.0A
Other languages
Chinese (zh)
Other versions
CN109078900B (en
Inventor
吕文伟
唐少波
李哲
苏文诚
黄富春
蒋海蓉
张也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Original Assignee
Sinopec Oilfield Equipment Corp
Sinopec Siji Petroleum Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Equipment Corp, Sinopec Siji Petroleum Machinery Co Ltd filed Critical Sinopec Oilfield Equipment Corp
Priority to CN201811050606.0A priority Critical patent/CN109078900B/en
Publication of CN109078900A publication Critical patent/CN109078900A/en
Application granted granted Critical
Publication of CN109078900B publication Critical patent/CN109078900B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/08Cleaning containers, e.g. tanks
    • B08B9/093Cleaning containers, e.g. tanks by the force of jets or sprays

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

It is related to a kind of cementing truck pipeline-cleaning process of petroleum drilling and mining workover rig, comprising: previous cleaning stage, one cycle wash phase, secondary cycle wash phase, three times wash cycles stage, blowdown.The present invention is realized pipeline segmentation cleaning using the high pressure water that centrifugal pump pumps out and is rinsed to huge discharges such as densitometer, mixers by switching pipe valve, solves the problems such as cleaning water consumption is big, and cleaning efficiency is low, and densitometer cleaning is not thorough.

Description

A kind of cementing truck pipeline-cleaning process
Technical field
The present invention relates to petroleum drilling and mining workover rig fields, are related specifically to cementing truck pipeline-cleaning process.
Background technique
Casing and cementing is the project of vital and lasting importance in oil field, and it is oil field that the quality of cementing quality, which is related to the exploitation and construction in oil field, The foundation engineering of long term stable production.By visiting investigation to major oil field equipment user, comprehensive current Domestic Environment protection is required With clean-in-place regimen condition, existing cleaning process is analyzed, summarizing existing procedure, that there are problems is as follows:
(1) equipment cleaning process is indefinite, and there is some difference for each well cementation team's cleaning process, redundancy, inefficient stream in cleaning process Journey is generally existing.
(2) the densitometer cleaning process for lacking high efficient and reliable, cement agglomeration, residue retention etc. in densitometer after cleaning There is presence when problem, influences densitometer service life and performance.
(3) increasingly harsh due to Law on Environmental Protection Laws & Regulations, scene is fewer and fewer for cementing equipment cleaning water consumption, Equipment cleaning difficulty increases.
Summary of the invention
It is an object of the invention to: a kind of cleaning process of cementing truck pipeline is provided, using pipeline segmentation cleaning, densitometer The methods of huge discharge flushing, solution cleaning water consumption is big, cleaning efficiency is low, densitometer and mixer clean the problems such as being not thorough.
To achieve the above object, the technical solution of the present invention is as follows:
A kind of cementing truck pipeline-cleaning process, characterized by the following steps: the previous cleaning stage, one cycle wash phase, Secondary cycle wash phase, three times wash cycles stage, blowdown;
The previous cleaning stage: first wash is carried out using clear water to densitometer, mixer, flowmeter, jet pump and circulating pump etc..Pass through The high flow rate clear water with pressure that centrifugal pump generates will all bring slurry mixing tank into pipeline and key components and parts for the cement slurry of agglomeration In;
One cycle wash phase: emphasis tentatively cleans densitometer, mixer.It is opened by suitably switching pipe valve It closes, and opens circulating pump, so that the previous cleaning stage is poured into the water in slurry mixing tank and iterative cycles flushing is carried out to densitometer and mixer.When Ejected wash water color keep is stablized, and waste liquid is discharged without valve, opening plunger pump is suitably switched when increased significantly for impurities in water;
Secondary cycle wash phase: closed cycle pipeline is formed using slurry mixing tank-circulating pump-densitometer, to densitometer, slurry mixing tank It is cleaned again.Firstly, opening circulating pump by suitably switching pipe valve switch and clear water in measuring tank being pressurized by close Degree meter and mixer are pumped in slurry mixing tank, when there being certain water in slurry mixing tank, by suitably switching pipe valve switch, Circulating pump is opened, water wash cycles densitometer and the mixer in slurry mixing tank are made, the purpose in this stage is to guarantee without larger dirt Grain remains in densitometer and mixer;
Wash cycles stage three times: huge discharge cleaning is carried out to densitometer, mixer using original clear water emphasis, it is ensured that It is remained inside it without cement slurry.Firstly, opening circulating pump by suitably switching pipe valve switch, making the clear water in measuring tank Wash cycles densitometer, the purpose in this stage are to guarantee to remain in densitometer without the sewage after any cleaning;Secondly, passing through Pipe valve switch is suitably switched, circulating pump is opened, makes the clear water in measuring tank, mixer is carried out most by circulating pump pressurization Primary cleaning, waste water are discharged into slurry mixing tank afterwards;The purpose in this stage is to guarantee to remain on mixing without the sewage after any cleaning In device;
Blowdown: equipment pipe valve is all closed, and is injected sewage in plunger pump by circulating pump, charge pump, finally by column Plug pump pumps out sewage, completes final cleaning step.
Beneficial effects of the present invention: manifold cleaning process solves ineffective, cleaning in current cleaning process and needs water Larger problem is measured, has formulated multistage cleaning program for the component of the easily residual cement slurry such as densitometer, mixer, it is ensured that Densitometer, mixer cleaning effect.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Specific embodiment
Principles and features of the present invention are illustrated with reference to the accompanying drawing, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
The previous cleaning stage
It is as shown in Fig. 1: densitometer 5, mixer 6, flowmeter 4, jet pump 9 and circulating pump 10 etc. will to be used in this stage clear Water carries out first wash.8 bottom water supply valve of measuring tank is opened, and not used clear water passes through jet pump 9 and circulation in measuring tank 8 10 pressurization of pump, meter pipeline is sealed by 7 pipeline of measuring tank 8- circulating pump 10- densitometer 5- slurry mixing tank;Measuring tank 8- circulating pump 7 pipelines of 10- jet pump 9- mixer 6- slurry mixing tank, that is, mixer pipeline;Measuring tank 8- circulating pump 10- flowmeter 4- slurry mixing tank 7 is managed Road, that is, flowmeter pipeline, is discharged into slurry mixing tank 7, and the valve of 7 bottom of slurry mixing tank is all closed at this time, passes through circulating pump 10 and injection The high flow rate clear water with pressure that pump 9 generates, all brings the cement slurry not agglomerated in pipeline and key components and parts into slurry mixing tank 7 In, complete previous cleaning operation.
One cycle wash phase
This stage is tentatively cleaned emphasis to densitometer 5, mixer 6, the specific steps are as follows:
Other valves of pipeline are closed, 7 pipeline of slurry mixing tank 7- circulating pump 10- densitometer 5- slurry mixing tank and slurry mixing tank 7- mixing are opened All valves of 7 pipeline of device 6- slurry mixing tank open circulating pump 10 using the previous cleaning stage and pour into the water in slurry mixing tank 7 to densitometer 5 Iterative cycles flushing is carried out with mixer 6;
The ejected wash water situation in slurry mixing tank 7 is observed, water color keep to be cleaned is stablized, and when impurities in water is without increased significantly, closes 7 pipeline of 7 pipeline of circulating pump 10- densitometer 5- slurry mixing tank and circulating pump 10- mixer 6- slurry mixing tank opens slurry mixing tank 7- circulating pump 14 pipeline of 10- plunger pump conduit and slurry mixing tank 7- charge pump 11- plunger pump, waste liquid is discharged, and the one cycle stage terminates,
Secondary cycle wash phase
So that slurry mixing tank-circulating pump-densitometer is formed closed cycle pipeline in this stage, densitometer, slurry mixing tank is carried out clear again It washes, the specific steps are as follows:
Measuring tank 7- circulating pump 10- densitometer 5- slurry mixing tank pipeline and measuring tank 8- circulating pump 10- mixer 6- slurry mixing tank 7 are managed Road valve is opened, remaining pipeline and valve are all closed, and is filled with original clear water in measuring tank 8 at this time;Open circulating pump 10 are pumped to clear water pressurization in measuring tank 7 in slurry mixing tank 7 by densitometer, rinse densitometer 5 and mixing using clear water at this time Device 6,
When having certain water in slurry mixing tank 7,10 pipe valve of measuring tank 8- circulating pump is closed, and opens slurry mixing tank 7- circulation Pump conduit valve opens circulating pump 10 for clear water pressurization in slurry mixing tank 7 and is pumped to slurry mixing tank 7 by densitometer 5 and mixer 6 In, circulation flushing densitometer 5,
Ejected wash water situation in slurry mixing tank 7 is observed, water color keep to be cleaned is stablized, and when impurities in water is without increased significantly, closes close Degree meter 7 pipe valve of 5- slurry mixing tank, 8 pipe valve of measuring tank 8- circulating pump 10- densitometer 5- measuring tank is opened, metering is used Clear water in tank 8 carries out 5 process of clear water wash cycles densitometer by circulating pump 10;The purpose in this stage is to guarantee that nothing is appointed Sewage after what is cleaned remains in densitometer 5,
The wash cycles stage three times
Huge discharge cleaning will be carried out to densitometer 5, mixer 6 using original clear water emphasis in this stage, it is ensured that in it Portion is remained without cement slurry, the specific steps are as follows:
8 pipe valve of densitometer 5- measuring tank is closed, 7 pipe valve of measuring tank 8- circulating pump 10- mixer 6- slurry mixing tank is beaten It opens, using the clear water in measuring tank 8, last time cleaning is carried out to mixer 6 by the pressurization of circulating pump 10, waste water is discharged into slurry In tank;The purpose in this stage is to guarantee to remain in mixer without the sewage after any cleaning.
Slurry mixing tank 7- circulating pump 10- plunger pump 12,12 pipe valve of slurry mixing tank 7- charge pump 11- plunger pump are opened, will be set Remaining standby pipe valve is all closed, and is injected sewage in plunger pump 12 by circulating pump 10, charge pump 11, finally by plunger pump Sewage is pumped out, final cleaning step is completed.

Claims (1)

1. a kind of cementing truck pipeline-cleaning process, characterized by the following steps: previous cleaning stage, one cycle clean rank Section, secondary cycle wash phase, three times wash cycles stage, blowdown;
The previous cleaning stage: first wash is carried out using clear water to densitometer, mixer, flowmeter, jet pump and circulating pump etc.;
The high flow rate clear water with pressure generated by centrifugal pump will all be brought into pipeline and key components and parts for the cement slurry of agglomeration In slurry mixing tank;
One cycle wash phase: emphasis tentatively cleans densitometer, mixer;It is opened by suitably switching pipe valve It closes, and opens circulating pump, so that the previous cleaning stage is poured into the water in slurry mixing tank and iterative cycles flushing is carried out to densitometer and mixer;
When ejected wash water color keep is stablized, impurities in water arranges waste liquid without valve, opening plunger pump is suitably switched when increased significantly Out;
Secondary cycle wash phase: closed cycle pipeline is formed using slurry mixing tank-circulating pump-densitometer, to densitometer, slurry mixing tank It is cleaned again;Firstly, opening circulating pump by suitably switching pipe valve switch and clear water in measuring tank being pressurized by close Degree meter and mixer are pumped in slurry mixing tank, when there being certain water in slurry mixing tank, by suitably switching pipe valve switch, Circulating pump is opened, water wash cycles densitometer and the mixer in slurry mixing tank are made, the purpose in this stage is to guarantee without larger dirt Grain remains in densitometer and mixer;
Wash cycles stage three times: huge discharge cleaning is carried out to densitometer, mixer using original clear water emphasis, it is ensured that It is remained inside it without cement slurry;Firstly, opening circulating pump by suitably switching pipe valve switch, making the clear water in measuring tank Wash cycles densitometer, the purpose in this stage are to guarantee to remain in densitometer without the sewage after any cleaning;Secondly, passing through Pipe valve switch is suitably switched, circulating pump is opened, makes the clear water in measuring tank, mixer is carried out most by circulating pump pressurization Primary cleaning, waste water are discharged into slurry mixing tank afterwards;The purpose in this stage is to guarantee to remain on mixing without the sewage after any cleaning In device;
Blowdown: equipment pipe valve is all closed, and is injected sewage in plunger pump by circulating pump, charge pump, finally by column Plug pump pumps out sewage, completes final cleaning step.
CN201811050606.0A 2018-09-10 2018-09-10 Well cementation car pipeline cleaning process Active CN109078900B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811050606.0A CN109078900B (en) 2018-09-10 2018-09-10 Well cementation car pipeline cleaning process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811050606.0A CN109078900B (en) 2018-09-10 2018-09-10 Well cementation car pipeline cleaning process

Publications (2)

Publication Number Publication Date
CN109078900A true CN109078900A (en) 2018-12-25
CN109078900B CN109078900B (en) 2020-07-14

Family

ID=64840997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811050606.0A Active CN109078900B (en) 2018-09-10 2018-09-10 Well cementation car pipeline cleaning process

Country Status (1)

Country Link
CN (1) CN109078900B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110142248A (en) * 2019-06-10 2019-08-20 长江大学 A kind of cementing truck densitometer cleaning device
CN112677316A (en) * 2020-11-16 2021-04-20 中油国家油气钻井装备工程技术研究中心有限公司 Well cementation slurry blending device, blending method and cleaning method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6491421B2 (en) * 2000-11-29 2002-12-10 Schlumberger Technology Corporation Fluid mixing system
CA2567913A1 (en) * 2005-12-02 2007-06-02 Schlumberger Canada Limited Blending system for solid/fluids mixtures
CN201507271U (en) * 2009-10-21 2010-06-16 烟台杰瑞石油装备技术有限公司 Automatic control continuous batch slurry mixing pry
CN202012328U (en) * 2011-04-13 2011-10-19 中国石油集团渤海石油装备制造有限公司 High efficient cement slurry mixing device
CN205991333U (en) * 2016-08-31 2017-03-01 四川宝石机械专用车有限公司 A kind of bidirectional multifunctional mixture manifold system being applied to cementing unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6491421B2 (en) * 2000-11-29 2002-12-10 Schlumberger Technology Corporation Fluid mixing system
CA2567913A1 (en) * 2005-12-02 2007-06-02 Schlumberger Canada Limited Blending system for solid/fluids mixtures
CN201507271U (en) * 2009-10-21 2010-06-16 烟台杰瑞石油装备技术有限公司 Automatic control continuous batch slurry mixing pry
CN202012328U (en) * 2011-04-13 2011-10-19 中国石油集团渤海石油装备制造有限公司 High efficient cement slurry mixing device
CN205991333U (en) * 2016-08-31 2017-03-01 四川宝石机械专用车有限公司 A kind of bidirectional multifunctional mixture manifold system being applied to cementing unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110142248A (en) * 2019-06-10 2019-08-20 长江大学 A kind of cementing truck densitometer cleaning device
CN110142248B (en) * 2019-06-10 2023-10-20 长江大学 Cement car densimeter online cleaning device
CN112677316A (en) * 2020-11-16 2021-04-20 中油国家油气钻井装备工程技术研究中心有限公司 Well cementation slurry blending device, blending method and cleaning method thereof

Also Published As

Publication number Publication date
CN109078900B (en) 2020-07-14

Similar Documents

Publication Publication Date Title
CN206655264U (en) A kind of hydraulic engineering desilting dredging vehicle
CN109078900A (en) A kind of cementing truck pipeline-cleaning process
CN101280671A (en) Concentric tube jet flow negative pressure sand washing apparatus and using method thereoof
CN205653622U (en) Can put in water installations of detergent
CN201093930Y (en) Earth heat cleaning machine
CN107940030B (en) Fluid path assists flushing valve device
CN215949443U (en) Sand removing system
CN204974629U (en) Metallurgical stove stove outer covering cooling water circulation water pipe washing unit
CN108723020A (en) High-pressure aerated turbulent flow fluid pressure line oil flushing equipment and its application method
CN204401735U (en) Impulse electromagnetic valve jettison gear
CN208373754U (en) A kind of pulsed indoor heating system cleaning device
CN205225231U (en) Mulling device, fracturing blender truck and fracturing unit
CN211083634U (en) Dewaterer sludge conveying pipeline with reuse water backwashing device
CN204591209U (en) Many seam volume fracturing diverting agent adding sets in a kind of Oil/gas Well multistage section
CN209577533U (en) One kind being used for clinac deflection coil cleaning device
CN208381268U (en) Automatic gearbox of vehicles oil cleans equivalent more exchange device
CN103212548B (en) A kind of rinse-system for clearing up local sedimentation in the nuclear power plant and method
CN207412918U (en) A kind of intelligent filtering device
CN206588292U (en) A kind of puddle mixer of easy to clean
CN204952702U (en) Foam mixer of self -service car washer
CN103877776B (en) Full-automatic self-discharging cleaning filter
CN205712376U (en) Mixing wastewater with air flushing system
CN207111098U (en) A kind of cutter head of shield machine washes away spout anti-block apparatus
CN105251740A (en) Device and method for eliminating memory effect of water quality online analyzer
CN208023698U (en) Anti-clogging cistern

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191219

Address after: 100020 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Applicant after: China Petroleum Chemical Industry Group Co Ltd

Address before: 434020 No. 1 Longshan Temple Street, Jingzhou District, Jingzhou, Hubei

Applicant before: Four Sinopec Petroleum Machinery Co. Ltd.

Applicant before: SINOPEC OILFIELD EQUIPMENT CORPORATION

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant