CN109038366A CN201810923454.4A CN201810923454A CN109038366A CN 109038366 A CN109038366 A CN 109038366A CN 201810923454 A CN201810923454 A CN 201810923454A CN 109038366 A CN109038366 A CN 109038366A
Authority
CN
China
Prior art keywords
rope
fixed pulley
pulley group
crossing frame
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810923454.4A
Other languages
Chinese (zh)
Inventor
于天刚
虞佳旻
盛建昌
黄庆锦
郑伟华
杨俊�
白立泉
李劲云
董佳洵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
Original Assignee
SHANGHAI TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd filed Critical SHANGHAI TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
Priority to CN201810923454.4A priority Critical patent/CN109038366A/en
Publication of CN109038366A publication Critical patent/CN109038366A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to a kind of pre- block devices of crossing frame, it is matched with lattice crossing frame, including bearing rope (4) and linked network coaster (7), linked network coaster (7) is mounted on operation platform and connect with bearing rope (4), bearing rope (4) is for carrying protective net, it further include front end fixture (2), rear end fixture (3) and connecting rope (9), front end fixture (2) and rear end fixture (3) are fixed on the top crossbeam (1) of crossing frame, fixture (2) bottom in front end is equipped with the first fixed pulley group (12), second fixed pulley group (13) and rope gripper (11), rope gripper (11) setting is other in the second fixed pulley group (13), fixture (3) bottom in rear end is equipped with third fixed pulley group (14) and construction hole.Compared with prior art, the present invention will need the block worked continuously construction to split into two processes originally, complete during used time longer and linked network work there are uncertain factor is advanceed to preparation of construction, not by time restriction.

Description

A kind of pre- block device of crossing frame
Technical field
The present invention relates to a kind of Work tools that extra high voltage network crossing construction uses, more particularly, to a kind of crossing frame Pre- block device.
Background technique
High voltage overhead lines unwrapping wire Midspan sag, high-speed railway, highway, highway, high-voltage line etc. generally use and set up hair The methods of bamboo crossing frame, steel pipe crossing frame, live crossing frame, which are used as, crosses over frame body, the method that catch net is sealed on top again.Block needs It to be carried out within the time of license, need to be spanned object road closure or the cooperation that has a power failure.Traditional block mode is arranged in place in bearing rope Afterwards, protective net needs to draw when hanging, and small in high-altitude application space, can generate pocket card phenomenon toward contact, time-consuming very long.
A kind of method and apparatus are needed, the block process for needing continuously to construct originally is split, reduction is spanned object permission Other a large amount of work and uncertain factor after reduce road closure or power off time when crossing over, while reducing artificial investment, mention High construction safety is particularly important.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of pre- blocks of crossing frame Device.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of pre- block device of crossing frame, matches, including bearing rope and linked network coaster with lattice crossing frame, described Linked network coaster be mounted on operation platform and connect with bearing rope, the bearing rope is for carrying protective net, before further including Fixture, rear end fixture and connecting rope are held, the front end fixture and rear end fixture are fixed on the crossbeam on crossing frame top, described Front end clamp base be equipped with the first fixed pulley group, the second fixed pulley group and rope gripper, the described rope gripper setting is the By two fixed pulley groups, the rear end clamp base is equipped with third fixed pulley group and construction hole,
Construction includes following below scheme:
1) bearing rope rear end is fixed in construction hole, and front end passes through the second fixed pulley group after rope gripper, front end After rope end is by the front end staff control on ground, rope gripper is clamped, and fixes bearing rope;
2) operating rope rear end passes through third fixed pulley group, and the rope end of rear end is controlled by the rear end staff on ground, front end Rope end across the first fixed pulley group front end is controlled by the front end staff on ground, and operating rope is below bearing rope;
3) protective net is all hooked on bearing rope, and is connect with operating rope, adjust the width and length between protective net Degree;
4) after closing a road to traffic or have a power failure, rope gripper is unclamped, keeps bearing rope middle part sagging, while making to grasp by decontroling both ends rope end Make rope decline, adjust bearing rope and operating rope falling head, makes to protect net unfolding and be moved to be spanned designated position above object Afterwards, operating rope and the anchoring of bearing rope both ends, complete construction.
First fixed pulley group, the second fixed pulley group and the third fixed pulley group has pulley locking mechanism.
First fixed pulley group, the second fixed pulley group and the third fixed pulley group respectively include two linkage determine cunning Wheel.
The protective net is arranged on bearing rope by linked network coaster.
The rope gripper is presser type fixture.
The presser type fixture includes main body, spring, pressing plate and bolt, and described pressing plate one end is connected to by shaft In main body, the spring is arranged between pressing plate and main body, and the bolt connects after passing through pressing plate and spring with main body screw It connects, the elasticity of the length adjustment presser type fixture of mainboard is entered by bolt.
The bolt is band handle bolt.
The bearing rope is Di Nima bearing rope.
The protective net includes glass reinforced plastic fender rod.
Compared with prior art, the invention has the following advantages that
(1) the block construction working worked continuously will be needed to split into two processes originally, by the used time it is longer and exist not It determines and is completed during the linked network work of factor advances to preparation of construction, not by time restriction.
(2) after closing a road to traffic or have a power failure, bearing rope and operating rope is conventionally carried out across object is spanned, is adjusted after fixing As long as after loosening the rope gripper on the fixture of front end, protective net can be pulled to designated position, complete block operation, reduced big Amount needs the times such as linked network adjustment originally, reduces the time of road closure or power failure.
(3) it is completed during advanceing to preparation of construction because of part work, when reducing usual manner block while what is needed applies Work personnel amount.
(4) first fixed pulley groups, the second fixed pulley group and third fixed pulley group respectively include the fixed pulley of two linkages, mention Strong mechanical performance extends the fixed pulley group service life.
(5) three fixed pulley groups have pulley locking mechanism, facilitate operation.
(6) presser type fixture uses spring pressing plate, and using bolt fastening, no loose mail is fallen, easy to operate.
Detailed description of the invention
Fig. 1 is the pre- block device operation principle schematic diagram of the present embodiment crossing frame;
Fig. 2 (a) is the sectional view of the present embodiment rope gripper open configuration;
Fig. 2 (b) is the sectional view of the present embodiment rope gripper clamped condition;
Fig. 3 (a) is the first fixed pulley group sectional view that the present embodiment pulley locks mechanism opening state;
Fig. 3 (b) is the first fixed pulley group sectional view of the present embodiment pulley locking mechanism collapsed state;
Appended drawing reference:
1 is top crossbeam;2 be front end fixture;3 be rear end fixture;4 be bearing rope;5 be bracing wire;6 protect for glass reinforced plastic Bar;7 be linked network coaster;8 be connecting rope;9 be operating rope;10 be draw operations rope;11 be rope gripper;12 be the first fixed pulley Group;13 be the second fixed pulley group;14 be third fixed pulley group;15 be connector.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to Following embodiments.
Embodiment
As shown in Fig. 1~3 (b), a kind of pre- block device of crossing frame matches, including load with lattice crossing frame Rope 4 and linked network coaster 7, linked network coaster 7 are mounted on operation platform and connect with bearing rope 4, and bearing rope 4 is for carrying protection Net further includes front end fixture 2, rear end fixture 3 and connecting rope 9, and front end fixture 2 and rear end fixture 3 are with removable frame-type structure set In top cross rail outer, it is fastened by bolts.Fixture 2 bottom in front end is equipped with the first fixed pulley group 12,13 and of the second fixed pulley group Rope gripper 11, rope gripper 11 are arranged by the second fixed pulley group 13, and fixture 3 bottom in rear end is equipped with 14 He of third fixed pulley group Construction hole,
First fixed pulley group 12, the second fixed pulley group 13 and third fixed pulley group 14 respectively include two linkage determine cunning Wheel has pulley locking mechanism, and pulley locks mechanism principle and rope gripper 11 is essentially identical.
Rope gripper 11 is presser type fixture, and presser type fixture includes main body, spring, pressing plate and with handle bolt, pressing plate One end is connected in main body by shaft, and spring is arranged between pressing plate and main body, after band handle bolt passes through pressing plate and spring It is connect with main body screw, the elasticity of the length adjustment presser type fixture of mainboard is entered by bolt.
Bracing wire 5 is connect with rear end fixture 3, and 4 tail end of bearing rope is connect by shackle with rear end fixture 3, and bearing rope 4 is enlightening Buddhist nun Ma bearing rope.
It completes crossing frame in the crossing construction preparation stage to set up, in the lattice crossing frame for being spanned the side of object in parallel On forward and backward top crossbeam 1, front and back end fixture is installed respectively, rear end fixture 3 is connected by buckle with bracing wire 5 and bearing rope 4, Front end fixture 2 is fixedly clamped after the tightening of bearing rope 4 by rope gripper 11, will and be leveled bearing rope 4.
Glass reinforced plastic fender rod 6 is hung on bearing rope 4 by linked network coaster 7 by root on the operational platform, and and connecting rope 8, operating rope 9 connects, and adjusts the width x length between protective net, protective net includes glass reinforced plastic fender rod 6, each glass reinforced plastic fender rod 6 bottoms are connected by connecting rope 8.
Road closure or after having a power failure, can will be across being spanned the operating rope 9 of object and bearing rope 4 and another by draw operations rope 10 The operating rope 9 of root trawlnet connects, and carries out one and leads multioperation, is connected between rope by connector 15.
Loosen the rope gripper 11 of front end fixture 2, manpower eases out below the first fixed pulley group 12, and bearing rope 4 is detached from folder It is naturally drooped after rope device 11, adjustment bearing rope 4 keeps can normally pulling protective net after height is consistent to being spanned object top Specified position, reduces the time of a large amount of mounting and adjusting protective net, and reduces artificial investment.

Claims (9)

1. a kind of pre- block device of crossing frame, matches with lattice crossing frame, including bearing rope (4) and linked network coaster (7), The linked network coaster (7) is mounted on operation platform and connect with bearing rope (4), and the bearing rope (4) is anti-for carrying Protective net, which is characterized in that further include front end fixture (2), rear end fixture (3) and connecting rope (9), the front end fixture (2) and Rear end fixture (3) is fixed on the top crossbeam (1) of crossing frame, and front end fixture (2) bottom is equipped with the first fixed pulley group (12), the second fixed pulley group (13) and rope gripper (11), the rope gripper (11) are arranged in the second fixed pulley group (13) Side, rear end fixture (3) bottom are equipped with third fixed pulley group (14) and construction hole,
Construction includes following below scheme:
1) bearing rope (4) rear end is fixed in construction hole, and front end passes through the second fixed pulley group after rope gripper (11) (13), after the rope end of front end is by the front end staff control on ground, rope gripper (11) is clamped, and keeps bearing rope (4) fixed;
2) operating rope (9) rear end passes through third fixed pulley group (14), and the rope end of rear end is controlled by the rear end staff on ground, preceding The rope end across first fixed pulley group (12) front end is held to be controlled by the front end staff on ground, operating rope (9) is generally in holding Below power rope (4);
3) protective net is all hooked on bearing rope (4), and is connect with operating rope (9), adjust width between protective net and Length;
4) it after closing a road to traffic or have a power failure, unclamps rope gripper (11), keeps bearing rope (4) middle part sagging, while by decontroling both ends rope end Decline operating rope (9), adjust bearing rope (4) and operating rope (9) falling head, makes to protect net unfolding and be moved to be spanned object Behind the designated position of top, construction is completed in operating rope (9) and the anchoring of bearing rope (4) both ends.
2. the pre- block device of a kind of crossing frame according to claim 1, which is characterized in that the first fixed pulley group (12), the second fixed pulley group (13) and third fixed pulley group (14) have pulley locking mechanism.
3. the pre- block device of a kind of crossing frame according to claim 1, which is characterized in that the first fixed pulley group (12), the second fixed pulley group (13) and third fixed pulley group (14) respectively include the fixed pulley of two linkages.
4. the pre- block device of a kind of crossing frame according to claim 1, which is characterized in that the protective net passes through linked network Coaster (7) is arranged on bearing rope (4).
5. the pre- block device of a kind of crossing frame according to claim 1, which is characterized in that the rope gripper (11) is Presser type fixture.
6. the pre- block device of a kind of crossing frame according to claim 5, which is characterized in that the presser type fixture includes Main body, spring, pressing plate and bolt, described pressing plate one end are connected in main body by shaft, and the spring is arranged in pressing plate Between main body, the bolt is connect after passing through pressing plate and spring with main body screw, and the length tune of mainboard is entered by bolt Save the elasticity of presser type fixture.
7. the pre- block device of a kind of crossing frame according to claim 6, which is characterized in that the bolt is band handle spiral shell Bolt.
8. the pre- block device of a kind of crossing frame according to claim 1, which is characterized in that the bearing rope (4) is enlightening Nima bearing rope.
9. the pre- block device of a kind of crossing frame according to claim 1, which is characterized in that the protective net includes glass Steel fender rod (6).
CN201810923454.4A 2018-08-14 2018-08-14 A kind of pre- block device of crossing frame Pending CN109038366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810923454.4A CN109038366A (en) 2018-08-14 2018-08-14 A kind of pre- block device of crossing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810923454.4A CN109038366A (en) 2018-08-14 2018-08-14 A kind of pre- block device of crossing frame

Publications (1)

Publication Number Publication Date
CN109038366A true CN109038366A (en) 2018-12-18

Family

ID=64634156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810923454.4A Pending CN109038366A (en) 2018-08-14 2018-08-14 A kind of pre- block device of crossing frame

Country Status (1)

Country Link
CN (1) CN109038366A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112864946A (en) * 2021-02-25 2021-05-28 上海送变电工程有限公司 Crossing structure protection network integrated device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103427369A (en) * 2013-08-29 2013-12-04 国家电网公司 Double-deck block for spreading crossing rack rope and using method thereof
CN203875787U (en) * 2014-05-20 2014-10-15 李红 Elastic pressing plate clamp
CN204316007U (en) * 2014-12-30 2015-05-06 国家电网公司 A kind of transmission line crossing construction device
CN205681016U (en) * 2016-06-22 2016-11-09 江苏华成电力设备有限公司 A kind of cableway-type lives across net

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103427369A (en) * 2013-08-29 2013-12-04 国家电网公司 Double-deck block for spreading crossing rack rope and using method thereof
CN103427369B (en) * 2013-08-29 2016-12-28 国家电网公司 Unfolding crossing frame rope double-deck coaster and using method thereof
CN203875787U (en) * 2014-05-20 2014-10-15 李红 Elastic pressing plate clamp
CN204316007U (en) * 2014-12-30 2015-05-06 国家电网公司 A kind of transmission line crossing construction device
CN205681016U (en) * 2016-06-22 2016-11-09 江苏华成电力设备有限公司 A kind of cableway-type lives across net

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112864946A (en) * 2021-02-25 2021-05-28 上海送变电工程有限公司 Crossing structure protection network integrated device

Similar Documents

Publication Publication Date Title
CN207699037U (en) Wind power generating set single blade mounting hanger
CN206516767U (en) A kind of multipurpose ground connection pincers
CN109038366A (en) A kind of pre- block device of crossing frame
CN201109026Y (en) Strainer for rail vehicle body assemblage
CN202817593U (en) Circuit hardware bolt fastener
CN112152143A (en) Tension insulator replacing device
CN201153198Y (en) Backup protection rope for combined double- and four-splitting wire
CN109936079A (en) A kind of insulate removes foreign matter operating stick
CN207931736U (en) Anti roll device
CN201733011U (en) Saw-tooth sickle for electrified operation of transmission line
CN214070771U (en) Efficient ornamental trees and shrubs orthotic devices
CN209071952U (en) Contact net additional wire stringer and system
CN210779813U (en) Special tool for adjusting sag of 220kV vertically-arranged double-bundle conductor in electrified manner
CN209200519U (en) A kind of upper lower wire specific purpose tool
CN209298740U (en) A kind of power line tension connecting plate hanging point lifter device
CN108930508A (en) Ladder for high-power transformer
CN208241190U (en) 35 kilovolts to 500 kilovolts insulator General clampings
CN106696767A (en) Tool special for overhauling of electrification railway contact net
CN207234276U (en) A kind of specific purpose tool of live replacement of 220 kV tension-resistant insulator
CN206217681U (en) Electrification railway contact net special tool for examination and repair
CN106576952A (en) Multifunctional head-turning scissors special for garden
CN207339070U (en) Light tool for replacing insulator string
CN206004226U (en) For shortening the device of overhead line structures operation stringing time
CN206680885U (en) A kind of girder arch pushing steel truss girder flexibility arch brace anchor ear
CN207927050U (en) A kind of electric cabinet applied to construction site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination