CN109061286A - Off-grid is let out can type electric energy meter - Google Patents

Off-grid is let out can type electric energy meter Download PDF

Info

Publication number
CN109061286A
CN109061286A CN201810624516.1A CN201810624516A CN109061286A CN 109061286 A CN109061286 A CN 109061286A CN 201810624516 A CN201810624516 A CN 201810624516A CN 109061286 A CN109061286 A CN 109061286A
Authority
CN
China
Prior art keywords
electric energy
spdt
energy meter
pole double
throw switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810624516.1A
Other languages
Chinese (zh)
Other versions
CN109061286B (en
Inventor
王洁
徐琨
王德松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810624516.1A priority Critical patent/CN109061286B/en
Publication of CN109061286A publication Critical patent/CN109061286A/en
Application granted granted Critical
Publication of CN109061286B publication Critical patent/CN109061286B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Photovoltaic Devices (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to a kind of electric energy meters.Off-grid lets out energy type electric energy meter, it includes electric energy meter casing, power module, LCD MODULE, electric energy computation chip, microprocessor;Zero line output end is connected with the zero line output end of electric energy computation chip;It is characterized by: electric energy meter casing is equipped with ground terminal, ground terminal is connected by conducting wire with ground resistance;There is a single-pole double-throw switch (SPDT) in electric energy meter case body, the control terminal of the single-pole double-throw switch (SPDT) is connected with the control port of microprocessor, the input endpoint of single-pole double-throw switch (SPDT) is connected with fire wire output end, the output normal-closed end of single-pole double-throw switch (SPDT) is connected with the fire wire output end of electric energy computation chip, and the output normally open end of single-pole double-throw switch (SPDT) is connected with ground terminal.The electric energy meter has the function of that automatic off-grid lets out energy, the electrical shock safety risk of effective prevention and control low pressure photovoltaic user foldback electricity.

Description

Off-grid is let out can type electric energy meter
Technical field
The present invention relates to a kind of electric energy meter (kilowatt-hour meters).
Background technique
Divide the modular design of family access scheme in state's net fortune [2016] No. 408 texts of inspection about low voltage public grid, it is desirable that Distribution low-voltage side installs a set of anti-isolated island device additional, by realizing the choosing with each low-pressure line-outgoing of low-voltage comprehensive distribution box inside the device Switching and electric blocking function are selected, photo-voltaic power supply anti-power transmission when preventing the maintenance of the area Gong Biantai from constructing.
But according to actual field investigation and daily O&M hidden troubles removing as a result, discovery install anti-isolated island device have with Lower some limitations:
1, according to [2016] No. 408 literary modular designs, to be only used for platform area low for existing anti-isolated island device in power grid at present Press distribution side, low-voltage network can only be prevented to the anti-power transmission of high-voltage fence, and low pressure photovoltaic user to platform area low-voltage distribution side and The anti-power transmission of other low-voltage customers can only be controlled by the grid-connected switch (disconnecting link) of user's drawing, can not carry out unified management and Intelligent control.And existing anti-isolated island device price is high, volume is big, installation maintenance require it is high, can not popularization and application given in counnter attack The low pressure photovoltaic power generation user of electricity and the user of self energizing.
2, after the anti-isolated island device of user side puts into operation, power supply enterprise neither has the anti-isolated island appliance arrangement performance of periodic calibration Obligation, user is also without the consciousness of maintenance power grid security.Such equipment is not belonging to the scope of metering whole-life cycle fee, device The shortage of conventional detection work, the case where will lead to failure of apparatus, are difficult to manage in time, the anti-isolated island device of any one user side Once failure, foldback electricity will the safety of personal safety and distribution running equipment to operating personnel damage.
3, wideling popularize with distribution of countries formula photovoltaic anti-poverty project, the low pressure photo-voltaic power supply user of the area Gong Biantai access Quantity be doubled and redoubled year by year, the normal work of anti-isolated island device is particularly important, but the device does not have distant place concentration The function of control.To ensure safety, before carrying out the maintenance construction of the area Gong Biantai, unit-area management person must cooperate field personnel All anti-isolated island devices within the scope of interruption maintenance are operated manually one by one, and then for low capacity distributed photovoltaic power It needs to disconnect air switch from door to door, and carries out correspondingly safety measure.Whole process is not only time-consuming and laborious, increases interruption maintenance The risk of duration and customer complaint, and since locking measure can not effectively be implemented, safety can only be carried out by suspension nameplate Risk control, can not effectively prevention and control low pressure photo-voltaic power supply and the power autonomous foldback electricity of user electrical shock safety risk.
Summary of the invention
The purpose of the present invention is to provide a kind of off-grids to let out energy type electric energy meter, which has the function of that off-grid lets out energy.
In order to achieve the object of the present invention, the technical solution used in the present invention is: off-grid lets out energy type electric energy meter, it includes Electric energy meter casing, power module, LCD MODULE, electric energy computation chip, microprocessor;The power module and the electric energy Metering chip, LCD MODULE are connected with microprocessor, and power module is for providing power supply;The electric energy computation chip and institute Microprocessor connection is stated, the magnitude of power that electric energy computation chip is measured is transmitted to the microprocessor and handles;Institute It states LCD MODULE to connect with the microprocessor, receive the data of the microprocessor transmission and is shown;Power supply mould Block, LCD MODULE, electric energy computation chip and microprocessor are located in electric energy meter casing 7, and electric energy meter casing 7 is equipped with firewire Input terminal 1, zero curve input terminal 2, zero line output end 3, fire wire output end 4, the firewire of firewire input terminal 1 and electric energy computation chip 8 Input terminal is connected, and zero curve input terminal 2 is connected with the zero curve input terminal of electric energy computation chip 8, zero line output end 3 and electrical energy measurement core The zero line output end of piece 8 is connected;
It is characterized by: electric energy meter casing is equipped with ground terminal 5, ground terminal 5 is connected by conducting wire with ground resistance 6;Electric energy There is a single-pole double-throw switch (SPDT) K in watch shell, the control terminal of the single-pole double-throw switch (SPDT) is connected with the control port of microprocessor, hilted broadsword The input endpoint of commutator is connected with fire wire output end 4, output normal-closed end and the electric energy computation chip 8 of single-pole double-throw switch (SPDT) Fire wire output end is connected, and the output normally open end of single-pole double-throw switch (SPDT) is connected with ground terminal 5.
Beneficial effects of the present invention: first is that being equipped with ground terminal using electric energy meter casing, ground terminal is by conducting wire and ground connection electricity Resistance is connected;There is a single-pole double-throw switch (SPDT) in electric energy meter, which is connected with the control port of microprocessor, and microprocessor control is opened It closes to jump and close, switch, which jumps, when needing to let out energy closes fire wire output end and ground terminal (by the process control of electric energy meter), with fire The dump energy of the connected user's photo-voltaic power supply of line output terminal vents (energy of releasing) by ground terminal.The electric energy meter has automatic Off-grid lets out energy function, and photovoltaic power generation user is effectively prevented from source to system and the anti-power transmission of other users, has filled up property right point The technical safety measures of the area Jie Dianzhitai low-voltage distributing line counnter attack power transmission electric shock, effective prevention and control low pressure photo-voltaic power supply and user are certainly Stand-by power source foldback electricity electrical shock safety risk.Second is that by by anti-isolated island function (i.e. off-grid let out can function) built-in intelligence ammeter, energy The investment of anti-isolated island device and auxiliary material at present is reduced, system resource is saved.
Detailed description of the invention
Fig. 1 is that off-grid of the present invention lets out energy type electric energy meter (after anti-isolated island function built-in intelligence ammeter) low voltage public grid point family Access scheme electric main wiring diagram.
Fig. 2 is structural schematic diagram of the invention.
In figure: 1- firewire input terminal, 2- zero curve input terminal, 3- zero line output end, 4- fire wire output end, 5- ground terminal, 6- Ground resistance, 7- electric energy meter casing, 8- electric energy computation chip.
Specific embodiment
As shown in Figure 1 and Figure 2, off-grid lets out energy type electric energy meter, it includes electric energy meter casing, power module, liquid crystal display mode Block, electric energy computation chip, microprocessor;The power module and the electric energy computation chip, LCD MODULE and micro process Device connection, power module is for providing power supply;The electric energy computation chip is connect with the microprocessor, by electric energy computation chip The magnitude of power that metering obtains is transmitted to the microprocessor and is handled;The LCD MODULE and the microprocessor connect It connects, receive the data of the microprocessor transmission and is shown;Power module, LCD MODULE, electric energy computation chip and Microprocessor is located in electric energy meter casing 7, and electric energy meter casing 7 is equipped with firewire input terminal 1, zero curve input terminal 2, zero line output end 3, fire wire output end 4, firewire input terminal 1 are connected with the firewire input terminal of electric energy computation chip 8, zero curve input terminal 2 and electric energy meter The zero curve input terminal for measuring chip 8 is connected, and zero line output end 3 is connected with the zero line output end of electric energy computation chip 8;
Electric energy meter casing is equipped with ground terminal 5, and ground terminal 5 is connected by conducting wire with ground resistance 6;Have one in electric energy meter case body Single-pole double-throw switch (SPDT) K, the control terminal of the single-pole double-throw switch (SPDT) are connected (by the program of electric energy meter with the control port of microprocessor Control single-pole double-throw switch (SPDT) from output normally open end, output normal-closed end between jumped), the input endpoint of single-pole double-throw switch (SPDT) with Fire wire output end 4 is connected, and the output normal-closed end of single-pole double-throw switch (SPDT) is connected (i.e. single with the fire wire output end of electric energy computation chip 8 Fire wire output end 4 and the fire wire output end of electric energy computation chip 8 are closed double-pole double throw switch in normal state), single-pole double throw is opened The output normally open end of pass is connected (i.e. fire wire output end 4 and ground terminal 5 are closed, and photo-voltaic power supply energy ground connection vents) with ground terminal 5; Firewire input terminal 1, zero curve input terminal 2 are connected with electric system, zero line output end 3, fire wire output end 4 and photovoltaic user (photovoltaic Power supply) it is connected.
When distributed photovoltaic power normal power generation, system power grid has a power failure suddenly, and the dump energy of photo-voltaic power supply is needed to let out Fall.The present invention realizes photo-voltaic power supply dump energy of releasing by the conversion closure of single-pole double-throw switch (SPDT) K.
Existing skill can be used in power module of the present invention, LCD MODULE, electric energy computation chip, microprocessor Art.It is control circuit (prior art can also be used) that electric energy computation chip, microprocessor are also combinable.
First is that by by anti-isolated island function (i.e. off-grid lets out energy function) built-in intelligence ammeter, so that existing anti-isolated island device It is moved forward to from user's property right separation kilowatt-hour meter from distribution transformer low-pressure line-outgoing side, is having for low voltage electric network counnter attack power transmission electric shock Imitate technical safety measures, at the same can the anti-isolated island function of remote control switching, can effective identification switch state, grasp photovoltaic in real time Power grid state.
The subprogram that wherein anti-isolated island function executes specifically includes that quality of voltage detection, and (inlet-outlet line voltage determination, whether there is or not electricity Pressure judgement), grid-connected dot frequency determined, determined based on the built-in forward and reverse power of intelligent electric meter and the judgement of switch state.
Centralized remote control power-off is carried out to photovoltaic user by acquisition system before maintenance.It is two-way due to being disconnected in advance when maintenance The grid-connected switch in the inside of electricity-measuring meter, can preferably prevent photo-voltaic power supply user accidentally close air switch and caused by misdeliver electricity. After maintenance completion, increase to photovoltaic user progress checkout voltage judgement, realizes that photovoltaic user is single or batch all supplies, powers off function Can, to guarantee that power distribution station low-voltage customer will not be because of wherein a certain family or more family photovoltaic plant anti-islanding disablers to electricity Net foldback is electric and influences the safe and reliable power supply of the same other users in area.
Second is that metering whole-life cycle fee system is made full use of to solve the problems, such as no O&M.Integrate the electricity of anti-isolated island function The meter assets that table is still within the scope of metering whole-life cycle fee can be by anti-isolated island for the meter of photo-voltaic power supply user The detection of function is included in meter calibrating project, it is ensured that the anti-isolated island function of the operation meter for distributed photovoltaic power user It is effectively controllable, the electrical shock safety risk of low pressure photovoltaic user foldback electricity when reducing the area Gong Biantai interruption maintenance conscientiously.

Claims (1)

1. off-grid let out can type electric energy meter, it includes electric energy meter casing, power module, LCD MODULE, electric energy computation chip, micro- Processor;The power module is connect with the electric energy computation chip, LCD MODULE and microprocessor, and power module is used for Power supply is provided;The electric energy computation chip is connect with the microprocessor, the magnitude of power that electric energy computation chip is measured The microprocessor is transmitted to be handled;The LCD MODULE is connect with the microprocessor, receives the micro process The data of device transmission are simultaneously shown;Power module, LCD MODULE, electric energy computation chip and microprocessor are located at electric energy meter In shell (7), electric energy meter casing (7) is defeated equipped with firewire input terminal (1), zero curve input terminal (2), zero line output end (3), firewire Outlet (4), firewire input terminal (1) are connected with the firewire input terminal of electric energy computation chip (8), zero curve input terminal (2) and electric energy meter The zero curve input terminal for measuring chip (8) is connected, and zero line output end (3) are connected with the zero line output end of electric energy computation chip (8);
It is characterized by: electric energy meter casing is equipped with ground terminal (5), ground terminal (5) is connected by conducting wire with ground resistance (6);Electricity There can be a single-pole double-throw switch (SPDT) (K) in watch shell, the control terminal of the single-pole double-throw switch (SPDT) is connected with the control port of microprocessor, The input endpoint of single-pole double-throw switch (SPDT) is connected with fire wire output end (4), the output normal-closed end and electrical energy measurement of single-pole double-throw switch (SPDT) The fire wire output end of chip (8) is connected, and the output normally open end of single-pole double-throw switch (SPDT) is connected with ground terminal (5).
CN201810624516.1A 2018-06-16 2018-06-16 Off-grid energy release type electric energy meter Active CN109061286B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810624516.1A CN109061286B (en) 2018-06-16 2018-06-16 Off-grid energy release type electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810624516.1A CN109061286B (en) 2018-06-16 2018-06-16 Off-grid energy release type electric energy meter

Publications (2)

Publication Number Publication Date
CN109061286A true CN109061286A (en) 2018-12-21
CN109061286B CN109061286B (en) 2024-07-19

Family

ID=64820395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810624516.1A Active CN109061286B (en) 2018-06-16 2018-06-16 Off-grid energy release type electric energy meter

Country Status (1)

Country Link
CN (1) CN109061286B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080034530A (en) * 2006-10-17 2008-04-22 한국전기연구원 Islanding detection method for microgrid and its device
US20100201348A1 (en) * 2007-10-17 2010-08-12 Hubei Shengjia Electric Apparatus Co., Ltd. Modular energy meter
CN106026160A (en) * 2016-03-17 2016-10-12 国家电网公司 Distributed photovoltaic generation anti-islanding protective device
US20160329721A1 (en) * 2014-01-13 2016-11-10 Gng Electrical Pty Ltd Zero export relay
CN205809581U (en) * 2016-06-16 2016-12-14 赵怀方 A kind of intelligent switch
CN106253336A (en) * 2016-08-19 2016-12-21 长园深瑞继保自动化有限公司 Distributed power source isolated island effect prevention relay protecting method
CN206076966U (en) * 2016-07-27 2017-04-05 江苏孟弗斯新能源工程有限公司 A kind of intelligent distributed photovoltaic power generation is grid-connected and switching control grid-connection cabinet
US20170302081A1 (en) * 2016-04-14 2017-10-19 Det International Holding Limited Power supply arrangement
CN107732971A (en) * 2017-11-14 2018-02-23 福建网能科技开发有限责任公司 A kind of band bidirectional current protection distributed grid-connected access case
CN208736931U (en) * 2018-06-16 2019-04-12 王德松 A kind of off-grid is let out can type electric energy meter

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080034530A (en) * 2006-10-17 2008-04-22 한국전기연구원 Islanding detection method for microgrid and its device
US20100201348A1 (en) * 2007-10-17 2010-08-12 Hubei Shengjia Electric Apparatus Co., Ltd. Modular energy meter
US20160329721A1 (en) * 2014-01-13 2016-11-10 Gng Electrical Pty Ltd Zero export relay
CN106026160A (en) * 2016-03-17 2016-10-12 国家电网公司 Distributed photovoltaic generation anti-islanding protective device
US20170302081A1 (en) * 2016-04-14 2017-10-19 Det International Holding Limited Power supply arrangement
CN205809581U (en) * 2016-06-16 2016-12-14 赵怀方 A kind of intelligent switch
CN206076966U (en) * 2016-07-27 2017-04-05 江苏孟弗斯新能源工程有限公司 A kind of intelligent distributed photovoltaic power generation is grid-connected and switching control grid-connection cabinet
CN106253336A (en) * 2016-08-19 2016-12-21 长园深瑞继保自动化有限公司 Distributed power source isolated island effect prevention relay protecting method
CN107732971A (en) * 2017-11-14 2018-02-23 福建网能科技开发有限责任公司 A kind of band bidirectional current protection distributed grid-connected access case
CN208736931U (en) * 2018-06-16 2019-04-12 王德松 A kind of off-grid is let out can type electric energy meter

Also Published As

Publication number Publication date
CN109061286B (en) 2024-07-19

Similar Documents

Publication Publication Date Title
CN101030711B (en) Microcomputer protecting controller
CN201018284Y (en) Economically intelligent synthetic power distribution unit
CN103744417A (en) Multifunctional integrated measurement and control apparatus and system for intelligent transformer station
CN202840683U (en) Low-voltage grid intelligent distribution transformer terminal
CN211958263U (en) Internet of things intelligent power box and management system
CN105186682A (en) Novel intelligent distribution box
CN104135071A (en) Multi-functional low-voltage intelligent switch
CN208736931U (en) A kind of off-grid is let out can type electric energy meter
CN201374500Y (en) Intelligent power distribution cabinet
CN110687855A (en) A safety distribution automation monitored control system for electric power trade
KR101200950B1 (en) Power management system for using wired and wireless data gathering unit
CN206922507U (en) A kind of intelligent integrated switch board
CN204376531U (en) The remote and intelligent maintenance system of transforming plant DC power supply
CN204216589U (en) A kind of be used for that platform district is idle, the quality of power supply and efficiency composite control apparatus
CN101640425A (en) Intelligent electric load management device
CN201478839U (en) Intelligent type power load management apparatus
CN108562771A (en) Biswitch off-grid is let out can type electric energy meter
CN208443890U (en) A kind of biswitch off-grid is let out can type electric energy meter
CN109061286A (en) Off-grid is let out can type electric energy meter
CN208350888U (en) Low voltage equipment intelligent power monitor
CN203135579U (en) Integrated power switchgear monitoring device
CN201860126U (en) Monitoring protection comprehensive device of low voltage unit
CN201289990Y (en) Multifunctional low voltage distribution box
CN104734351B (en) A kind of intelligent split type terminal control unit of distribution large user
CN107124039A (en) A kind of intelligent integrated switch board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant