CN109074527A - Control data rewriting system - Google Patents

Control data rewriting system Download PDF

Info

Publication number
CN109074527A
CN109074527A CN201780021567.9A CN201780021567A CN109074527A CN 109074527 A CN109074527 A CN 109074527A CN 201780021567 A CN201780021567 A CN 201780021567A CN 109074527 A CN109074527 A CN 109074527A
Authority
CN
China
Prior art keywords
control
power supply
date
monitoring
data rewriting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201780021567.9A
Other languages
Chinese (zh)
Other versions
CN109074527B (en
Inventor
引地刚树
松枝丰
长德典宏
江藤雅文
小泽匡史
藤田武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp, Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Corp
Publication of CN109074527A publication Critical patent/CN109074527A/en
Application granted granted Critical
Publication of CN109074527B publication Critical patent/CN109074527B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B3/00Applications of devices for indicating or signalling operating conditions of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B1/00Control systems of elevators in general
    • B66B1/34Details, e.g. call counting devices, data transmission from car to control system, devices giving information to the control system
    • B66B1/3407Setting or modification of parameters of the control system
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0426Programming the control sequence
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Automation & Control Theory (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Indicating And Signalling Devices For Elevators (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

Control data rewriting system is configured to manage the control power on/off historical data of object and monitoring power on/off historical data according to each object, in a manner of being overlapped time execution date not according to each Object Management group object, it will be as the date-time after execution time target date or execution time target date, it include the date-time in period specific date that control device power supply is all connected with monitoring arrangement power supply, it is determined as time execution date, the control data rewriting processing of the control data of rewriting control device is executed according to time execution date of each Object Management group object.

Description

Control data rewriting system
Technical field
The present invention relates to control data rewriting systems, are directed to the efficient of the control data rewriting for managing object to realize Change.
Background technique
In the past, control parameter, the control program used in the movement for the control device control elevator for carrying out elevator etc. In the case where rewriting, even if the maintenance personnel of profession does not go to scene, program rewriting also can be remotely carried out (for example, referring to special Sharp document 1,2).Specifically, via the Long-Range Surveillance Unit of the state of monitoring elevator, telephone line is used in a manner of it can communicate Remote monitroing center side and elevator side are connected, carries out program rewriting from remote monitroing center side.
Existing technical literature
Patent document
Patent document 1: No. 5699451 bulletins of Japanese Patent No.
Patent document 2: Japanese Unexamined Patent Publication 2008-273730 bulletin
Summary of the invention
Problems to be solved by the invention
Here, the power supply of elevator side is disconnected sometimes.As the reasons why disconnecting power supply, for example, following reason By.First, according to the purposes for the building (such as station, house showground etc.) for being provided with elevator, do not using building The periods such as night power supply is disconnected.Second, for (such as the Ullabana, New Year during the fixation without using building Deng) carry out overhaul of the equipments and power supply is disconnected.Third, because the reasons such as heavy rain, thunder and lightning have a power failure between floors, by power supply It disconnects.
When power supply in this way in elevator side disconnects, it is impossible to new program is sent, thus not can be carried out program rewriting sometimes, Or allows to send new program and also disappear before rewriting.
That is, being somebody's turn to do even if the period that the power supply in elevator side disconnects attempts to carry out program rewriting from remote monitroing center side Rewriting also will fail.As a result, generating the telephone charge of waste, or carrying out for multiple program rewritings for managing objects In the case of, postpone for the program rewriting of other management objects, thus exist and cannot expeditiously carry out as program rewriting Problem.
In addition, be configured to record whether there is or not the period for using telephone line in the prior art described in Patent Document 1, Be staggered the usage time interval of telephone line, carries out program rewriting from outside.But in this configuration, even if by elevator side Power supply disconnect in the case where, if not the usage time interval of telephone line, then from the external knot for attempting to carry out program rewriting Fruit is that the rewriting is possible to failure.In this way, according to the viewpoint of the efficiency of program rewriting, the prior art described in Patent Document 1 There are also rooms for improvement.
The present invention is precisely in order to solving the above problems and completing, it is intended that obtaining a kind of control data rewriting system System realizes the high efficiency of the control data rewriting for management object.
The means used to solve the problem
Control data rewriting system of the invention includes control device, according to the movement of control data control equipment, makees It is defeated when control device power supply switches to disconnection from connection for the control power supply signal of the power supply status of expression control device power supply Power cut signal is controlled out, the output control multiplexed electrical signal when control device power supply switches to connection from disconnection;Monitoring arrangement, prison Depending on the state of equipment, as the monitoring power supply signal for the power supply status for indicating monitoring arrangement power supply, in monitoring arrangement power supply from connecing Lead to output monitoring power cut signal when switching to disconnection, output monitors letter of sending a telegram in reply when monitoring arrangement power supply switches to connection from disconnection Number;And control data rewriting device, the control data rewriting of the control data of rewriting control device is executed to control device Processing, control device and monitoring arrangement are arranged according to each management object, and control data rewriting device includes storage dress It sets;Power supply historical data generating unit obtains the control power supply signal exported from control device and the prison exported from monitoring arrangement Depending on power supply signal, acquired control power supply signal and monitoring power supply signal are controlled into power supply signal and prison with acquirement respectively respectively Date of acquisition association in time depending on power supply signal gets up, and is stored in storage dress according to each management object as power supply historical data In setting;Power on/off historical data generating unit, according to the power supply historical data of each management object, according to each pipe Object is managed to generate and the corresponding control power on/off historical data of control device power supply and corresponding with monitoring arrangement power supply Monitor power on/off historical data;Data rewriting configuration part is controlled, will be provided with as at execution control data rewriting The management object of the control device of the object of reason is set as Object Management group object, and setting executes the execution of control data rewriting processing Time target date;Control data rewriting date-time determination section, according to each object manage object control power supply connect/ Historical data and monitoring power on/off historical data are disconnected, when so as to execute the execution date of control data rewriting processing Between in such a way that each Object Management group object is not overlapped, will as execute time target date or execute time target date it Date in date-time afterwards, period specific date for including control device power supply and all being connected with monitoring arrangement power supply Time is determined as time execution date;And control data rewriting processing unit, according to the execution day of each Object Management group object Time phase executes control data rewriting processing.
Invention effect
In accordance with the invention it is possible to obtain a kind of control data rewriting system, realize that the control data for management object change The efficient activity write.
Detailed description of the invention
Fig. 1 is the structure chart for showing the control data rewriting system of embodiments of the present invention 1.
Fig. 2 is the control power supply for showing the management object A by the power on/off historical data generating unit generation of Fig. 1 Turn on/off the explanatory diagram of an example of historical data.
Fig. 3 is the control power supply for showing the management object B by the power on/off historical data generating unit generation of Fig. 1 Turn on/off the explanatory diagram of an example of historical data.
Fig. 4 is the control power supply for showing the management object C by the power on/off historical data generating unit generation of Fig. 1 Turn on/off the explanatory diagram of an example of historical data.
Specific embodiment
In the following, the control data rewriting system of the invention using Detailed description of the invention according to preferred embodiment.In addition, in attached drawing Explanation in, identical label is marked to identical part or comparable part and the repetitive description thereof will be omitted.Also, implementing The case where applying the present invention to elevator is illustrated in mode.
Embodiment 1
Fig. 1 is the structure chart for showing the control data rewriting system of embodiments of the present invention 1.In addition, being illustrated in Fig. 1 This three management objects of management object A~C are present in the situation in control data rewriting system out.
In Fig. 1, control data rewriting system has to the control device 1 of management object A setting and monitoring arrangement 2, right Manage the control device 1 and monitoring arrangement 2, control device 1 and monitoring arrangement 2, prison to management object C setting of object B setting Depending on center fixture 3 and control data rewriting device 4.In this way, control device 1 and monitoring arrangement 2 are according to each management object A ~C setting.
Monitoring arrangement 2 is connect with control device 1 in a manner of it can communicate, and then in a manner of it can communicate and in monitoring Center device 3 connects.Control data rewriting device 4 is connect with central monitoring position device 3 in a manner of it can communicate, and then can lead to The mode of letter is connect with monitoring arrangement 2.In addition, wired line can be used in order between attachment device in a manner of it can communicate Road or radiolink.
Control device 1 has the storage device of the control data of movement of the storage for controlling the elevator as equipment (not Diagram).Wherein, control data are to control the data used when the movement of elevator in control device 1, as control data, such as Control program, control parameter etc. can be enumerated.
Control device 1 controls the movement of elevator according to the control data stored in storage device.Specifically, control device 1 Such as movement, the movement of elevator cab door etc. of control elevator traction machine, the movement as elevator.
Control device 1 exports 2 kinds of power supply signals to monitoring arrangement 2, as the power supply status for indicating control device power supply Control power supply signal.As control power supply signal, control device 1 exports control when control device power supply switches to disconnection from connection Stop electric signal, the output control multiplexed electrical signal when control device power supply switches to connection from disconnection,.
Monitoring arrangement 2 monitors the state of the elevator as equipment, and monitoring result is exported to central monitoring position device 3.Specifically Ground exports different when the elevator of the supervision object of monitoring arrangement 2 is abnormal from the control device 1 for the movement for controlling the elevator Often detection signal.Monitoring arrangement 2 obtains the anomaly detection signal that exports from control device 1, by the anomaly detection signal export to Central monitoring position device 3.
Monitoring arrangement 2 exports 2 kinds of power supply signals to central monitoring position device 3, as the power supply shape for indicating monitoring arrangement power supply The monitoring power supply signal of state.As monitoring power supply signal, monitoring arrangement 2 is defeated when monitoring arrangement power supply switches to disconnection from connection Power cut signal is monitored out, the output monitoring multiplexed electrical signal when monitoring arrangement power supply switches to connection from disconnection.Also, monitoring arrangement 2 export the control power supply signal obtained from control device 1 to central monitoring position device 3.
Central monitoring position device 3 is set to the central monitoring position of the elevator of each management object of unified monitoring.Central monitoring position is usually arranged Relative to the farther away place each management object A~C.Central monitoring position device 3 is obtaining anomaly detection signal from monitoring arrangement 2 When, notify the elevator of management object corresponding with the anomaly detection signal to be abnormal.
The control power supply signal obtained from monitoring arrangement 2 is exported and gives control data rewriting device 4 by central monitoring position device 3. Equally, the monitoring power supply signal obtained from monitoring arrangement 2 is exported and gives control data rewriting device 4 by central monitoring position device 3.
There is control data rewriting device 4 storage device 41, power supply historical data generating unit 42, power on/off to go through History data generating section 43, control data rewriting configuration part 44, control data rewriting date-time determination section 45 and control data Rewrite processing unit 46.Control data rewriting device 4 is such as the CPU and system LSI by executing the program stored in memory Processing circuit is realized.In addition, control data rewriting device 4 can be set to the facility different from central monitoring position, can also be set to In central monitoring position.
Power supply historical data generating unit 42 obtains the control power supply signal that exports from control device 1 and defeated from monitoring arrangement 2 Monitoring power supply signal out.Power supply historical data generating unit 42 is according to each management object A~C, by acquired control power supply Signal and monitoring power supply signal control power supply signal with acquirement respectively respectively and monitor the date of acquisition association in time of power supply signal Get up, as power supply historical data.
Specifically, power supply historical data generating unit 42 obtains the control exported from the control device 1 of each management object A~C Power supply signal and the monitoring power supply signal exported from the monitoring arrangement 2 of each management object A~C.Also, power supply historical data generates Portion 42 according to each management object A~C by power supply history data store in storage device 41.
Power on/off historical data generating unit 43 is according to each management object A~C's stored in storage device 41 Power supply historical data generates control power on/off corresponding with control device power supply according to each management object A~C and goes through History data and monitoring power on/off historical data corresponding with monitoring arrangement power supply.Also, power on/off history Data generating section 43 connects the control power on/off historical data of each management object A~C of generation and monitoring power supply On/off opens history data store in storage device 41.
Here, illustrating the control power on/off historical data and prison of each management object A~C referring to Fig. 2~Fig. 4 Depending on power on/off historical data.
Fig. 2 is the control electricity for showing the management object A generated by the power on/off historical data generating unit 43 of Fig. 1 Source turns on/off the explanatory diagram of an example of historical data.Fig. 3 is the power on/off historical data generating unit shown by Fig. 1 The explanatory diagram of an example of the control power on/off historical data of the 43 management object B generated.Fig. 4 is the electricity shown by Fig. 1 Source turns on/off an example of the control power on/off historical data for the management object C that historical data generating unit 43 generates Explanatory diagram.
In addition, the period of shadeless part is equivalent to the control of control device power supply connection in Fig. 2~Fig. 4 Power on time section, the period of dash area are equivalent to the control power off-times section of control device power supply disconnection.
Here, in a period of " when 1 day 0 January " of previous year~" when 31 days 24 December ", as power supply historical data The movement of generating unit 42 considers following situation.
<management object A>
Power supply historical data generating unit 42 does not obtain control power cut signal and control multiplexed electrical signal in previous year.
<management object B>
Power supply historical data generating unit 42 obtains control power cut signal in " at August 14 days 22 " of previous year, " 8 When the moon 15 days 6 " obtain control multiplexed electrical signal.
Power supply historical data generating unit 42 obtains control power cut signal in " at August 15 days 22 " of previous year, " 8 When the moon 16 days 6 " obtain control multiplexed electrical signal.
<management object C>
Power supply historical data generating unit 42 obtains control power cut signal in " at August 14 days 12 " of previous year, " 8 When the moon 16 days 12 " obtain control multiplexed electrical signal.
In the above cases, power on/off historical data generating unit 43 generates shown in Fig. 2 for managing object A Control power on/off historical data.Also, power on/off historical data generating unit 43 for manage object B, Generate will " at August 14 days 22 "~period of " at August 15 days 6 " and " at August 15 days 22 "~" at August 16 days 6 " when Between section as control power off-times section, using the period in addition to this as control power on time section Fig. 3 shown in Power on/off historical data.In addition, power on/off historical data generating unit 43 is generated for managing object C Will " at August 14 days 12 "~period of " at August 16 days 12 " as control power off-times section, by the time in addition to this The power on/off historical data shown in Fig. 4 of Duan Zuowei control power on time section.
In addition, power on/off historical data generating unit 43 connects on/off by controlling power supply with above explained generation The identical processing of historical data is opened, generates monitoring power on/off historical data according to each management object A~C.
Also, whenever power supply historical data generating unit 42 by newest power supply history data store in storage device 41 When, power on/off historical data generating unit 43 updates control power on/off using the newest power supply historical data Historical data and monitoring power on/off historical data.
In this way, power on/off historical data generating unit 43 is according to each management object A stored in storage device 41 The power supply historical data of~C generates control power supply corresponding with control device power supply according to each management object A~C and connects on/off Open historical data and monitoring power on/off historical data corresponding with monitoring arrangement power supply.
Back to the explanation of Fig. 1, controlling data rewriting configuration part 44 will be provided with as the control for executing rewriting control device 1 The management object of the control device 1 of the object of the control data rewriting processing of data processed is set as Object Management group object.Specifically, It controls data rewriting configuration part 44 and sets Object Management group object according to from external instruction.If such as being configured to operator's warp The Object Management group object that control data rewriting processing is executed by the input desired control device 1 such as terminal installation (not shown), then control Data rewriting configuration part 44 processed sets the Object Management group object.
Also, control execution time target date that the setting of data rewriting configuration part 44 executes control data rewriting processing. For example, control data rewriting configuration part 44 is configured to the date by operator via terminal installation input object management object Time is set to execute time target date, may be also constructed to set operator via time terminal installation designated date At execution time target date.
The control power on/off that control data rewriting date-time determination section 45 manages object according to each object is gone through History data and monitoring power on/off historical data determine to execute at control data rewriting according to each Object Management group object Time execution date of reason.In this case, the decision of control data rewriting date-time determination section 45 makes each Object Management group Time execution date of object is not overlapped.
It is illustrated in more details, controls data rewriting date-time determination section 45 so that time execution date is according to each The mode that Object Management group object is not overlapped, by it is being set by control data rewriting configuration part 44, as execute time target date Or execute date-time after time target date, included in when control device power supply and monitoring arrangement power supply are all connected Between date-time in section, be determined as time execution date.In addition, control device power supply and monitoring arrangement power supply are all connect below The logical period is referred to as " period specific date ".
Specifically, it is executed when in control power on/off historical data and monitoring power on/off historical data When time target date was included in period specific date, control data rewriting date-time determination section 45 makes a reservation for the execution Date-time is as time execution date.
On the other hand, when being not included in the period specific date execution time target date, data rewriting day is controlled Time phase determination section 45 using than execute time target date rearward and include date-time in period specific date as Time execution date.Especially if be configured to will than execute time target date rearward and be included in period specific date in With execute time target date nearest date-time as time execution date, then can be realized and quickly control data and change Write processing.
Alternatively, it is also possible to be configured to, gone through when in control power on/off historical data and monitoring power on/off In history data, there is no the execution pre- settled date set by control data rewriting configuration part 44 or execute connection after the pre- settled date/ In the case where disconnecting historical data, using the on/off historical data obtained before current time, prediction executes the pre- settled date Or the on/off historical data after the execution pre- settled date, time execution date is determined according to its prediction result.
Data rewriting processing unit 46 is controlled according to each object determined by control data rewriting date-time determination section 45 Time execution date for managing object executes control data rewriting processing.
Specifically, control data rewriting processing unit 46 is from time execution date earlier Object Management group object successively to prison View apparatus 2 exports new control data and write-over instruction signal.The monitoring arrangement 2 believes the new control data and write-over instruction Number output to control device 1.
If being entered new control data and write-over instruction signal, control device 1 will according to the write-over instruction signal The control data rewriting of current time storage in the storage device is at the new control data.In this case, control device 1 Use the movement of new control data control elevator.
In the following, Fig. 2~Fig. 4 referring to front further illustrates control data rewriting date-time determination section 45 and control number According to an example for the movement for rewriting processing unit 46.
In this, it is assumed that power on/off historical data generating unit 43 generates Fig. 2~control shown in Fig. 4 electricity of front Source turns on/off historical data, and then generates Fig. 2~control shown in Fig. 4 power on/off historical data phase with front Same monitoring power on/off historical data.Also, it is by the Object Management group object that control data rewriting configuration part 44 is set Object A~C is managed, execution time target date set by control data rewriting configuration part 44 is the current year " August 15 days 13 When ".
In the above cases, control data rewriting date-time determination section 45 is according to control corresponding with management object A Power on/off historical data and monitoring power on/off historical data (referring to Fig. 2), determine the execution of management object A Date-time.As can be seen from FIG. 2, it is connect in control power on/off historical data corresponding with management object A and monitoring power supply On/off is opened in historical data, is included in period specific date as " at August 15 days 3 " for executing time target date.? In this case, time execution date for managing object A is set as " August 15 days 3 by control data rewriting date-time determination section 45 When ".
Also, control data rewriting date-time determination section 45 connects on/off according to control power supply corresponding with management object B Historical data and monitoring power on/off historical data (referring to Fig. 3) are opened, determines time execution date of management object B.Root According to Fig. 3 it is found that in control power on/off historical data corresponding with management object B and monitoring power on/off history In data, as being not included in period specific date " at August 15 days 3 " for execution time target date.In such case Under, time execution date for managing object B is set as " at August 15 days 6 " by control data rewriting date-time determination section 45.It is somebody's turn to do " 8 When the moon 15 days 6 " it is than executing time target date rearward and including the date-time in period specific date.
In addition, control data rewriting date-time determination section 45 connects on/off according to control power supply corresponding with management object C Historical data and monitoring power on/off historical data (referring to Fig. 4) are opened, determines time execution date of management object C.Root According to Fig. 3 it is found that in control power on/off historical data corresponding with management object C and monitoring power on/off history In data, as being not included in period specific date " at August 15 days 3 " for execution time target date.In such case Under, time execution date for managing object B is set as " at August 16 days 12 " by control data rewriting date-time determination section 45.It should " at August 16 days 12 " are than executing time target date rearward and including the date-time in period specific date.
In this way, control data rewriting processing unit 46 by control data rewriting date-time determination section 45 according to each of being determined Time execution date of Object Management group object executes control data rewriting processing.That is, control data rewriting processing unit 46 is according to " 8 When months 15 days 3 " be manage object A, " at August 15 days 6 " be manage object B, " at August 16 days 12 " are the sequences for managing object C, Execute control data rewriting processing.
In the following, as described above, further illustrating that control data rewriting date-time is determined referring to Fig. 2~Fig. 4 of front Determine portion 45 and controls another example of the movement of data rewriting processing unit 46.
Here, Fig. 2~control shown in Fig. 4 power supply that power on/off historical data generating unit 43 generates front connects On/off opens historical data, and then generates identical with Fig. 2 of front~control power on/off historical data shown in Fig. 4 Monitor power on/off historical data.It also, is management by the Object Management group object that control data rewriting configuration part 44 is set Object B, C, execution time target date set by control data rewriting configuration part 44 are the current year " at August 16 days 15 ".
In the above cases, control data rewriting date-time determination section 45 is according to control corresponding with management object B Power on/off historical data and monitoring power on/off historical data (referring to Fig. 3), determine the execution of management object B Date-time.As can be seen from FIG. 3, it is connect in control power on/off historical data corresponding with management object B and monitoring power supply On/off is opened in historical data, is included in period specific date as " at August 16 days 15 " for executing time target date.
Also, control data rewriting date-time determination section 45 connects on/off according to control power supply corresponding with management object C Historical data and monitoring power on/off historical data (referring to Fig. 4) are opened, determines time execution date of management object C.Root According to Fig. 4 it is found that in control power on/off historical data corresponding with management object C and monitoring power on/off history In data, it is included in period specific date as " at August 16 days 15 " for executing time target date.
As described above, executing time target date in each object management object includes in period specific date In the case of, it is adjusted so that time execution date is not overlapped in each object management object.For example, the control data rewriting date Time execution date for managing object B is set as " at August 16 days 15 " by time determination section 45, will manage the execution date of object C Time is staggered the arbitrary time relative to " at August 16 days 15 ", such as is set as " at August 16 days 16 ".
In the above cases, control data rewriting processing unit 46 is management object B, " August according to " at August 16 days 15 " At 16 days 16 " it is the sequence for managing object C, execute control data rewriting processing.In addition, in management object A, due to not set Determine into Object Management group object, because without executing control data rewriting processing.
In addition, being also configured in present embodiment 1, when according to the execution date of each Object Management group object Between execute control data rewriting processing when, confirm at the time of time execution date, control device power supply and monitoring arrangement electricity Source both sides connect, and stop the control for executing the Object Management group object disconnected for control device power supply or monitoring arrangement power supply Data rewriting processing.
In this case, control data rewriting processing unit 46 is filled when executing control data rewriting processing for control The control device for setting the Object Management group object that power supply or monitoring arrangement power supply disconnect stops to execute control data rewriting processing.And And it can be according to the control power supply signal and monitoring power supply signal for being input to control data rewriting device 4, confirmation control device electricity Source and monitoring arrangement power supply are respectively to turn on or disconnect.
In addition, being exemplified in present embodiment 1 such as the case where flowering structure: having in control data rewriting system from prison View apparatus 2 obtains the central monitoring position device 3 of the monitoring result of the elevator as equipment, and power supply historical data generating unit 42 is from control Device 1 obtains control power supply signal via monitoring arrangement 2 and central monitoring position device 3, from monitoring arrangement 2 via central monitoring position device 3 obtain monitoring power supply signal.But it is also possible to be configured to, in control data rewriting system, monitoring arrangement 2 is not via monitoring Center fixture 3 and will control power supply signal and monitoring power supply signal be directly output to control data rewriting device 4.
More than, according to the present embodiment 1, the control power on/off for being configured to manage object according to each object is gone through History data and monitoring power on/off historical data, so that time execution date is not overlapped according to each Object Management group object Mode, by as execute time target date or execute time target date after date-time, be included in control dress The date-time in period specific date that power supply is all connected with monitoring arrangement power supply is set, time execution date is determined as, presses Control data rewriting processing is executed according to time execution date of each Object Management group object.
With this configuration, the date-time section that the power supply that can be staggered over disconnects is handled to execute control data rewriting, The telephone charge of waste can be thus cut down, the case where executing control data rewriting processing when power supply disconnects is reduced.Also, in needle In the case where carrying out control data rewriting to multiple management objects, can shorten whole objects control data rewriting complete when Between.In such manner, it is possible to realize the efficient activity of the control data rewriting for management object.
In addition, the case where applying the present invention to elevator is exemplified in present embodiment 1, but not limited to this, as long as The mode of the control data of the control device of control equipment can remotely be rewritten, it will be able to apply the present invention to other than elevator Any equipment.
Label declaration
1 control device;2 monitoring arrangements;3 central monitoring position devices;4 control data rewriting devices;41 storage devices;42 power supplys Historical data generating unit;43 power on/off historical data generating units;44 control data rewriting configuration parts;45 control data Rewrite date-time determination section;46 control data rewriting processing units.

Claims (5)

1. a kind of control data rewriting system, which is included
Control device, the control according to the movement of control data control equipment, as the power supply status for indicating control device power supply Power supply signal processed, the output control power cut signal when the control device power supply switches to disconnection from connection, fills in the control Set output control multiplexed electrical signal when power supply switches to connection from disconnection;
Monitoring arrangement monitors the state of the equipment, the monitoring power supply letter as the power supply status for indicating monitoring arrangement power supply Number, when the monitoring arrangement power supply switches to disconnection from connection output monitoring power cut signal, the monitoring arrangement power supply from Output monitoring multiplexed electrical signal when disconnection switches to connection;And
Data rewriting device is controlled, the control for rewriting the control data of the control device is executed to the control device Data rewriting processing,
The control device and the monitoring arrangement are arranged according to each management object,
The control data rewriting device includes
Storage device;
Power supply historical data generating unit obtains the control power supply signal that exports from the control device and from the monitoring The monitoring power supply signal of device output, by the acquired control power supply signal and the monitoring power supply signal respectively with The date of acquisition association in time for obtaining the control power supply signal and the monitoring power supply signal respectively, as power supply history Data store in the storage device according to each management object;
Power on/off historical data generating unit, according to it is each it is described management object the power supply historical data, according to Each management object generate control power on/off historical data corresponding with the control device power supply and with it is described The corresponding monitoring power on/off historical data of monitoring arrangement power supply;
Data rewriting configuration part is controlled, the control as the object for executing the control data rewriting processing will be provided with The management object of device is set as Object Management group object, and setting executes the execution pre- settled date of the control data rewriting processing Time phase;
Control data rewriting date-time determination section, according to the control power supply of each Object Management group object connect/ Historical data and the monitoring power on/off historical data are disconnected, so as to execute holding for the control data rewriting processing Row date-time will be used as execution time target date or institute in such a way that each Object Management group object is not overlapped State execute the date-time after time target date, be included in the control device power supply and the monitoring arrangement power supply all Date-time in period specific date of connection is determined as time execution date;And
Data rewriting processing unit is controlled, executes the control according to time execution date of each Object Management group object Data rewriting processing processed.
2. control data rewriting system according to claim 1, wherein
When being included in the period specific date execution time target date, when the control data rewriting date Between determination section using execution time target date as time execution date,
When being not included in the period specific date execution time target date, the control data rewriting date Time determination section will rearward and include date-time in period specific date than execution time target date As time execution date.
3. control data rewriting system according to claim 1 or 2, wherein
When executing control data rewriting processing, the control data rewriting processing unit stops to the control device power supply Or the control device of the Object Management group object of the monitoring arrangement power supply disconnection executes the control data rewriting Processing.
4. control data rewriting system according to any one of claims 1 to 3, wherein
The control data rewriting system also has central monitoring position device, which obtains institute from the monitoring arrangement The monitoring result of the state of equipment is stated,
The power supply historical data generating unit takes from the control device via the monitoring arrangement and the central monitoring position device The control power supply signal is obtained, obtains the monitoring power supply signal from the monitoring arrangement via the central monitoring position device.
5. control data rewriting system described in any one according to claim 1~4, wherein
The equipment is elevator.
CN201780021567.9A 2016-04-05 2017-04-03 Control data rewriting system Active CN109074527B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2016-075940 2016-04-05
JP2016075940A JP6463294B2 (en) 2016-04-05 2016-04-05 Control data rewriting system
PCT/JP2017/013927 WO2017175712A1 (en) 2016-04-05 2017-04-03 Control data rewrite system

Publications (2)

Publication Number Publication Date
CN109074527A true CN109074527A (en) 2018-12-21
CN109074527B CN109074527B (en) 2021-10-22

Family

ID=60000490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201780021567.9A Active CN109074527B (en) 2016-04-05 2017-04-03 Control data rewriting system

Country Status (5)

Country Link
JP (1) JP6463294B2 (en)
KR (1) KR102032077B1 (en)
CN (1) CN109074527B (en)
DE (1) DE112017001936T5 (en)
WO (1) WO2017175712A1 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04107725A (en) * 1990-08-29 1992-04-09 Nec Corp Data saving/restoring system
CN1111375A (en) * 1993-07-26 1995-11-08 国际商业机器公司 Information processing system
JP2008273730A (en) * 2007-05-07 2008-11-13 Mitsubishi Electric Building Techno Service Co Ltd Program renewing method for elevator
CN101365642A (en) * 2006-02-10 2009-02-11 三菱电机株式会社 Remote updating system for elevator control program
US20090050417A1 (en) * 2007-08-21 2009-02-26 De Groot Pieter J Intelligent destination elevator control system
CN101997706A (en) * 2009-08-28 2011-03-30 ***通信集团公司 Method, terminal and data server for updating at regulated time
JP2013063688A (en) * 2011-09-16 2013-04-11 Alpine Electronics Inc Multifunctional equipment consuming less standby power
CN105260267A (en) * 2015-09-28 2016-01-20 联想(北京)有限公司 Data refreshing method and solid state disk

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5699451A (en) 1980-11-25 1981-08-10 Teikoku Hormone Mfg Co Ltd Diphenylamine derivative
JPH075231B2 (en) * 1989-05-19 1995-01-25 三菱電機株式会社 Operation specification setting device for elevator control
JP3561001B2 (en) * 1994-03-09 2004-09-02 東芝エレベータ株式会社 Elevator control device and operation control program maintenance device
JP4910293B2 (en) * 2005-02-16 2012-04-04 カシオ計算機株式会社 Electronic camera, noise reduction device, and noise reduction control program
JP5699451B2 (en) * 2010-05-17 2015-04-08 三菱電機ビルテクノサービス株式会社 Elevator automatic remote program rewriting system
JP5346906B2 (en) * 2010-11-11 2013-11-20 株式会社日立ビルシステム Software update method for remote monitoring client terminal

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04107725A (en) * 1990-08-29 1992-04-09 Nec Corp Data saving/restoring system
CN1111375A (en) * 1993-07-26 1995-11-08 国际商业机器公司 Information processing system
CN101365642A (en) * 2006-02-10 2009-02-11 三菱电机株式会社 Remote updating system for elevator control program
JP2008273730A (en) * 2007-05-07 2008-11-13 Mitsubishi Electric Building Techno Service Co Ltd Program renewing method for elevator
US20090050417A1 (en) * 2007-08-21 2009-02-26 De Groot Pieter J Intelligent destination elevator control system
CN101997706A (en) * 2009-08-28 2011-03-30 ***通信集团公司 Method, terminal and data server for updating at regulated time
JP2013063688A (en) * 2011-09-16 2013-04-11 Alpine Electronics Inc Multifunctional equipment consuming less standby power
CN105260267A (en) * 2015-09-28 2016-01-20 联想(北京)有限公司 Data refreshing method and solid state disk

Also Published As

Publication number Publication date
JP2017186126A (en) 2017-10-12
KR20180120223A (en) 2018-11-05
KR102032077B1 (en) 2019-10-14
CN109074527B (en) 2021-10-22
WO2017175712A1 (en) 2017-10-12
DE112017001936T5 (en) 2019-01-10
JP6463294B2 (en) 2019-01-30

Similar Documents

Publication Publication Date Title
EP2377222B1 (en) Hybrid distribution network power restoration control
EP2757648B1 (en) Methods and systems for restoring power based on forecasted loads
CA2967030C (en) Systems, devices and methods for remotely controlling loads in response to configuration rules and networked accessories
KR20110084674A (en) System for monitoring a communication failure of power device based on ethernet and method therefor
KR101700697B1 (en) Wireless remote monitoring and control system and its method
JP6138216B2 (en) Battery cabinet management method, apparatus, and battery management system
CN109473974A (en) A kind of power grid regulation operation self-adapting program operating method and system
CN109074527A (en) Control data rewriting system
CN104969440A (en) Intelligent electrical power network device
CN103109269A (en) A low or medium voltage electric power distribution network
US8791821B2 (en) Meter maintenance and tampering detection system and method
JP5431391B2 (en) Transfer interruption system for distributed power supply and settling value processing device
JP5431392B2 (en) Protective relay diagnostic device
CN103825258A (en) Constant value group setting method and system
CN111781465A (en) Fault positioning system and method for ungrounded power grid
CN103199626A (en) Switch cabinet integrated monitoring terminal
JP2013158187A (en) Accident information collection method, and system using the same
KR102678704B1 (en) Fault management system for power distribution management system
CN211603926U (en) Animal protection electric wire netting on-line monitoring controlling means and system
KR102036041B1 (en) Power acquisition monitoring system
EP3951557A1 (en) Diagnostic module of a photovoltaic panel
EP1552998A2 (en) System for the diagnosis and operation of apparatuses for generating and distributing power supplies, in particular for railway&#39;s safety and signalling plants
CN111176171A (en) Building thing networking data acquisition device based on distributing type cloud framework
JP7069649B2 (en) Short-circuit accident trial power transmission system and short-circuit accident trial power transmission method
CN107846149B (en) A kind of Double-working-condition embedded communication power supply upgrading interpolation frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211214

Address after: Tokyo, Japan

Patentee after: MITSUBISHI ELECTRIC BUILDING TECHNO-SERVICE Co.,Ltd.

Address before: Tokyo, Japan

Patentee before: MITSUBISHI ELECTRIC BUILDING TECHNO-SERVICE Co.,Ltd.

Patentee before: MITSUBISHI ELECTRIC Corp.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: Tokyo, Japan

Patentee after: Mitsubishi Electric Building Solutions Co.,Ltd.

Address before: Tokyo, Japan

Patentee before: MITSUBISHI ELECTRIC BUILDING TECHNO-SERVICE Co.,Ltd.

CP01 Change in the name or title of a patent holder