CN109025965A - A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits - Google Patents

A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits Download PDF

Info

Publication number
CN109025965A
CN109025965A CN201811012923.3A CN201811012923A CN109025965A CN 109025965 A CN109025965 A CN 109025965A CN 201811012923 A CN201811012923 A CN 201811012923A CN 109025965 A CN109025965 A CN 109025965A
Authority
CN
China
Prior art keywords
limit
well
permeability
oil
super
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811012923.3A
Other languages
Chinese (zh)
Inventor
樊建明
王冲
赵继勇
屈雪峰
黄天镜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201811012923.3A priority Critical patent/CN109025965A/en
Publication of CN109025965A publication Critical patent/CN109025965A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Geophysics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of methods of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, comprising the following steps: step 1): being maintained an equal level with unit area gross investment and profit as foundation, calculates economic limit net well density;Step 2): according to the calculated economic limit net well density of step 1), calculating Area of a well, calculates array pitch by Area of a well, calculates economic limit injector producer distance by array pitch;Step 3): limit water drive distance is calculated;Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits.The present invention is conducive to improve development benefit from source, based on economy ultimate well spacing density, it proposes to determine economic limit injector producer distance using economy ultimate well spacing density, the method for being suitble to the reservoir permeability lower limit effectively filled the water is determined according to the relationship of economic limit injector producer distance, limit water drive distance, to provide foundation for Oil in Super-low Permeability compact oil reservoir reasonable development mode.

Description

A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits
Technical field
The invention belongs to reservoir waterflooding extraction permeabilities to simulate computing technique field, and in particular to a kind of determining Oil in Super-low Permeability cause The method of close reservoir waterflooding extraction permeability limits.
Background technique
Oil in Super-low Permeability compact reservoir permeability is generally less than 1mD, and the effective exploitation of such resource has become development of oil industry The new issue faced, as development object (extra-low-permeability reservoir) reservoir permeability gradually reduces, exploitation quality is deteriorated year by year, is Further increase well yield, exploitation well type gradually from being to horizontal well+volume fracturing exploitation based on well development to orient Main transformation;Simultaneously numerical simulation study and mining site practice have shown that, with the reduction of reservoir permeability, waterflooding extraction and natural energy The individual well of exploitation tires out oil-producing difference and becomes smaller, and theoretically analyzes, and waterflooding extraction, which takes effect, to be increasingly difficult to, when water filling brings benefits cannot be more When the cost of after-teeming water system investment, it should be developed using natural energy, that is to say, that water filling supplement energy exploitation Oil in Super-low Permeability causes Close oil reservoir should have certain scope of application.In order to further increase such oil reservoir development benefit, the fine and close oil of Oil in Super-low Permeability from source How hiding waterflooding extraction reservoir permeability lower limit is determined to become problem.
The core of waterflooding extraction is to establish effective displacement system, and extra-low-permeability reservoir waterflooding extraction reservoir permeability lower limit is The reservoir permeability lower limit of effective displacement system can be established, effective displacement includes the meaning of two aspects: first is that can establish Displacement system, note adopt barometric gradient greater than starting pressure gradient;Second is that the displacement system established is that by the benefit of oil reservoir Exploitation, that is to say, that be economically profitable.For how determining this problem of waterflooding extraction reservoir permeability lower limit, from From the point of view of literature survey, Gaoyang etc. proposed to determine hypotonic contain using minimal flow pore throat radius method " scientific and technological Leader " 04 phase in 2011 Gas reservoir physical property lower limit: its core is the minimal flow pore throat radius that gas bearing interval is determined using experimental method, and then according to reality Measured data establishes pore throat radius and porosity, permeability correlativity, so that it is determined that the porosity and permeability lower limit of reservoir.It is yellow It is small it is bright et al. propose to adopt barometric gradient and the equal principle of starting pressure according to note " Xinjiang petroleum geology " 02 phase in 2008, obtain Maximum well spacing is obtained, to obtain the permeability limits that low-permeability oil deposit under the conditions of different notes are adopted is capable of waterflooding extraction.Both the above The permeability limit of low permeability reservoir that all can only establish displacement system that method determines, from the practical mining site of extra-low-permeability reservoir From the point of view of the case where testing post evaluation of economy, displacement system is only established in water filling, and taking a long time water filling in other words can see Effect is inadequate, if water filling is lesser to the amplification or stabilizing influence of yield, economically evaluates no benefit, and ultralow The reservoir permeability lower limit that infiltration compact oil reservoir can establish effective displacement system is compared, and both the above method determines reservoir permeability Lower limit value is less than normal, and method applicability is poor.Extra-low-permeability reservoir waterflooding extraction reservoir permeability lower limit should economically effectively and Can establish effective displacement system the two aspect carry out the work.The present invention is based on economically effectively and effective displacement can be established The principle of system, a kind of method for proposing determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits.
Summary of the invention
It is an object of the invention to overcome above-mentioned the deficiencies in the prior art, a kind of determining Oil in Super-low Permeability compact reservoir water filling is provided The method for developing permeability limits overcomes in the prior art 1: determining that reservoir permeability lower limit value is less than normal, and 2: method applicability Difference, 3: can not determine the problems such as economically effective.
In order to solve technical problem, the technical scheme is that a kind of determining Oil in Super-low Permeability compact reservoir waterflooding extraction seeps The method of saturating rate lower limit, comprising the following steps:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2
Preferably, Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2
Preferably, array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2
D is well spacing, m;
L is horizontal section length, m.
Preferably, economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Preferably, different injection production pressure difference limit inferior water drives are obtained according to limit water drive distance calculation formula in the step 3) Relation curve between distance and core permeability, wherein limit water drive distance calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD;
Preferably, when limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferiors Relation curve between water drive distance and core permeability obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein permeating Rate lower limit calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
Compared with the existing technology, the present invention has the advantages that
(1) present invention is conducive to further increase Oil in Super-low Permeability compact reservoir development benefit from source, with economic limit well Based on reticular density, propose to determine economic limit injector producer distance using economy ultimate well spacing density, according to economic limit injection-production well Relationship away from, limit water drive distance determines the method for being suitble to the reservoir permeability lower limit effectively filled the water, thus fine and close for Oil in Super-low Permeability Oil reservoir reasonable development mode provides foundation;
(2) present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits is reasonable, evaluation is accurate, calculation method Simply, easy to operate, it can be widely applied to the calculating of various Oil in Super-low Permeability compact reservoir permeability limits, this method adaptability is good;
(3) present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits joined crude oil cost valence, drilling well investment Expense, surface construction expense, loan rate, investment payback time etc. calculate permeability limits in conjunction with economic cost.
Detailed description of the invention
Fig. 1, flow chart of the present invention;
Fig. 2,5 horizontal well "five-spot" flood system schematic diagram of the embodiment of the present invention;
The graph of relation of Fig. 3, the embodiment of the present invention 5 different injection production pressure difference limit inferior water drive distances and reservoir permeability.
Specific embodiment
The specific embodiment of the invention is described with reference to the accompanying drawings and embodiments:
It should be noted that structure, ratio, the size etc. illustrated in this specification institute attached drawing, only to cooperate explanation The revealed content of book is not intended to limit the invention enforceable restriction so that those skilled in the art understands and reads Condition, the modification of any structure, the change of proportionate relationship or the adjustment of size, do not influence the effect of present invention can be generated and Under the purpose that can reach, should all still it fall in the range of disclosed technology contents can cover.
Meanwhile cited such as "upper" in this specification, "lower", "left", "right", " centre " and " one " term, also Only being illustrated convenient for narration, rather than to limit the scope of the invention, relativeness is altered or modified, in nothing Under essence change technology contents, when being also considered as the enforceable scope of the present invention.
Embodiment 1
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate Rate lower limit.
Embodiment 2
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2
Embodiment 3
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2
Preferably, Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2
Preferably, array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2
D is well spacing, m;
L is horizontal section length, m.
Preferably, economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Embodiment 4
As shown in Figure 1, the invention discloses a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, The following steps are included:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, individual well control is passed through Areal calculation array pitch processed calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine Oil in Super-low Permeability Reservoirs waterflooding extraction permeate Rate lower limit.
Preferably, the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2
Preferably, Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2
Preferably, array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2
D is well spacing, m;
L is horizontal section length, m.
Preferably, economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Preferably, different injection production pressure difference limit inferior water drives are obtained according to limit water drive distance calculation formula in the step 3) Relation curve between distance and core permeability, wherein limit water drive distance calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD;
Preferably, when limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferiors Relation curve between water drive distance and core permeability obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein permeating Rate lower limit calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
Embodiment 5
As shown in Figures 1 to 3, the present embodiment is by taking China celebrates Chang-6 oil reservoir as an example.
Deep lake-depth lake the parfacies of China celebrating Chang-6 oil reservoir development prodelta~half, sedimentary micro mainly with distributary channel, Based on gravity flow channel, host sand body 10~45m of tape thickness, 10~15km of sandbody width, from the water filling of development straight well, level in 2010 The extensive volume fracturing test of well, but since 6 physical property difference of Hua Qingchang is larger, some block flood effectiveness are preferable, and some areas Block water filling is really ineffective, it is therefore desirable to determine the permeability limits of waterflooding extraction.
Step 1): maintained an equal level with unit area gross investment and profit as according to calculating economy ultimate well spacing density
The value of each parameter is according to Changqing oilfields actual conditions value in formula, as shown in table 1.
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2
1 economy ultimate well spacing density parameter list of table
Crude oil commodity rate c/ decimal 0.96 I is invested in drilling wellD/ member 24660000
PC/ yuan/ton of crude oil cost valence 866 Surface construction invests IB/ member 2557800
N/ tons of oil in-place 500000 Loan rate r/ decimal 0.058
Oil recovery factor ER/ decimal 0.1 Investment payback time T/ 6.1
The economy ultimate well spacing density under different oil prices is calculated according to above formula.
Step 2): Area of a well calculates
According to calculated economy ultimate well spacing density, corresponding Area of a well is calculated.
In above formula:
Area of a well under A-economy ultimate well spacing density, m2
Step 3): array pitch calculates
As shown in Fig. 2, for geology and process aspect, when horizontal segment L is 600m, well spacing d is by taking five-spot pattern as an example When 600m, the higher reservoir-encountered rate of horizontal well not only can guarantee, but also be able to achieve all standing of fracturing reform, calculate different individual well controls The corresponding array pitch of area processed.
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2
D is well spacing, m;
L is horizontal section length, m.
Step 4): economic limit injector producer distance calculates
As shown in Fig. 2, calculating the injector producer distance between water injection well and producing well, calculated result is such as according to trigonometric function relationship Shown in table 2.
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
Each parameter calculated result value under the different oil prices of table 2
Step 5): limit water drive distance calculates
(1) starting pressure gradient calculates
According to starting pressure gradient laboratory experiment Measurement results, obtains this area starting pressure gradient and rock core permeates Relational expression between rate.
λ=0.0151k-1.024
In above formula:
λ is starting pressure gradient, MPa/m;
K is core permeability, mD.
(2) Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits are determined
It is flowed down according to planar radial, Isoquant source-remittance main stream line midpoint formation pressure gradient, which is greater than under irreducible water, to be opened The principle of dynamic pressure force gradient calculates different starting pressure gradient limit inferior water drive distances.
λ is brought into above formula, different permeability limit inferior water drive distances are obtained
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD;
When limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferior water drive distances Relation curve (as shown in Figure 3) between core permeability, obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein seeping Saturating rate lower limit calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
Different injection production pressure difference limit inferior water drive distances are obtained with the relation curve between reservoir permeability (such as according to above formula Shown in Fig. 3), oil price is 2600 yuan/ton at present, and searching corresponding economic limit injector producer distance according to table 2 is 316.5m, local super Hypotonic compact reservoir injection production pressure difference is generally in 20MPa or so, when economic limit injector producer distance is equal to limit water drive distance 316.5m When, according to Fig. 3, determining waterflooding extraction Oil in Super-low Permeability compact reservoir permeability limits are 0.25mD.
10MPa, 15MPa, 20MPa and 25MPa injection production pressure difference limit inferior water drive distance and reservoir permeability are depicted in Fig. 3 Between relation curve.
The present invention is conducive to further increase Oil in Super-low Permeability compact reservoir development benefit from source, close with economic limit well pattern Based on degree, propose to determine economic limit injector producer distance using economy ultimate well spacing density, according to economic limit injector producer distance, pole It restricts water supply and drives the method that the relationship of distance determines the suitable reservoir permeability lower limit effectively filled the water, to be closed for Oil in Super-low Permeability compact oil reservoir It manages development scheme and foundation is provided.
Present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits is reasonable, evaluation is accurate, calculation method letter It is single, it is easy to operate, it can be widely applied to the calculating of various Oil in Super-low Permeability compact reservoir permeability limits, this method adaptability is good.
Present invention determine that the method for Oil in Super-low Permeability compact reservoir permeability limits joined crude oil cost valence, drilling well capital cost With, surface construction expense, loan rate, investment payback time etc., calculate permeability limits in conjunction with economic cost.
The preferred embodiment for the present invention is explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention It makes a variety of changes.
Many other changes and remodeling can be made by not departing from the spirit and scope of the present invention.It should be appreciated that the present invention is not It is limited to specific embodiment, the scope of the present invention is defined by the following claims.

Claims (7)

1. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits, which comprises the following steps:
Step 1): maintained an equal level with unit area gross investment and profit as foundation, calculate economic limit net well density;
Step 2): according to the calculated economic limit net well density of step 1), Area of a well is calculated, single well-controlled face is passed through Product calculates array pitch, calculates economic limit injector producer distance by array pitch;
Step 3): limit water drive distance is calculated;
Step 4): when economic limit injector producer distance be equal to limit water drive distance, determine under Oil in Super-low Permeability Reservoirs waterflooding extraction permeability Limit.
2. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 1, special Sign is that the calculation formula of economic limit net well density is as follows in the step 1):
In above formula:
C-crude oil commodity rate, decimal;
UP-crude oil price, yuan/ton;
PC-crude oil cost valence, yuan/ton;
N-oil in-place, ton;
ER- oil recovery factor, decimal;
ID- drilling well investment, member;
IBThe investment of-surface construction, member;
R-loan rate, decimal;
T-investment payback time, year;
sm- economy ultimate well spacing density, mouth/× 104m2
3. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 2, special Sign is that Area of a well calculation formula is as follows in the step 2):
In above formula:
Area of a well under A-economy ultimate well spacing density, m2
4. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 3, special Sign is that array pitch calculation formula is as follows in the step 2):
In above formula:
A is array pitch, m;
Area of a well under A economy ultimate well spacing density, m2
D is well spacing, m;
L is horizontal section length, m.
5. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 4, special Sign is that economic limit injector producer distance calculation formula is as follows in the step 2):
Rec-lim=(a2+d2)1/2
In above formula:
Rec-limFor economic limit injector producer distance, m;
A is array pitch, m;
D is well spacing, m.
6. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 5, special Sign is, obtains different injection production pressure difference limit inferior water drive distances and rock according to limit water drive distance calculation formula in the step 3) Relation curve between heart permeability, wherein limit water drive distance calculation formula is as follows:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
K is core permeability, mD.
7. a kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits according to claim 6, special Sign is, when limit water drive distance is equal with economic limit injector producer distance, according to different injection production pressure difference limit inferior water drive distances Relation curve between core permeability obtains Oil in Super-low Permeability Reservoirs waterflooding extraction permeability limits, wherein permeability limits meter It is as follows to calculate formula:
In above formula:
RThe limitFor limit water drive distance, m;
rwFor wellbore radius, m;
pHFor water injection well flowing bottomhole pressure (FBHP), MPa;
pwFor oil well flowing bottomhole pressure (FBHP), MPa;
kminFor permeability limits, mD.
CN201811012923.3A 2018-08-31 2018-08-31 A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits Pending CN109025965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811012923.3A CN109025965A (en) 2018-08-31 2018-08-31 A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811012923.3A CN109025965A (en) 2018-08-31 2018-08-31 A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits

Publications (1)

Publication Number Publication Date
CN109025965A true CN109025965A (en) 2018-12-18

Family

ID=64622677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811012923.3A Pending CN109025965A (en) 2018-08-31 2018-08-31 A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits

Country Status (1)

Country Link
CN (1) CN109025965A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075423A (en) * 2020-01-03 2020-04-28 中国石油化工股份有限公司 Method for determining water injection development well spacing of low-permeability sandstone reservoir
CN113051759A (en) * 2021-03-27 2021-06-29 西南石油大学 Method for rapidly evaluating economic development well spacing of compact oil and gas reservoir
CN113090254A (en) * 2019-12-23 2021-07-09 中国石油天然气股份有限公司 Method for determining low permeability reservoir development means
CN113486537A (en) * 2021-08-04 2021-10-08 中国石油大学(北京) Well spacing design method, device and equipment based on gas-water alternating oil displacement
CN113761733A (en) * 2021-08-31 2021-12-07 中国石油天然气股份有限公司 Method and device for creating self-driving well exploitation scheme

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2299318C2 (en) * 2002-11-18 2007-05-20 Виталий Александрович Аристов Oil deposit development method
CN101806208A (en) * 2010-04-26 2010-08-18 徐萍 Optimization method for plane well pattern of horizontal well
RU2441144C2 (en) * 2009-08-12 2012-01-27 Открытое акционерное общество "Акционерная нефтяная компания "Башнефть" (ОАО "АНК "Башнефть") Method of oil bench development
RU2463445C2 (en) * 2010-12-14 2012-10-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method of developing oil pool in fractured-porous carbonate basins
CN202832467U (en) * 2012-09-04 2013-03-27 中国石油天然气股份有限公司 Lengthways superimposed development double bed series oil deposit well network
CN103267718A (en) * 2013-02-27 2013-08-28 中国石油大学(华东) Double lower limit low permeability-compact sandstone reservoir classification method
CN104213913A (en) * 2014-07-24 2014-12-17 中国石油大学(华东) Method for calculating effective exploitation permeability lower limits of low-permeability clastic rock reservoir
CN104564041A (en) * 2014-07-24 2015-04-29 中国石油大学(华东) Low-permeability clastic rock reservoir effectiveness evaluation method based on development permeability lower limit
CN105089612A (en) * 2014-05-04 2015-11-25 中国石油化工股份有限公司 Determining method for distance of well-drain and length of pressure break of low penetration oil reservoir artificial fracture
CN105756654A (en) * 2015-12-30 2016-07-13 中国石油大学(华东) Water-drive reservoir well network optimization design method
CN105822284A (en) * 2016-03-29 2016-08-03 中国石油天然气股份有限公司 Well pattern spacing method of triangular horizontal well
CN106285593A (en) * 2015-06-26 2017-01-04 中国石油化工股份有限公司 Horizontal well steam drives physical model and experimental technique
CN106337679A (en) * 2015-07-10 2017-01-18 中国石油化工股份有限公司 Novel method for measuring and calculating well pattern thickening potential
CN106437674A (en) * 2015-08-06 2017-02-22 中国石油化工股份有限公司 Imitation horizontal well waterflooding well pattern adapting method
CN106593400A (en) * 2016-12-29 2017-04-26 中国石油天然气股份有限公司 Volume fracturing directional well arranging method for ultra-low permeability dense reservoir
CN107832540A (en) * 2017-11-20 2018-03-23 广东石油化工学院 A kind of compact oil reservoir technical limit well space determines method
CN207315337U (en) * 2017-07-19 2018-05-04 中国石油天然气股份有限公司 Well pattern structure for the exploitation of stratiform LOW PERMEABILITY RESERVOIR

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2299318C2 (en) * 2002-11-18 2007-05-20 Виталий Александрович Аристов Oil deposit development method
RU2441144C2 (en) * 2009-08-12 2012-01-27 Открытое акционерное общество "Акционерная нефтяная компания "Башнефть" (ОАО "АНК "Башнефть") Method of oil bench development
CN101806208A (en) * 2010-04-26 2010-08-18 徐萍 Optimization method for plane well pattern of horizontal well
RU2463445C2 (en) * 2010-12-14 2012-10-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method of developing oil pool in fractured-porous carbonate basins
CN202832467U (en) * 2012-09-04 2013-03-27 中国石油天然气股份有限公司 Lengthways superimposed development double bed series oil deposit well network
CN103267718A (en) * 2013-02-27 2013-08-28 中国石油大学(华东) Double lower limit low permeability-compact sandstone reservoir classification method
CN105089612A (en) * 2014-05-04 2015-11-25 中国石油化工股份有限公司 Determining method for distance of well-drain and length of pressure break of low penetration oil reservoir artificial fracture
CN104564041A (en) * 2014-07-24 2015-04-29 中国石油大学(华东) Low-permeability clastic rock reservoir effectiveness evaluation method based on development permeability lower limit
CN104213913A (en) * 2014-07-24 2014-12-17 中国石油大学(华东) Method for calculating effective exploitation permeability lower limits of low-permeability clastic rock reservoir
CN106285593A (en) * 2015-06-26 2017-01-04 中国石油化工股份有限公司 Horizontal well steam drives physical model and experimental technique
CN106337679A (en) * 2015-07-10 2017-01-18 中国石油化工股份有限公司 Novel method for measuring and calculating well pattern thickening potential
CN106437674A (en) * 2015-08-06 2017-02-22 中国石油化工股份有限公司 Imitation horizontal well waterflooding well pattern adapting method
CN105756654A (en) * 2015-12-30 2016-07-13 中国石油大学(华东) Water-drive reservoir well network optimization design method
CN105822284A (en) * 2016-03-29 2016-08-03 中国石油天然气股份有限公司 Well pattern spacing method of triangular horizontal well
CN106593400A (en) * 2016-12-29 2017-04-26 中国石油天然气股份有限公司 Volume fracturing directional well arranging method for ultra-low permeability dense reservoir
CN207315337U (en) * 2017-07-19 2018-05-04 中国石油天然气股份有限公司 Well pattern structure for the exploitation of stratiform LOW PERMEABILITY RESERVOIR
CN107832540A (en) * 2017-11-20 2018-03-23 广东石油化工学院 A kind of compact oil reservoir technical limit well space determines method

Non-Patent Citations (10)

* Cited by examiner, † Cited by third party
Title
JINFANG WANG, JUN TIAN, ZHENGMAO WANG, CHANGBING TIAN, CHENGFANG: ""Optimization of Water Injection Policy for Horizontal Wells in Tight Oil with Low Pressure"", 《SOCIETY OF PETROLEUM ENGINEERS》 *
JIYONG ZHAO,JIANMING FAN,WUBIN GAO: ""Optimization of horizontal well injection-production parameters for ultra-low permeable–tight oil production:A case from Changqing Oilfield, Ordos Basin, NW China"", 《PETROLEUM EXPLORATION AND DEVELOPMENT》 *
周科: ""低渗透油藏极限注采井距的确定与附加压力损耗分析"", 《内蒙古石油化工》 *
娄小娟: ""特低渗透油藏极限井网密度计算方法"", 《石化技术》 *
朱博敏: ""萨中开发区高台子油层井网井距优化"", 《辽宁石油化工大学学报》 *
樊建明: ""超低渗透油藏水平井注采井网设计优化研究"", 《西南石油大学学报(自然科学版)》 *
王冕冕: ""低渗透油藏井网井距及有效动用方式研究"", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 *
***: ""低渗透油田井距与动用储量百分数关系研究"", 《科学技术与工程》 *
邵碧莹: ""特低渗透油藏井网适应性评价"", 《当代化工》 *
黄小亮: ""注水开发低渗油藏时的储集层渗透率下限"", 《新疆石油地质》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113090254A (en) * 2019-12-23 2021-07-09 中国石油天然气股份有限公司 Method for determining low permeability reservoir development means
CN113090254B (en) * 2019-12-23 2023-12-26 中国石油天然气股份有限公司 Method for determining low permeability reservoir development means
CN111075423A (en) * 2020-01-03 2020-04-28 中国石油化工股份有限公司 Method for determining water injection development well spacing of low-permeability sandstone reservoir
CN111075423B (en) * 2020-01-03 2022-01-11 中国石油化工股份有限公司 Method for determining water injection development well spacing of low-permeability sandstone reservoir
CN113051759A (en) * 2021-03-27 2021-06-29 西南石油大学 Method for rapidly evaluating economic development well spacing of compact oil and gas reservoir
CN113051759B (en) * 2021-03-27 2022-02-08 西南石油大学 Method for rapidly evaluating economic development well spacing of compact oil and gas reservoir
CN113486537A (en) * 2021-08-04 2021-10-08 中国石油大学(北京) Well spacing design method, device and equipment based on gas-water alternating oil displacement
CN113486537B (en) * 2021-08-04 2022-09-23 中国石油大学(北京) Well spacing design method, device and equipment based on gas-water alternating oil displacement
CN113761733A (en) * 2021-08-31 2021-12-07 中国石油天然气股份有限公司 Method and device for creating self-driving well exploitation scheme
CN113761733B (en) * 2021-08-31 2022-11-04 中国石油天然气股份有限公司 Method and device for creating self-driving well exploitation scheme

Similar Documents

Publication Publication Date Title
Yang et al. Theories and practices of carbonate reservoirs development in China
CN109025965A (en) A kind of method of determining Oil in Super-low Permeability compact reservoir waterflooding extraction permeability limits
CN110334431A (en) A kind of low permeability tight gas reservoir single well controlled reserves calculating and remaining gas analysis method
CN111236908A (en) Multi-stage fractured horizontal well productivity prediction model and productivity sensitivity analysis method suitable for low-permeability tight gas reservoir
CN104504230A (en) Estimation method for recovery ratio and limit drainage radius of low-permeability gas well
CN105386751B (en) A kind of horizontal wellbore logging PRODUCTION FORECASTING METHODS based on reservoir model
CN107630686B (en) compact oil energy supplementing method for staggered displacement and imbibition displacement between horizontal well sections
CN109577929A (en) A kind of Oil in Super-low Permeability compact oil reservoir horizontal well establishes the quantitative evaluation method of effective displacement
CN108460203A (en) Shale oil reservoir gas recycling oil well output analysis method and its application
CN108518219B (en) Evaluation method for oil field scale extract well selection based on natural energy development
CN110469315A (en) Well spacing determines that method and note adopt array pitch and determine method
Zou et al. Investigating reservoir pressure transmission for three types of coalbed methane reservoirs in the Qinshui Basin in Shan’xi Province, China
Jiang et al. Characterization of the reservoir property time-variation based on ‘surface flux’and simulator development
Levanov et al. Concept baseline for the development of a major complex field in Eastern Siberia using flow simulation
Meng et al. Study of water Huff-n-Puff in low-permeability oil reservoirs with horizontal fractures: a case study of Chang 6 reservoir in Yanchang, China
Spivak et al. Simulation of immiscible CO2 injection in a fractured carbonate reservoir, Bati Raman Field, Turkey
Shi et al. Improve the Performance and Mitigate the Risk of Brownfield Infilling Project
Xia et al. Tight oil reservoir production characteristics developed by CO2 huff ‘n’puff under well pattern conditions
Bigno et al. Multilateral waterflood development of a low-permeability carbonate reservoir
LING et al. Flood pattern optimization of horizontal well injection
CN107387039B (en) The pressure up-front method of data inversion carbon dioxide flooding is continuously surveyed using multiple spot
Hu et al. Quick assessment to ascertain technical rational well spacing density in artificial water flooding oilfield
Rassenfoss Finding pathways to produce heavy oil from Canadian carbonates
Yong et al. A method of production profile quick prediction based on typical curves: A case study of the Upper Shale large multi-layered sandstone reservoir, Rumaila Oilfield, Iraq
Ren et al. Competitive Effects of Permeability and Gravity on the Drying-Out Process during CO2 Geological Sequestration in Saline Aquifers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication