CN109038569A - Power distribution network reconstruction method, device and system and computer readable storage medium - Google Patents

Power distribution network reconstruction method, device and system and computer readable storage medium Download PDF

Info

Publication number
CN109038569A
CN109038569A CN201810974060.1A CN201810974060A CN109038569A CN 109038569 A CN109038569 A CN 109038569A CN 201810974060 A CN201810974060 A CN 201810974060A CN 109038569 A CN109038569 A CN 109038569A
Authority
CN
China
Prior art keywords
scheme
distribution network
power distribution
reconfiguration
optimal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810974060.1A
Other languages
Chinese (zh)
Inventor
简淦杨
郭晓斌
罗俊平
刘昌�
雷金勇
袁智勇
于力
史训涛
田兵
姜臻
白浩
黄彦璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China South Power Grid International Co ltd
China Southern Power Grid Co Ltd
Original Assignee
China South Power Grid International Co ltd
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China South Power Grid International Co ltd, China Southern Power Grid Co Ltd filed Critical China South Power Grid International Co ltd
Priority to CN201810974060.1A priority Critical patent/CN109038569A/en
Publication of CN109038569A publication Critical patent/CN109038569A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The application discloses a power distribution network reconstruction method which comprises the steps of generating a preset number of initial reconstruction schemes meeting preset operation conditions according to acquired power distribution network data information, then carrying out iterative updating optimization on the initial reconstruction schemes based on a Levis flight mode and a cuckoo search algorithm, obtaining a final current optimal reconstruction scheme when the updating optimization times reach a preset optimization upper limit, and further reconstructing a power distribution network based on the current optimal reconstruction scheme. The method can be used for efficiently optimizing and obtaining a more accurate optimal power distribution network reconstruction scheme so as to reconstruct the power distribution network. The application also discloses a power distribution network reconstruction device, a power distribution network reconstruction system and a computer readable storage medium, which have the beneficial effects.

Description

A kind of reconstruction method of power distribution network, device, system and computer readable storage medium
Technical field
This application involves distribution network technology field, in particular to a kind of reconstruction method of power distribution network further relates to a kind of power distribution network Device, system and computer readable storage medium.
Background technique
Power distribution network may cause operational efficiency and power supply quality be not high to ask because the method for operation is improper at runtime Topic, to influence the effectiveness of operation of power grid enterprises and the customer service quality of sale of electricity enterprise.By planning as a whole, power distribution network is adjustable to be opened It puts row power distribution network reconfiguration into, is the important means for promoting power distribution network operational efficiency and power supply quality.As country continues to increase electricity The dynamics of power system reform, electricity market are graduallyed relax control, especially in increment distribution business scope, a large amount of emerging sale of electricity companies with Competition between traditional power grid enterprise is more fierce, and it is horizontal to the operation management of power distribution network greatly to test power grid enterprises, because This, needs more to combine practical operation situation, and power distribution network optimization operation is realized by power distribution network reconfiguration.
In the prior art, generally by cuckoo searching algorithm (Cuckoo search, CS) to multiple power distribution network reconfiguration sides Case carries out optimizing processing, optimal power distribution network reconfiguration scheme is obtained, to realize the reconstruct of power distribution network.Wherein, cuckoo searching algorithm Be it is a kind of imitation cuckoo by host's Bird's Nest hatch and bring up offspring parasitic nestling behavior develop made of optimizing algorithm, have For body, cuckoo takes advantage of the opportunity that host bird is looked for food outside, and cuckoo bird egg is produced host's Bird's Nest in other species;Cuckoo children After bird birth, other bird eggs in same Bird's Nest can be released to Bird's Nest, and issue the cry louder than host birdling and attract to obtain More feedings;When host bird finds strange bird egg can be released to Bird's Nest, or abandon Bird's Nest simultaneously there are when strange bird egg in Bird's Nest It finds place and newly builds Bird's Nest;As a result, during this is constantly competed, the bird egg of cuckoo and birdling cry are towards simulation The direction of host bird is developed, to fight the resolution capability that host bird is constantly evolved.It therefore, can be real based on cuckoo searching algorithm Now the optimizing of multiple power distribution network reconfiguration schemes is handled, is realized with further obtaining optimal power distribution network reconfiguration scheme with power distribution network Reconstruct.
However, optimal power distribution network reconfiguration scheme is obtained there are problems based on original cuckoo searching algorithm optimizing, When carrying out initial operation, since the randomness of its initialized location is larger, corresponding final search precision is lower, The case where being easy to appear local optimum, to be difficult to obtain real optimal power distribution network reconfiguration scheme;In addition, being searched in cuckoo The iteration later period of algorithm, due to its convergence rate problem that is slower, and causing Searching efficiency lower.
Therefore, how optimizing obtains more accurate optimal power distribution network reconfiguration scheme, to realize the reconstruct to power distribution network Journey, while improving Searching efficiency is those skilled in the art's urgent problem to be solved.
Summary of the invention
The purpose of the application is to provide a kind of reconstruction method of power distribution network, this method can greater efficiency optimizing obtain it is more smart True optimal power distribution network reconfiguration scheme realizes the reconstruct to power distribution network;The another object of the application is to provide a kind of power distribution network weight Structure device, system and computer readable storage medium all have above-mentioned beneficial effect.
In order to solve the above technical problems, this application provides a kind of reconstruction method of power distribution network, comprising:
The initial reconstitution scheme that predetermined quantity meets preset operating conditions is generated according to the power distribution network data information of acquisition;
Energy consumption calculation is carried out to each initial reconstitution scheme, obtains initial optimal reconfiguration scheme;
Using the initial optimal reconfiguration scheme as reference data, using Lay dimension offline mode to each initial reconstitution side Case is updated, and obtains the first reconfiguration scheme that the predetermined quantity meets the preset operating conditions;
Energy consumption calculation is carried out to each first reconfiguration scheme, obtains the first optimal reconfiguration scheme;
Using the described first optimal reconfiguration scheme as reference data, based on cuckoo searching algorithm to each first reconstruct Scheme is updated, and obtains the second reconfiguration scheme that the predetermined quantity meets the preset operating conditions;
Energy consumption calculation is carried out to each second reconfiguration scheme, obtains the second optimal reconfiguration scheme;
Judge to update whether optimizing number reaches the default optimizing upper limit;
If the update optimizing number reaches the default optimizing upper limit, using the described second optimal reconfiguration scheme as working as Preceding optimal reconfiguration scheme, and power distribution network is reconstructed based on the current optimal reconfiguration scheme;
It is ginseng with the described second optimal reconfiguration scheme if the update optimizing number is not up to the default optimizing upper limit Benchmark is examined, optimizing is re-started to each second reconfiguration scheme and is updated, until the update optimizing number reaches described pre- If the optimizing upper limit, obtain the current optimal reconfiguration scheme, and based on the current optimal reconfiguration scheme to the power distribution network into Row reconstruct.
Preferably, the preset operating conditions include:
The corresponding power distribution network of each reconfiguration scheme is all satisfied the radial method of operation;
The corresponding each load of each reconfiguration scheme is effectively powered.
Preferably, judge whether the corresponding power distribution network of each reconfiguration scheme is all satisfied the radial method of operation, comprising:
The interconnection switch number that closing or opening is in the corresponding power distribution network of each reconfiguration scheme is judged, with initial fortune Whether the interconnection switch number in the corresponding power distribution network of row scheme in closing or opening is consistent;If consistent, meet the radiation The shape method of operation.
Preferably, judge whether each load is effectively powered in the corresponding power distribution network of each reconfiguration scheme, comprising:
Load flow calculation is carried out to the corresponding power distribution network of each reconfiguration scheme, obtains each node voltage and each line power;
Judge whether each node voltage and each line power meet preset condition, if satisfied, then described each negative Lotus is effectively powered.
Preferably, described that energy consumption calculation is carried out to each initial reconstitution scheme, obtain initial optimal reconfiguration scheme, packet It includes:
It calculates and obtains the corresponding losses of distribution network of each initial reconstitution scheme;
It is calculated according to the losses of distribution network and obtains the corresponding losses of distribution network ratio of each initial reconstitution scheme;
Corresponding initial reconstitution scheme is as the initial optimal reconstruct when choosing the losses of distribution network than value minimum Scheme.
Preferably, the losses of distribution network is obtained based on formula:
Wherein,For the losses of distribution network of i-th of initial reconstitution scheme;RjFor the fever equivalent resistance of route j;PjtFor The active power of t period route j transmission;QjtFor the reactive power of t period route j transmission;VjtIt is leaned on for t period route j The voltage value of nearly power end;T is the quantity of the period, and L is the quantity of the route;As i=0,It is described initial The corresponding losses of distribution network of operating scheme.
Preferably, the losses of distribution network ratio is obtained based on formula:
Wherein, FiFor the corresponding losses of distribution network ratio of i-th of initial reconstitution scheme.
In order to solve the above technical problems, this application provides a kind of power distribution network reconfiguration devices, comprising:
Schemes generation module meets default operation item for generating predetermined quantity according to the power distribution network data information of acquisition The initial reconstitution scheme of part;
First energy consumption calculation module obtains initial optimal for carrying out energy consumption calculation to each initial reconstitution scheme Reconfiguration scheme;
First scheme update module, for tieing up flight mould using Lay using the initial optimal reconfiguration scheme as reference data Formula is updated each initial reconstitution scheme, obtains the predetermined quantity and meets the first of the preset operating conditions Reconfiguration scheme;
It is optimal to obtain first for carrying out energy consumption calculation to each first reconfiguration scheme for second energy consumption calculation module Reconfiguration scheme;
Alternative plan update module, for being searched for based on cuckoo using the described first optimal reconfiguration scheme as reference data Algorithm is updated each first reconfiguration scheme, obtains the predetermined quantity meets the preset operating conditions the Two reconfiguration schemes;
It is optimal to obtain second for carrying out energy consumption calculation to each second reconfiguration scheme for third energy consumption calculation module Reconfiguration scheme;
Optimizing times condition judgment module updates whether optimizing number reaches the default optimizing upper limit for judging;If so, Into power distribution network reconfiguration module;If it is not, being then back to the first scheme update module, realize with the described second optimal reconstruct side Case is reference data, re-starts optimizing to each second reconfiguration scheme and updates, until the update optimizing number reaches The default optimizing upper limit;
The power distribution network reconfiguration module is used for using the described second optimal reconfiguration scheme as current optimal reconfiguration scheme, and Power distribution network is reconstructed based on the current optimal reconfiguration scheme.
In order to solve the above technical problems, present invention also provides a kind of power distribution network reconfiguration systems, comprising:
Memory, for storing computer program;
Processor realizes reconstruction method of power distribution network described in any one of the above when for executing the computer program Step.
In order to solve the above technical problems, this application provides a kind of computer readable storage medium, it is described computer-readable Computer program is stored on storage medium, the computer program is realized described in any one of the above when being executed by processor The step of reconstruction method of power distribution network.
A kind of reconstruction method of power distribution network provided herein, it is predetermined including being generated according to the power distribution network data information of acquisition Quantity meets the initial reconstitution scheme of preset operating conditions;Energy consumption calculation is carried out to each initial reconstitution scheme, is obtained Initial optimal reconfiguration scheme;Using the initial optimal reconfiguration scheme as reference data, using Lay dimension offline mode to each described Initial reconstitution scheme is updated, and obtains the first reconfiguration scheme that the predetermined quantity meets the preset operating conditions;It is right Each first reconfiguration scheme carries out energy consumption calculation, obtains the first optimal reconfiguration scheme;With the described first optimal reconfiguration scheme For reference data, each first reconfiguration scheme is updated based on cuckoo searching algorithm, obtains the predetermined quantity A the second reconfiguration scheme for meeting the preset operating conditions;Energy consumption calculation is carried out to each second reconfiguration scheme, is obtained Second optimal reconfiguration scheme;Judge to update whether optimizing number reaches the default optimizing upper limit;If the update optimizing number reaches The default optimizing upper limit, then using the described second optimal reconfiguration scheme as current optimal reconfiguration scheme, and based on described current Power distribution network is reconstructed in optimal reconfiguration scheme;If the update optimizing number is not up to the default optimizing upper limit, with institute Stating the second optimal reconfiguration scheme is reference data, re-starts optimizing to each second reconfiguration scheme and updates, until described It updates optimizing number and reaches the default optimizing upper limit, obtain the current optimal reconfiguration scheme, and based on described current optimal The power distribution network is reconstructed in reconfiguration scheme.
As it can be seen that reconstruction method of power distribution network provided herein, is matching the multiple of generation using cuckoo searching algorithm It during reconfiguration of electric networks scheme carries out optimizing, is combined with Lay dimension offline mode (L é vy Flights, LF), is tieed up and flown by Lay Row mode expands the search range of optimal power distribution network reconfiguration scheme, substantially increases the diversity of initialized location, effectively mentions The high precision of cuckoo optimizing dynamic process, so as to avoid there is the case where local optimum;Cloth is also effectively increased simultaneously The convergence rate in paddy bird searching algorithm later period, further improves Searching efficiency, to obtain optimal power distribution network reconfiguration scheme, thus Realize the reconstruct to power distribution network.
A kind of power distribution network reconfiguration device, system and computer readable storage medium provided herein, all has above-mentioned Beneficial effect, details are not described herein.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of application for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of flow diagram of reconstruction method of power distribution network provided herein;
Fig. 2 is a kind of flow diagram of power distribution network Calculation Method of Energy Consumption provided herein;
Fig. 3 is a kind of schematic diagram of power distribution network reconfiguration device provided herein;
Fig. 4 is a kind of schematic diagram of power distribution network reconfiguration system provided herein.
Specific embodiment
The core of the application is to provide a kind of reconstruction method of power distribution network, this method can greater efficiency optimizing obtain it is more smart True optimal power distribution network reconfiguration scheme realizes the reconstruct to power distribution network;Another core of the application is to provide a kind of power distribution network weight Structure device, system and computer readable storage medium, it may have above-mentioned beneficial effect.
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art All other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Referring to FIG. 1, Fig. 1 is a kind of flow diagram of reconstruction method of power distribution network provided herein, this method can To include:
S1: the initial reconstitution side that predetermined quantity meets preset operating conditions is generated according to the power distribution network data information of acquisition Case;
Specifically, the essential information of power distribution network can be obtained first, i.e., above-mentioned power distribution network data information, further, Ji Keji The initial power distribution network reconfiguration scheme of predetermined quantity, i.e., above-mentioned initial reconstitution scheme are generated in the power distribution network data information.Wherein, Above-mentioned power distribution network data information may include power distribution network topological structure, each feeder line capacity, each capacity of distribution transform, each load point predetermined time It is respectively switched under active and idle curve, each route maximum transfer capacity, each node voltage bound, initial launch mode in section The relevant informations such as state;For the duration of above-mentioned predetermined amount of time, the application can be one day or one hour etc. without limitation. In addition, the quantity of the initial reconstitution scheme for above-mentioned generation, i.e., above-mentioned predetermined quantity can be based on actual conditions voluntarily by user Setting, the application do not do unique restriction to it.
Wherein, it for the generation method of above-mentioned initial reconstitution scheme, can be realized based on cuckoo searching algorithm, due to each The reconfiguration scheme of power distribution network is all to be made of the topological relation of its switch, therefore each scheme can be regarded as to a Bird's Nest, just The predetermined quantity Bird's Nest of beginningization can be indicated with the state of each switch.Certainly, which is only that the application is mentioned A kind of embodiment supplied, not uniquely.
It should be noted that above-mentioned each initial reconstitution scheme is to meet the scheme of preset operating conditions, that is, obtain Each initial reconstitution scheme be can run, enforceable power distribution network reconfiguration scheme.
Optionally, above-mentioned preset operating conditions may include: the corresponding power distribution network of each reconfiguration scheme be all satisfied it is radial The method of operation;The corresponding each load of each reconfiguration scheme is effectively powered.
Specifically, the reconfiguration scheme obtained for above steps is the reconfiguration scheme for meeting preset operating conditions, i.e., Each reconfiguration scheme is that can run, is enforceable.Wherein, corresponding preset operating conditions may include: firstly, each step is raw At each reconfiguration scheme when power distribution network is reconstructed, be intended to meet the radial method of operation;Secondly, it is to be ensured that each step When power distribution network is reconstructed, each load is intended to effectively be powered each reconfiguration scheme generated.
Preferably, judge whether the corresponding power distribution network of each reconfiguration scheme is all satisfied the radial method of operation, may include: Judge the interconnection switch number that closing or opening is in the corresponding power distribution network of each reconfiguration scheme, it is corresponding with initial launch scheme Whether the interconnection switch number in power distribution network in closing or opening is consistent;If consistent, meet the radial method of operation.
Specifically, each power distribution network reconfiguration scheme is made of switch topology relationship as, each scheme can be regarded to a bird Nest, N number of Bird's Nest of initialization can be used each switch state to indicate.In practical projects, it has integrated and has examined when distribution network closed-loop design Consider the more feasible radial method of operation, usually can only carry out grid switching operation, power distribution network reconfiguration scheme to interconnection switch It can simplify to be indicated with interconnection switch state:
Wherein, TiIndicate i-th of Bird's Nest, i.e. i-th of reconfiguration scheme, i can value 1 arrive N, i.e., explanation shares N number of Bird's Nest, I.e. N number of reconfiguration scheme;Each element in each Bird's Nest is that 0 or 1,0 expression switchs separating brake, and 1 indicates that switch closes a floodgate, power distribution network B interconnection switch is shared in network.
Based on this, whether the power distribution network that verify after reconstruct meets the radial method of operation, then need to check based on each heavy After power distribution network is reconstructed in structure scheme, wherein when interconnection switch number and original state in closure (or disconnect) whether one It causes, that is, judges whether to meet following equation:
Wherein, C0Power distribution network is in the interconnection switch number of closure as under original state.
Preferably, judge that whether each load is effectively powered in the corresponding power distribution network of each reconfiguration scheme, can wrap It includes: Load flow calculation being carried out to the corresponding power distribution network of each reconfiguration scheme, obtains each node voltage and each line power;Judge each section Whether point voltage and each line power meet preset condition, if satisfied, then each load is effectively powered.
Specifically, to verify whether each load is effectively powered, it can be by carrying out trend to the power distribution network after reconstruct It calculates, obtains each node voltage and each line power, check after power distribution network is reconstructed based on each reconfiguration scheme, power distribution network is each Whether node voltage and each line power meet with lower inequality:
Wherein, VbtFor the voltage magnitude of t-th of period node b,WithThe voltage of respectively corresponding node is upper and lower Limit;PjtFor t-th of period route j transmission active power,For the maximum transfer capacity of corresponding line.
S2: carrying out energy consumption calculation to each initial reconstitution scheme, obtains initial optimal reconfiguration scheme;
Specifically, after obtaining predetermined quantity and meeting the initial reconstitution scheme of preset operating conditions, it can be to based on each The power distribution network of a initial reconstitution scheme reconstruct carries out energy consumption calculation, to obtain initial optimal reconfiguration scheme, and as reference base Standard realizes subsequent optimizing processing.
Optionally, referring to FIG. 2, the process that Fig. 2 is a kind of power distribution network Calculation Method of Energy Consumption provided herein is illustrated Scheme, energy consumption calculation is carried out to each initial reconstitution scheme in above-mentioned S2, obtains initial optimal reconfiguration scheme, may include:
S201: it calculates and obtains the corresponding losses of distribution network of each initial reconstitution scheme;
S202: it is calculated according to losses of distribution network and obtains the corresponding losses of distribution network ratio of each initial reconstitution scheme;
S203: corresponding initial reconstitution scheme is as initial optimal reconstruct side when choosing losses of distribution network than value minimum Case.
Specifically, the Calculation Method of Energy Consumption of each initial reconstitution scheme can be realized based on losses of distribution network, can first calculate each The corresponding losses of distribution network of power distribution network after the corresponding reconstruct of a initial reconstitution scheme, further obtains corresponding losses of distribution network Than, and corresponding initial reconstitution scheme is chosen when losses of distribution network ratio is minimized as above-mentioned initial optimal reconfiguration scheme.
Preferably, losses of distribution network can be obtained based on formula:
Wherein,For the losses of distribution network of i-th of initial reconstitution scheme;RjFor the fever equivalent resistance of route j;PjtFor The active power of t period route j transmission;QjtFor the reactive power of t period route j transmission;VjtIt is leaned on for t period route j The voltage value of nearly power end;T is the quantity of period, and L is the quantity of route;As i=0,It is corresponding for initial launch scheme Losses of distribution network.
Preferably, losses of distribution network ratio can be obtained based on formula:
Wherein, FiFor the corresponding losses of distribution network ratio of i-th of initial reconstitution scheme.
At this point, F can be chosen from N number of Bird's NestiThe smallest Bird's Nest is as initial optimal Bird's Nest Ti best, i.e., above-mentioned initial Optimal reconfiguration scheme, meanwhile, the FiInitial value F as optimal objective functioni best.Wherein, above-mentioned Pjt、Qjt、VjtIt can root Show that details are not described herein by the application according to the Load flow calculation of day part t under initial reconstitution scheme i.
S3: using initial optimal reconfiguration scheme as reference data, using Lay dimension offline mode to each initial reconstitution scheme into Row updates, and obtains the first reconfiguration scheme that the predetermined quantity meets preset operating conditions;
Specifically, after obtaining initial optimal reconfiguration scheme, i.e., using Lay dimension offline mode to except above-mentioned initial optimal Other each initial reconstitution schemes except reconfiguration scheme are updated processing, to obtain the first reconfiguration scheme of predetermined quantity. Wherein, the flight of Lay dimension is a kind of random walk, and flight interval obeys power law distribution, is flown in intelligent optimization algorithm using Lay dimension Row mode can effectively expand search range, and the multiplicity for increasing particle populations is new, and Lay is tieed up offline mode and cuckoo as a result, Searching algorithm combines, and substantially increases the diversity of initialized location, effectively increases the essence of cuckoo optimizing dynamic process Degree.
Specifically, tieing up offline mode based on Lay to the initial reconstitution scheme in addition to above-mentioned initial optimal reconfiguration scheme When being updated processing, it can be updated according to the following formula:
Wherein, α > 0 is step factor;Expression rounds up to each element in vector, while ensuring its value not Greater than 1 and it is not less than 0, particularly, value is taken as 1 when being greater than 1, is taken as 0 when less than 0;Indicate each member to the right and left vector Element is corresponding to carry out product operation;L is the B dimensional vector for indicating Lay dimension flight coefficient, each of which element is random number, below with the For p ties up component (p=1,2 ..., B), meet following formula:
Wherein, stochastic variable xpAnd ypThe normal distribution that mean value is 0 is obeyed, standard deviation is respectively as follows:
σyp(β)=1;
Wherein, β is distribution factor, and value range is 0.3≤β≤1.99, determines value for it, can be sought according to actual The demands such as excellent speed, optimizing result quality are chosen in its value range in conjunction with specific experience;Γ () is standard gal Ma distribution function.
In addition, each first reconfiguration scheme that above-mentioned steps obtain is both needed to ensure to meet preset operating conditions, it is each to ensure A first reconfiguration scheme be can run, enforceable power distribution network reconfiguration scheme can refer to aforementioned each its verification mode The checking procedure of initial reconstitution scheme, details are not described herein.
S4: energy consumption calculation is carried out to each first reconfiguration scheme, obtains the first optimal reconfiguration scheme;
Specifically, after obtaining predetermined quantity and meeting the first reconfiguration scheme of preset operating conditions, it can be to based on each The power distribution network of a first reconfiguration scheme reconstruct carries out energy consumption calculation, to obtain the first optimal reconfiguration scheme, and as reference base Standard realizes subsequent optimizing processing.
S5: using the first optimal reconfiguration scheme as reference data, based on cuckoo searching algorithm to each first reconfiguration scheme It is updated, obtains the second reconfiguration scheme that predetermined quantity meets preset operating conditions;
Specifically, after obtaining the first optimal reconfiguration scheme, i.e., using cuckoo searching algorithm again to except above-mentioned the Other each first reconfiguration schemes except one optimal reconfiguration scheme are updated processing, to obtain the second reconstruct of predetermined quantity Scheme, namely simulation host bird carry out the first reconfiguration scheme of predetermined quantity in such a way that certain probability finds exotic bird eggs Update processing obtains the second reconfiguration scheme of predetermined quantity.
Specifically, based on cuckoo searching algorithm to each first weight in addition to the above-mentioned first optimal reconfiguration scheme When structure scheme is updated processing, it can be updated according to the following formula:
Wherein, ηjThe marker bit that exotic bird eggs are found for host bird, can be based on host during each iterative processing The probability of bird discovery exotic bird eggs regenerates;uj、vj、wjIt is B dimension random vector, the area each of which element value range Jun Between between [0,1], and obey mean value be 0, the standardized normal distribution N (0,1) that standard deviation is 1;In addition, ηjObey following two-value Distribution:
Wherein, random number q value range is between section [0,1], and obeys the normal state point that mean value is 0.5, standard deviation is 1 Cloth N (0.5,1);Pd The probability of exotic bird eggs is found for host bird.
Wherein, each second reconfiguration scheme that above-mentioned steps obtain is both needed to ensure to meet preset operating conditions, each to ensure A second reconfiguration scheme be can run, enforceable power distribution network reconfiguration scheme can refer to aforementioned each its verification mode The checking procedure of initial reconstitution scheme, details are not described herein.
S6: energy consumption calculation is carried out to each second reconfiguration scheme, obtains the second optimal reconfiguration scheme;
Specifically, after obtaining predetermined quantity and meeting the second reconfiguration scheme of preset operating conditions, it can be to based on each The power distribution network of a second reconfiguration scheme reconstruct carries out energy consumption calculation, to obtain the second optimal reconfiguration scheme, thus completes primary The optimizing processing that offline mode and cuckoo searching algorithm are completely tieed up based on Lay, further can be according to the second optimal reconstruct Scheme carries out subsequent processing.
S7: judge to update whether optimizing number reaches the default optimizing upper limit;If so, into S8;If it is not, being then back to S3;
S8: using the second optimal reconfiguration scheme as current optimal reconfiguration scheme, and based on current optimal reconfiguration scheme to matching Power grid is reconstructed.
Specifically, processing can be iterated using S3 to S6 as loop body, after successively having executed the loop body, can sentence It is disconnected to update whether optimizing number has reached the default optimizing upper limit, if not up to, can return to S3, with the second optimal reconfiguration scheme For reference data, Lay dimension offline mode and cuckoo searching algorithm are based on again to the second reconfiguration scheme of predetermined quantity of acquisition It is updated processing, until updating optimizing number reaches the default optimizing upper limit, to obtain current optimal reconfiguration scheme;If update is sought Excellent number has reached the default optimizing upper limit, then can be using the second of acquisition the optimal reconfiguration scheme as current reconfiguration scheme;Further, i.e., Subsequent power distribution network reconfiguration operation can be carried out according to current reconfiguration scheme.Wherein, above-mentioned update optimizing number is with S3 to S6 As the number that loop body is iterated, the above-mentioned default optimizing upper limit can be based on actual conditions sets itself, the application by user Without limitation to it.In addition, the default optimizing upper limit is higher, cuckoo optimizing result precision is higher, but time-consuming relatively long;It is default The optimizing upper limit is lower, and cuckoo optimizing result precision is also lower, but time-consuming relatively short.
Reconstruction method of power distribution network provided herein, in multiple power distribution network weights using cuckoo searching algorithm to generation During structure scheme carries out optimizing, is combined with Lay dimension offline mode (L é vy Flights, LF), offline mode is tieed up by Lay The search range for expanding optimal power distribution network reconfiguration scheme, substantially increases the diversity of initialized location, effectively increases cloth The precision of paddy bird optimizing dynamic process, so as to avoid there is the case where local optimum;Cuckoo is also effectively increased simultaneously to search The convergence rate in rope algorithm later period, further improves Searching efficiency, to obtain optimal power distribution network reconfiguration scheme, thus realization pair The reconstruct of power distribution network.
To solve the above problems, referring to FIG. 3, Fig. 3 is a kind of signal of power distribution network reconfiguration device provided herein Figure, the apparatus may include:
Schemes generation module 10 meets default operation for generating predetermined quantity according to the power distribution network data information of acquisition The initial reconstitution scheme of condition;
First energy consumption calculation module 20 obtains initial optimal heavy for carrying out energy consumption calculation to each initial reconstitution scheme Structure scheme;
First scheme update module 30, for tieing up offline mode using Lay using initial optimal reconfiguration scheme as reference data Each initial reconstitution scheme is updated, the first reconfiguration scheme that predetermined quantity meets preset operating conditions is obtained;
It is optimal heavy to obtain first for carrying out energy consumption calculation to each first reconfiguration scheme for second energy consumption calculation module 40 Structure scheme;
Alternative plan update module 50, for being calculated based on cuckoo search using the first optimal reconfiguration scheme as reference data Method is updated each first reconfiguration scheme, obtains the second reconfiguration scheme that predetermined quantity meets preset operating conditions;
It is optimal heavy to obtain second for carrying out energy consumption calculation to each second reconfiguration scheme for third energy consumption calculation module 60 Structure scheme;
Optimizing times condition judgment module 70 updates whether optimizing number reaches the default optimizing upper limit for judging;If so, Then enter power distribution network reconfiguration module 80;If it is not, being then back to first scheme update module 30, realize with the second optimal reconfiguration scheme For reference data, optimizing is re-started to each second reconfiguration scheme and is updated, reached in default optimizing until updating optimizing number Limit;
Power distribution network reconfiguration module 80 is used for using the second optimal reconfiguration scheme as current optimal reconfiguration scheme, and is based on working as Power distribution network is reconstructed in preceding optimal reconfiguration scheme.
As a kind of preferred embodiment, above-mentioned first energy consumption calculation module 20 may include:
First computational submodule obtains the corresponding losses of distribution network of each initial reconstitution scheme for calculating;
Second computational submodule obtains the corresponding power distribution network of each initial reconstitution scheme for calculating according to losses of distribution network Loss ratio;
Scheme selection submodule, corresponding initial reconstitution scheme is as just when for choosing losses of distribution network than value minimum Begin optimal reconfiguration scheme.
Above method embodiment is please referred to for the introduction of device provided by the present application, this will not be repeated here by the application.
To solve the above problems, referring to FIG. 4, Fig. 4 is a kind of signal of power distribution network reconfiguration system provided herein Figure, the system can include:
Memory 1, for storing computer program;
Processor 2 can realize following steps when for executing computer program:
The initial reconstitution scheme that predetermined quantity meets preset operating conditions is generated according to the power distribution network data information of acquisition; Energy consumption calculation is carried out to each initial reconstitution scheme, obtains initial optimal reconfiguration scheme;It is reference with initial optimal reconfiguration scheme Benchmark is updated each initial reconstitution scheme using Lay dimension offline mode, obtains predetermined quantity and meets default operation item First reconfiguration scheme of part;Energy consumption calculation is carried out to each first reconfiguration scheme, obtains the first optimal reconfiguration scheme;Most with first Excellent reconfiguration scheme is reference data, is updated based on cuckoo searching algorithm to each first reconfiguration scheme, and predetermined number is obtained Amount meets the second reconfiguration scheme of preset operating conditions;Energy consumption calculation is carried out to each second reconfiguration scheme, obtains second most Excellent reconfiguration scheme;Judge to update whether optimizing number reaches the default optimizing upper limit;If updating optimizing number to reach in default optimizing Limit, then using the second optimal reconfiguration scheme as current optimal reconfiguration scheme, and based on currently optimal reconfiguration scheme to power distribution network into Row reconstruct;If the not up to default optimizing upper limit of optimizing number is updated, using the second optimal reconfiguration scheme as reference data, to each Second reconfiguration scheme re-starts optimizing update, until updating optimizing number reaches the default optimizing upper limit, obtains current optimal heavy Structure scheme, and power distribution network is reconstructed based on current optimal reconfiguration scheme.
Above method embodiment is please referred to for the introduction of system provided by the present application, this will not be repeated here by the application.
To solve the above problems, present invention also provides a kind of computer readable storage medium, the computer-readable storage It is stored with computer program on medium, can realize following steps when computer program is executed by processor:
The initial reconstitution scheme that predetermined quantity meets preset operating conditions is generated according to the power distribution network data information of acquisition; Energy consumption calculation is carried out to each initial reconstitution scheme, obtains initial optimal reconfiguration scheme;It is reference with initial optimal reconfiguration scheme Benchmark is updated each initial reconstitution scheme using Lay dimension offline mode, obtains predetermined quantity and meets default operation item First reconfiguration scheme of part;Energy consumption calculation is carried out to each first reconfiguration scheme, obtains the first optimal reconfiguration scheme;Most with first Excellent reconfiguration scheme is reference data, is updated based on cuckoo searching algorithm to each first reconfiguration scheme, and predetermined number is obtained Amount meets the second reconfiguration scheme of preset operating conditions;Energy consumption calculation is carried out to each second reconfiguration scheme, obtains second most Excellent reconfiguration scheme;Judge to update whether optimizing number reaches the default optimizing upper limit;If updating optimizing number to reach in default optimizing Limit, then using the second optimal reconfiguration scheme as current optimal reconfiguration scheme, and based on currently optimal reconfiguration scheme to power distribution network into Row reconstruct;If the not up to default optimizing upper limit of optimizing number is updated, using the second optimal reconfiguration scheme as reference data, to each Second reconfiguration scheme re-starts optimizing update, until updating optimizing number reaches the default optimizing upper limit, obtains current optimal heavy Structure scheme, and power distribution network is reconstructed based on current optimal reconfiguration scheme.
The computer readable storage medium may include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic or disk etc. is various to deposit Store up the medium of program code.
Above method embodiment is please referred to for the introduction of computer readable storage medium provided by the present application, the application exists This is not repeated them here.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration ?.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond scope of the present application.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
Reconstruction method of power distribution network provided herein, device, system and computer readable storage medium are carried out above It is discussed in detail.Specific examples are used herein to illustrate the principle and implementation manner of the present application, above embodiments Explanation be merely used to help understand the present processes and its core concept.It should be pointed out that for the common of the art For technical staff, under the premise of not departing from the application principle, can also to the application, some improvement and modification can also be carried out, these Improvement and modification also fall into the protection scope element of the claim of this application.

Claims (10)

1. a kind of reconstruction method of power distribution network characterized by comprising
The initial reconstitution scheme that predetermined quantity meets preset operating conditions is generated according to the power distribution network data information of acquisition;
Energy consumption calculation is carried out to each initial reconstitution scheme, obtains initial optimal reconfiguration scheme;
Using the initial optimal reconfiguration scheme as reference data, using Lay dimension offline mode to each initial reconstitution scheme into Row updates, and obtains the first reconfiguration scheme that the predetermined quantity meets the preset operating conditions;
Energy consumption calculation is carried out to each first reconfiguration scheme, obtains the first optimal reconfiguration scheme;
Using the described first optimal reconfiguration scheme as reference data, based on cuckoo searching algorithm to each first reconfiguration scheme It is updated, obtains the second reconfiguration scheme that the predetermined quantity meets the preset operating conditions;
Energy consumption calculation is carried out to each second reconfiguration scheme, obtains the second optimal reconfiguration scheme;
Judge to update whether optimizing number reaches the default optimizing upper limit;
If the update optimizing number reaches the default optimizing upper limit, using the described second optimal reconfiguration scheme as it is current most Excellent reconfiguration scheme, and power distribution network is reconstructed based on the current optimal reconfiguration scheme;
It is with reference to base with the described second optimal reconfiguration scheme if the update optimizing number is not up to the default optimizing upper limit Standard re-starts optimizing to each second reconfiguration scheme and updates, until the update optimizing number reaches described preset and seeks The excellent upper limit obtains the current optimal reconfiguration scheme, and carries out weight to the power distribution network based on the current optimal reconfiguration scheme Structure.
2. reconstruction method of power distribution network as described in claim 1, which is characterized in that the preset operating conditions include:
The corresponding power distribution network of each reconfiguration scheme is all satisfied the radial method of operation;
Each load is effectively powered in the corresponding power distribution network of each reconfiguration scheme.
3. reconstruction method of power distribution network as claimed in claim 2, which is characterized in that judge the corresponding power distribution network of each reconfiguration scheme Whether the radial method of operation is all satisfied, comprising:
The interconnection switch number that closing or opening is in the corresponding power distribution network of each reconfiguration scheme is judged, with initial launch side Whether the interconnection switch number in the corresponding power distribution network of case in closing or opening is consistent;If consistent, meet the radial fortune Line mode.
4. reconstruction method of power distribution network as claimed in claim 2, which is characterized in that judge the corresponding power distribution network of each reconfiguration scheme In each load whether effectively powered, comprising:
Load flow calculation is carried out to the corresponding power distribution network of each reconfiguration scheme, obtains each node voltage and each line power;
Judge whether each node voltage and each line power meet preset condition, if satisfied, then each load is equal Effectively powered.
5. reconstruction method of power distribution network as described in claim 1, which is characterized in that it is described to each initial reconstitution scheme into Row energy consumption calculation obtains initial optimal reconfiguration scheme, comprising:
It calculates and obtains the corresponding losses of distribution network of each initial reconstitution scheme;
It is calculated according to the losses of distribution network and obtains the corresponding losses of distribution network ratio of each initial reconstitution scheme;
Corresponding initial reconstitution scheme is as the initial optimal reconfiguration scheme when choosing the losses of distribution network than value minimum.
6. reconstruction method of power distribution network as claimed in claim 5, which is characterized in that obtain the losses of distribution network based on formula:
Wherein,For the losses of distribution network of i-th of initial reconstitution scheme;RjFor the fever equivalent resistance of route j;PjtWhen for t The active power of section route j transmission;QjtFor the reactive power of t period route j transmission;VjtIt is t period route j close to electricity The voltage value of source;T is the quantity of the period, and L is the quantity of the route;As i=0,For the initial launch The corresponding losses of distribution network of scheme.
7. reconstruction method of power distribution network as claimed in claim 6, which is characterized in that obtain the losses of distribution network based on formula Than:
Wherein, FiFor the corresponding losses of distribution network ratio of i-th of initial reconstitution scheme.
8. a kind of power distribution network reconfiguration side's device characterized by comprising
Schemes generation module meets preset operating conditions for generating predetermined quantity according to the power distribution network data information of acquisition Initial reconstitution scheme;
First energy consumption calculation module obtains initial optimal reconstruct for carrying out energy consumption calculation to each initial reconstitution scheme Scheme;
First scheme update module, for tieing up offline mode pair using Lay using the initial optimal reconfiguration scheme as reference data Each initial reconstitution scheme is updated, and obtains the first reconstruct that the predetermined quantity meets the preset operating conditions Scheme;
Second energy consumption calculation module obtains the first optimal reconstruct for carrying out energy consumption calculation to each first reconfiguration scheme Scheme;
Alternative plan update module, for being based on cuckoo searching algorithm using the described first optimal reconfiguration scheme as reference data Each first reconfiguration scheme is updated, the second weight that the predetermined quantity meets the preset operating conditions is obtained Structure scheme;
Third energy consumption calculation module obtains the second optimal reconstruct for carrying out energy consumption calculation to each second reconfiguration scheme Scheme;
Optimizing times condition judgment module updates whether optimizing number reaches the default optimizing upper limit for judging;If so, into Power distribution network reconfiguration module;If it is not, being then back to the first scheme update module, realization is with the described second optimal reconfiguration scheme Reference data re-starts optimizing to each second reconfiguration scheme and updates, until the update optimizing number reaches described The default optimizing upper limit;
The power distribution network reconfiguration module is used for using the described second optimal reconfiguration scheme as current optimal reconfiguration scheme, and is based on Power distribution network is reconstructed in the current optimal reconfiguration scheme.
9. a kind of power distribution network reconfiguration system characterized by comprising
Memory, for storing computer program;
Processor realizes power distribution network reconfiguration as claimed in any one of claims 1 to 7 when for running the computer program The step of method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program, the computer program realize power distribution network reconfiguration side as claimed in any one of claims 1 to 7 when being executed by processor The step of method.
CN201810974060.1A 2018-08-24 2018-08-24 Power distribution network reconstruction method, device and system and computer readable storage medium Pending CN109038569A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810974060.1A CN109038569A (en) 2018-08-24 2018-08-24 Power distribution network reconstruction method, device and system and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810974060.1A CN109038569A (en) 2018-08-24 2018-08-24 Power distribution network reconstruction method, device and system and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN109038569A true CN109038569A (en) 2018-12-18

Family

ID=64628395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810974060.1A Pending CN109038569A (en) 2018-08-24 2018-08-24 Power distribution network reconstruction method, device and system and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN109038569A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110061494A (en) * 2019-04-09 2019-07-26 上海电力学院 A kind of probabilistic three-phase imbalance reconstruction method of power distribution network of consideration DG power output
CN111342469A (en) * 2020-05-18 2020-06-26 广东电网有限责任公司佛山供电局 Multi-voltage-level network architecture optimization method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103746376A (en) * 2014-01-21 2014-04-23 重庆大学 Power distribution network dynamic power restoration method based on load curve
CN106026187A (en) * 2016-08-10 2016-10-12 广东工业大学 Distributed-power-source-containing power distribution network reconfiguration method and system
CN107846010A (en) * 2016-09-19 2018-03-27 国网上海市电力公司 A kind of reconstruction method of power distribution network for considering cyclization constraint

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103746376A (en) * 2014-01-21 2014-04-23 重庆大学 Power distribution network dynamic power restoration method based on load curve
CN106026187A (en) * 2016-08-10 2016-10-12 广东工业大学 Distributed-power-source-containing power distribution network reconfiguration method and system
CN107846010A (en) * 2016-09-19 2018-03-27 国网上海市电力公司 A kind of reconstruction method of power distribution network for considering cyclization constraint

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
THUAN THANH NGUYEN ET AL: "Distribution network reconfiguration for power loss minimization and voltage profile improvement using cuckoo search algorithm", 《ELECTRICAL POWER AND ENERGY SYSTEMS》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110061494A (en) * 2019-04-09 2019-07-26 上海电力学院 A kind of probabilistic three-phase imbalance reconstruction method of power distribution network of consideration DG power output
CN110061494B (en) * 2019-04-09 2023-04-28 上海电力学院 Three-phase unbalanced distribution network reconstruction method considering uncertainty of DG output
CN111342469A (en) * 2020-05-18 2020-06-26 广东电网有限责任公司佛山供电局 Multi-voltage-level network architecture optimization method

Similar Documents

Publication Publication Date Title
Yu et al. Unit commitment using Lagrangian relaxation and particle swarm optimization
Kavousi-Fard et al. Reliability-oriented reconfiguration of vehicle-to-grid networks
CN111860828B (en) Neural network training method, storage medium and equipment
CN109451012B (en) End cloud collaborative load balancing scheduling method, system and storage medium
CN103731277B (en) Power-economizing method and energy-saving control apparatus in software defined network
CN104636801A (en) Transmission line audible noise prediction method based on BP neural network optimization
CN102158417A (en) Method and device for optimizing multi-constraint quality of service (QoS) routing selection
CN108108224A (en) Virtual machine placement method in cloud data center based on ant colony optimization algorithm
CN109976901A (en) A kind of resource regulating method, device, server and readable storage medium storing program for executing
CN108832615A (en) A kind of reconstruction method of power distribution network and system based on improvement binary particle swarm algorithm
Gupta et al. Optimal placement strategy of distributed generators based on radial basis function neural network in distribution networks
CN109038569A (en) Power distribution network reconstruction method, device and system and computer readable storage medium
CN106329568A (en) User-commercial type photovoltaic generation economic dispatching control system
CN105681052A (en) Energy-saving method for data center distributed file storage
CN109066660A (en) A kind of power distribution network congestion management and decreasing loss method and apparatus based on optimal reconfiguration
Reddy et al. Implementation of clustering based unit commitment employing imperialistic competition algorithm
CN103995749B (en) The calculation task allocating method and system of cell cloud system
CN104392317A (en) Project scheduling method based on genetic culture gene algorithm
CN112465301B (en) Edge smart power grid cooperation decision method based on differential privacy mechanism
CN117595392A (en) Power distribution network joint optimization method and system considering light Fu Xiaona and light storage and charge configuration
CN116937584A (en) Micro-grid group multi-objective optimization solving method and device based on improved wolf algorithm
CN104283214B (en) Network reconstruction method for power distribution network
CN115001978B (en) Cloud tenant virtual network intelligent mapping method based on reinforcement learning model
CN105976052A (en) Improved quantum-behaved particle swarm optimization algorithm-based multi-region economic dispatch method
CN109213104A (en) The dispatching method and scheduling system of energy-storage system based on heuristic dynamic programming

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218