CN109061378A - 小电流接地***接地故障排查方法 - Google Patents
小电流接地***接地故障排查方法 Download PDFInfo
- Publication number
- CN109061378A CN109061378A CN201810590896.1A CN201810590896A CN109061378A CN 109061378 A CN109061378 A CN 109061378A CN 201810590896 A CN201810590896 A CN 201810590896A CN 109061378 A CN109061378 A CN 109061378A
- Authority
- CN
- China
- Prior art keywords
- time
- wire
- block switch
- residual voltage
- outgoing breaker
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/086—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Emergency Protection Circuit Devices (AREA)
Abstract
本发明公开了一种小电流接地***接地故障排查方法,涉及电网自动化技术领域,通过以下步骤:检测到零序电压值大于设定值后,按照从大至小逐条对相应的出线断路器进行跳闸操作;出线断路器跳闸后,经过断路器延时合闸时间后,出线断路器进行重合闸;出线断路器重合闸后,与出线断路器连接的自动化分段开关检测到电压恢复并进行单侧得电延时合闸;自动化分段开关延时合闸后,在零序电压检测延时时间内对零序电压进行检测,如果未发现零序电压值大于设定值,则保持合闸状态接通下一段的线路,如果在零序电压检测延时时间内检测到零序电压值大于设定值,则该自动化分段开关自动分闸并闭锁,即可判断接地故障点就在该段,其能够快速排查出故障线路位置。
Description
技术领域
本发明涉及电网自动化技术领域,特别涉及一种小电流接地***接地故障排查方法。
背景技术
配电自动化是对配电网中的各类设备进行实时监测,监控的集成***,将配电网的检测计量、故障探测定位、自动控制、规划、数据统计管理集为一体的综合***,一种提高配电网运行管理水平、缩短停电时间、提高供电可靠性和服务质量的有力措施。
馈线自动化利用自动化装置或***,监视配电网的运行状况,及时发现配电网故障,进行故障定位、隔离和恢复对非故障区域的供电。对配网故障的自动定位和隔离,它具备不依赖于主站和通信、运维工作量小、投资低等优点,因而在配电自动化建设和改造中得到了广泛的应用。
然而,现有的馈线自动化只适用于短路故障的自动化处理,无法适用于小电流接地***条件下的接地故障处理。当出现小电流接地故障时,需要分断线路然后对线路各段进行人工排查,影响电网运行,增加了工作人员劳动。
发明内容
为解决上述问题,本发明提供一种小电流接地***接地故障排查方法,其采用如下技术方案实现:
一种小电流接地***接地故障排查方法,包括以下步骤:
S1、小电流接地选线装置检测到零序电压值大于设定值后,根据每条线路的故障发生概率,按照设定的切换时间从大至小逐条对相应的出线断路器进行跳闸操作;
S2、出线断路器跳闸后,经过断路器延时合闸时间后,出线断路器进行重合闸;
S3、出线断路器重合闸后,与出线断路器连接的自动化分段开关检测到电压恢复并进行单侧得电延时合闸;
S4、自动化分段开关延时合闸后,在零序电压检测延时时间内对零序电压进行检测,如果未发现零序电压值大于设定值,则保持合闸状态接通下一段的线路,如果在零序电压检测延时时间内检测到零序电压值大于设定值,则该自动化分段开关自动分闸并闭锁,即可判断接地故障点就在该段;
S5、经过步骤S4之后,如果自动化分段开关没有出现跳闸,则下一段的自动化分段开关重复步骤S4直到完成线路上所有自动化分段开关的重合闸及零序电压检测操作。
优选地,步骤S1所述切换时间大于等于线路中所有自动化分段开关延时合闸时间、最后一级自动化分段开关的零序电压检测延时时间以及出线断路器重合闸时间之和。
优选地,步骤S2所述断路器延时合闸时间大于同一线路上各个自动化分段开关失压跳闸分断的时间。
优选地,步骤S4所述零序电压检测延时时间为自动化分段开关完成单侧得电延时合闸后开始计时,其时间长度不小于100ms。
本发明有益效果包括:不需要改变现有设备的接线,只需在每一个自动化分段开关上设置零序电压检测延时时间即可,其操作简单,判断准确,效率高。
附图说明
图1是常见变电站出线断路器及自动化分段开关连接图;
图2是采用本发明提供的方法对故障点进行排查的连接示意图;
图3是图2中故障点3的排查时序图;
图中,CBx表示变电站出线断路器、FSxx表示自动化分段开关、LSx表示联络开关;
T0是出线断路器重合闸延时时间;
T10是第一级自动化分段开关延时合闸时间,T11是第一自动化分段开关零序电压检测延时时间;
T20是第二级自动化分段开关延时合闸时间,T21是第二自动化分段开关零序电压检测延时时间;
T30是第三级自动化分段开关延时合闸时间,T31是第三自动化分段开关零序电压检测延时时间。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图1-3,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图2和图3所示,假设FS13分段开关出线端发生了小电流接地故障,首先设置在变电站内的小电流接地选线装置检测到零序电压值大于设定值,如图3中V1所示,V0表示零序电压设定值,V1表示当前检测到的零序电压值,这时候***根据每条线路的故障发生概率,按照设定的切换时间从大至小逐条对每一条变电站出线的出线断路器进行跳闸操作。
1)当对第一条线路进行跳闸操作时,其余的线路是接通的,出线断路器跳闸后,经过断路器延时合闸时间T0后,出线断路器进行重合闸,如图3中T/CB1所示;
2)出线断路器重合闸后,与出线断路器连接的第一自动化分段开关FS11检测到电压恢复并进行单侧得电延时合闸;
3)自动化分段开关FS11单侧得电延时合闸后,在零序电压检测延时时间T11内对零序电压进行检测,未发现零序电压值大于设定值,则保持合闸状态接通下一段的线路;
4)自动化分段开关FS12单侧得电延时合闸后,在零序电压检测延时时间T21内对零序电压进行检测,未发现零序电压值大于设定值,则保持合闸状态接通下一段的线路;
5)自动化分段开关FS13单侧得电延时合闸后,在零序电压检测延时时间T31内对零序电压进行检测,发现零序电压值大于设定值,则FS13自动化分段开关自动分闸并闭锁,即可判断接地故障点就在该段。
同样的,其余线路当馈线发生接地故障时,小电流选线装置将检测的零序电压值大于定值作为发生接地故障的判据,同时通过自身算法对故障发生概率从大至小逐条触发变电站出线断路器跳闸。变电站出线断路器跳闸后,经过设置时间(重合闸时间大于线路上开关的失压分闸时间即可)自动重合。再经过设定时间(大于无故障情况下任一线路中出线断路器分闸,线路上分段开关均已失压分闸后,出线断路器重合时刻至最后一个分段开关合闸经历的时间)后:若小电流选线装置检测的零序电压值仍大于定值,则执行故障概率较小的线路出线开关跳闸;若小电流选线装置检测的零序电压值小于定值,则可判断接地故障已被隔离;若所有线路均经历过选线调整后,小电流选线装置检测的零序电压值仍大于定值,则可以判断为线路上有多点同相接地。如图1,接地故障发生在单一发生在馈线上,如仅发生接地故障点1或3,此类逻辑能准确实现线路上单一接地故障的隔离。
线路上的馈线自动化分段开关逐级得电合闸,当合于接地故障点时,馈线自动化分段开关在设定时间内(理论上设定时间小于下一级分段开关得电合闸的时间X,一般设置为合闸后故障的判断时间Y)分闸并闭锁。馈线自动化分段开关执行这一分闸闭锁的条件如下:合闸之前检测到线路零序电压小于定值1(未检测到零序电压的判断依据),合闸之后在设定时间后(故障的判断时间Y)检测到线路零序电压大于定值2。在以下两种情况下均不执行分闸闭锁:(1)馈线自动化开关在合闸之前已检测到零序电压(判断依据为零序电压大于定值);(2)合闸之前X时限内未检测到接地故障(判断依据为零序电压<设定值1),合闸后在经历故障判断时间Y后检测到检测到接地故障(判断依据为零序电压>设定值2)。如图1中接地故障点2、3,接地故障发生在第一个出线自动化分段开关之后,此逻辑可以用于切除此类接地故障,而不会发生扩大故障的情况。
变电站选线出线开关在重合闸之前,未检测到接地故障(判断依据为零序电压小于定值I),若重合闸后的设定时间(出线第一个分段开关得电合闸的设定时间)内,检测到接地故障(判断依据为零序电压大于定值II),则分闸并闭锁开关。若重合闸后的设定时间(出线第一个分段开关得电合闸的设定时间)外,检测到接地故障(判断依据为零序电压大于定值II),则不动作。如图1中接地故障点1,接地故障发生在出线断路器与第一个出线自动化分段开关之间时,此逻辑可以用于切除此类接地故障。
此处已经依据特定的示例性实例对本发明进行了描述。对本领域的技术人员来说在不脱离本发明的范围下进行适当的替换或修改将是显而易见的。示例性的示例仅仅是例证性的,而不是对本发明的限制,本发明的范围由权利要求定义。
Claims (4)
1.一种小电流接地***接地故障排查方法,其特征在于,包括以下步骤:
S1、小电流接地选线装置检测到零序电压值大于设定值后,根据每条线路的故障发生概率,按照设定的切换时间从大至小逐条对相应的出线断路器进行跳闸操作;
S2、出线断路器跳闸后,经过断路器延时合闸时间后,出线断路器进行重合闸;
S3、出线断路器重合闸后,与出线断路器连接的自动化分段开关检测到电压恢复并进行单侧得电延时合闸;
S4、自动化分段开关延时合闸后,在零序电压检测延时时间内对零序电压进行检测,如果未发现零序电压值大于设定值,则保持合闸状态接通下一段的线路,如果在零序电压检测延时时间内检测到零序电压值大于设定值,则该自动化分段开关自动分闸并闭锁,即可判断接地故障点就在该段;
S5、经过步骤S4之后,如果自动化分段开关没有出现跳闸,则下一段的自动化分段开关重复步骤S4直到完成线路上所有自动化分段开关的重合闸及零序电压检测操作。
2.根据权利要求1所述的小电流接地***接地故障排查方法,其特征在于:
步骤S1所述切换时间大于等于线路中所有自动分段开关重合闸时间、零序电压检测延时时间以及出线断路器重合闸时间之和。
3.根据权利要求1所述的小电流接地***接地故障排查方法,其特征在于:
步骤S2所述断路器延时合闸时间大于同一线路上各个自动化分段开关失压跳闸分断的时间。
4.根据权利要求3所述的小电流接地***接地故障排查方法,其特征在于:
步骤S4所述零序电压检测延时时间为自动分段开关完成合闸后开始计时,其时间长度不小于100ms。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810590896.1A CN109061378A (zh) | 2018-06-09 | 2018-06-09 | 小电流接地***接地故障排查方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810590896.1A CN109061378A (zh) | 2018-06-09 | 2018-06-09 | 小电流接地***接地故障排查方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109061378A true CN109061378A (zh) | 2018-12-21 |
Family
ID=64820095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810590896.1A Pending CN109061378A (zh) | 2018-06-09 | 2018-06-09 | 小电流接地***接地故障排查方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109061378A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109613383A (zh) * | 2018-12-27 | 2019-04-12 | 中国电力科学研究院有限公司 | 计及直流接入的交流线路故障判断方法及*** |
CN110568316A (zh) * | 2019-10-16 | 2019-12-13 | 国网四川省电力公司绵阳供电公司 | 一种小电流接地***接地故障快速选线方法 |
CN111781465A (zh) * | 2020-06-28 | 2020-10-16 | 云南电网有限责任公司电力科学研究院 | 用于不接地电网的故障定位***及方法 |
CN112540322A (zh) * | 2020-12-29 | 2021-03-23 | 广东电网有限责任公司电力科学研究院 | 变电站馈线单相接地故障线路的选线方法、装置及设备 |
CN113484681A (zh) * | 2021-07-14 | 2021-10-08 | 广西电网有限责任公司电力科学研究院 | 就地重合式馈线自动化线路接地故障区间检测方法及装置 |
CN113866563A (zh) * | 2021-09-30 | 2021-12-31 | 广东电网有限责任公司东莞供电局 | 一种电压电流型馈线自动化测试*** |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1423132A (zh) * | 2001-11-28 | 2003-06-11 | 淄博科汇电气有限公司 | 电力***小电流接地故障选线、分段方法 |
CN201398071Y (zh) * | 2009-02-25 | 2010-02-03 | 北京盛华宏业科技有限公司 | 基于线路重合器的小电流接地故障自动隔离装置 |
CN102545167A (zh) * | 2010-12-10 | 2012-07-04 | 吴玉莲 | 一种小电流接地***单相接地故障自动隔离装置 |
CN103022992A (zh) * | 2012-11-23 | 2013-04-03 | 山东电力集团公司 | 基于分散零序电压检测的馈线接地定位方法 |
CN106324432A (zh) * | 2016-08-30 | 2017-01-11 | 南京南瑞继保电气有限公司 | 一种小电流接地***单相接地选线的方法 |
CN106526429A (zh) * | 2016-12-06 | 2017-03-22 | 李晓明 | 一种具有纠错功能的接地故障选线方法 |
CN107144762A (zh) * | 2017-04-20 | 2017-09-08 | 广西电网有限责任公司电力科学研究院 | 一种基于小电流接地选线装置的配电网接地故障定位方法 |
-
2018
- 2018-06-09 CN CN201810590896.1A patent/CN109061378A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1423132A (zh) * | 2001-11-28 | 2003-06-11 | 淄博科汇电气有限公司 | 电力***小电流接地故障选线、分段方法 |
CN201398071Y (zh) * | 2009-02-25 | 2010-02-03 | 北京盛华宏业科技有限公司 | 基于线路重合器的小电流接地故障自动隔离装置 |
CN102545167A (zh) * | 2010-12-10 | 2012-07-04 | 吴玉莲 | 一种小电流接地***单相接地故障自动隔离装置 |
CN103022992A (zh) * | 2012-11-23 | 2013-04-03 | 山东电力集团公司 | 基于分散零序电压检测的馈线接地定位方法 |
CN106324432A (zh) * | 2016-08-30 | 2017-01-11 | 南京南瑞继保电气有限公司 | 一种小电流接地***单相接地选线的方法 |
CN106526429A (zh) * | 2016-12-06 | 2017-03-22 | 李晓明 | 一种具有纠错功能的接地故障选线方法 |
CN107144762A (zh) * | 2017-04-20 | 2017-09-08 | 广西电网有限责任公司电力科学研究院 | 一种基于小电流接地选线装置的配电网接地故障定位方法 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109613383A (zh) * | 2018-12-27 | 2019-04-12 | 中国电力科学研究院有限公司 | 计及直流接入的交流线路故障判断方法及*** |
CN110568316A (zh) * | 2019-10-16 | 2019-12-13 | 国网四川省电力公司绵阳供电公司 | 一种小电流接地***接地故障快速选线方法 |
CN111781465A (zh) * | 2020-06-28 | 2020-10-16 | 云南电网有限责任公司电力科学研究院 | 用于不接地电网的故障定位***及方法 |
CN112540322A (zh) * | 2020-12-29 | 2021-03-23 | 广东电网有限责任公司电力科学研究院 | 变电站馈线单相接地故障线路的选线方法、装置及设备 |
CN113484681A (zh) * | 2021-07-14 | 2021-10-08 | 广西电网有限责任公司电力科学研究院 | 就地重合式馈线自动化线路接地故障区间检测方法及装置 |
CN113484681B (zh) * | 2021-07-14 | 2022-09-23 | 广西电网有限责任公司电力科学研究院 | 就地重合式馈线自动化线路接地故障区间检测方法及装置 |
CN113866563A (zh) * | 2021-09-30 | 2021-12-31 | 广东电网有限责任公司东莞供电局 | 一种电压电流型馈线自动化测试*** |
CN113866563B (zh) * | 2021-09-30 | 2024-02-13 | 广东电网有限责任公司东莞供电局 | 一种电压电流型馈线自动化测试*** |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109061378A (zh) | 小电流接地***接地故障排查方法 | |
US20200412167A1 (en) | Method and system for fast reconfiguration of power supply network in tens of milliseconds after power grid failure | |
CN108132425A (zh) | 电网配电线路故障在线监测方法及*** | |
CN108957243A (zh) | 一种应用于配电网的单相接地故障定位方法及*** | |
JP2019537701A (ja) | 高信頼性の配電ネットワーク故障の検出方法、装置及び記憶媒体 | |
Sharafi et al. | Transmission system wide-area back-up protection using current phasor measurements | |
US11489365B2 (en) | Non-three-phase fault isolation and restoration systems | |
CN108134378A (zh) | 一种直流保护***和直流保护实现方法 | |
CN108287295B (zh) | 电力线路接地故障位置查找方法和*** | |
KR100920946B1 (ko) | 부하 기기의 영향을 고려한 배전 선로의 고장 검출 및위치를 판단하는 장치 및 방법 | |
CN109245072A (zh) | 基于区域序号的自适应就地型馈线自动化故障处理方法 | |
Esmail et al. | Detection and experimental investigation of open conductor and single-phase earth return faults in distribution systems | |
CN106329492A (zh) | 一种基于***拓扑的简易母线保护方法 | |
EP3293854A1 (de) | Verfahren zum ermitteln einer ursache eines fehlers in einem elektrischen energieversorgungsnetz und schutzgerät zur durchführung eines solchen verfahrens | |
CN103779846B (zh) | 基于导纳矩阵快速修正的电网线路广域电流保护方法 | |
CN111781465A (zh) | 用于不接地电网的故障定位***及方法 | |
US10840691B2 (en) | Lateral disturbance detection and remote tracking of automatic lateral switch operations | |
Albinali et al. | Hidden failure detection via dynamic state estimation in substation protection systems | |
US11114892B2 (en) | Electric power system transducer failure monitor and measurement recovery | |
KR20180090106A (ko) | 배전 관리 시스템의 고장 관리 장치 | |
Friend et al. | Effect of distribution automation on protective relaying | |
CN207992363U (zh) | 单相接地故障线路监测*** | |
CN111781464A (zh) | 用于消弧线圈和小电阻接地电网的故障定位***及方法 | |
Babu et al. | Analysing correlated events in power system using fault statistics | |
CN111781466A (zh) | 用于消弧线圈接地电网的故障定位***及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |
|
RJ01 | Rejection of invention patent application after publication |