CN109035402A - A kind of architectural electricity mechanized production system based on BIM model - Google Patents
A kind of architectural electricity mechanized production system based on BIM model Download PDFInfo
- Publication number
- CN109035402A CN109035402A CN201810847150.4A CN201810847150A CN109035402A CN 109035402 A CN109035402 A CN 109035402A CN 201810847150 A CN201810847150 A CN 201810847150A CN 109035402 A CN109035402 A CN 109035402A
- Authority
- CN
- China
- Prior art keywords
- bim model
- bim
- architectural electricity
- system based
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 46
- 230000005611 electricity Effects 0.000 title claims abstract description 26
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000013461 design Methods 0.000 claims abstract description 12
- 238000005259 measurement Methods 0.000 claims description 15
- 230000005540 biological transmission Effects 0.000 claims description 8
- 239000002699 waste material Substances 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 238000012800 visualization Methods 0.000 description 3
- 206010054949 Metaplasia Diseases 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000000875 corresponding effect Effects 0.000 description 2
- 230000015689 metaplastic ossification Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000002079 cooperative effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/10—Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
- G06T19/20—Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Computer Graphics (AREA)
- Software Systems (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Architecture (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of architectural electricity mechanized production systems based on BIM model, including three-dimensional scanner, BIM model library and digital measuring device, the three-dimensional scanner obtains the three-dimensional data of construction site after being used to be scanned the construction site of building, and the three-dimensional data that will acquire is sent to terminal device, the preliminary drafting that Virtual Building model is carried out to construction site is completed on the terminal device, the digital measuring device measures scene again, and measured information is sent on terminal device again, after verifying the data measured again and Virtual Building model, design the corresponding Virtual Space BIM and BIM model library, the Virtual Space BIM and BIM model library are used for the planning and designing to the electrical system of building, and pass through wired or nothing according to planning and designing The mode of line controls manufacture system, and the automated production of architectural electricity is completed by manufacture system;The present invention has the advantages that Fine design, reduces waste.
Description
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of automatic metaplasia of architectural electricity based on BIM model
Production system.
Background technique
Building Information Model (Buliding Information Modeling) is related with the items of construction-engineering project
Basis of the information data as model, carries out the foundation of buildings model, by possessed by digital information analogue simulation building
Real information, it has the characteristics that visualization, harmony, simulation, optimization property and can to go out figure five big.
Building Information Model covers geometry, spatial relationship, GIS-Geographic Information System, the property of various construction sets and number
Amount, Building Information Model can be used to show whole building life cycle, including build process and operation process, extract in building
The information of material is very convenient, builds interior various pieces, each system can show.
Currently, emerging in large numbers with modernization project facility and equipment, the electricity consumptions of all trades and professions increases sharply, especially numerous
Skyscraper and large-sized workshop workshop, the traditional cable as transmission pressure have been unable to meet the demand of high current transportation system,
The used in parallel of multiway cable brings many inconvenience to in-site installation construction connection;Bus bridge frame is led as a kind of new distribution
Line fully demonstrates its superiority in high current conveying compared with traditional cable;But current bus bridge is being installed
When due to measurement accuracy etc., the physical length of bus duct often with measurement length violation close, cause construction when difficulty, together
When, the change of some ideas when due to customization is difficult to reach real-time design by measurement such as the variation of the position of equipment
Change, virtually increases the waste of human resources and construction time in this way;To solve the above problems, developing a kind of with fine
Design, the architectural electricity mechanized production system based on BIM model for reducing waste are necessary.
Summary of the invention
The purpose of the invention is to overcome the deficiencies in the prior art, and provide a kind of with Fine design, reduction waste
The architectural electricity mechanized production system based on BIM model.
The object of the present invention is achieved like this: a kind of architectural electricity mechanized production system based on BIM model, including
Three-dimensional scanner, BIM model library and digital measuring device, the three-dimensional scanner be used for the construction site of building into
Row scanning, and the three-dimensional data of construction site is obtained, the three-dimensional data that the three-dimensional scanner obtains passes through wireless transmission
Mode is sent to terminal device, and carries out the preliminary drafting of Virtual Building model, the number to construction site on the terminal device
Word measuring device measures scene again, and measured information is sent to end again by way of wireless transmission
In end equipment, verify that the data measured again with Virtual Building model, after carrying out error analysis and the verifying of model,
Go out the corresponding Virtual Space BIM and BIM model library, the Virtual Space BIM and BIM model library by Virtual Building modelling
Manufacture system is controlled by wired or wireless mode for the planning and designing of the electrical system to building, and according to planning and designing
System, the automated production of architectural electricity is completed by manufacture system.
Further, the three-dimensional scanner uses three-dimensional laser scanner.
Further, the digital measuring device uses robot measurement.
Further, the terminal device includes computer, tablet computer, mobile phone etc..
Further, the manufacture system mainly for the production of architectural electricity bus bridge.
Further, the planning and designing of the electrical system be used for determine bus bridge concrete specification and detailed drawing.
Further, the electrical model includes various switchgears, electrical cabinet and electrical terminations.
Further, the quantity of the robot measurement is multiple.
By adopting the above-described technical solution, the beneficial effects of the present invention are:
(1) by the three-dimensional scanner and digital measuring device of setting, is carried out by first measurement and is surveyed again for construction site
Amount, reduces the error of measurement, realizes Fine design, reduce as measure size do not met with actual size caused by various waves
Take;
(2) Virtual Space BIM by setting and BIM model library optimize electrical system, and the electrical model after optimize is joined
Number, completes the automated production of architectural electricity by manufacture system, whole process, can according to the demand real time modifying of client,
After client finally confirms, carries out automated production and, even if client is ignorant of engineering drawing, nor affected on due to entire model visualization
Client understands, reduces the communication with client, saves the time of design and production.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Fig. 2 is the electrical equipment installation diagram of the present invention in practice.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing technical solution of the present invention is described in further detail.
As shown in Figure 1 and Figure 2, a kind of architectural electricity mechanized production system based on BIM model, based on building for BIM model
Build electric automatization production system, including three-dimensional scanner, BIM model library and digital measuring device, the 3-D scanning
Device obtains the three-dimensional data of construction site for being scanned to the construction site of building, and the three-dimensional scanner obtains
The three-dimensional data taken is sent to terminal device by way of wireless transmission, and carries out on the terminal device to construction site virtual
The preliminary drafting of buildings model;
The digital measuring device to scene measured again, and by way of wireless transmission by measured information again
It is secondary to be sent on terminal device, it verifies that the data measured again with Virtual Building model, carries out error analysis and model
Verifying after, the corresponding Virtual Space BIM and BIM model library are gone out by Virtual Building modelling;
The planning and designing to the electrical system of building, in the process, client are completed according to the Virtual Space BIM and BIM model library
It may participate in into, due to the visualization of the Virtual Space BIM and BIM model library, even if client is ignorant of engineering drawing, nor affect on visitor
Family participate in design, client participate in design during obtained it is psychological certain satisfaction, compared to original communication way,
By the Virtual Space BIM and BIM model library, design it is more efficient, save the time cost of design;
Planning and designing are controlled into manufacture system by wired or wireless mode, architectural electricity oneself is completed by manufacture system
Dynamic metaplasia produces, and during entire production, is sent to manufacture system by the mode for then passing through wired or wireless, realizes number
It is more efficient according to the with no paper of transmission.
Wherein, the three-dimensional scanner uses three-dimensional laser scanner.
Wherein, robot measurement is used in the digital measuring device, and building is applied by robot measurement completion
The setting out survey at work scene.
Wherein, terminal device includes computer, tablet computer, mobile phone etc., not only be can be carried around, but also can be carried out in fixed place
Office realizes that office is with no paper, reduces the waste of resource.
Wherein, the manufacture system mainly for the production of architectural electricity bus bridge.
Wherein, the planning and designing of the electrical system be used for determine bus bridge concrete specification and detailed drawing, make bus
Bridge does not influence other pipelines, so that bus bridge is realized with no paper at all in production, and is not passed through label by the interference of other pipelines yet
The position for realizing each section is limited by vehicle transport or the size of container, bus bridge is made to be easily installed and transport.
Wherein, electrical model includes various switchgears, electrical cabinet and electrical terminations, these electrical terminations include
Numerical control device, cleaner etc..
Wherein, the quantity of the robot measurement is multiple, by multiple robot measurement cooperatives, is further decreased
The error of measurement.
The present invention, according to the Virtual Space BIM and BIM modeling technique, specific product is placed when controlling manufacture system
At the desired position, according to the position of determining electrical model and the demand of entire power load amount, it is abundant to reserve certain safety
Degree, prevents the excessive injury caused by electrical equipment of transient current, is determined according to power load amount and specific space construction female
The specific specification of line bridge, by these specific specifications, entire bus is completed in the manufacturing through manufacture system
The production of bridge is numbered specific bus bridge section during production, if 1 building since electrical cabinet, number F11,
F12, F13 etc., 2 buildings since the bus bridge of vertical section, number F21, F22, F23 etc., other floors are arranged successively, and are prevented
Mistake is used when in-site installation, caused by installation the phenomenon that doing over again, save the time of installation, improve the accuracy of installation with
Efficiency.
The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, although referring to above-described embodiment pair
The present invention is described in detail, it should be understood by a person of ordinary skill in the art that still can be to of the invention specific
Embodiment is modified or replaced equivalently, and without departing from any modification of spirit and scope of the invention or equivalent replacement,
It is intended to be within the scope of the claims of the invention.
Claims (8)
1. a kind of architectural electricity mechanized production system based on BIM model, including three-dimensional scanner, BIM model library sum number
Word measuring device, it is characterised in that: the three-dimensional scanner is obtained and applied for being scanned to the construction site of building
The three-dimensional data at work scene, the three-dimensional data that the three-dimensional scanner obtains are sent to terminal by way of wireless transmission and set
It is standby, and the preliminary drafting of Virtual Building model is carried out to construction site on the terminal device, the digital measuring device is to existing
Field is measured again, and is sent to measured information on terminal device again by way of wireless transmission, is made again
The data of measurement are verified with Virtual Building model, after carrying out error analysis and the verifying of model, pass through Virtual Building mould
Type designs the corresponding Virtual Space BIM and BIM model library, and the Virtual Space BIM and BIM model library are used for the electricity to building
The planning and designing of gas system, and manufacture system is controlled by wired or wireless mode according to planning and designing, pass through manufacture system
To complete the automated production of architectural electricity.
2. a kind of architectural electricity mechanized production system based on BIM model according to claim 1, it is characterised in that:
The three-dimensional scanner uses three-dimensional laser scanner.
3. a kind of architectural electricity mechanized production system based on BIM model according to claim 1, it is characterised in that:
The digital measuring device uses robot measurement.
4. a kind of architectural electricity mechanized production system based on BIM model according to claim 1, it is characterised in that:
The terminal device includes computer, tablet computer, mobile phone etc..
5. a kind of architectural electricity mechanized production system based on BIM model according to claim 1, it is characterised in that:
The manufacture system mainly for the production of architectural electricity bus bridge.
6. a kind of architectural electricity mechanized production system based on BIM model, feature exist according to claim 1 or 5
In: planning and designing of the electrical system be used to determine bus bridge concrete specification and detailed drawing.
7. a kind of architectural electricity mechanized production system based on BIM model according to claim 1, it is characterised in that:
The electrical model includes various switchgears, electrical cabinet and electrical terminations.
8. a kind of architectural electricity mechanized production system based on BIM model according to claim 1 or 3, feature exist
In: the quantity of the robot measurement is multiple.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810847150.4A CN109035402A (en) | 2018-07-27 | 2018-07-27 | A kind of architectural electricity mechanized production system based on BIM model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810847150.4A CN109035402A (en) | 2018-07-27 | 2018-07-27 | A kind of architectural electricity mechanized production system based on BIM model |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109035402A true CN109035402A (en) | 2018-12-18 |
Family
ID=64646344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810847150.4A Pending CN109035402A (en) | 2018-07-27 | 2018-07-27 | A kind of architectural electricity mechanized production system based on BIM model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109035402A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109540036A (en) * | 2019-01-21 | 2019-03-29 | 中国葛洲坝集团第五工程有限公司 | A kind of pond column measuring system and measurement method based on BIM and three-dimensional laser scanner |
CN110188403A (en) * | 2019-05-07 | 2019-08-30 | 河北电力装备有限公司 | A kind of three dimensional design and automation equipment control system |
CN111563303A (en) * | 2020-04-03 | 2020-08-21 | 广东省工业设备安装有限公司 | Control method, system and storage medium for electrical circuit aided design |
CN112632781A (en) * | 2020-12-24 | 2021-04-09 | 广州浩能机电安装工程有限公司 | Electromechanical installation system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104899378A (en) * | 2015-06-10 | 2015-09-09 | 上海大学 | Digital installation method for high-rise steel structure based on BIM and three-dimensional measurement |
CN106055839A (en) * | 2016-06-30 | 2016-10-26 | 上海宝冶集团有限公司 | Application method of three-dimensional scanning technology in building engineering based on BIM |
CN106777680A (en) * | 2016-12-14 | 2017-05-31 | 华中科技大学 | A kind of existing bridge fast B IM modelings and method |
CN106777831A (en) * | 2017-02-10 | 2017-05-31 | 深圳瑞和建筑装饰股份有限公司 | A kind of construction and decoration method based on BIM |
CN107992643A (en) * | 2017-10-25 | 2018-05-04 | 刘界鹏 | It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification |
-
2018
- 2018-07-27 CN CN201810847150.4A patent/CN109035402A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104899378A (en) * | 2015-06-10 | 2015-09-09 | 上海大学 | Digital installation method for high-rise steel structure based on BIM and three-dimensional measurement |
CN106055839A (en) * | 2016-06-30 | 2016-10-26 | 上海宝冶集团有限公司 | Application method of three-dimensional scanning technology in building engineering based on BIM |
CN106777680A (en) * | 2016-12-14 | 2017-05-31 | 华中科技大学 | A kind of existing bridge fast B IM modelings and method |
CN106777831A (en) * | 2017-02-10 | 2017-05-31 | 深圳瑞和建筑装饰股份有限公司 | A kind of construction and decoration method based on BIM |
CN107992643A (en) * | 2017-10-25 | 2018-05-04 | 刘界鹏 | It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109540036A (en) * | 2019-01-21 | 2019-03-29 | 中国葛洲坝集团第五工程有限公司 | A kind of pond column measuring system and measurement method based on BIM and three-dimensional laser scanner |
CN110188403A (en) * | 2019-05-07 | 2019-08-30 | 河北电力装备有限公司 | A kind of three dimensional design and automation equipment control system |
CN110188403B (en) * | 2019-05-07 | 2023-04-18 | 河北电力装备有限公司 | Three-dimensional design and automation device control system |
CN111563303A (en) * | 2020-04-03 | 2020-08-21 | 广东省工业设备安装有限公司 | Control method, system and storage medium for electrical circuit aided design |
CN111563303B (en) * | 2020-04-03 | 2023-09-19 | 广东省工业设备安装有限公司 | Control method, system and storage medium for auxiliary design of electric circuit |
CN112632781A (en) * | 2020-12-24 | 2021-04-09 | 广州浩能机电安装工程有限公司 | Electromechanical installation system and method |
CN112632781B (en) * | 2020-12-24 | 2023-12-19 | 广州浩能机电安装工程有限公司 | Electromechanical installation system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109035402A (en) | A kind of architectural electricity mechanized production system based on BIM model | |
CN102957205B (en) | A kind of method and system setting up electricity distribution network model | |
CN108875273B (en) | BIM-based foundation pit engineering forward design and operation and maintenance management system | |
Farooq et al. | Applications of Building Information Modeling in Electrical Systems Design. | |
CN109359367A (en) | Pipeline layout construction technology based on BIM | |
CN110704930A (en) | BIM-based transformer substation three-dimensional construction cost model construction method | |
CN103093007A (en) | Power transmission iron tower three-dimensional virtual assembly method | |
CN103729801A (en) | Method for power distribution network state estimation on basis of SG-CIM model | |
CN103955865A (en) | Scheduled and faulted power outage range visualization method based on information interaction | |
CN210072621U (en) | BIM management-based deepened transformation system for vehicle section with ultra-large cover body | |
CN103093493A (en) | High-precision three-dimensional object modeling method with power grid equipment existing | |
CN108520082A (en) | A kind of application process of Revit parametrizations race in electrical design | |
CN104868339A (en) | Method for establishing grounding grid based on BIM (building information modeling) | |
CN111611665B (en) | Intelligent substation design method based on three-dimensional modular design | |
Zhang | Intelligent building planning system based on BIM and artificial intelligence | |
CN104298792A (en) | Modularized design method and system for nuclear power station | |
CN107357950B (en) | Three-dimensional simulation design method for assembly structure | |
CN109980773A (en) | Data processing method under a kind of comprehensive automation system of transformer substation inspecting state | |
Zhang et al. | Research on General Model System for Three-Dimensional Design of Transmission and Transformation Project Under Smart Grid Modeling Standards | |
CN114139862A (en) | Large data-based distribution room line loss analysis monitoring system and analysis method thereof | |
CN103577563B (en) | A kind of transformer station model moving method | |
Xiaolei | Research on the Application of BIM Concept and BIM Software in Architectural Design | |
CN111754628A (en) | Three-dimensional visualization method and system for power transmission and transformation project | |
CN103295082A (en) | Electrical systematical diaphragm layering method based on power supply range | |
CN113971708B (en) | Automatic matching and orthogonal connection line plotting method for graph component relation of CAD residential strong-current power distribution trunk system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |
|
RJ01 | Rejection of invention patent application after publication |