CN109034611A - Back-end software development approach, platform and the system quickly delivered - Google Patents
Back-end software development approach, platform and the system quickly delivered Download PDFInfo
- Publication number
- CN109034611A CN109034611A CN201810820096.4A CN201810820096A CN109034611A CN 109034611 A CN109034611 A CN 109034611A CN 201810820096 A CN201810820096 A CN 201810820096A CN 109034611 A CN109034611 A CN 109034611A
- Authority
- CN
- China
- Prior art keywords
- task
- server
- engineer
- development
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/20—Software design
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Software Systems (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Abstract
The invention discloses back-end software development approach, platform and systems that one kind is quickly delivered, server calculates development amount and overall development expense by the back-end software exploration project demand that client terminal is sent according to client in the method, and back-end software exploration project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and receives registration instruction;The engineer that all working task distributes to registration task is developed, and mandatory period is set, guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;It checks whether task code is all submitted on time after task expiration of time limit, is then to send project to client terminal to complete message, server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failed message.The present invention improves development rate, it is ensured that quickly delivers.
Description
Technical field
The present invention relates to computer application technology, the back-end software development approach quickly delivered in particular to one kind,
Platform and system.
Background technique
Development platform has accumulated a large amount of engineers, and exploitation service can be provided for client.Traditional development platform is mainly wrapped
Three important stages are included, are client's release tasks first, software design original text is provided by client and interaction illustrates document, recruit exploitation
Engineer pays corresponding expense after linking up clear requirement details with engineer;Subsequently into development phase, Developmental Engineer's root
It is developed according to design original text and requirement documents, code is submitted in development process, integrates code after the completion of exploitation, consigns to visitor
Family;Client receives deliver code after, carry out last test, Developmental Engineer's cooperation is modified perfect, then is carried out by client
It checks and accepts, pays remaining development cost.It links up and assists currently, the bottleneck for influencing platform development task working efficiency essentially consists in demand
With the two links are developed, it is directed between a large amount of engineer and client, the communication work between engineer and engineer.
On the one hand artificial link up is easy to omit or misread requirement details, on the other hand links up confirmation repeatedly and takes a long time, to cause
The delay of delivery time.
Summary of the invention
Technical problems based on background technology, the invention proposes the back-end software exploitation sides that one kind is quickly delivered
Method, platform and system, by standardization process by response speed ultimate attainmentization of client development demand, with reasonable task fractionation side
Project's finish time is limited within mandatory period by formula, quickly delivers development task to realize.
In order to achieve the above objectives, the technical solution adopted in the present invention the following steps are included:
1) client issues back-end software exploration project demand to server by client terminal;
2) server calculates development amount and overall development expense according to back-end software exploration project demand, and by rear end
Development project is decomposed into several tasks;
3) server provides mission bit stream to engineer user by user terminal, and receives the report from engineer user
Name instruction;
4) server develops the engineer that all working task distributes to registration task, and mandatory period is arranged,
Guarantee that all working task is completed in mandatory period;
5) after completing assignment task in engineer user's business time limit in office, task code is uploaded to server;
6) server checks whether task code is all submitted on time after task expiration of time limit, is then to send out to client terminal
Project is sent to complete message, server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise to user
Terminal sends project and completes failed message.
Preferably, back-end software exploration project demand includes Software Architecture Design document, Software Interface Design in step 1)
Document, software data structure design documentation.
It preferably, is that rear end is soft by the method that back-end software exploration project is decomposed into several tasks in step 2)
Part exploration project is to develop the page or software function or software module or software design original text or interface quantity as metering
Unit calculates development amount, and it is several tasks that overall development workload, which is developed rate cutting with specified time, averagely,.
Preferably, the specific steps of step 4) include:
41) after server receives registration instruction, satisfactory engineering is screened according to the technical label of engineer user
Teacher user, and sorted according to the running parameter of engineer user, form alternative engineer's list;
42) all working task is distributed to engineer user according to alternative engineer's tab sequential by server, and is arranged
Mandatory period, engineer user send confirmation order instruction to server by user terminal, and server receives confirmation order and refers to
It enables and starts timing;
43) if the number in alternative engineer's list is greater than 0 and is less than number of tasks or does not receive in specified time all really
Recognize order instruction, then server sends distribution failure command and the instruction that asks for a postponement to client terminal, goes to step 44), if alternatively
Number in engineer's list is 0, then server sends distribution failure command to client terminal, and project terminates;
44) client receives distribution failure command and the instruction that asks for a postponement by client terminal, sends to server and agrees to prolong
Phase instruction or project END instruction, server receive instruction of agreeing to delay then according to alternative engineer's tab sequential by all works
It is distributed to engineer user as task, and mandatory period is reset according to alternative engineer's number.
Preferably, in step 5), if engineer user's business time limit in office in actively abandon task, pass through user terminal to
Assignment instructions are abandoned in server transmission, and server develops rate according to mandatory period remaining time and averagely and judges whether to need to appoint
Business is delayed, and is, is sent the instruction that asks for a postponement to client terminal, is otherwise redistributed this task;Client passes through client terminal
Reception asks for a postponement instruction, returns and agrees to delay that then server redistributes this task for instruction, returns to project END instruction
Then server sends expense to client terminal and returns instruction.
Preferably, after server sends project completion message to client terminal in step 6), project enters quality guarantee period, is setting
In the quality guarantee time limit set, client submits the suggestion for revision of task based access control by client terminal, and suggestion for revision is sent to by server
Corresponding user terminal, engineer user modify to task, and submit modified generation to server by user terminal
Modified code is deployed to test environment and sends page access address and code downloading ground to client terminal by code, server
Location.
Preferably, after the quality guarantee time limit, server according to task carry out disbursement and sattlement, by task settlement amounts pay to
The specified account of the corresponding user terminal of the task, and clearing message is sent to user terminal.
The present invention also proposes a kind of back-end software development platform quickly delivered, including
Client terminal pays overall development expense, checks and accepts exploitation code for issuing back-end software exploration project demand;
User terminal, for obtaining the task of mission bit stream, the instruction for sending registration task, confirmation reception distribution, from clothes
Device downloading exploitation of being engaged in requires, and development task is completed in mandatory period and to server upload code;
Server, for calculating development amount and overall development expense according to back-end software exploration project demand, and will
Back-end software exploration project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and
Receive the registration instruction from engineer user;The engineer that all working task distributes to registration task is developed, and
Mandatory period is set, guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;In task
It checks whether task code is all submitted on time after expiration of time limit, is then to send project to client terminal to complete message, server
Disbursement and sattlement is carried out according to task, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failure
Message.
Further, server includes
Task management server calculates development amount and overall development for receiving back-end software exploration project demand
Development amount after receiving reimbursement of expense message, is decomposed into several tasks, according to task development progress by expense
And term of delivery adjustment task distribution;
Document storage server, for storing back-end software exploration project demand file;
Code administration server, for creating initial skeleton code according to back-end software exploration project demand, for user's end
End uploads development result code, and code is deployed to test environment and is called for client terminal;
Management server is modified, task test modifications opinion is submitted for receiving client terminal, suggestion for revision is sent to
User terminal and the modification result phase for receiving feedback.
Based on the above-mentioned back-end software development approach quickly delivered, the present invention also proposes a kind of back-end software development system,
Including memory, processor and it is stored in the computer program that can be run in the memory and on the processor, the processing
The step of device realizes upper the method when being configured as executing the computer program.
Compared with prior art, back-end software development approach, platform and system that the present invention quickly delivers, using reasonable
Development amount accounting method and flexibly controllable task cutting method, the exploitation that front-end software, back-end software, software are docked
Process forms the operation flow of standardization, standardization, on the one hand avoids the confirmation repeatedly to wide variety of conventional demand, reduces visitor
The communication workload at family and engineer;The delivery quality of task entirety when on the other hand ensure that multidigit engineer's concurrent development,
And which thereby enhance task development rate, it is ensured that quickly deliver.
Detailed description of the invention
Fig. 1 is the flow chart for the back-end software development approach that the present invention quickly delivers.
Fig. 2 is the structural block diagram for the back-end software development platform that the present invention quickly delivers.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and examples.
As shown in Figure 1, the present invention proposes a kind of back-end software development approach quickly delivered, the specific steps of the method
Include:
1) client issues back-end software exploration project demand to server by client terminal;
It includes Software Architecture Design document, Software Interface Design document, software number that back-end software, which develops exploration project demand,
According to structure design documentation.
Client uploads demand file by client terminal, after server receives demand file, according to filename back page
Title.Client only need to provide above-mentioned necessary information according to system prompt, other detailed requirements information are included in design documentation,
Client does not need to provide greater demand information, reduces demand to the greatest extent and links up workload.
2) server calculates development amount and overall development expense according to back-end software exploration project demand, and by rear end
Development project is decomposed into several tasks.
Calculating development amount can be to develop the page, software function or software module or software design original text as metering
Unit, it is several tasks, the task of each task that overall development workload, which is developed rate cutting with mandatory period, averagely,
Time limit is within the specified time at distribution task moment.
By taking module type and scale calculate development amount as an example.In module type, basic general module workload is 5 people
Day, basic services module workload was 8 day for human beings, and basic package module workload was 4 day for human beings;In module scale, takes on a small scale and be
Number 0.6, Standard capacity take coefficient 1, take coefficient 1.5 on a large scale, ultra-large to take coefficient 3;According to each module corresponding types
Workload is task pair multiplied by its corresponding scale coefficient, the workload of as each module, the sum of all module workloads
The workload answered.For example, overall development workload was 10 day for human beings, then it is 10 tasks by the project cutting, each task is appointed
The business time limit is set as any time limit within 20 hours or 24 hours, guarantees that overall development workload is complete within 24 hours with this
At.Server calculates overall development expense according to the sum of module workload, after client's payment expense, in service end-apparatus publication
Mission bit stream.
Task is divided into level-one task, second task, three-level task ... according to complexity by server, respectively with level-one
Engineer, second level engineer, three-level engineer match.When server release tasks, by level-one task, second task, three-level
The corresponding user terminal for being distributed to level-one engineer, second level engineer, three-level engineer of task, the task of low level are issued simultaneously
To high level engineer.
After client passes through platform bill payment expense, server opens flow of task, and to currently can order engineer
User terminal sends mission bit stream.Server is simultaneously according to the technological frame of front-end software exploration project demand, selection and technology
It is required that matched code template, creates the initial code frame of the project, it is every then according to the page info in project demands
One page creation initial directory and initial code file.
3) server provides mission bit stream to engineer user by user terminal, and receives the report from engineer user
Name instruction.
4) server develops the engineer that all working task distributes to registration task, and mandatory period is arranged,
Guarantee that all working task is completed in mandatory period.
41) after server receives registration instruction, satisfactory engineering is screened according to the technical label of engineer user
Teacher user, and sorted according to the running parameter of engineer user, form alternative engineer's list;
42) all working task is distributed to engineer user according to alternative engineer's tab sequential by server, and is arranged
Mandatory period, engineer user send confirmation order instruction to server by user terminal, and server receives confirmation order and refers to
It enables and starts timing;
43) if the number in alternative engineer's list is greater than 0 and is less than number of tasks or does not receive in specified time all really
Recognize order instruction, then server sends distribution failure command and the instruction that asks for a postponement to client terminal, goes to step 44), if alternatively
Number in engineer's list is 0, then server sends distribution failure command to client terminal, and project terminates;
44) client receives distribution failure command and the instruction that asks for a postponement by client terminal, sends to server and agrees to prolong
Phase instruction or project END instruction, server receive instruction of agreeing to delay then according to alternative engineer's tab sequential by all works
It is distributed to engineer user as task, and mandatory period is reset according to alternative engineer's number.
When due to release tasks, server has been sent to the Developmental Engineer user of appropriate level, engineering according to task rank
Teacher user registers the task of appropriate level or the task of low level, when server distributes task, by level-one task, two in charge of a grade
Business, three-level task are respectively allocated to appropriate level or high level engineer user.
For example, client has issued the back-end software development task in an online store, according to client
Module | Task rank | Description | Engineer |
User management | Level-one task | User information maintenance logs in, registration | Level-one engineer A |
Merchandise control | Second task | Merchandise news maintenance, commodity shopping | Second level engineer B |
Order management | Second task | Order process, logistics information | Second level engineer C |
Payment | Second task | User account management, payment flow | Second level engineer D |
The software requirement design documentation of submission, task distribution condition are as follows
5) after completing assignment task in engineer user's business time limit in office, task code is uploaded to server.
Engineer is after user terminal receives the task message of distribution, from the design original text text of server downloading corresponding page
Part, and the initial code of synchronous task, based on design original text, the development specifications according to as defined in platform is developed.Development specifications from
The realization of code spice, page layout and front end various elements, component has carried out detailed regulation, it is desirable that in design original text
Identifiable principle is unified to be standardized exploitation according to platform development specification.
If actively abandoning task in engineer user's business time limit in office, abandon appointing to server transmission by user terminal
Business instruction, it is then to visitor that server, which develops rate according to mandatory period remaining time and averagely and judges whether to need task-delay,
Family terminal sends the instruction that asks for a postponement, and otherwise redistributes this task;Client receives the finger that asks for a postponement by client terminal
It enables, returns and agree to that then server redistributes this task for extension instruction, is detached from the task for current engineer, by the engineering
The page that teacher does not submit is reassigned to Other Engineering teacher in queue, sends task distribution letter to the user terminal of substitute engineer
Breath;The END instruction of return project then server to client terminal send expense return instruction.
6) server checks whether task code is all submitted on time after task expiration of time limit, is then to send out to client terminal
Project is sent to complete message, server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise to user
Terminal sends project and completes failed message.
Server stores the code that engineer user sends, and code is deployed to test environment and sends page to client terminal
Face access address and code download address.Server sends project to client terminal and completes message, and server is carried out according to task
Disbursement and sattlement, and clearing message is sent to user terminal.
After server sends project completion message to client terminal, project enters quality guarantee period, within the quality guarantee time limit of setting,
Client submits the suggestion for revision of task based access control by client terminal, and suggestion for revision is sent to corresponding user terminal by server,
Engineer user modifies to task, and submits modified code to server by user terminal, and server will be modified
Code afterwards is deployed to test environment and sends page access address and code download address to client terminal.
Client after client terminal receives page completion information, check by the page access address that access server provides
Test delivery results page.If it find that the problem of modification and perfection in need, be published to server for suggestion for revision.Client can also
With the code download address provided by server, page code is all completed in downloading.Server receives client's submission
When suggestion for revision, amendment advice message is sent to corresponding user terminal.Engineer is according to the suggestion for revision received, to the page
It modifies, then submits modified page code to server.
After the quality guarantee time limit, server carries out disbursement and sattlement according to task, and task settlement amounts are paid to the task
The specified account of corresponding user terminal, and clearing message is sent to user terminal.
As shown in Fig. 2, the present invention also proposes a kind of back-end software development platform quickly delivered, including
Client terminal pays overall development expense, checks and accepts exploitation code for issuing back-end software exploration project demand;
User terminal, for obtaining the task of mission bit stream, the instruction for sending registration task, confirmation reception distribution, from clothes
Device downloading exploitation of being engaged in requires, and development task is completed in mandatory period and to server upload code;
Server, for calculating development amount and overall development expense according to back-end software exploration project demand, and will
Back-end software exploration project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and
Receive the registration instruction from engineer user;The engineer that all working task distributes to registration task is developed, and
Mandatory period is set, guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;In task
It checks whether task code is all submitted on time after expiration of time limit, is then to send project to client terminal to complete message, server
Disbursement and sattlement is carried out according to task, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failure
Message.
Further, server includes
Task management server calculates development amount and overall development expense for receiving back-end software exploration project demand
With development amount being decomposed into several tasks, according to task development progress and delivery after receiving reimbursement of expense message
Time limit adjusts task distribution;
Document storage server, for storing back-end software exploration project demand file;
Code administration server, for creating initial skeleton code according to back-end software exploration project demand, for user's end
End uploads development result code, and code is deployed to test environment and is called for client terminal;
Management server is modified, task test modifications opinion is submitted for receiving client terminal, suggestion for revision is sent to
User terminal and the modification result phase for receiving feedback.
Based on the above-mentioned back-end software development approach quickly delivered, the present invention also proposes a kind of software development system, including
Memory, processor and it is stored in the computer program that can be run in the memory and on the processor, the processor quilt
The step of realizing upper the method when being configured to execute the computer program.
Claims (10)
1. the back-end software development approach that one kind is quickly delivered, it is characterised in that: described method includes following steps:
1) client issues back-end software exploration project demand to server by client terminal;
2) server calculates development amount and overall development expense according to back-end software exploration project demand, and by back-end software
Exploration project is decomposed into several tasks;
3) server provides mission bit stream to engineer user by user terminal, and receives the registration from engineer user and refer to
It enables;
4) server develops the engineer that all working task distributes to registration task, and mandatory period is arranged, and guarantees
All working task is completed in mandatory period;
5) after completing assignment task in engineer user's business time limit in office, task code is uploaded to server;
6) server checks whether task code is all submitted on time after task expiration of time limit, is then to client terminal sending item
Mesh completes message, and server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise to user terminal
Transmission project completes failed message.
2. the back-end software development approach according to claim 1 quickly delivered, it is characterised in that: rear end is soft in step 1)
Part exploration project demand includes Software Architecture Design document, Software Interface Design document, software data structure design documentation.
3. the back-end software development approach according to claim 1 quickly delivered, it is characterised in that: by rear end in step 2)
The method that development project is decomposed into several tasks is by back-end software exploration project to develop the page or software
Function or software module or software design original text or interface quantity are that measurement unit calculates development amount, by overall development
Workload is with specified time, averagely exploitation rate cutting is several tasks.
4. the back-end software development approach according to claim 1 quickly delivered, it is characterised in that: the specific step of step 4)
Suddenly include:
41) after server receives registration instruction, satisfactory Utility Engineers are screened according to the technical label of engineer user
Family, and sorted according to the running parameter of engineer user, form alternative engineer's list;
42) all working task is distributed to engineer user according to alternative engineer's tab sequential by server, and task is arranged
Time limit, engineer user send confirmation order instruction to server by user terminal, and server receives confirmation order instruction simultaneously
Start timing;
43) if the number in alternative engineer's list is less than number of tasks greater than 0 or does not receive whole confirmations in specified time and connects
Single instrction, then server sends distribution failure command and the instruction that asks for a postponement to client terminal, goes to step 44), if alternative engineering
Number in Shi Liebiao is 0, then server sends distribution failure command to client terminal, and project terminates;
44) client receives distribution failure command and the instruction that asks for a postponement by client terminal, sends to server and agrees to delay to refer to
It enables or project END instruction, server receives instruction of agreeing to delay and then appointed all working according to alternative engineer's tab sequential
Business is distributed to engineer user, and resets mandatory period according to alternative engineer's number.
5. the back-end software development approach according to claim 1 quickly delivered, it is characterised in that: in step 5), if work
Cheng Shi user actively abandons task in mandatory period, then abandons assignment instructions to server transmission by user terminal, service
Device develops rate according to mandatory period remaining time and averagely and judges whether to need task-delay, is, asks to client terminal transmission
It asks extension to instruct, otherwise redistributes this task;Client receives the instruction that asks for a postponement by client terminal, returns and agrees to prolong
Then server redistributes this task for phase instruction, and returning to project END instruction, then server is moved back to client terminal transmission expense
Also instruct.
6. the back-end software development approach according to claim 1 quickly delivered, it is characterised in that: server in step 6)
After sending project completion message to client terminal, project enters quality guarantee period, and within the quality guarantee time limit of setting, client passes through client's end
The suggestion for revision of task based access control is submitted at end, and suggestion for revision is sent to corresponding user terminal by server, and engineer user is to appointing
Business is modified, and submits modified code to server by user terminal, and modified code is deployed to by server
It tests environment and sends page access address and code download address to client terminal.
7. the back-end software development approach according to claim 6 quickly delivered, it is characterised in that: the quality guarantee time limit terminates
Afterwards, server according to task carry out disbursement and sattlement, by task settlement amounts pay to the corresponding user terminal of the task specify
Account, and clearing message is sent to user terminal.
8. the back-end software development platform that one kind is quickly delivered, it is characterised in that: including
Client terminal pays overall development expense, checks and accepts exploitation code for issuing back-end software exploration project demand;
User terminal, for obtaining the task of mission bit stream, the instruction for sending registration task, confirmation reception distribution, from server
Downloading exploitation requires, and development task is completed in mandatory period and to server upload code;
Server, for calculating development amount and overall development expense according to back-end software exploration project demand, and by rear end
Development project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and is received
Registration instruction from engineer user;The engineer that all working task distributes to registration task is developed, and is arranged
Mandatory period guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;In mandatory period
After at the expiration check task code whether all submits on time, be then to client terminal send project complete message, server according to
Task carries out disbursement and sattlement, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failed message.
9. the back-end software development platform according to claim 7 quickly delivered, it is characterised in that: the server includes
Task management server, for receiving back-end software exploration project demand, calculating development amount and overall development expense,
After receiving reimbursement of expense message, development amount is decomposed into several tasks, according to task development progress and term of delivery tune
Whole task distribution;
Document storage server, for storing back-end software exploration project demand file;
Code administration server, for creating initial skeleton code according to back-end software exploration project demand, on user terminal
It spreads and sends out object code, and code is deployed to test environment and is called for client terminal;
Management server is modified, task test modifications opinion is submitted for receiving client terminal, suggestion for revision is sent to user
Terminal and the modification result phase for receiving feedback.
10. the system of back-end software development approach that one kind is quickly delivered, including memory, processor and it is stored in the storage
In device and the computer program that can run on the processor, it is characterised in that: the processor is configured as executing the computer
It is realized when program such as the step of any one of claim 1~7 the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810820096.4A CN109034611A (en) | 2018-07-24 | 2018-07-24 | Back-end software development approach, platform and the system quickly delivered |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810820096.4A CN109034611A (en) | 2018-07-24 | 2018-07-24 | Back-end software development approach, platform and the system quickly delivered |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109034611A true CN109034611A (en) | 2018-12-18 |
Family
ID=64644765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810820096.4A Pending CN109034611A (en) | 2018-07-24 | 2018-07-24 | Back-end software development approach, platform and the system quickly delivered |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109034611A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110929032A (en) * | 2019-11-21 | 2020-03-27 | 山东鲁能软件技术有限公司 | User demand processing system and method for software system |
CN111314413A (en) * | 2019-12-17 | 2020-06-19 | 武汉空心科技有限公司 | Task allocation device for a work platform |
CN112132553A (en) * | 2020-09-30 | 2020-12-25 | 广西民族大学 | Auxiliary protection system and method for formalized development of computer software |
CN112966308A (en) * | 2021-04-23 | 2021-06-15 | 京东方科技集团股份有限公司 | Software delivery method, processing device and storage medium |
CN114003212A (en) * | 2020-07-28 | 2022-02-01 | 阿里巴巴集团控股有限公司 | Data processing method, device and equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018075548A1 (en) * | 2016-10-17 | 2018-04-26 | Sd Squared Limited | Systems and method for creating software from library and custom components |
CN108280631A (en) * | 2018-02-10 | 2018-07-13 | 武汉空心科技有限公司 | A kind of front end development task management-control method and system |
-
2018
- 2018-07-24 CN CN201810820096.4A patent/CN109034611A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018075548A1 (en) * | 2016-10-17 | 2018-04-26 | Sd Squared Limited | Systems and method for creating software from library and custom components |
CN108280631A (en) * | 2018-02-10 | 2018-07-13 | 武汉空心科技有限公司 | A kind of front end development task management-control method and system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110929032A (en) * | 2019-11-21 | 2020-03-27 | 山东鲁能软件技术有限公司 | User demand processing system and method for software system |
CN110929032B (en) * | 2019-11-21 | 2022-12-09 | 山东鲁能软件技术有限公司 | User demand processing system and method for software system |
CN111314413A (en) * | 2019-12-17 | 2020-06-19 | 武汉空心科技有限公司 | Task allocation device for a work platform |
CN114003212A (en) * | 2020-07-28 | 2022-02-01 | 阿里巴巴集团控股有限公司 | Data processing method, device and equipment |
CN112132553A (en) * | 2020-09-30 | 2020-12-25 | 广西民族大学 | Auxiliary protection system and method for formalized development of computer software |
CN112966308A (en) * | 2021-04-23 | 2021-06-15 | 京东方科技集团股份有限公司 | Software delivery method, processing device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108876201A (en) | Development approach, platform and the system quickly delivered | |
CN109034611A (en) | Back-end software development approach, platform and the system quickly delivered | |
CN108876202A (en) | Design work management method, platform and the system quickly delivered | |
CN109271142A (en) | Exploitation cloud platform based on template component | |
US9875276B2 (en) | Database view generation | |
CN103309946B (en) | Multimedia file processing method, Apparatus and system | |
CN109146251A (en) | Component- based development method and system | |
CN109118059A (en) | Front-end software development approach, platform and the system quickly delivered | |
CN109214645A (en) | Development approach and system based on module metering | |
CN109118063A (en) | Task based on unit time distribution develops cloud platform | |
CN109144480A (en) | Working platform method, platform and the system quickly delivered | |
CN109034610A (en) | Software development cloud platform based on different periods difference distribution mechanism | |
CN111444213B (en) | Ledger clearing system and method based on credit business | |
CN108830715A (en) | Disk processing method and system are returned in batch documents part | |
CN109117366A (en) | The method for testing software and system quickly delivered | |
CN111142855A (en) | Software development method and software development system | |
CN109377011A (en) | The software docking development approach and system quickly delivered | |
CN109101222A (en) | A kind of 24 hours front end development platforms quickly delivered | |
CN109102168A (en) | Exploitation cloud platform based on page metering and timeliness control | |
CN109491650A (en) | A kind of date-time component setting method, device and computer readable storage medium | |
US7383225B2 (en) | Module for the interconnectivity of independent software applications | |
CN109118060A (en) | Quick development method, platform and system based on timeliness control | |
CN109785047A (en) | Order method for pushing, device, computer equipment and the storage medium of financial product | |
US8751276B2 (en) | Capturing and processing data generated in an ERP interim phase | |
CN109255515A (en) | A kind of task exploitation cloud platform based on page metering and unit time distribution |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |