CN109025343A - A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile - Google Patents

A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile Download PDF

Info

Publication number
CN109025343A
CN109025343A CN201810523682.2A CN201810523682A CN109025343A CN 109025343 A CN109025343 A CN 109025343A CN 201810523682 A CN201810523682 A CN 201810523682A CN 109025343 A CN109025343 A CN 109025343A
Authority
CN
China
Prior art keywords
hollowing
ceramic tile
tile
displacement
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810523682.2A
Other languages
Chinese (zh)
Inventor
杨雨奕
缪德忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai State Mstar Technology Ltd
Original Assignee
Shanghai State Mstar Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai State Mstar Technology Ltd filed Critical Shanghai State Mstar Technology Ltd
Priority to CN201810523682.2A priority Critical patent/CN109025343A/en
Publication of CN109025343A publication Critical patent/CN109025343A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0296Repairing or restoring facades

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

Engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile disclosed by the invention, include the following steps: (1) hollowing checking step: in the step, being hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall range that should be cut and root out with marking pen;(2) it cuts and roots out hollowing ceramic tile step: first being cut the outdoor tile edge for the outer surface of wall range that should be cut and root out that step (1) determines with cutting machine in the step, then dig shovel outer surface of wall with tool until rooting out clean;(3) base cleaning step;(4) base and the two-way attachment of increase interface processing step: are reinforced rooting out part roller coating interfacial agents;(5) screed and levelling step are painted: using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;(6) cracking resistance enhancement layer construction procedure: decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;(7) furring brick step.

Description

A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile
Technical field
The present invention relates to external wall ceramic tile hollowing recovery technique field, in particular to a kind of hollowing of hollowing outdoor tile Engineering method is repaired in displacement.
Background technique
Exterior-wall heat insulation facing pastes ceramic tile, the materials category rigid material such as mosaic, and heat preservation layer material is flexible material, and two kinds The technical performance indexs difference such as coefficient of expansion of the material of different attribute is larger.Especially traditional handicraft pastes ceramic tile cement element The brickwork joint of ash, when summer temperature reaches 35 DEG C, insulating layer of external wall temperature may be up to 70 DEG C -- and 80 DEG C, chance of dashing forward rainfall moment temperature can It is reduced to 10 DEG C -- 20 DEG C, 50 DEG C of the temperature difference -- 60 DEG C.The biggish two kinds of materials of two kinds of coefficient of expansion difference are bonded together, Shi Erjiu Be bound to cause cement element ash ceramic tile seam cracking.Winter porcelain will certainly just occur after freeze thawing in rainwater infiltration crack when snowing Brick hollowing falls off, and causes the safety accident for killing people, injuring people by a crashing object.The serious safety for threatening living environment.
Traditional ceramic tile hollowing restorative procedure mainly include the following types:
(1) ceramic tile is all rooted out.Ceramic tile is all rooted out with air compressor machine impact drill, the water of 30kg is not less than with every square metre After cement mortar fills up levelling, then carry out the construction of facing ornament materials.It is time-consuming, take material, be at high cost, and leave a large amount of building Rubbish.
(2) ceramic tile falls off part sectional repair.After being rooted out to obvious hollowing, loose or dislocation part, with cement mortar or resist It splits mortar and fills up levelling reparation.Not patched next year falls off again, then studies for a second time courses one has flunked.Many building image patches of present big and medium-sized cities Equally, one piece shallow one piece deep, seriously affect the beautification and the unsafe hidden danger of living environment of urban construction.
(3) fall off after the repairing of position to ceramic tile, with traditional putty batch scrape it is levelling after, direct spraying finishing material.Smooth Ceramic tile basal plane on do not do special reinforcement processing, directly construct finishing material in ceramic tile basal plane, caused by consequence be after 2,3 years Falling off again is formed again.So that the building for spending huge fund decoration is changed so much that one loses one's identity, not only influences urban environment beautification, and And increase secondary, coating expense again three times.
For this reason, Chinese invention patent publication number CN107338967A discloses a kind of aging blocks outdoor tile facing renewal and reform New process and new material, new process, the new material of renewal and reform TY-686 flexibility face brick-imitation directly on smooth ceramic tile face, Its construction technology and the feature of new material are as follows: root out hollowing, ceramic tile-anticracking grout for loosening, falling off fill up it is levelling-apply and seep The high-strength ceramic tile bonding mucilage-batch compound alkali-resistant glass fiber mesh-anchor studs of ceramic tile cementing mortar of reinforcement liquid-spray are fixed on outer thoroughly Wall cement basic layer-batch background color filleting rubber cement is levelling-and it applies infiltration and reinforces ground coat enamel-painting flexibility face brick-imitation slurry.The patent of invention is deposited In reparative processes complexity, the big technical problem of project amount.
Summary of the invention
It is provided aiming at the problem that technical problem to be solved by the present invention lies in the presence of ceramic tile hollowing repair process A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile.
The technical problems to be solved by the invention can be achieved through the following technical solutions:
A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile, includes the following steps:
(1) hollowing checking step
In the step, is hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall that should be cut and root out with marking pen Range;
(2) it cuts and roots out hollowing ceramic tile step
The outdoor tile for the outer surface of wall range that should be cut and root out for first being determined step (1) with cutting machine in the step Edge is cut, and then digs shovel outer surface of wall with tool until rooting out clean;
(3) base cleaning step
The step is to clean to have rooted out position;
(4) interface processing step
Base and the two-way attachment of increase are reinforced rooting out part roller coating interfacial agents;
(5) screed and levelling step are painted
Using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;
(6) cracking resistance enhancement layer construction procedure
Decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;
(7) furring brick step
Ceramic tile is pasted using flexible ceramic tile agglomerant, and the flexible flexible water jointing agent with hydrophobicity of apparatus carries out porcelain Brick carries out jointing processing.
In a preferred embodiment of the invention, in the step (2), hollowing position is rooted out to structure sheaf, to extending out It roots out to cracking resistance layer surface at exhibition position.
In a preferred embodiment of the invention, described to extend to the outside position in vertical direction not less than hollowing position two Block ceramic tile, horizontal direction are not less than one block of hollowing position ceramic tile, can guarantee that ceramic tile hollowing is rooted out thoroughly in this way, are convenient for and former metope Linking.
In a preferred embodiment of the invention, the outer rim for extending to the outside position is serrated, and is convenient for grid cloth Overlap joint.
In a preferred embodiment of the invention, the outer rim for extending to the outside position should be greater than the outer rim at hollowing position 100mm or more.
Due to using technical solution as above, the present invention has compared with existing ceramic tile hollowing repairs engineering method and repairs work The advantages that sequence is simple, at low cost, and short time limit, rubbish are few, is not easy occur hollowing again after repairerment.
Detailed description of the invention
Fig. 1 is the schematic diagram that the present invention cut and rooted out hollowing ceramic tile.
Specific embodiment
A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile, includes the following steps:
(1) hollowing checking step
In the step, is hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall that should be cut and root out with marking pen Range;
(2) it cuts and roots out hollowing ceramic tile step
The outdoor tile for the outer surface of wall range that should be cut and root out for first being determined step (1) with cutting machine in the step Edge is cut, and then digs shovel outer surface of wall with tool until rooting out clean;Referring to Fig. 1, hollowing position 10 is rooted out to structure Layer, extends to the outside position 20 and roots out to cracking resistance layer surface.Position 20 is extended to the outside in vertical direction not less than hollowing position 10 2 Block ceramic tile, horizontal direction are not less than 10 1 blocks of hollowing position ceramic tile, can guarantee that ceramic tile hollowing is rooted out thoroughly in this way, are convenient for and former wall The linking in face.The outer rim for extending to the outside position 20 is serrated, and overlaps convenient for grid cloth.The outer rim for extending to the outside position 20 should be big Outer rim 100mm or more in hollowing position 10.
(3) base cleaning step
The step is to clean to have rooted out position;
(4) interface processing step
Base and the two-way attachment of increase are reinforced rooting out part roller coating interfacial agents;
(5) screed and levelling step are painted
Using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;
(6) cracking resistance enhancement layer construction procedure
Decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;
(7) furring brick step
Ceramic tile is pasted using flexible ceramic tile agglomerant, and the flexible flexible water jointing agent with hydrophobicity of apparatus carries out porcelain Brick carries out jointing processing.

Claims (5)

1. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile, which comprises the steps of:
(1) hollowing checking step
In the step, is hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall model that should be cut and root out with marking pen It encloses;
(2) it cuts and roots out hollowing ceramic tile step
The outdoor tile edge for the outer surface of wall range that should be cut and root out for first being determined step (1) with cutting machine in the step It is cut, then digs shovel outer surface of wall with tool until rooting out clean;
(3) base cleaning step
The step is to clean to have rooted out position;
(4) interface processing step
Base and the two-way attachment of increase are reinforced rooting out part roller coating interfacial agents;
(5) screed and levelling step are painted
Using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;
(6) cracking resistance enhancement layer construction procedure
Decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;
(7) furring brick step
Ceramic tile is pasted using flexible ceramic tile agglomerant, and apparatus is flexible and the flexible water jointing agent of hydrophobicity carry out ceramic tile into Row jointing processing.
2. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as described in claim 1, which is characterized in that the step (2) in, hollowing position is rooted out to structure sheaf, is extended to the outside position and is rooted out to cracking resistance layer surface.
3. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as claimed in claim 2, which is characterized in that described outside It extends position and is not less than two blocks of hollowing position ceramic tile in vertical direction, horizontal direction is not less than one block of hollowing position ceramic tile, in this way It can guarantee that ceramic tile hollowing is rooted out thoroughly, convenient for being connected with former metope.
4. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as claimed in claim 3, which is characterized in that described outside The outer rim at extension position is serrated, and overlaps convenient for grid cloth.
5. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as claimed in claim 4, which is characterized in that described outside The outer rim at extension position should be greater than the outer rim 100mm or more at hollowing position.
CN201810523682.2A 2018-05-28 2018-05-28 A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile Pending CN109025343A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810523682.2A CN109025343A (en) 2018-05-28 2018-05-28 A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810523682.2A CN109025343A (en) 2018-05-28 2018-05-28 A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile

Publications (1)

Publication Number Publication Date
CN109025343A true CN109025343A (en) 2018-12-18

Family

ID=64611652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810523682.2A Pending CN109025343A (en) 2018-05-28 2018-05-28 A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile

Country Status (1)

Country Link
CN (1) CN109025343A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185276A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure of existing building Countermeasures for Dropping of Face Bricks of Exposed Walls
CN110185274A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure that existing building exterior wall true stone paint falls off
CN110185279A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure of existing building sloughing of exterior wall
CN110552517A (en) * 2019-02-27 2019-12-10 谭壮 reinforcing method for preventing exterior wall tiles from falling off
CN110821198A (en) * 2019-10-23 2020-02-21 浙江勤业建工集团有限公司 High-rise building external wall thermal insulation mortar falling prevention method
CN111441608A (en) * 2020-05-28 2020-07-24 建修科技有限公司 Method for repairing bottom of swimming pool
CN112376932A (en) * 2020-11-03 2021-02-19 马鞍山安慧智电子科技有限公司 Hollowing maintenance robot
CN112459526A (en) * 2020-12-03 2021-03-09 安徽墨砂工程修缮技术有限公司 Method for repairing external wall thermal insulation hollowing and dropping
CN113550514A (en) * 2021-07-24 2021-10-26 深圳市中弘建设工程有限公司 Construction process for preventing outer wall tile from hollowing and falling off
CN116065845A (en) * 2021-10-29 2023-05-05 山东省高速养护集团有限公司 Maintenance and decoration process based on service area toilet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110054943A (en) * 2009-11-19 2011-05-25 심기승 A manufacture and construction method of remodeling panel for building outside wall
CN104989071A (en) * 2015-05-20 2015-10-21 莆田学院 Method for paving new ground tiles on original cushion layer
CN106285037A (en) * 2016-09-19 2017-01-04 余春冠 A kind of finishing material hollowing comes off method for repairing and mending
CN106760599A (en) * 2016-12-14 2017-05-31 四川省爱馨佳建筑装饰工程有限公司 Sloughing of exterior wall restorative procedure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110054943A (en) * 2009-11-19 2011-05-25 심기승 A manufacture and construction method of remodeling panel for building outside wall
CN104989071A (en) * 2015-05-20 2015-10-21 莆田学院 Method for paving new ground tiles on original cushion layer
CN106285037A (en) * 2016-09-19 2017-01-04 余春冠 A kind of finishing material hollowing comes off method for repairing and mending
CN106760599A (en) * 2016-12-14 2017-05-31 四川省爱馨佳建筑装饰工程有限公司 Sloughing of exterior wall restorative procedure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552517A (en) * 2019-02-27 2019-12-10 谭壮 reinforcing method for preventing exterior wall tiles from falling off
CN110185276A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure of existing building Countermeasures for Dropping of Face Bricks of Exposed Walls
CN110185274A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure that existing building exterior wall true stone paint falls off
CN110185279A (en) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 The restorative procedure of existing building sloughing of exterior wall
CN110821198A (en) * 2019-10-23 2020-02-21 浙江勤业建工集团有限公司 High-rise building external wall thermal insulation mortar falling prevention method
CN111441608A (en) * 2020-05-28 2020-07-24 建修科技有限公司 Method for repairing bottom of swimming pool
CN112376932A (en) * 2020-11-03 2021-02-19 马鞍山安慧智电子科技有限公司 Hollowing maintenance robot
CN112459526A (en) * 2020-12-03 2021-03-09 安徽墨砂工程修缮技术有限公司 Method for repairing external wall thermal insulation hollowing and dropping
CN112459526B (en) * 2020-12-03 2021-12-14 安徽墨砂工程修缮技术有限公司 Method for repairing external wall thermal insulation hollowing and dropping
CN113550514A (en) * 2021-07-24 2021-10-26 深圳市中弘建设工程有限公司 Construction process for preventing outer wall tile from hollowing and falling off
CN116065845A (en) * 2021-10-29 2023-05-05 山东省高速养护集团有限公司 Maintenance and decoration process based on service area toilet

Similar Documents

Publication Publication Date Title
CN109025343A (en) A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile
CN109838065B (en) Floor tile ground paving construction method
CN104018598B (en) A kind of external wall structure and construction installation method
CN104746772B (en) Ash concrete hollow partition board anti-cracking construction method
CN109057385A (en) Engineering method is repaired in the fixed pin part slip casting of inlet of a kind of hollowing inner-outer wall ceramic tile, stone material
CN111042570B (en) Repairing construction method for fresh water brick wall of ancient building
CN107254954A (en) Ground paving ceramic tile construction technology
CN109653529A (en) Historical building clean water brick wall repairs construction method
CN103321442A (en) Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN204826464U (en) Waterproof construction of parapet
CN109025344A (en) Engineering method is repaired in the comprehensive slip casting of inlet fixed pin of a kind of hollowing inner-outer wall ceramic tile, stone material
CN110424775A (en) The mixed structure of wood collects together point pavilion modelled after an antique and its construction method
CN102486048A (en) Construction method for exterior heat preserving wall surface of exterior wall of high-rise building
CN108130992A (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method
CN108708563A (en) It is a kind of to keep the ceramic tile of ceramic tile original state, stone facing point face to reinforce repairing engineering method
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN208534084U (en) A kind of tile decorative surface point face reinforcing repairerment engineering method anchor studs
CN208534936U (en) A kind of tile decorative surface point face reinforcing repairerment engineering method modified anchor studs
CN102182323A (en) Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus
CN104763158A (en) Joggle joint type lightweight aggregate interlocking block construction method
CN114575620A (en) Formwork-supporting-free reinforcement high-ductility concrete construction method for masonry reinforcement
CN109537926B (en) Waterproof and leaking stoppage construction method for building area
CN113530124A (en) Construction method for preventing water-blocking wet plaster inside and outside volcanic rocks on wall surface
CN216949463U (en) Template structure of modern rammed concrete artistic texture wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218