Summary of the invention
Problems to be solved by the invention
Here, the power supply of elevator side is disconnected sometimes.As the reasons why disconnecting power supply, for example, following reason
By.First, according to the purposes for the building (such as station, house showground etc.) for being provided with elevator, do not using building
The periods such as night power supply is disconnected.Second, for (such as the Ullabana, New Year during the fixation without using building
Deng) carry out overhaul of the equipments and power supply is disconnected.Third, because the reasons such as heavy rain, thunder and lightning have a power failure between floors, by power supply
It disconnects.
When power supply in this way in elevator side disconnects, it is impossible to new program is sent, thus not can be carried out program rewriting sometimes,
Or allows to send new program and also disappear before rewriting.
That is, being somebody's turn to do even if the period that the power supply in elevator side disconnects attempts to carry out program rewriting from remote monitroing center side
Rewriting also will fail.As a result, generating the telephone charge of waste, or carrying out for multiple program rewritings for managing objects
In the case of, postpone for the program rewriting of other management objects, thus exist and cannot expeditiously carry out as program rewriting
Problem.
In addition, be configured to record whether there is or not the period for using telephone line in the prior art described in Patent Document 1,
Be staggered the usage time interval of telephone line, carries out program rewriting from outside.But in this configuration, even if by elevator side
Power supply disconnect in the case where, if not the usage time interval of telephone line, then from the external knot for attempting to carry out program rewriting
Fruit is that the rewriting is possible to failure.In this way, according to the viewpoint of the efficiency of program rewriting, the prior art described in Patent Document 1
There are also rooms for improvement.
The present invention is precisely in order to solving the above problems and completing, it is intended that obtaining a kind of control data rewriting system
System realizes the high efficiency of the control data rewriting for management object.
The means used to solve the problem
Control data rewriting system of the invention includes control device, according to the movement of control data control equipment, makees
It is defeated when control device power supply switches to disconnection from connection for the control power supply signal of the power supply status of expression control device power supply
Power cut signal is controlled out, the output control multiplexed electrical signal when control device power supply switches to connection from disconnection;Monitoring arrangement, prison
Depending on the state of equipment, as the monitoring power supply signal for the power supply status for indicating monitoring arrangement power supply, in monitoring arrangement power supply from connecing
Lead to output monitoring power cut signal when switching to disconnection, output monitors letter of sending a telegram in reply when monitoring arrangement power supply switches to connection from disconnection
Number;And control data rewriting device, the control data rewriting of the control data of rewriting control device is executed to control device
Processing, control device and monitoring arrangement are arranged according to each management object, and control data rewriting device includes storage dress
It sets;Power supply historical data generating unit obtains the control power supply signal exported from control device and the prison exported from monitoring arrangement
Depending on power supply signal, acquired control power supply signal and monitoring power supply signal are controlled into power supply signal and prison with acquirement respectively respectively
Date of acquisition association in time depending on power supply signal gets up, and is stored in storage dress according to each management object as power supply historical data
In setting;Power on/off historical data generating unit, according to the power supply historical data of each management object, according to each pipe
Object is managed to generate and the corresponding control power on/off historical data of control device power supply and corresponding with monitoring arrangement power supply
Monitor power on/off historical data;Data rewriting configuration part is controlled, will be provided with as at execution control data rewriting
The management object of the control device of the object of reason is set as Object Management group object, and setting executes the execution of control data rewriting processing
Time target date;Control data rewriting date-time determination section, according to each object manage object control power supply connect/
Historical data and monitoring power on/off historical data are disconnected, when so as to execute the execution date of control data rewriting processing
Between in such a way that each Object Management group object is not overlapped, will as execute time target date or execute time target date it
Date in date-time afterwards, period specific date for including control device power supply and all being connected with monitoring arrangement power supply
Time is determined as time execution date;And control data rewriting processing unit, according to the execution day of each Object Management group object
Time phase executes control data rewriting processing.
Invention effect
In accordance with the invention it is possible to obtain a kind of control data rewriting system, realize that the control data for management object change
The efficient activity write.
Embodiment 1
Fig. 1 is the structure chart for showing the control data rewriting system of embodiments of the present invention 1.In addition, being illustrated in Fig. 1
This three management objects of management object A~C are present in the situation in control data rewriting system out.
In Fig. 1, control data rewriting system has to the control device 1 of management object A setting and monitoring arrangement 2, right
Manage the control device 1 and monitoring arrangement 2, control device 1 and monitoring arrangement 2, prison to management object C setting of object B setting
Depending on center fixture 3 and control data rewriting device 4.In this way, control device 1 and monitoring arrangement 2 are according to each management object A
~C setting.
Monitoring arrangement 2 is connect with control device 1 in a manner of it can communicate, and then in a manner of it can communicate and in monitoring
Center device 3 connects.Control data rewriting device 4 is connect with central monitoring position device 3 in a manner of it can communicate, and then can lead to
The mode of letter is connect with monitoring arrangement 2.In addition, wired line can be used in order between attachment device in a manner of it can communicate
Road or radiolink.
Control device 1 has the storage device of the control data of movement of the storage for controlling the elevator as equipment (not
Diagram).Wherein, control data are to control the data used when the movement of elevator in control device 1, as control data, such as
Control program, control parameter etc. can be enumerated.
Control device 1 controls the movement of elevator according to the control data stored in storage device.Specifically, control device 1
Such as movement, the movement of elevator cab door etc. of control elevator traction machine, the movement as elevator.
Control device 1 exports 2 kinds of power supply signals to monitoring arrangement 2, as the power supply status for indicating control device power supply
Control power supply signal.As control power supply signal, control device 1 exports control when control device power supply switches to disconnection from connection
Stop electric signal, the output control multiplexed electrical signal when control device power supply switches to connection from disconnection,.
Monitoring arrangement 2 monitors the state of the elevator as equipment, and monitoring result is exported to central monitoring position device 3.Specifically
Ground exports different when the elevator of the supervision object of monitoring arrangement 2 is abnormal from the control device 1 for the movement for controlling the elevator
Often detection signal.Monitoring arrangement 2 obtains the anomaly detection signal that exports from control device 1, by the anomaly detection signal export to
Central monitoring position device 3.
Monitoring arrangement 2 exports 2 kinds of power supply signals to central monitoring position device 3, as the power supply shape for indicating monitoring arrangement power supply
The monitoring power supply signal of state.As monitoring power supply signal, monitoring arrangement 2 is defeated when monitoring arrangement power supply switches to disconnection from connection
Power cut signal is monitored out, the output monitoring multiplexed electrical signal when monitoring arrangement power supply switches to connection from disconnection.Also, monitoring arrangement
2 export the control power supply signal obtained from control device 1 to central monitoring position device 3.
Central monitoring position device 3 is set to the central monitoring position of the elevator of each management object of unified monitoring.Central monitoring position is usually arranged
Relative to the farther away place each management object A~C.Central monitoring position device 3 is obtaining anomaly detection signal from monitoring arrangement 2
When, notify the elevator of management object corresponding with the anomaly detection signal to be abnormal.
The control power supply signal obtained from monitoring arrangement 2 is exported and gives control data rewriting device 4 by central monitoring position device 3.
Equally, the monitoring power supply signal obtained from monitoring arrangement 2 is exported and gives control data rewriting device 4 by central monitoring position device 3.
There is control data rewriting device 4 storage device 41, power supply historical data generating unit 42, power on/off to go through
History data generating section 43, control data rewriting configuration part 44, control data rewriting date-time determination section 45 and control data
Rewrite processing unit 46.Control data rewriting device 4 is such as the CPU and system LSI by executing the program stored in memory
Processing circuit is realized.In addition, control data rewriting device 4 can be set to the facility different from central monitoring position, can also be set to
In central monitoring position.
Power supply historical data generating unit 42 obtains the control power supply signal that exports from control device 1 and defeated from monitoring arrangement 2
Monitoring power supply signal out.Power supply historical data generating unit 42 is according to each management object A~C, by acquired control power supply
Signal and monitoring power supply signal control power supply signal with acquirement respectively respectively and monitor the date of acquisition association in time of power supply signal
Get up, as power supply historical data.
Specifically, power supply historical data generating unit 42 obtains the control exported from the control device 1 of each management object A~C
Power supply signal and the monitoring power supply signal exported from the monitoring arrangement 2 of each management object A~C.Also, power supply historical data generates
Portion 42 according to each management object A~C by power supply history data store in storage device 41.
Power on/off historical data generating unit 43 is according to each management object A~C's stored in storage device 41
Power supply historical data generates control power on/off corresponding with control device power supply according to each management object A~C and goes through
History data and monitoring power on/off historical data corresponding with monitoring arrangement power supply.Also, power on/off history
Data generating section 43 connects the control power on/off historical data of each management object A~C of generation and monitoring power supply
On/off opens history data store in storage device 41.
Here, illustrating the control power on/off historical data and prison of each management object A~C referring to Fig. 2~Fig. 4
Depending on power on/off historical data.
Fig. 2 is the control electricity for showing the management object A generated by the power on/off historical data generating unit 43 of Fig. 1
Source turns on/off the explanatory diagram of an example of historical data.Fig. 3 is the power on/off historical data generating unit shown by Fig. 1
The explanatory diagram of an example of the control power on/off historical data of the 43 management object B generated.Fig. 4 is the electricity shown by Fig. 1
Source turns on/off an example of the control power on/off historical data for the management object C that historical data generating unit 43 generates
Explanatory diagram.
In addition, the period of shadeless part is equivalent to the control of control device power supply connection in Fig. 2~Fig. 4
Power on time section, the period of dash area are equivalent to the control power off-times section of control device power supply disconnection.
Here, in a period of " when 1 day 0 January " of previous year~" when 31 days 24 December ", as power supply historical data
The movement of generating unit 42 considers following situation.
<management object A>
Power supply historical data generating unit 42 does not obtain control power cut signal and control multiplexed electrical signal in previous year.
<management object B>
Power supply historical data generating unit 42 obtains control power cut signal in " at August 14 days 22 " of previous year, " 8
When the moon 15 days 6 " obtain control multiplexed electrical signal.
Power supply historical data generating unit 42 obtains control power cut signal in " at August 15 days 22 " of previous year, " 8
When the moon 16 days 6 " obtain control multiplexed electrical signal.
<management object C>
Power supply historical data generating unit 42 obtains control power cut signal in " at August 14 days 12 " of previous year, " 8
When the moon 16 days 12 " obtain control multiplexed electrical signal.
In the above cases, power on/off historical data generating unit 43 generates shown in Fig. 2 for managing object A
Control power on/off historical data.Also, power on/off historical data generating unit 43 for manage object B,
Generate will " at August 14 days 22 "~period of " at August 15 days 6 " and " at August 15 days 22 "~" at August 16 days 6 " when
Between section as control power off-times section, using the period in addition to this as control power on time section Fig. 3 shown in
Power on/off historical data.In addition, power on/off historical data generating unit 43 is generated for managing object C
Will " at August 14 days 12 "~period of " at August 16 days 12 " as control power off-times section, by the time in addition to this
The power on/off historical data shown in Fig. 4 of Duan Zuowei control power on time section.
In addition, power on/off historical data generating unit 43 connects on/off by controlling power supply with above explained generation
The identical processing of historical data is opened, generates monitoring power on/off historical data according to each management object A~C.
Also, whenever power supply historical data generating unit 42 by newest power supply history data store in storage device 41
When, power on/off historical data generating unit 43 updates control power on/off using the newest power supply historical data
Historical data and monitoring power on/off historical data.
In this way, power on/off historical data generating unit 43 is according to each management object A stored in storage device 41
The power supply historical data of~C generates control power supply corresponding with control device power supply according to each management object A~C and connects on/off
Open historical data and monitoring power on/off historical data corresponding with monitoring arrangement power supply.
Back to the explanation of Fig. 1, controlling data rewriting configuration part 44 will be provided with as the control for executing rewriting control device 1
The management object of the control device 1 of the object of the control data rewriting processing of data processed is set as Object Management group object.Specifically,
It controls data rewriting configuration part 44 and sets Object Management group object according to from external instruction.If such as being configured to operator's warp
The Object Management group object that control data rewriting processing is executed by the input desired control device 1 such as terminal installation (not shown), then control
Data rewriting configuration part 44 processed sets the Object Management group object.
Also, control execution time target date that the setting of data rewriting configuration part 44 executes control data rewriting processing.
For example, control data rewriting configuration part 44 is configured to the date by operator via terminal installation input object management object
Time is set to execute time target date, may be also constructed to set operator via time terminal installation designated date
At execution time target date.
The control power on/off that control data rewriting date-time determination section 45 manages object according to each object is gone through
History data and monitoring power on/off historical data determine to execute at control data rewriting according to each Object Management group object
Time execution date of reason.In this case, the decision of control data rewriting date-time determination section 45 makes each Object Management group
Time execution date of object is not overlapped.
It is illustrated in more details, controls data rewriting date-time determination section 45 so that time execution date is according to each
The mode that Object Management group object is not overlapped, by it is being set by control data rewriting configuration part 44, as execute time target date
Or execute date-time after time target date, included in when control device power supply and monitoring arrangement power supply are all connected
Between date-time in section, be determined as time execution date.In addition, control device power supply and monitoring arrangement power supply are all connect below
The logical period is referred to as " period specific date ".
Specifically, it is executed when in control power on/off historical data and monitoring power on/off historical data
When time target date was included in period specific date, control data rewriting date-time determination section 45 makes a reservation for the execution
Date-time is as time execution date.
On the other hand, when being not included in the period specific date execution time target date, data rewriting day is controlled
Time phase determination section 45 using than execute time target date rearward and include date-time in period specific date as
Time execution date.Especially if be configured to will than execute time target date rearward and be included in period specific date in
With execute time target date nearest date-time as time execution date, then can be realized and quickly control data and change
Write processing.
Alternatively, it is also possible to be configured to, gone through when in control power on/off historical data and monitoring power on/off
In history data, there is no the execution pre- settled date set by control data rewriting configuration part 44 or execute connection after the pre- settled date/
In the case where disconnecting historical data, using the on/off historical data obtained before current time, prediction executes the pre- settled date
Or the on/off historical data after the execution pre- settled date, time execution date is determined according to its prediction result.
Data rewriting processing unit 46 is controlled according to each object determined by control data rewriting date-time determination section 45
Time execution date for managing object executes control data rewriting processing.
Specifically, control data rewriting processing unit 46 is from time execution date earlier Object Management group object successively to prison
View apparatus 2 exports new control data and write-over instruction signal.The monitoring arrangement 2 believes the new control data and write-over instruction
Number output to control device 1.
If being entered new control data and write-over instruction signal, control device 1 will according to the write-over instruction signal
The control data rewriting of current time storage in the storage device is at the new control data.In this case, control device 1
Use the movement of new control data control elevator.
In the following, Fig. 2~Fig. 4 referring to front further illustrates control data rewriting date-time determination section 45 and control number
According to an example for the movement for rewriting processing unit 46.
In this, it is assumed that power on/off historical data generating unit 43 generates Fig. 2~control shown in Fig. 4 electricity of front
Source turns on/off historical data, and then generates Fig. 2~control shown in Fig. 4 power on/off historical data phase with front
Same monitoring power on/off historical data.Also, it is by the Object Management group object that control data rewriting configuration part 44 is set
Object A~C is managed, execution time target date set by control data rewriting configuration part 44 is the current year " August 15 days 13
When ".
In the above cases, control data rewriting date-time determination section 45 is according to control corresponding with management object A
Power on/off historical data and monitoring power on/off historical data (referring to Fig. 2), determine the execution of management object A
Date-time.As can be seen from FIG. 2, it is connect in control power on/off historical data corresponding with management object A and monitoring power supply
On/off is opened in historical data, is included in period specific date as " at August 15 days 3 " for executing time target date.?
In this case, time execution date for managing object A is set as " August 15 days 3 by control data rewriting date-time determination section 45
When ".
Also, control data rewriting date-time determination section 45 connects on/off according to control power supply corresponding with management object B
Historical data and monitoring power on/off historical data (referring to Fig. 3) are opened, determines time execution date of management object B.Root
According to Fig. 3 it is found that in control power on/off historical data corresponding with management object B and monitoring power on/off history
In data, as being not included in period specific date " at August 15 days 3 " for execution time target date.In such case
Under, time execution date for managing object B is set as " at August 15 days 6 " by control data rewriting date-time determination section 45.It is somebody's turn to do " 8
When the moon 15 days 6 " it is than executing time target date rearward and including the date-time in period specific date.
In addition, control data rewriting date-time determination section 45 connects on/off according to control power supply corresponding with management object C
Historical data and monitoring power on/off historical data (referring to Fig. 4) are opened, determines time execution date of management object C.Root
According to Fig. 3 it is found that in control power on/off historical data corresponding with management object C and monitoring power on/off history
In data, as being not included in period specific date " at August 15 days 3 " for execution time target date.In such case
Under, time execution date for managing object B is set as " at August 16 days 12 " by control data rewriting date-time determination section 45.It should
" at August 16 days 12 " are than executing time target date rearward and including the date-time in period specific date.
In this way, control data rewriting processing unit 46 by control data rewriting date-time determination section 45 according to each of being determined
Time execution date of Object Management group object executes control data rewriting processing.That is, control data rewriting processing unit 46 is according to " 8
When months 15 days 3 " be manage object A, " at August 15 days 6 " be manage object B, " at August 16 days 12 " are the sequences for managing object C,
Execute control data rewriting processing.
In the following, as described above, further illustrating that control data rewriting date-time is determined referring to Fig. 2~Fig. 4 of front
Determine portion 45 and controls another example of the movement of data rewriting processing unit 46.
Here, Fig. 2~control shown in Fig. 4 power supply that power on/off historical data generating unit 43 generates front connects
On/off opens historical data, and then generates identical with Fig. 2 of front~control power on/off historical data shown in Fig. 4
Monitor power on/off historical data.It also, is management by the Object Management group object that control data rewriting configuration part 44 is set
Object B, C, execution time target date set by control data rewriting configuration part 44 are the current year " at August 16 days 15 ".
In the above cases, control data rewriting date-time determination section 45 is according to control corresponding with management object B
Power on/off historical data and monitoring power on/off historical data (referring to Fig. 3), determine the execution of management object B
Date-time.As can be seen from FIG. 3, it is connect in control power on/off historical data corresponding with management object B and monitoring power supply
On/off is opened in historical data, is included in period specific date as " at August 16 days 15 " for executing time target date.
Also, control data rewriting date-time determination section 45 connects on/off according to control power supply corresponding with management object C
Historical data and monitoring power on/off historical data (referring to Fig. 4) are opened, determines time execution date of management object C.Root
According to Fig. 4 it is found that in control power on/off historical data corresponding with management object C and monitoring power on/off history
In data, it is included in period specific date as " at August 16 days 15 " for executing time target date.
As described above, executing time target date in each object management object includes in period specific date
In the case of, it is adjusted so that time execution date is not overlapped in each object management object.For example, the control data rewriting date
Time execution date for managing object B is set as " at August 16 days 15 " by time determination section 45, will manage the execution date of object C
Time is staggered the arbitrary time relative to " at August 16 days 15 ", such as is set as " at August 16 days 16 ".
In the above cases, control data rewriting processing unit 46 is management object B, " August according to " at August 16 days 15 "
At 16 days 16 " it is the sequence for managing object C, execute control data rewriting processing.In addition, in management object A, due to not set
Determine into Object Management group object, because without executing control data rewriting processing.
In addition, being also configured in present embodiment 1, when according to the execution date of each Object Management group object
Between execute control data rewriting processing when, confirm at the time of time execution date, control device power supply and monitoring arrangement electricity
Source both sides connect, and stop the control for executing the Object Management group object disconnected for control device power supply or monitoring arrangement power supply
Data rewriting processing.
In this case, control data rewriting processing unit 46 is filled when executing control data rewriting processing for control
The control device for setting the Object Management group object that power supply or monitoring arrangement power supply disconnect stops to execute control data rewriting processing.And
And it can be according to the control power supply signal and monitoring power supply signal for being input to control data rewriting device 4, confirmation control device electricity
Source and monitoring arrangement power supply are respectively to turn on or disconnect.
In addition, being exemplified in present embodiment 1 such as the case where flowering structure: having in control data rewriting system from prison
View apparatus 2 obtains the central monitoring position device 3 of the monitoring result of the elevator as equipment, and power supply historical data generating unit 42 is from control
Device 1 obtains control power supply signal via monitoring arrangement 2 and central monitoring position device 3, from monitoring arrangement 2 via central monitoring position device
3 obtain monitoring power supply signal.But it is also possible to be configured to, in control data rewriting system, monitoring arrangement 2 is not via monitoring
Center fixture 3 and will control power supply signal and monitoring power supply signal be directly output to control data rewriting device 4.
More than, according to the present embodiment 1, the control power on/off for being configured to manage object according to each object is gone through
History data and monitoring power on/off historical data, so that time execution date is not overlapped according to each Object Management group object
Mode, by as execute time target date or execute time target date after date-time, be included in control dress
The date-time in period specific date that power supply is all connected with monitoring arrangement power supply is set, time execution date is determined as, presses
Control data rewriting processing is executed according to time execution date of each Object Management group object.
With this configuration, the date-time section that the power supply that can be staggered over disconnects is handled to execute control data rewriting,
The telephone charge of waste can be thus cut down, the case where executing control data rewriting processing when power supply disconnects is reduced.Also, in needle
In the case where carrying out control data rewriting to multiple management objects, can shorten whole objects control data rewriting complete when
Between.In such manner, it is possible to realize the efficient activity of the control data rewriting for management object.
In addition, the case where applying the present invention to elevator is exemplified in present embodiment 1, but not limited to this, as long as
The mode of the control data of the control device of control equipment can remotely be rewritten, it will be able to apply the present invention to other than elevator
Any equipment.
Label declaration
1 control device;2 monitoring arrangements;3 central monitoring position devices;4 control data rewriting devices;41 storage devices;42 power supplys
Historical data generating unit;43 power on/off historical data generating units;44 control data rewriting configuration parts;45 control data
Rewrite date-time determination section;46 control data rewriting processing units.