CN109034550A - Project survey and construction field monitoring method, system and computer equipment - Google Patents

Project survey and construction field monitoring method, system and computer equipment Download PDF

Info

Publication number
CN109034550A
CN109034550A CN201810714985.2A CN201810714985A CN109034550A CN 109034550 A CN109034550 A CN 109034550A CN 201810714985 A CN201810714985 A CN 201810714985A CN 109034550 A CN109034550 A CN 109034550A
Authority
CN
China
Prior art keywords
construction
prospecting
current
information
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810714985.2A
Other languages
Chinese (zh)
Inventor
孙颖
赵颖
郭斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201810714985.2A priority Critical patent/CN109034550A/en
Publication of CN109034550A publication Critical patent/CN109034550A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of project survey and construction field monitoring method, system and computer equipments, its method includes: to obtain the prospecting personal information and prospecting field data that terminal uploads, and obtains prospecting task according to prospecting personal information and prospecting field data and is transferred to terminal;It is spaced the first preset time and obtains the current prospecting progress msg that terminal uploads, current prospecting task is obtained according to current prospecting progress msg and be transferred to terminal, until project prospecting is completed;Construction personnel's information and construction site information that terminal uploads are obtained, according to construction personnel's information and construction site acquisition of information construction task and is transferred to terminal;It is spaced the second preset time and obtains the current construction speed information that terminal uploads, according to the current construction task of current construction speed acquisition of information and be transferred to terminal, until project construction is completed.Using the present invention program, the design and construction management level and efficiency of power supply company's marketing programs can be improved.

Description

Project survey and construction field monitoring method, system and computer equipment
Technical field
The present invention relates to technical field of electric power, more particularly to a kind of project survey and construction field monitoring method, system and Computer equipment.
Background technique
Under in-depth power system reform and Internet era background, the increase of marketing programs construction and administrator Relative deficiency is contradictory becomes increasingly conspicuous by member.
With the arrival of full-service competition and mobile interchange epoch, market competition is fiercer, the marketing programs inspection of the scene of a crime A large amount of administrative staff are needed to be monitored and manage with construction, the human resources of consuming are more, and to various regions marketing programs pipe It is high to manage personnel requirement, the efficiency of management is lower.
Therefore, it is necessary to the planned management of construction in a kind of pair of power supply company's marketing programs, construction speed monitoring, goods and materials pipe Reason, reasonable distribution of construction personnel etc. etc. carry out the plateform system of comprehensive systematization control, to promote whole management effect Rate.
Summary of the invention
The purpose of the present invention is to provide a kind of project survey and construction field monitoring method, system and computer equipments, can To improve the process management and control ability and efficiency of Project design and construction, to further increase the design of power supply company's marketing programs And construction management is horizontal and efficiency.
The purpose of the present invention is achieved through the following technical solutions:
A kind of project survey and construction field monitoring method, which comprises
The prospecting personal information and prospecting field data that terminal uploads are obtained, it is existing according to the prospecting personal information and prospecting Field acquisition of information prospecting task is simultaneously transferred to the terminal;
Be spaced the first preset time and obtain the current prospecting progress msg that the terminal uploads, according to it is described it is current reconnoitre into Degree acquisition of information currently reconnoitres task and is transferred to the terminal, until project prospecting is completed;
Construction personnel's information and construction site information that the terminal uploads are obtained, according to construction personnel's information and is applied Work field data obtains construction task and is transferred to the terminal;
Be spaced the second preset time and obtain the current construction speed information that the terminal uploads, according to it is described it is current construct into The current construction task of degree acquisition of information is simultaneously transferred to the terminal, until project construction is completed.
The first preset time of the interval obtains the current prospecting progress that the terminal uploads in one of the embodiments, Information obtains current prospecting task according to the current prospecting progress msg and is transferred to the terminal, until project has been reconnoitred At including:
It is spaced the first preset time and obtains the current prospecting progress msg of the terminal upload and according to the current prospecting Progress msg judges whether project prospecting is completed;
If not completing, the current prospecting task is obtained according to the prospecting progress msg and is transferred to the terminal.
The second preset time of the interval obtains the current construction speed that the terminal uploads in one of the embodiments, Information according to the current construction task of the current construction speed acquisition of information and is transferred to the terminal, until project construction is complete At including:
It is spaced the second preset time and obtains the current construction speed information of the terminal upload and according to the current construction Progress msg judges whether project construction is completed;
If not completing, the current construction task according to the construction speed acquisition of information is simultaneously transferred to the terminal.
A kind of project survey and construction field monitoring method, which comprises
Prospecting personal information and prospecting field data to server are uploaded, and the prospecting for receiving the server transmitting is appointed Business;
The first preset time is spaced to upload current prospecting progress msg to the server and receive the server transmitting Current prospecting task corresponding with the current prospecting progress msg, until project prospecting is completed;
Construction personnel's information and construction site information are uploaded to the server, and receives the construction of the server transmitting Task;
The second preset time is spaced to upload current construction speed information to the server and receive the server transmitting Current construction task corresponding with the current construction speed information, until project construction is completed.
A kind of project survey and construction field monitoring method, which comprises
Server obtain terminal upload prospecting personal information and prospecting field data, according to the prospecting personal information with Prospecting field data obtains prospecting task and is transferred to the terminal;
The first preset time of server interval obtains the current prospecting progress msg that the terminal uploads, according to described current Prospecting progress msg obtains current prospecting task and is transferred to the terminal, until project prospecting is completed;
Server obtains the construction personnel's information and construction site information that the terminal uploads, and is believed according to the construction personnel Breath and construction site acquisition of information construction task are simultaneously transferred to the terminal;
The second preset time of server interval obtains the current construction speed information that the terminal uploads, according to described current The current construction task of construction speed acquisition of information is simultaneously transferred to the terminal, until project construction is completed.
A kind of project survey and construction Field Monitoring System, the system comprises:
Investigation information obtains module, for obtaining the prospecting personal information and prospecting field data of terminal upload, according to institute It states prospecting personal information and prospecting field data obtains prospecting task and is transferred to the terminal;
Prospecting task adjusts module, obtains the current prospecting progress letter that the terminal uploads for being spaced the first preset time Breath obtains current prospecting task according to the current prospecting progress msg and is transferred to the terminal, until project prospecting is completed;
Construction information obtains module, the construction personnel's information and construction site information uploaded for obtaining the terminal, root According to construction personnel's information and construction site acquisition of information construction task and it is transferred to the terminal;
Construction task adjusts module, obtains the current construction speed letter that the terminal uploads for being spaced the second preset time Breath according to the current construction task of the current construction speed acquisition of information and is transferred to the terminal, until project construction is completed.
The prospecting task adjustment module includes: in one of the embodiments,
Judging unit is reconnoitred, obtains the current prospecting progress msg of the terminal upload simultaneously for being spaced the first preset time Judge whether project prospecting is completed according to the current prospecting progress msg;
Adjustment unit is reconnoitred, for obtaining institute according to the prospecting progress msg when project prospecting is not completed It states current prospecting task and is transferred to the terminal.
The construction task adjustment module includes: in one of the embodiments,
Construction judging unit obtains the current construction speed information of the terminal upload simultaneously for being spaced the second preset time Judge whether project construction is completed according to the current construction speed information;
It constructs adjustment unit, for when the project construction is not completed, according to the construction speed acquisition of information institute It states current construction task and is transferred to the terminal.
A kind of project survey and construction Field Monitoring System, the system comprises:
Investigation information uploading module for uploading prospecting personal information and prospecting field data to server, and receives institute State the prospecting task of server transmitting;
Prospecting task receiving module uploads current prospecting progress msg to the server for being spaced the first preset time And the current prospecting task corresponding with the current prospecting progress msg for receiving server transmitting, up to project has been reconnoitred At;
Construction information uploading module for uploading construction personnel's information and construction site information to the server, and connects Receive the construction task of the server transmitting;
Construction task receiving module uploads current construction speed information to the server for being spaced the second preset time And the current construction task corresponding with the current construction speed information for receiving server transmitting, until project construction is complete At.
A kind of computer equipment, including memory and processor, the memory are stored with computer program, the processing Device realizes following steps when executing the computer program:
The prospecting personal information and prospecting field data that terminal uploads are obtained, it is existing according to the prospecting personal information and prospecting Field acquisition of information prospecting task is simultaneously transferred to the terminal;
Be spaced the first preset time and obtain the current prospecting progress msg that the terminal uploads, according to it is described it is current reconnoitre into Degree acquisition of information currently reconnoitres task and is transferred to the terminal, until project prospecting is completed;
Construction personnel's information and construction site information that the terminal uploads are obtained, according to construction personnel's information and is applied Work field data obtains construction task and is transferred to the terminal;
Be spaced the second preset time and obtain the current construction speed information that the terminal uploads, according to it is described it is current construct into The current construction task of degree acquisition of information is simultaneously transferred to the terminal, until project construction is completed.
According to the scheme of aforementioned present invention, the prospecting personal information and prospecting field data that terminal uploads are obtained, according to The prospecting personal information and prospecting field data obtain prospecting task and are transferred to the terminal;The first preset time is spaced to obtain The current prospecting progress msg for taking the terminal to upload obtains current prospecting task according to the current prospecting progress msg and passes It is handed to the terminal, until project prospecting is completed;Obtain construction personnel's information and construction site information that the terminal uploads, root According to construction personnel's information and construction site acquisition of information construction task and it is transferred to the terminal;It is spaced the second preset time The current construction speed information that the terminal uploads is obtained, simultaneously according to the current current construction task of construction speed acquisition of information It is transferred to the terminal, until project construction is completed.In this way, the present invention program passes through prospecting and construction stage server and terminal Interactive information is to improve the process management and control ability and efficiency of project survey and construction, to further increase power supply company's marketing programs Survey and construction management level and efficiency.
Detailed description of the invention
Fig. 1 is the applied environment figure of project survey and construction field monitoring method in one embodiment;
Fig. 2 is the flow diagram of project survey and construction field monitoring method in one embodiment;
Fig. 3 is the flow diagram of project survey and construction field monitoring method in one embodiment;
Fig. 4 is the flow diagram of project survey and construction field monitoring method in one embodiment;
Fig. 5 is the flow diagram of project survey and construction field monitoring method in second embodiment;
Fig. 6 is the flow diagram of project survey and construction field monitoring method in third embodiment;
Fig. 7 is the structural block diagram of project survey and construction Field Monitoring System in one embodiment;
Fig. 8 is the structural block diagram of project survey and construction Field Monitoring System in another embodiment;
Fig. 9 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, with reference to the accompanying drawings and embodiments, to this Invention is described in further detail.It should be appreciated that the specific embodiments described herein are only used to explain the present invention, And the scope of protection of the present invention is not limited.
Project survey and construction field monitoring method provided by the present application, can be applied in application environment as shown in Figure 1. Wherein, terminal 102 is communicated with server 104 by network by network.Server 104 obtains surveying for the upload of terminal 102 Personal information and prospecting field data are examined, prospecting task is obtained according to the prospecting personal information and prospecting field data and is transmitted To terminal 102;Server 104 is spaced the first preset time and obtains the current prospecting progress msg that terminal 102 uploads, according to described Current prospecting progress msg obtains current prospecting task and is transferred to terminal 102, until project prospecting is completed;Server 104 obtains The construction personnel's information and construction site information for taking terminal 102 to upload, according to construction personnel's information and construction site information It obtains construction task and is transferred to terminal 102;Server 104 is spaced the second preset time and obtains currently applying for the upload of terminal 102 Work progress msg according to the current construction task of the current construction speed acquisition of information and is transferred to terminal 102, until project is applied Work is completed.Wherein, terminal 102 can be, but not limited to be various personal computers, laptop, smart phone, tablet computer With portable wearable device, server 104 can use the server set of the either multiple server compositions of independent server Group realizes.It, not only can be with it will be understood by those skilled in the art that project survey and construction field monitoring method provided by the present application Applied in application environment shown in FIG. 1, can also applying but be not limited in various computers.
In one embodiment, as shown in Fig. 2, providing a kind of project survey and construction field monitoring method, in this way Applied to being illustrated for the server in Fig. 1, comprising the following steps:
Step S101 obtains prospecting personal information and prospecting field data that terminal uploads, is believed according to the prospecting personnel Breath and prospecting field data obtain prospecting task and are transferred to the terminal;
Step S102, the first preset time of interval obtains the current prospecting progress msg that the terminal uploads, according to described Current prospecting progress msg obtains current prospecting task and is transferred to the terminal, until project prospecting is completed;
Step S103 obtains construction personnel's information and construction site information that the terminal uploads, according to the constructor Member's information and construction site acquisition of information construction task are simultaneously transferred to the terminal;
Step S104, the second preset time of interval obtains the current construction speed information that the terminal uploads, according to described The current construction task of current construction speed acquisition of information is simultaneously transferred to the terminal, until project construction is completed.
In above-mentioned project survey and construction field monitoring method, pass through prospecting and construction stage server and terminal interaction information To improve the process management and control ability and efficiency of project survey and construction, so that the prospecting for further increasing power supply company's marketing programs is applied Work management level and efficiency.
Specifically, the prospecting personal information and prospecting field data that terminal uploads are obtained, according to the prospecting personal information Obtaining prospecting task with prospecting field data and be transferred to the terminal includes: the project phase of exploration that server uploads terminal The staff and unit in charge of construction's information being related to, which register, completes organizational structure goes forward side by side row information maintenance management;Then complete At organizational structure management, including Role Management, rights management, organizational structure management;Wherein, Role Management includes combining Construction Industry It is related to human roles in pragmatic border, creates system actor and post;Rights management includes completing Character menu permission, personnel angle The configuration of color corresponding relationship, that is, complete the authority distribution of each role and function menu;Organizational structure management includes completing project under construction Affiliated construction unit and associated construction unit organization framework increase, delete, changing function maintenance;Carrying out maintenance of information management includes project Bid section maintenance of information and project team member's configuration, item target phase maintenance of information includes that finished item bid section information is increased newly, modifies, deleted It removes and query function, program member is configured to finished item group membership and is related to construction unit, unit in charge of construction's personnel depaly.Prospecting Task status is state of having assigned, and prospecting user information does not allow to modify, delete, and corresponding prospecting personnel can download in terminal Corresponding prospecting user information.
Specifically, construction personnel's information and construction site information that the terminal uploads are obtained, according to the construction personnel Information and construction site acquisition of information construction task and be transferred to the terminal include to terminal upload construction personnel's information into Row construction personnel registration management, unit in charge of construction's registration management, Role Management, rights management and organizational structure management, constructor Member's registration management is specially to complete power supply branch office and the registration of unit in charge of construction's personal information and audit;Unit registration management is specific To complete the registration of unit in charge of construction's enterprise qualification and audit;Role Management is specially to combine the pragmatic border of Construction Industry, creates system angle Color and post;Rights management is specially to complete Character menu permission, the configuration of human roles' corresponding relationship, that is, completes each role and function The authority distribution of energy menu;Organizational structure management is specially to complete the affiliated construction unit of project under construction and associated construction unit group Stretching frame structure increases, deletes and modifies function maintenance management.
The current prospecting progress msg includes the prospecting personnel distributed intelligence and surveys in one of the embodiments, Examine mark information.Specifically, prospecting mark information includes field conduct data and spot plane diagram, wherein field conduct number According to including live electricity box relationship, family table relationship, measuring terminal rotation state and prospecting personnel, prospecting time and prospecting engineering The information such as amount;Spot plane diagram is by the latitude and longitude information in conjunction with collection in worksite measuring terminal, and real-time exhibition is applied in Baidu Work terminal location information obtains.Prospecting personnel's distributed intelligence includes that prospecting personnel register situation statistics and map red dot mark day Know, grasps the daily human input situation of constituent parts in real time.Personnel register function combination GPS positioning function, support based on Baidu Figure realizes address fine tuning, obtains accurate geographical location, and prospecting personnel click and register, and selects corresponding terminal job that can cut automatically Zapping area carries out inspection of the scene of a crime operation, and the information of registering of server real-time reception mobile terminal controls the prospecting rail of prospecting personnel Mark timely feedbacks Field Force's attendance and efficiency of turning out for work.Mobile terminal provides show staff on mobile terminals and registers, is electric Sub- map, equipment GPS positioning, personnel track is recorded, track such as uploads at the functions in real time.Mobile terminal GIS is existed using combination offline Ray mode, off-line mode complete positioning using offline map and GPS, and on-line mode is positioned using network coordinate.
Specifically, electricity box information include new and old electricity box electricity box model, electricity box digit, mounting means and table before line length record Enter, obtains the image collection that electricity box information further includes the image collection and panorama sketch to electricity box, and use GPS positioning, acquisition Signal strength, latitude and longitude information;Obtaining electricity box user information includes the image collection to electric supply meter, using GPS positioning, acquisition Signal strength, latitude and longitude information.
In one of the embodiments, as shown in figure 3, the first preset time of interval obtains currently surveying for the terminal upload Progress msg is examined, current prospecting task is obtained according to the current prospecting progress msg and is transferred to the terminal, until project Prospecting is completed
S1021, the first preset time of interval obtain the current prospecting progress msg that the terminal uploads and are worked as according to described Preceding prospecting progress msg judges whether project prospecting is completed;
S1022 obtains the current prospecting task according to the prospecting progress msg and is transferred to described if not completing Terminal.
Specifically, the first preset time can be set to one day or one week;Current prospecting progress msg include to engineering into Degree, project process, region progress and unit in charge of construction's progress are counted, wherein project progress statistics is specially to press project, area Domain, unit in charge of construction carry out the analysis of various dimensions project process;Project process statistics is each to project under construction specially using project as dimension Platform area construction speed statistics;Region statistics are specially to carry out accumulative completion to each bid section of project under construction using region as dimension Amount, filing amount, global progress, region statistics.
Current construction speed information includes construction personnel's distributed intelligence and construction trace in one of the embodiments, Mark information.Specifically, construction mark information includes project under construction information, detail design information, construction material information, construction plan Information, construction archive information and collection copy business information;Wherein, project under construction specifically includes completion project verification management, item design Member's configuration and field data management;Project verification management is specially the maintenance of information of finished item bid section, relates generally to a target phase letter The newly-increased of breath, modification, deletion and query function;Project team member's configuration is specially to complete construction unit, unit in charge of construction personnel Configuration;Field data management specifically: platform area data import: the plan of integration project week exports corresponding platform area from marketing system Inventory carries out system introducing to construction user according to platform area;It locks locking/unlocking in platform area: the locking of platform area, unlocking function, locking is provided The area state Xia Tai is in write-protect state, does not allow to modify, deletes data;Task distribution: assign task to construction personnel. The area Hou Tai is assigned, state is state of having assigned, and construction user information does not allow to modify, delete, and corresponding construction personnel is in movement Terminal will can download the construction user information in corresponding platform area.
Specifically, detail design specifically includes maintenance engineering amount template, Maintenance Design material depot and imports designing user Inventory;Wherein Maintenance Design material depot specifically includes: the material depot of design is entered into system by region chief designer in advance In the middle, Maintenance Design material type;Designing material is associated with project amount, goods and materials.
Specifically, construction material mainly realizes counter box, electric energy meter, measurement seal, the mutual inductor for project construction The storage of equal goods and materials is received, moves back fortune, scrapping and goods and materials use state tracking function, handling of goods and materials include frame trick goods and materials library, storehouse Library, buying storage receive application, goods and materials tracking and the management of storage goods and materials;Wherein, it is specially system administration that frame, which recruits goods and materials library, The frame in the current year is recruited goods and materials input system by member, for initializing material category, and the subsequent warehouse entry content of constraint;Storehouse Depositary management reason is specially the maintenance that unit in charge of construction responsible person carries out warehouse information to itself unit, need to be safeguarded by hand, major maintenance storehouse Library address, stock clerk, stock clerk's telephone number and synchronous office side's warehouse information.Buying is put in storage specific maintenance office Square object provides initialization data;Receive the goods and materials neck material application that application is specially unit in charge of construction;Goods and materials tracking is specially to exist to goods and materials Library, using, move back fortune situation be tracked, to project construction goods and materials library, receive, using, move back transport row detail track, grasp The whereabouts of goods and materials;Warehousing management is specially that the analysis to inventories counts, and constituent parts carry out being put in storage out for goods and materials in the unit It manages, allot management, and check the storage condition of constituent parts storehouse raw material, service condition and allot situation.
Specifically, the process that construction material claims is specific as follows:
(1) unit in charge of construction responsible person chooses a project, click newly-increased goods and materials and claim, and passes through selecting some to examine Plan construction month, and click confirmation;
(2) turn to jump to a plan material request confirmation interface after above-mentioned confirmation, interface refers to unit in charge of construction (moon) demand Plan application for materials needed;If no problem, confirmation can be clicked, this application is sent to office side project leader.
(3) if each unit in charge of construction under the project has been filed on goods and materials application, office side project leader can be every A unit in charge of construction carries out the reply of goods and materials quantity, or chooses and enter projected demand list reply interface to the inventory in requisition for reply; Only need to insert office side's reply quantity below unit in charge of construction's material request.
(4) completing need to be with after plan goods and materials examination & approval, and unit in charge of construction can carry out goods and materials neck material registration.Wherein claim people, The construction unit that neck material date, neck material place are selected by unit in charge of construction responsible person, and material place led to be necessary under this project Warehouse location;Other default value, the goods and materials record of reply can be given an written reply in list from goods and materials and obtain;Then it only needs to modify Corresponding this gets quantity.Goods and materials neck material application prompt will be popped up after confirmation in the account of construction unit responsible person;
(5) construction unit responsible person receives neck material Request Notices, will confirm or retract neck material application;Unit in charge of construction After responsible person receives acknowledgement notification, the warehouse location of office side can be gone to carry out neck material operation.
Specifically, construction plan includes the establishment of monthly plan, week plan and goods and materials plan.Monthly plan establishment is specially item Mesh creates moon construction plan, and platform area is implemented in addition under the plan, and system can provide total implementation platform area number and number of users; Responsible person can be submitted to examine after working out;All plannings are specially that after monthly plan examination & approval pass through, can generate each Week plan, hereafter can plan the layout for carrying out an implementation sequence to week, and subsequent work can be opened according to secondary sequence Open up work;Goods and materials need to be specially construction material needed for the application of moon construction plan with plan.Pass through examination & approval in moon construction plan Afterwards, unit in charge of construction responsible person can carry out goods and materials and claim operation.Unit in charge of construction can be according to the construction quantity of monthly plan, and construction The stockpile number of unit, to determine goods and materials quantity that needs are applied;It, can also be according to inventory in office among the process that office side examines The storage of situation and each unit in charge of construction and application situation carry out filling in for reply quantity.
Specifically, construction archives include that customer profile is verified, work order is verified and the acquisition of plane diagram;Customer profile core It looks into specifically by the mobile mobile terminal image information acquired and the new and old terminal number of terminal typing, new and old table bottom, seal etc. Key message is checked, and is completed site operation and is filed data verification, construction filing data includes electricity box, electric supply meter construction money Material;Work order is verified image information specifically by mobile mobile terminal acquisition and terminal typing rotation ammeter, electricity box and is made It is checked with project amounts such as tubing, wire rod, switch, mutual inductors, completes the audit of site operation project amount;Mobile terminal at the scene When operation, needs to acquire electricity box and ammeter information before construction, need to acquire construction as-constructed plan after the completion of construction, eventually by movement After end is uploaded to control platform, quality audit personnel according to front and back Construction Comparison image, to construction quality make it is quality, good, In, difference quality measurement grade evaluation, the work order poor to processing quality can identify audit does not pass through, it is desirable that construction personnel does over again Construction technology quality audit is realized in processing;Acquisition is specially that user positions plan view displaying when plan view, in conjunction with collection in worksite meter The latitude and longitude information for measuring terminal, the real-time exhibition construction terminal location information in Baidu.
Specifically, when collection copies business offer typing collecting and copying device installation, the data record of required acquisition includes equipment class The information such as type, device numbering, logical address, installation site, cabinet number, and the project amount of construction etc., it is specific that collection copies installation Process is as follows:
(1) office side responsible person will need construct user's inventory typing marketing construction class control platform, can by interface from Marketing system obtains (or user's inventory is imported into platform by way of being introduced directly into excel);
(2) low-voltage collecting meter reading design data is imported, the later period can be imported by power supply unit and platform area title with construction personnel Platform area data of constructing are associated;
(3) construction material import system is carried out materials warehousing by office side responsible person, so that unit in charge of construction is received;
(4) unit in charge of construction responsible person receives construction material import system progress goods and materials, uses so that construction personnel downloads;
(5) construction personnel logs in mobile application and carries out construction data downloading and construction material downloading, copies industry subsequently into collection Concentrator, collector construction data are then carried out typing and are acquired to construction image, in addition, by electric by business main interface Table information is associated with collector information.
(6) construction data is back to marketing construction class control platform, unit in charge of construction's shelves by mobile application by construction personnel Case administrative staff audit concentrator, collector construction quality and construction technology.
In one of the embodiments, as shown in figure 3, the second preset time of interval obtains currently applying for the terminal upload Work progress msg according to the current construction task of the current construction speed acquisition of information and is transferred to the terminal, until project Construction is completed to include: S1041, and the second preset time of interval obtains the current construction speed information that the terminal uploads and according to institute It states current construction speed information and judges whether project construction is completed;S1042, if not completing, according to the construction speed information It obtains the current construction task and is transferred to the terminal.
Specifically, the second preset time can be set to one day or one week;Construction speed acquisition of information be specially press project, Region, unit in charge of construction carry out the analysis of various dimensions project process;Construction personnel's statistics of registering is specially that construction personnel registers situation day Statistics and map red dot mark, grasp the daily human input situation of each unit in charge of construction in real time;It is specially to press that personnel, which are distributed diagram, Personnel are completed according to unit in charge of construction to register rate and personnel's distribution statistics;Project amount statistics is specially applying for statistics site operation personnel Work project amount;Design alteration statistics is specially to carry out construction by project to be obstructed the statistical analysis of user;Construction efficiency analysis is specific Construction efficiency to carry out various dimensions by unit in charge of construction, project, construction teams and groups statisticallys analyze;It is specific that goods and materials declare analysis of the accuracy It compares for the practical goods and materials declared of unit in charge of construction with the data that design provides.
Accordingly, according to the scheme of above-described embodiment, the prospecting personal information and prospecting field data that terminal uploads are obtained, Prospecting task is obtained according to the prospecting personal information and prospecting field data and is transferred to the terminal;Be spaced first it is default when Between obtain the current prospecting progress msg that the terminal uploads, obtained according to the current prospecting progress msg and currently reconnoitre task And it is transferred to the terminal, until project prospecting is completed;Obtain the construction personnel's information and construction site letter that the terminal uploads Breath, according to construction personnel's information and construction site acquisition of information construction task and is transferred to the terminal;Interval second is pre- If the time obtains the current construction speed information that the terminal uploads, currently constructed according to the current construction speed acquisition of information Task is simultaneously transferred to the terminal, until project construction is completed.In this way, the present invention program passes through prospecting and construction stage server With terminal interaction information to improve the process management and control ability and efficiency of project survey and construction, to further increase battalion of power supply company The survey and construction management level and efficiency of pin project.
It is described in one of the embodiments, as shown in figure 4, providing a kind of project survey and construction field monitoring method Method includes:
Step S201 uploads prospecting personal information and prospecting field data to server, and receives the server transmitting Prospecting task;
Step S202, the first preset time of interval upload current prospecting progress msg and to the server and receive the clothes It is engaged in the current prospecting task corresponding with the current prospecting progress msg of device transmitting, until project prospecting completion;
Step S203 uploads construction personnel's information and construction site information to the server, and receives the server The construction task of transmitting;
Step S204, the second preset time of interval upload current construction speed information to the server and receive the clothes It is engaged in the current construction task corresponding with the current construction speed information of device transmitting, until project construction is completed.
It is described in one of the embodiments, as shown in figure 5, providing a kind of project survey and construction field monitoring method Method includes:
S301, server obtains the prospecting personal information that terminal uploads and prospecting field data, according to the prospecting personnel Information and prospecting field data obtain prospecting task and are transferred to the terminal;
S302, the first preset time of server interval obtains the current prospecting progress msg that the terminal uploads, according to institute It states current prospecting progress msg to obtain current prospecting task and be transferred to the terminal, until project prospecting is completed;
S303, server obtains the construction personnel's information and construction site information that the terminal uploads, according to the construction Personal information and construction site acquisition of information construction task are simultaneously transferred to the terminal;
S304, the second preset time of server interval obtains the current construction speed information that the terminal uploads, according to institute It states the current construction task of current construction speed acquisition of information and is transferred to the terminal, until project construction is completed.
It is described in one of the embodiments, as shown in fig. 6, providing a kind of project survey and construction Field Monitoring System System is applied to server, the system comprises:
Investigation information obtains module 101, for obtaining the prospecting personal information and prospecting field data of terminal upload, according to The prospecting personal information and prospecting field data obtain prospecting task and are transferred to the terminal;
Prospecting task adjusts module 102, for be spaced that the first preset time obtains that the terminal uploads it is current reconnoitre into Information is spent, current prospecting task is obtained according to the current prospecting progress msg and is transferred to the terminal, until project is reconnoitred It completes;
Construction information obtains module 103, the construction personnel's information and construction site information uploaded for obtaining the terminal, According to construction personnel's information and construction site acquisition of information construction task and it is transferred to the terminal;
Construction task adjusts module 104, for be spaced that the second preset time obtains that the terminal uploads it is current construct into Information is spent, according to the current construction task of the current construction speed acquisition of information and the terminal is transferred to, until project construction It completes.
In one of the embodiments, as shown in fig. 7, prospecting task adjustment module 102 includes:
Judging unit 1021 is reconnoitred, obtains the current prospecting progress letter that the terminal uploads for being spaced the first preset time It ceases and judges whether project prospecting is completed according to the current prospecting progress msg;Adjustment unit 1022 is reconnoitred, for when described When project prospecting is not completed, the current prospecting task is obtained according to the prospecting progress msg and is transferred to the terminal.
In one of the embodiments, as shown in fig. 7, construction task adjustment module 104 includes: construction judging unit 1041, the current construction speed information of the terminal upload is obtained and according to the current construction for being spaced the second preset time Progress msg judges whether project construction is completed;It constructs adjustment unit 1042, for when the project construction is not completed, root According to current construction task described in the construction speed acquisition of information and it is transferred to the terminal.
It is described in one of the embodiments, as shown in figure 8, providing a kind of project survey and construction Field Monitoring System System is applied to terminal, the system comprises:
Investigation information uploading module 201 for uploading prospecting personal information and prospecting field data to server, and receives The prospecting task of the server transmitting;
Prospecting task receiving module 202 uploads current prospecting progress msg to the clothes for being spaced the first preset time Business device and the current prospecting task corresponding with the current prospecting progress msg for receiving server transmitting, up to project is surveyed Examine completion;
Construction information uploading module 203, for uploading construction personnel's information and construction site information to the server, and Receive the construction task of the server transmitting;
Construction task receiving module 204 uploads current construction speed information to the clothes for being spaced the second preset time Business device and the current construction task corresponding with the current construction speed information for receiving server transmitting, until project is applied Work is completed.
Specifically, terminal can be cell phone application, and design mobile terminal also has data upload function and system setting function Energy;Specifically, data upload function includes upload user data with information such as grade pictures, mobile application support to upload in real time and Work offline mode, and the data in system can select to upload in real time with single, also can choose off-line mode, temporary local, In the state that network signal is good, reselection batch is uploaded, and data upload at present is divided into the upload of two parts data and picture uploads, Data are uploaded in the database server of design platform system and store, and pictorial information is uploaded to the file clothes of design platform system It is stored in business device;System setting function includes providing APP to use configurations and more new management, including scan setting, barcode scanning Setting includes handset mode and engineering mode, and more new management is specially that can be checked more before mobile service handheld applications start Newly, guarantee that the handheld applications used are latest edition, and user of service is prompted to upgrade, operate straightforward.Pass through design Real-time communication between terminal and server may be implemented operation flow, business datum Real-Time Sharing, and pass through the infrared of terminal Barcode scanning, GPS positioning, video miscellaneous function of taking pictures realize the with no paper operation of inspection of the scene of a crime business.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction Composition can be as shown in Figure 9.The computer equipment include by system bus connect processor, memory, network interface and Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating The database of machine equipment is for storing the data that performance appraisal is related to.The network interface of the computer equipment is used for and external end End passes through network connection communication.To realize a kind of performance appraisal method when the computer program is executed by processor.
It will be understood by those skilled in the art that structure shown in Fig. 9, only part relevant to application scheme is tied The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment It may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment, including memory and processor are provided, is stored in memory Computer program, the processor perform the steps of when executing computer program
The prospecting personal information and prospecting field data that terminal uploads are obtained, it is existing according to the prospecting personal information and prospecting Field acquisition of information prospecting task is simultaneously transferred to the terminal;
Be spaced the first preset time and obtain the current prospecting progress msg that the terminal uploads, according to it is described it is current reconnoitre into Degree acquisition of information currently reconnoitres task and is transferred to the terminal, until project prospecting is completed;
Construction personnel's information and construction site information that the terminal uploads are obtained, according to construction personnel's information and is applied Work field data obtains construction task and is transferred to the terminal;
Be spaced the second preset time and obtain the current construction speed information that the terminal uploads, according to it is described it is current construct into The current construction task of degree acquisition of information is simultaneously transferred to the terminal, until project construction is completed.
The first preset time of interval obtains the terminal when processor executes computer program in one of the embodiments, The current prospecting progress msg uploaded obtains current prospecting task according to the current prospecting progress msg and is transferred to the end It holds, until project prospecting is completed to include: to be spaced the first preset time to obtain the current prospecting progress msg of the terminal upload simultaneously Judge whether project prospecting is completed according to the current prospecting progress msg;If not completing, according to the prospecting progress msg It obtains the current prospecting task and is transferred to the terminal.
The second preset time of interval obtains the terminal when processor executes computer program in one of the embodiments, The current construction speed information uploaded according to the current construction task of the current construction speed acquisition of information and is transferred to the end End, until project construction is completed to include: to be spaced the second preset time to obtain the current construction speed information of the terminal upload simultaneously Judge whether project construction is completed according to the current construction speed information;If not completing, according to the construction speed information It obtains the current construction task and is transferred to the terminal.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program performs the steps of when being executed by processor
The prospecting personal information and prospecting field data that terminal uploads are obtained, it is existing according to the prospecting personal information and prospecting Field acquisition of information prospecting task is simultaneously transferred to the terminal;
Be spaced the first preset time and obtain the current prospecting progress msg that the terminal uploads, according to it is described it is current reconnoitre into Degree acquisition of information currently reconnoitres task and is transferred to the terminal, until project prospecting is completed;
Construction personnel's information and construction site information that the terminal uploads are obtained, according to construction personnel's information and is applied Work field data obtains construction task and is transferred to the terminal;
Be spaced the second preset time and obtain the current construction speed information that the terminal uploads, according to it is described it is current construct into The current construction task of degree acquisition of information is simultaneously transferred to the terminal, until project construction is completed.
The first preset time of interval obtains the end when computer program is executed by processor in one of the embodiments, The current prospecting progress msg uploaded is held, current prospecting task is obtained according to the current prospecting progress msg and is transferred to described Terminal, until project prospecting is completed to include: to be spaced the first preset time to obtain the current prospecting progress msg that the terminal uploads And judge whether project prospecting is completed according to the current prospecting progress msg;If not completing, believed according to the prospecting progress Breath obtains the current prospecting task and is transferred to the terminal.
The second preset time of interval obtains the end when computer program is executed by processor in one of the embodiments, The current construction speed information uploaded is held, according to the current construction task of the current construction speed acquisition of information and is transferred to described Terminal, until project construction is completed to include: to be spaced the second preset time to obtain the current construction speed information that the terminal uploads And judge whether project construction is completed according to the current construction speed information;If not completing, believed according to the construction speed Breath obtains the current construction task and is transferred to the terminal.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, To any reference of memory, storage, database or other media used in each embodiment provided herein, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of project survey and construction field monitoring method, which is characterized in that the described method includes:
The prospecting personal information and prospecting field data that terminal uploads are obtained, according to the prospecting personal information and prospecting scene letter Breath obtains prospecting task and is transferred to the terminal;
It is spaced the first preset time and obtains the current prospecting progress msg that the terminal uploads, believed according to the current prospecting progress Breath obtains current prospecting task and is transferred to the terminal, until project prospecting is completed;
Construction personnel's information and construction site information that the terminal uploads are obtained, it is existing according to construction personnel's information and construction Field acquisition of information construction task is simultaneously transferred to the terminal;
It is spaced the second preset time and obtains the current construction speed information that the terminal uploads, believed according to the current construction speed Breath obtains current construction task and is transferred to the terminal, until project construction is completed.
2. project survey and construction field monitoring method according to claim 1, which is characterized in that the interval first is default Time obtains the current prospecting progress msg that the terminal uploads, and obtains current prospecting according to the current prospecting progress msg and appoints It is engaged in and is transferred to the terminal, until project prospecting completion includes:
It is spaced the first preset time and obtains the current prospecting progress msg of the terminal upload and according to the current prospecting progress Information judges whether project prospecting is completed;
If not completing, the current prospecting task is obtained according to the prospecting progress msg and is transferred to the terminal.
3. project survey and construction field monitoring method according to claim 1, which is characterized in that the interval second is default Time obtains the current construction speed information that the terminal uploads, and is currently constructed and is appointed according to the current construction speed acquisition of information It is engaged in and is transferred to the terminal, until project construction completion includes:
It is spaced the second preset time and obtains the current construction speed information of the terminal upload and according to the current construction speed Information judges whether project construction is completed;
If not completing, the current construction task according to the construction speed acquisition of information is simultaneously transferred to the terminal.
4. a kind of project survey and construction field monitoring method, which is characterized in that the described method includes:
Prospecting personal information and prospecting field data to server are uploaded, and receives the prospecting task of the server transmitting;
Be spaced the first preset time upload current prospecting progress msg to the server and receive the server transmitting with The corresponding current prospecting task of the current prospecting progress msg, until project prospecting is completed;
Construction personnel's information and construction site information are uploaded to the server, and the construction for receiving the server transmitting is appointed Business;
Be spaced the second preset time upload current construction speed information to the server and receive server transmitting with The corresponding current construction task of the current construction speed information, until project construction is completed.
5. a kind of project survey and construction field monitoring method, which is characterized in that the described method includes:
Server obtains the prospecting personal information that terminal uploads and prospecting field data, according to the prospecting personal information and prospecting Field data obtains prospecting task and is transferred to the terminal;
The first preset time of server interval obtains the current prospecting progress msg that the terminal uploads, according to the current prospecting Progress msg obtains current prospecting task and is transferred to the terminal, until project prospecting is completed;
Server obtains the construction personnel's information and construction site information that the terminal uploads, according to construction personnel's information and Construction site acquisition of information construction task is simultaneously transferred to the terminal;
The second preset time of server interval obtains the current construction speed information that the terminal uploads, according to the current construction Progress msg obtains current construction task and is transferred to the terminal, until project construction is completed.
6. a kind of project survey and construction Field Monitoring System, which is characterized in that the system comprises:
Investigation information obtains module, for obtaining the prospecting personal information and prospecting field data of terminal upload, is surveyed according to described It examines personal information and prospecting field data obtains prospecting task and is transferred to the terminal;
Prospecting task adjusts module, obtains the current prospecting progress msg that the terminal uploads for being spaced the first preset time, Current prospecting task is obtained according to the current prospecting progress msg and is transferred to the terminal, until project prospecting is completed;
Construction information obtains module, the construction personnel's information and construction site information uploaded for obtaining the terminal, according to institute It states construction personnel's information and construction site acquisition of information construction task and is transferred to the terminal;
Construction task adjusts module, obtains the current construction speed information that the terminal uploads for being spaced the second preset time, According to the current construction task of the current construction speed acquisition of information and it is transferred to the terminal, until project construction is completed.
7. project survey and construction Field Monitoring System according to claim 6, which is characterized in that the prospecting task adjustment Module includes:
Judging unit is reconnoitred, obtains the current prospecting progress msg and basis that the terminal uploads for being spaced the first preset time The current prospecting progress msg judges whether project prospecting is completed;
Adjustment unit is reconnoitred, for working as according to prospecting progress msg acquisition when project prospecting is not completed Preceding prospecting task is simultaneously transferred to the terminal.
8. project survey and construction Field Monitoring System according to claim 6, which is characterized in that the construction task adjustment Module includes:
Construction judging unit obtains the current construction speed information and basis that the terminal uploads for being spaced the second preset time The current construction speed information judges whether project construction is completed;
Construct adjustment unit, for when the project construction is not completed, according to the construction speed acquisition of information when Preceding construction task is simultaneously transferred to the terminal.
9. a kind of project survey and construction Field Monitoring System, which is characterized in that the system comprises:
Investigation information uploading module for uploading prospecting personal information and prospecting field data to server, and receives the clothes The prospecting task of business device transmitting;
Prospecting task receiving module to the server and connects for being spaced the current prospecting progress msg of the first preset time upload The current prospecting task corresponding with the current prospecting progress msg for receiving server transmitting, until project prospecting completion;
Construction information uploading module for uploading construction personnel's information and construction site information to the server, and receives institute State the construction task of server transmitting;
Construction task receiving module, for being spaced the current construction speed information of the second preset time upload to the server and connecing The current construction task corresponding with the current construction speed information for receiving server transmitting, until project construction is completed.
10. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 3 the method when executing the computer program.
CN201810714985.2A 2018-07-03 2018-07-03 Project survey and construction field monitoring method, system and computer equipment Pending CN109034550A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810714985.2A CN109034550A (en) 2018-07-03 2018-07-03 Project survey and construction field monitoring method, system and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810714985.2A CN109034550A (en) 2018-07-03 2018-07-03 Project survey and construction field monitoring method, system and computer equipment

Publications (1)

Publication Number Publication Date
CN109034550A true CN109034550A (en) 2018-12-18

Family

ID=65522203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810714985.2A Pending CN109034550A (en) 2018-07-03 2018-07-03 Project survey and construction field monitoring method, system and computer equipment

Country Status (1)

Country Link
CN (1) CN109034550A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112990838A (en) * 2019-12-12 2021-06-18 北京车和家信息技术有限公司 Operation management platform and system for charging pile installation service
CN113112408A (en) * 2021-06-15 2021-07-13 赣通通信股份有限公司 Progress management system and method for intelligent construction
CN113962622A (en) * 2021-09-16 2022-01-21 湖南亘晟门窗幕墙有限公司 Door and window production management system
CN113962623A (en) * 2021-09-16 2022-01-21 湖南亘晟门窗幕墙有限公司 Door and window production management method and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886287A (en) * 2016-09-30 2018-04-06 厦门美家帮科技股份有限公司 A kind of decoration construction work Self management system and its control method
CN108090748A (en) * 2018-02-07 2018-05-29 墨点狗智能科技(东莞)有限公司 A kind of construction task management system of automation
CN108154308A (en) * 2017-12-29 2018-06-12 广州供电局有限公司 Power construction process management optimization method and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886287A (en) * 2016-09-30 2018-04-06 厦门美家帮科技股份有限公司 A kind of decoration construction work Self management system and its control method
CN108154308A (en) * 2017-12-29 2018-06-12 广州供电局有限公司 Power construction process management optimization method and system
CN108090748A (en) * 2018-02-07 2018-05-29 墨点狗智能科技(东莞)有限公司 A kind of construction task management system of automation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112990838A (en) * 2019-12-12 2021-06-18 北京车和家信息技术有限公司 Operation management platform and system for charging pile installation service
CN113112408A (en) * 2021-06-15 2021-07-13 赣通通信股份有限公司 Progress management system and method for intelligent construction
CN113962622A (en) * 2021-09-16 2022-01-21 湖南亘晟门窗幕墙有限公司 Door and window production management system
CN113962623A (en) * 2021-09-16 2022-01-21 湖南亘晟门窗幕墙有限公司 Door and window production management method and system

Similar Documents

Publication Publication Date Title
US20210110347A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
CN109034550A (en) Project survey and construction field monitoring method, system and computer equipment
CN203165006U (en) Engineering project management system
CN105989443A (en) Intelligent-mobile-terminal-based communication line inspection system
US10127507B2 (en) Project management system providing interactive issue creation and management
CN102136162B (en) A kind of power transmission line polling system
CN204791127U (en) Job site quality control information system
US10200877B1 (en) Systems and methods for telecommunications network design, improvement, expansion, and deployment
CN112287050A (en) Territorial monitoring service system based on high-resolution remote sensing
CN116362909A (en) Mineral resource dynamic law enforcement monitoring system
CN108960758A (en) Architectural engineering process control management system
CN104268671A (en) Management method and device for drawing and document file data
KR102244587B1 (en) Method and System for Managing Work Daily Report in Construction Filed
van den Berg et al. Collaborative Work Environments in Shell-Global Scale, Learning and Evolution
CN105574707A (en) Radio-frequency identification technology based electronic bidding system and electronic bidding method using same
CN112801446A (en) Cloud service station and cloud service method
CN113220702A (en) Ground building right and person collaborative updating system and management platform thereof
Dharsono Information System Design on Project Supervision Related to Quality Control Effectiveness Using Android-Based Smartphone Applications
CN112395476A (en) Engineering data management method
Ghanem Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation
KR20210074664A (en) Review method and server of system linkage for renewable energy
Tang et al. Short-term work team scheduling models for effective road repair and management
Hafez Managing heritage through facilities data management heritage information system
CN104091251A (en) National nutrition improvement plan supervisory system and method based on mobile internet technology
Munywoki Integrating a web-based GIS in the optimization of the customer connection process for utility company: A case of Kenya Power; Lighting Company, Ltd.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication