CN109025965A - A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits - Google Patents
A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits Download PDFInfo
- Publication number
- CN109025965A CN109025965A CN201811012923.3A CN201811012923A CN109025965A CN 109025965 A CN109025965 A CN 109025965A CN 201811012923 A CN201811012923 A CN 201811012923A CN 109025965 A CN109025965 A CN 109025965A
- Authority
- CN
- China
- Prior art keywords
- limit
- well
- permeability
- oil
- super
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000035699 permeability Effects 0.000 title claims abstract description 120
- 238000000605 extraction Methods 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 34
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 71
- 239000003921 oil Substances 0.000 claims description 70
- 238000004364 calculation method Methods 0.000 claims description 34
- 239000010779 crude oil Substances 0.000 claims description 22
- 238000002347 injection Methods 0.000 claims description 20
- 239000007924 injection Substances 0.000 claims description 20
- 238000004519 manufacturing process Methods 0.000 claims description 12
- 238000010276 construction Methods 0.000 claims description 9
- 238000005553 drilling Methods 0.000 claims description 9
- 239000003129 oil well Substances 0.000 claims description 8
- 238000011084 recovery Methods 0.000 claims description 7
- 239000011435 rock Substances 0.000 claims description 2
- 238000011161 development Methods 0.000 abstract description 12
- 230000008901 benefit Effects 0.000 abstract description 8
- 238000006073 displacement reaction Methods 0.000 description 10
- 239000012466 permeate Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000011156 evaluation Methods 0.000 description 3
- 239000011148 porous material Substances 0.000 description 3
- 241000184339 Nemophila maculata Species 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 230000000704 physical effect Effects 0.000 description 2
- 238000009738 saturating Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000009096 changqing Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000009533 lab test Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Theoretical Computer Science (AREA)
- Geophysics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention discloses a kind of methods of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, comprising the following steps: step 1): being maintained an equal level with unit area gross investment and profit as foundation, calculates economic limit net well density;Step 2): according to the calculated economic limit net well density of step 1), calculating Area of a well, calculates array pitch by Area of a well, calculates economic limit injector producer distance by array pitch;Step 3): limit water drive distance is calculated;Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits.The present invention is conducive to improve development benefit from source, based on economy ultimate well spacing density, it proposes to determine economic limit injector producer distance using economy ultimate well spacing density, the method for being suitble to the reservoir permeability lower limit effectively filled the water is determined according to the relationship of economic limit injector producer distance, limit water drive distance, to provide foundation for Oil in Super-low Permeability compact oil reservoir reasonable development mode.
Description
Technical field
The invention belongs to reservoir waterflooding extraction permeabilities to simulate computing technique field, and in particular to a kind of determining Oil in Super-low Permeability cause
The method of close reservoir waterflooding extraction permeability limits.
Background technique
Oil in Super-low Permeability compact reservoir permeability is generally less than 1mD, and the effective exploitation of such resource has become development of oil industry
The new issue faced, as development object (extra-low-permeability reservoir) reservoir permeability gradually reduces, exploitation quality is deteriorated year by year, is
Further increase well yield, exploitation well type gradually from being to horizontal well+volume fracturing exploitation based on well development to orient
Main transformation;Simultaneously numerical simulation study and mining site practice have shown that, with the reduction of reservoir permeability, waterflooding extraction and natural energy
The individual well of exploitation tires out oil-producing difference and becomes smaller, and theoretically analyzes, and waterflooding extraction, which takes effect, to be increasingly difficult to, when water filling brings benefits cannot be more
When the cost of after-teeming water system investment, it should be developed using natural energy, that is to say, that water filling supplement energy exploitation Oil in Super-low Permeability causes
Close oil reservoir should have certain scope of application.In order to further increase such oil reservoir development benefit, the fine and close oil of Oil in Super-low Permeability from source
How hiding waterflooding extraction reservoir permeability lower limit is determined to become problem.
The core of waterflooding extraction is to establish effective displacement system, and extra-low-permeability reservoir waterflooding extraction reservoir permeability lower limit is
The reservoir permeability lower limit of effective displacement system can be established, effective displacement includes the meaning of two aspects: first is that can establish
Displacement system, note adopt barometric gradient greater than starting pressure gradient;Second is that the displacement system established is that by the benefit of oil reservoir
Exploitation, that is to say, that be economically profitable.For how determining this problem of waterflooding extraction reservoir permeability lower limit, from
From the point of view of literature survey, Gaoyang etc. proposed to determine hypotonic contain using minimal flow pore throat radius method " scientific and technological Leader " 04 phase in 2011
Gas reservoir physical property lower limit: its core is the minimal flow pore throat radius that gas bearing interval is determined using experimental method, and then according to reality
Measured data establishes pore throat radius and porosity, permeability correlativity, so that it is determined that the porosity and permeability lower limit of reservoir.It is yellow
It is small it is bright et al. propose to adopt barometric gradient and the equal principle of starting pressure according to note " Xinjiang petroleum geology " 02 phase in 2008, obtain
Maximum well spacing is obtained, to obtain the permeability limits that low-permeability oil deposit under the conditions of different notes are adopted is capable of waterflooding extraction.Both the above
The permeability limit of low permeability reservoir that all can only establish displacement system that method determines, from the practical mining site of extra-low-permeability reservoir
From the point of view of the case where testing post evaluation of economy, displacement system is only established in water filling, and taking a long time water filling in other words can see
Effect is inadequate, if water filling is lesser to the amplification or stabilizing influence of yield, economically evaluates no benefit, and ultralow
The reservoir permeability lower limit that infiltration compact oil reservoir can establish effective displacement system is compared, and both the above method determines reservoir permeability
Lower limit value is less than normal, and method applicability is poor.Extra-low-permeability reservoir waterflooding extraction reservoir permeability lower limit should economically effectively and
Can establish effective displacement system the two aspect carry out the work.The present invention is based on economically effectively and effective displacement can be established
The principle of system, a kind of method for proposing determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits.
Summary of the invention
It is an object of the invention to overcome above-mentioned the deficiencies in the prior art, a kind of determining Oil in Super-low Permeability compact reservoir water filling is provided
The method for developing permeability limits overcomes in the prior art 1: determining that reservoir permeability lower limit value is less than normal, and 2: method applicability
Difference, 3: can not determine the problems such as economically effective.
In order to solve technical problem, the technical scheme is that a kind of determining Oil in Super-low Permeability compact reservoir waterflooding extraction seeps
The method of saturating rate lower limit, comprising the following steps:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through
Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate
Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2。
Preferably, Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2;
Preferably, array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2;
D is well spacing, m;
L is horizontal section length, m.
Preferably, economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Preferably, different injection production pressure difference limit inferior water drives are obtained according to limit water drive distance calculation formula in the step 3)
Relation curve between distance and core permeability, wherein limit water drive distance calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD;
Preferably, when limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferiors
Relation curve between water drive distance and core permeability obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein permeating
Rate lower limit calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
Compared with the existing technology, the present invention has the advantages that
(1) present invention is conducive to further increase Oil in Super-low Permeability compact reservoir development benefit from source, with economic limit well
Based on reticular density, propose to determine economic limit injector producer distance using economy ultimate well spacing density, according to economic limit injection-production well
Relationship away from, limit water drive distance determines the method for being suitble to the reservoir permeability lower limit effectively filled the water, thus fine and close for Oil in Super-low Permeability
Oil reservoir reasonable development mode provides foundation;
(2) present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits is reasonable, evaluation is accurate, calculation method
Simply, easy to operate, it can be widely applied to the calculating of various Oil in Super-low Permeability compact reservoir permeability limits, this method adaptability is good;
(3) present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits joined crude oil cost valence, drilling well investment
Expense, surface construction expense, loan rate, investment payback time etc. calculate permeability limits in conjunction with economic cost.
Detailed description of the invention
Fig. 1, flow chart of the present invention;
Fig. 2,5 horizontal well "five-spot" flood system schematic diagram of the embodiment of the present invention;
The graph of relation of Fig. 3, the embodiment of the present invention 5 different injection production pressure difference limit inferior water drive distances and reservoir permeability.
Specific embodiment
The specific embodiment of the invention is described with reference to the accompanying drawings and embodiments:
It should be noted that structure, ratio, the size etc. illustrated in this specification institute attached drawing, only to cooperate explanation
The revealed content of book is not intended to limit the invention enforceable restriction so that those skilled in the art understands and reads
Condition, the modification of any structure, the change of proportionate relationship or the adjustment of size, do not influence the effect of present invention can be generated and
Under the purpose that can reach, should all still it fall in the range of disclosed technology contents can cover.
Meanwhile cited such as "upper" in this specification, "lower", "left", "right", " centre " and " one " term, also
Only being illustrated convenient for narration, rather than to limit the scope of the invention, relativeness is altered or modified, in nothing
Under essence change technology contents, when being also considered as the enforceable scope of the present invention.
Embodiment 1
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits,
The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through
Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate
Rate lower limit.
Embodiment 2
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits,
The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through
Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate
Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2。
Embodiment 3
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits,
The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through
Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate
Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2。
Preferably, Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2;
Preferably, array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2;
D is well spacing, m;
L is horizontal section length, m.
Preferably, economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Embodiment 4
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits,
The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through
Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate
Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2。
Preferably, Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2;
Preferably, array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2;
D is well spacing, m;
L is horizontal section length, m.
Preferably, economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Preferably, different injection production pressure difference limit inferior water drives are obtained according to limit water drive distance calculation formula in the step 3)
Relation curve between distance and core permeability, wherein limit water drive distance calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD;
Preferably, when limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferiors
Relation curve between water drive distance and core permeability obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein permeating
Rate lower limit calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
Embodiment 5
As shown in Figures 1 to 3, the present embodiment is by taking China celebrates Chang-6 oil reservoir as an example.
Deep lake-depth lake the parfacies of China celebrating Chang-6 oil reservoir development prodelta~half, sedimentary micro mainly with distributary channel,
Based on gravity flow channel, host sand body 10~45m of tape thickness, 10~15km of sandbody width, from the water filling of development straight well, level in 2010
The extensive volume fracturing test of well, but since 6 physical property difference of Hua Qingchang is larger, some block flood effectiveness are preferable, and some areas
Block water filling is really ineffective, it is therefore desirable to determine the permeability limits of waterflooding extraction.
Step 1): maintained an equal level with unit area gross investment and profit as according to calculating economy ultimate well spacing density
The value of each parameter is according to Changqing oilfields actual conditions value in formula, as shown in table 1.
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2。
1 economy ultimate well spacing density parameter list of table
Crude oil commodity rate c/ decimal | 0.96 | I is invested in drilling wellD/ member | 24660000 |
PC/ yuan/ton of crude oil cost valence | 866 | Surface construction invests IB/ member | 2557800 |
N/ tons of oil in-place | 500000 | Loan rate r/ decimal | 0.058 |
Oil recovery factor ER/ decimal | 0.1 | Investment payback time T/ | 6.1 |
The economy ultimate well spacing density under different oil prices is calculated according to above formula.
Step 2): Area of a well calculates
According to calculated economy ultimate well spacing density, corresponding Area of a well is calculated.
In above formula:
Area of a well under A-economy ultimate well spacing density, m2;
Step 3): array pitch calculates
As shown in Fig. 2, for geology and process aspect, when horizontal segment L is 600m, well spacing d is by taking five-spot pattern as an example
When 600m, the higher reservoir-encountered rate of horizontal well not only can guarantee, but also be able to achieve all standing of fracturing reform, calculate different individual well controls
The corresponding array pitch of area processed.
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2;
D is well spacing, m;
L is horizontal section length, m.
Step 4): economic limit injector producer distance calculates
As shown in Fig. 2, calculating the injector producer distance between water injection well and producing well, calculated result is such as according to trigonometric function relationship
Shown in table 2.
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Each parameter calculated result value under the different oil prices of table 2
Step 5): limit water drive distance calculates
(1) starting pressure gradient calculates
According to starting pressure gradient laboratory experiment Measurement results, obtains this area starting pressure gradient and rock core permeates
Relational expression between rate.
λ=0.0151k-1.024
In above formula:
λ is starting pressure gradient, MPa/m;
K is core permeability, mD.
(2) Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits are determined
It is flowed down according to planar radial, Isoquant source-remittance main stream line midpoint formation pressure gradient, which is greater than under irreducible water, to be opened
The principle of dynamic pressure force gradient calculates different starting pressure gradient limit inferior water drive distances.
λ is brought into above formula, different permeability limit inferior water drive distances are obtained
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD;
When limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferior water drive distances
Relation curve (as shown in Figure 3) between core permeability, obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein seeping
Saturating rate lower limit calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
Different injection production pressure difference limit inferior water drive distances are obtained with the relation curve between reservoir permeability (such as according to above formula
Shown in Fig. 3), oil price is 2600 yuan/ton at present, and searching corresponding economic limit injector producer distance according to table 2 is 316.5m, local super
Hypotonic compact reservoir injection production pressure difference is generally in 20MPa or so, when economic limit injector producer distance is equal to limit water drive distance 316.5m
When, according to Fig. 3, determining waterflooding extraction Oil in Super-low Permeability compact reservoir permeability limits are 0.25mD.
10MPa, 15MPa, 20MPa and 25MPa injection production pressure difference limit inferior water drive distance and reservoir permeability are depicted in Fig. 3
Between relation curve.
The present invention is conducive to further increase Oil in Super-low Permeability compact reservoir development benefit from source, close with economic limit well pattern
Based on degree, propose to determine economic limit injector producer distance using economy ultimate well spacing density, according to economic limit injector producer distance, pole
It restricts water supply and drives the method that the relationship of distance determines the suitable reservoir permeability lower limit effectively filled the water, to be closed for Oil in Super-low Permeability compact oil reservoir
It manages development scheme and foundation is provided.
Present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits is reasonable, evaluation is accurate, calculation method letter
It is single, it is easy to operate, it can be widely applied to the calculating of various Oil in Super-low Permeability compact reservoir permeability limits, this method adaptability is good.
Present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits joined crude oil cost valence, drilling well capital cost
With, surface construction expense, loan rate, investment payback time etc., calculate permeability limits in conjunction with economic cost.
The preferred embodiment for the present invention is explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations
Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention
It makes a variety of changes.
Many other changes and remodeling can be made by not departing from the spirit and scope of the present invention.It should be appreciated that the present invention is not
It is limited to specific embodiment, the scope of the present invention is defined by the following claims.
Claims (7)
1. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, which comprises the following steps:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, single well-controlled face is passed through
Product calculates array pitch, calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine under Oil in Super-low Permeability Reservoirs waterflooding extraction permeability
Limit.
2. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 1, special
Sign is that the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2。
3. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 2, special
Sign is that Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2。
4. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 3, special
Sign is that array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2;
D is well spacing, m;
L is horizontal section length, m.
5. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 4, special
Sign is that economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
6. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 5, special
Sign is, obtains different injection production pressure difference limit inferior water drive distances and rock according to limit water drive distance calculation formula in the step 3)
Relation curve between heart permeability, wherein limit water drive distance calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD.
7. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 6, special
Sign is, when limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferior water drive distances
Relation curve between core permeability obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein permeability limits meter
It is as follows to calculate formula:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811012923.3A CN109025965A (en) | 2018-08-31 | 2018-08-31 | A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811012923.3A CN109025965A (en) | 2018-08-31 | 2018-08-31 | A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109025965A true CN109025965A (en) | 2018-12-18 |
Family
ID=64622677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811012923.3A Pending CN109025965A (en) | 2018-08-31 | 2018-08-31 | A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109025965A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075423A (en) * | 2020-01-03 | 2020-04-28 | 中国石油化工股份有限公司 | Method for determining water injection development well spacing of low-permeability sandstone reservoir |
CN113051759A (en) * | 2021-03-27 | 2021-06-29 | 西南石油大学 | Method for rapidly evaluating economic development well spacing of compact oil and gas reservoir |
CN113090254A (en) * | 2019-12-23 | 2021-07-09 | 中国石油天然气股份有限公司 | Method for determining low permeability reservoir development means |
CN113486537A (en) * | 2021-08-04 | 2021-10-08 | 中国石油大学(北京) | Well spacing design method, device and equipment based on gas-water alternating oil displacement |
CN113761733A (en) * | 2021-08-31 | 2021-12-07 | 中国石油天然气股份有限公司 | Method and device for creating self-driving well exploitation scheme |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2299318C2 (en) * | 2002-11-18 | 2007-05-20 | Виталий Александрович Аристов | Oil deposit development method |
CN101806208A (en) * | 2010-04-26 | 2010-08-18 | 徐萍 | Optimization method for plane well pattern of horizontal well |
RU2441144C2 (en) * | 2009-08-12 | 2012-01-27 | Открытое акционерное общество "Акционерная нефтяная компания "Башнефть" (ОАО "АНК "Башнефть") | Method of oil bench development |
RU2463445C2 (en) * | 2010-12-14 | 2012-10-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method of developing oil pool in fractured-porous carbonate basins |
CN202832467U (en) * | 2012-09-04 | 2013-03-27 | 中国石油天然气股份有限公司 | Lengthways superimposed development double bed series oil deposit well network |
CN103267718A (en) * | 2013-02-27 | 2013-08-28 | 中国石油大学(华东) | Double lower limit low permeability-compact sandstone reservoir classification method |
CN104213913A (en) * | 2014-07-24 | 2014-12-17 | 中国石油大学(华东) | Method for calculating effective exploitation permeability lower limits of low-permeability clastic rock reservoir |
CN104564041A (en) * | 2014-07-24 | 2015-04-29 | 中国石油大学(华东) | Low-permeability clastic rock reservoir effectiveness evaluation method based on development permeability lower limit |
CN105089612A (en) * | 2014-05-04 | 2015-11-25 | 中国石油化工股份有限公司 | Determining method for distance of well-drain and length of pressure break of low penetration oil reservoir artificial fracture |
CN105756654A (en) * | 2015-12-30 | 2016-07-13 | 中国石油大学(华东) | Water-drive reservoir well network optimization design method |
CN105822284A (en) * | 2016-03-29 | 2016-08-03 | 中国石油天然气股份有限公司 | Well pattern spacing method of triangular horizontal well |
CN106285593A (en) * | 2015-06-26 | 2017-01-04 | 中国石油化工股份有限公司 | Horizontal well steam drives physical model and experimental technique |
CN106337679A (en) * | 2015-07-10 | 2017-01-18 | 中国石油化工股份有限公司 | Novel method for measuring and calculating well pattern thickening potential |
CN106437674A (en) * | 2015-08-06 | 2017-02-22 | 中国石油化工股份有限公司 | Imitation horizontal well waterflooding well pattern adapting method |
CN106593400A (en) * | 2016-12-29 | 2017-04-26 | 中国石油天然气股份有限公司 | Volume fracturing directional well arranging method for ultra-low permeability dense reservoir |
CN107832540A (en) * | 2017-11-20 | 2018-03-23 | 广东石油化工学院 | A kind of compact oil reservoir technical limit well space determines method |
CN207315337U (en) * | 2017-07-19 | 2018-05-04 | 中国石油天然气股份有限公司 | Well pattern structure for the exploitation of stratiform LOW PERMEABILITY RESERVOIR |
-
2018
- 2018-08-31 CN CN201811012923.3A patent/CN109025965A/en active Pending
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2299318C2 (en) * | 2002-11-18 | 2007-05-20 | Виталий Александрович Аристов | Oil deposit development method |
RU2441144C2 (en) * | 2009-08-12 | 2012-01-27 | Открытое акционерное общество "Акционерная нефтяная компания "Башнефть" (ОАО "АНК "Башнефть") | Method of oil bench development |
CN101806208A (en) * | 2010-04-26 | 2010-08-18 | 徐萍 | Optimization method for plane well pattern of horizontal well |
RU2463445C2 (en) * | 2010-12-14 | 2012-10-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method of developing oil pool in fractured-porous carbonate basins |
CN202832467U (en) * | 2012-09-04 | 2013-03-27 | 中国石油天然气股份有限公司 | Lengthways superimposed development double bed series oil deposit well network |
CN103267718A (en) * | 2013-02-27 | 2013-08-28 | 中国石油大学(华东) | Double lower limit low permeability-compact sandstone reservoir classification method |
CN105089612A (en) * | 2014-05-04 | 2015-11-25 | 中国石油化工股份有限公司 | Determining method for distance of well-drain and length of pressure break of low penetration oil reservoir artificial fracture |
CN104564041A (en) * | 2014-07-24 | 2015-04-29 | 中国石油大学(华东) | Low-permeability clastic rock reservoir effectiveness evaluation method based on development permeability lower limit |
CN104213913A (en) * | 2014-07-24 | 2014-12-17 | 中国石油大学(华东) | Method for calculating effective exploitation permeability lower limits of low-permeability clastic rock reservoir |
CN106285593A (en) * | 2015-06-26 | 2017-01-04 | 中国石油化工股份有限公司 | Horizontal well steam drives physical model and experimental technique |
CN106337679A (en) * | 2015-07-10 | 2017-01-18 | 中国石油化工股份有限公司 | Novel method for measuring and calculating well pattern thickening potential |
CN106437674A (en) * | 2015-08-06 | 2017-02-22 | 中国石油化工股份有限公司 | Imitation horizontal well waterflooding well pattern adapting method |
CN105756654A (en) * | 2015-12-30 | 2016-07-13 | 中国石油大学(华东) | Water-drive reservoir well network optimization design method |
CN105822284A (en) * | 2016-03-29 | 2016-08-03 | 中国石油天然气股份有限公司 | Well pattern spacing method of triangular horizontal well |
CN106593400A (en) * | 2016-12-29 | 2017-04-26 | 中国石油天然气股份有限公司 | Volume fracturing directional well arranging method for ultra-low permeability dense reservoir |
CN207315337U (en) * | 2017-07-19 | 2018-05-04 | 中国石油天然气股份有限公司 | Well pattern structure for the exploitation of stratiform LOW PERMEABILITY RESERVOIR |
CN107832540A (en) * | 2017-11-20 | 2018-03-23 | 广东石油化工学院 | A kind of compact oil reservoir technical limit well space determines method |
Non-Patent Citations (10)
Title |
---|
JINFANG WANG, JUN TIAN, ZHENGMAO WANG, CHANGBING TIAN, CHENGFANG: ""Optimization of Water Injection Policy for Horizontal Wells in Tight Oil with Low Pressure"", 《SOCIETY OF PETROLEUM ENGINEERS》 * |
JIYONG ZHAO,JIANMING FAN,WUBIN GAO: ""Optimization of horizontal well injection-production parameters for ultra-low permeable–tight oil production:A case from Changqing Oilfield, Ordos Basin, NW China"", 《PETROLEUM EXPLORATION AND DEVELOPMENT》 * |
周科: ""低渗透油藏极限注采井距的确定与附加压力损耗分析"", 《内蒙古石油化工》 * |
娄小娟: ""特低渗透油藏极限井网密度计算方法"", 《石化技术》 * |
朱博敏: ""萨中开发区高台子油层井网井距优化"", 《辽宁石油化工大学学报》 * |
樊建明: ""超低渗透油藏水平井注采井网设计优化研究"", 《西南石油大学学报(自然科学版)》 * |
王冕冕: ""低渗透油藏井网井距及有效动用方式研究"", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 * |
***: ""低渗透油田井距与动用储量百分数关系研究"", 《科学技术与工程》 * |
邵碧莹: ""特低渗透油藏井网适应性评价"", 《当代化工》 * |
黄小亮: ""注水开发低渗油藏时的储集层渗透率下限"", 《新疆石油地质》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113090254A (en) * | 2019-12-23 | 2021-07-09 | 中国石油天然气股份有限公司 | Method for determining low permeability reservoir development means |
CN113090254B (en) * | 2019-12-23 | 2023-12-26 | 中国石油天然气股份有限公司 | Method for determining low permeability reservoir development means |
CN111075423A (en) * | 2020-01-03 | 2020-04-28 | 中国石油化工股份有限公司 | Method for determining water injection development well spacing of low-permeability sandstone reservoir |
CN111075423B (en) * | 2020-01-03 | 2022-01-11 | 中国石油化工股份有限公司 | Method for determining water injection development well spacing of low-permeability sandstone reservoir |
CN113051759A (en) * | 2021-03-27 | 2021-06-29 | 西南石油大学 | Method for rapidly evaluating economic development well spacing of compact oil and gas reservoir |
CN113051759B (en) * | 2021-03-27 | 2022-02-08 | 西南石油大学 | Method for rapidly evaluating economic development well spacing of compact oil and gas reservoir |
CN113486537A (en) * | 2021-08-04 | 2021-10-08 | 中国石油大学(北京) | Well spacing design method, device and equipment based on gas-water alternating oil displacement |
CN113486537B (en) * | 2021-08-04 | 2022-09-23 | 中国石油大学(北京) | Well spacing design method, device and equipment based on gas-water alternating oil displacement |
CN113761733A (en) * | 2021-08-31 | 2021-12-07 | 中国石油天然气股份有限公司 | Method and device for creating self-driving well exploitation scheme |
CN113761733B (en) * | 2021-08-31 | 2022-11-04 | 中国石油天然气股份有限公司 | Method and device for creating self-driving well exploitation scheme |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yang et al. | Theories and practices of carbonate reservoirs development in China | |
CN109025965A (en) | A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits | |
CN110334431A (en) | A kind of low permeability tight gas reservoir single well controlled reserves calculating and remaining gas analysis method | |
CN111236908A (en) | Multi-stage fractured horizontal well productivity prediction model and productivity sensitivity analysis method suitable for low-permeability tight gas reservoir | |
CN104504230A (en) | Estimation method for recovery ratio and limit drainage radius of low-permeability gas well | |
CN105386751B (en) | A kind of horizontal wellbore logging PRODUCTION FORECASTING METHODS based on reservoir model | |
CN107630686B (en) | compact oil energy supplementing method for staggered displacement and imbibition displacement between horizontal well sections | |
CN109577929A (en) | A kind of Oil in Super-low Permeability compact oil reservoir horizontal well establishes the quantitative evaluation method of effective displacement | |
CN108460203A (en) | Shale oil reservoir gas recycling oil well output analysis method and its application | |
CN108518219B (en) | Evaluation method for oil field scale extract well selection based on natural energy development | |
CN110469315A (en) | Well spacing determines that method and note adopt array pitch and determine method | |
Zou et al. | Investigating reservoir pressure transmission for three types of coalbed methane reservoirs in the Qinshui Basin in Shan’xi Province, China | |
Jiang et al. | Characterization of the reservoir property time-variation based on ‘surface flux’and simulator development | |
Levanov et al. | Concept baseline for the development of a major complex field in Eastern Siberia using flow simulation | |
Meng et al. | Study of water Huff-n-Puff in low-permeability oil reservoirs with horizontal fractures: a case study of Chang 6 reservoir in Yanchang, China | |
Spivak et al. | Simulation of immiscible CO2 injection in a fractured carbonate reservoir, Bati Raman Field, Turkey | |
Shi et al. | Improve the Performance and Mitigate the Risk of Brownfield Infilling Project | |
Xia et al. | Tight oil reservoir production characteristics developed by CO2 huff ‘n’puff under well pattern conditions | |
Bigno et al. | Multilateral waterflood development of a low-permeability carbonate reservoir | |
LING et al. | Flood pattern optimization of horizontal well injection | |
CN107387039B (en) | The pressure up-front method of data inversion carbon dioxide flooding is continuously surveyed using multiple spot | |
Hu et al. | Quick assessment to ascertain technical rational well spacing density in artificial water flooding oilfield | |
Rassenfoss | Finding pathways to produce heavy oil from Canadian carbonates | |
Yong et al. | A method of production profile quick prediction based on typical curves: A case study of the Upper Shale large multi-layered sandstone reservoir, Rumaila Oilfield, Iraq | |
Ren et al. | Competitive Effects of Permeability and Gravity on the Drying-Out Process during CO2 Geological Sequestration in Saline Aquifers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |
|
RJ01 | Rejection of invention patent application after publication |