CN108999760A - 风机扭缆马鞍装置 - Google Patents
风机扭缆马鞍装置 Download PDFInfo
- Publication number
- CN108999760A CN108999760A CN201810933766.3A CN201810933766A CN108999760A CN 108999760 A CN108999760 A CN 108999760A CN 201810933766 A CN201810933766 A CN 201810933766A CN 108999760 A CN108999760 A CN 108999760A
- Authority
- CN
- China
- Prior art keywords
- cable
- saddle
- protection cylinder
- center
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005299 abrasion Methods 0.000 claims abstract description 9
- 230000001174 ascending effect Effects 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 8
- 238000009429 electrical wiring Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
- F03D80/80—Arrangement of components within nacelles or towers
- F03D80/82—Arrangement of components within nacelles or towers of electrical components
- F03D80/85—Cabling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
本发明涉及一种风机扭缆马鞍装置,包括中心防护筒、马鞍挂架、支撑杆、分体式电缆夹块、螺栓副、支撑座,多个马鞍挂架焊接在中心防护筒上,并呈沿中心防护筒下部外壁360°均布,与多个马鞍挂架相对应的多个支撑杆上端焊接在中心防护筒下端,并呈360°均布,多个支撑杆下端焊接在支撑座上;中心防护筒侧面和支撑座侧面对应每个支撑杆处分别通过螺栓副固定连接有一个分体式电缆夹块。该装置可避免扭缆与扭缆之间的磨损、局部扭缆受力过大等问题。
Description
技术领域
本发明涉及一种风力发电机,尤其是一种风力发电机的电气布线装置。
背景技术
目前,风力发电机的电气布线装置的同类产品通常采用如图1所示的结构。该结构利用整体式电缆夹板将多组“品”字型扭缆汇集成束后整体敷设为落水弯型,当风机扭缆***扭转时,相邻组“品”字型扭缆有相互摩擦的风险,会导致电缆间的磨损。与此同时,由于电缆束的整体直径较大,导致整体型落水弯的内外侧电缆长度差异较大,落水弯结构扭转后,内侧电缆将会紧绷,外侧电缆松弛,引起局部电缆承载过大,导致动力电缆破坏等重大安全隐患。
目前风机扭缆磨损是风电行业最常见的电缆类损坏问题,针对扭缆马鞍装置环节,急需根据实际工况设计新型的风机扭缆马鞍结构。
发明内容
本发明的目的是为了解决风电行业扭缆马鞍装置频繁导致电缆磨损的问题,而提供一种风机扭缆马鞍装置,该装置可避免扭缆与扭缆之间的磨损、局部扭缆受力过大等问题。
为实现上述目的,本发明的技术方案是:一种风机扭缆马鞍装置,包括中心防护筒、马鞍挂架、支撑杆、分体式电缆夹块、螺栓副、支撑座,多个马鞍挂架焊接在中心防护筒上,并呈沿中心防护筒下部外壁360°均布,与多个马鞍挂架相对应的多个支撑杆上端焊接在中心防护筒下端,并呈360°均布,多个支撑杆下端焊接在支撑座上;中心防护筒侧面和支撑座侧面对应每个支撑杆处分别通过螺栓副固定连接有一个分体式电缆夹块。
所述马鞍挂架由圆形马鞍桶和后部支撑板组成,所述圆形马鞍桶上开有扎带固定孔,用于电缆绑扎,后部支撑板焊接至中心防护筒,且马鞍挂架2与中心防护筒侧壁呈一角度。
八组电缆组分别通过中心防护筒侧面和支撑座侧面对应的螺栓副后挂在各自对应的马鞍挂架上,使电缆组之间的扭转和上升运动彼此完全独立,相邻电缆组间无相互接触,有效避免电缆之间的磨损。
本发明的有益效果是:
1)每组扭缆的扭转运动完全独立,相邻电缆组间无相互接触,能够有效避免电缆之间的磨损;
2)所有发生相对运动的扭缆部位采用完全对称的结构设计,扭缆***运行时所有电缆运动行程一致,能够有效避免***发生偏载导致的局部电缆承载过大的问题。
附图说明
图1为现有的风力发电机的电气布线装置示意图;
图2为本发明的风机扭缆马鞍装置结构示意图;
图3为马鞍挂架结构示意图;
图4为八个马鞍挂架焊接在中心防护筒上示意图;
图5为八个支撑杆焊接在中心防护筒上示意图;
图6为分体式夹块利用螺栓组与支架连接示意图;
图7为八组马鞍支架呈360°均布示意图;
图8为本发明的风机扭缆马鞍装置整体工作过程中的最佳状态示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
如图2至图8所示,本发明的风机扭缆马鞍装置,包括中心防护筒1、马鞍挂架2、支撑杆3、分体式电缆夹块4、螺栓副5、支撑座6。
八个马鞍挂架2焊接在中心防护筒1上,并呈沿中心防护筒1下部外壁360°均布(见图2,4,7)。八个支撑杆3上端焊接在中心防护筒1下端,并呈360°均布(见图2),八个支撑杆3下端焊接在支撑座6上。中心防护筒1侧面和支撑座6侧面对应每个支撑杆3处分别通过螺栓副5固定连接有一个分体式电缆夹块4(见图6)。
如图3所示,马鞍挂架2由圆形马鞍桶2-1和后部支撑板2-2组成,圆形马鞍桶2-1上开有扎带固定孔2-3,用于电缆绑扎,后部支撑板2-2焊接至中心防护筒1,且马鞍挂架2与中心防护筒1侧壁呈一角度A。
八组马鞍挂架呈360°均布,电缆组之间的扭转和上升运动彼此完全独立,相邻电缆组间无相互接触,能够有效避免电缆之间的磨损。
本发明的风机扭缆马鞍装置整体工作过程中的最佳状态,如图8所示。当所有发生相对运动的扭缆部位采用完全对称的结构设计,扭缆***运行时所有电缆运动行程一致,能够有效避免***发生偏载导致的局部电缆承载过大的问题。
Claims (3)
1.一种风机扭缆马鞍装置,包括中心防护筒、马鞍挂架、支撑杆、分体式电缆夹块、螺栓副、支撑座,其特征在于:多个马鞍挂架焊接在中心防护筒上,并呈沿中心防护筒下部外壁360°均布,与多个马鞍挂架相对应的多个支撑杆上端焊接在中心防护筒下端,并呈360°均布,多个支撑杆下端焊接在支撑座上;中心防护筒侧面和支撑座侧面对应每个支撑杆处分别通过螺栓副固定连接有一个分体式电缆夹块。
2.根据权利要求1所述的风机扭缆马鞍装置,其特征在于:所述马鞍挂架由圆形马鞍桶和后部支撑板组成,所述圆形马鞍桶上开有扎带固定孔,用于电缆绑扎,后部支撑板焊接至中心防护筒,且马鞍挂架与中心防护筒侧壁呈一角度。
3.根据权利要求1所述的风机扭缆马鞍装置,其特征在于:八组电缆组分别通过中心防护筒侧面和支撑座侧面对应的螺栓副后挂在各自对应的马鞍挂架上,使电缆组之间的扭转和上升运动彼此完全独立,相邻电缆组间无相互接触,有效避免电缆之间的磨损。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810933766.3A CN108999760B (zh) | 2018-08-16 | 2018-08-16 | 风机扭缆马鞍装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810933766.3A CN108999760B (zh) | 2018-08-16 | 2018-08-16 | 风机扭缆马鞍装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108999760A true CN108999760A (zh) | 2018-12-14 |
CN108999760B CN108999760B (zh) | 2023-10-27 |
Family
ID=64592343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810933766.3A Active CN108999760B (zh) | 2018-08-16 | 2018-08-16 | 风机扭缆马鞍装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108999760B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3702616A1 (en) * | 2019-02-26 | 2020-09-02 | Siemens Gamesa Renewable Energy A/S | Power cable installation in a wind turbine tower |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090206610A1 (en) * | 2008-02-15 | 2009-08-20 | Negel Martin | Cable guard and method of installation |
EP2435698A1 (de) * | 2009-05-27 | 2012-04-04 | Huber + Suhner Ag | Kabel mit einer aufhängevorrichtung, verwendung dieses kabels und der aufhängevorrichtung in einem windkraftwerk sowie windkraftwerk mit einem solchen kabel und einer solchen aufhängevorrichtung |
CN203151294U (zh) * | 2012-12-26 | 2013-08-21 | 中国石油集团长城钻探工程有限公司顶驱技术分公司 | 顶驱用防水型电缆悬挂*** |
CN205422945U (zh) * | 2014-10-24 | 2016-08-03 | 通用电气公司 | 用于布设涡轮机械的可旋转线束的*** |
WO2016206690A1 (en) * | 2015-06-25 | 2016-12-29 | Envision Energy (Denmark) Aps | Cable twisting system with elastic deformable fixture |
CN106567810A (zh) * | 2016-11-09 | 2017-04-19 | 北京金风科创风电设备有限公司 | 风力发电机组的缆线保护***以及风力发电机组 |
-
2018
- 2018-08-16 CN CN201810933766.3A patent/CN108999760B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090206610A1 (en) * | 2008-02-15 | 2009-08-20 | Negel Martin | Cable guard and method of installation |
EP2435698A1 (de) * | 2009-05-27 | 2012-04-04 | Huber + Suhner Ag | Kabel mit einer aufhängevorrichtung, verwendung dieses kabels und der aufhängevorrichtung in einem windkraftwerk sowie windkraftwerk mit einem solchen kabel und einer solchen aufhängevorrichtung |
CN203151294U (zh) * | 2012-12-26 | 2013-08-21 | 中国石油集团长城钻探工程有限公司顶驱技术分公司 | 顶驱用防水型电缆悬挂*** |
CN205422945U (zh) * | 2014-10-24 | 2016-08-03 | 通用电气公司 | 用于布设涡轮机械的可旋转线束的*** |
WO2016206690A1 (en) * | 2015-06-25 | 2016-12-29 | Envision Energy (Denmark) Aps | Cable twisting system with elastic deformable fixture |
CN106567810A (zh) * | 2016-11-09 | 2017-04-19 | 北京金风科创风电设备有限公司 | 风力发电机组的缆线保护***以及风力发电机组 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3702616A1 (en) * | 2019-02-26 | 2020-09-02 | Siemens Gamesa Renewable Energy A/S | Power cable installation in a wind turbine tower |
WO2020173794A1 (en) * | 2019-02-26 | 2020-09-03 | Siemens Gamesa Renewable Energy A/S | Power cable installation in a wind turbine tower |
US12000383B2 (en) | 2019-02-26 | 2024-06-04 | Siemens Gamesa Renewable Energy A/S | Tower cable installation in a wind turbine tower |
Also Published As
Publication number | Publication date |
---|---|
CN108999760B (zh) | 2023-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208674827U (zh) | 一种电力杆塔固定电缆的组件 | |
CN105398990B (zh) | 电力角钢塔用辅助提升装置 | |
CN208900296U (zh) | 风机扭缆马鞍装置 | |
CN108999760A (zh) | 风机扭缆马鞍装置 | |
CN210443990U (zh) | 一种***导线间隔装置 | |
CN103594968A (zh) | 一种输电杆塔多***导线提升装置 | |
CN203932553U (zh) | 一种在特高压直流输电线路上使用的便携式接地线收线器 | |
CN103979403A (zh) | 线缆终端头提升卡具及线缆提升方法 | |
CN103236659A (zh) | 输电线路近杆检修吊架 | |
CN106711877B (zh) | 一种便于线缆安装和更换的线缆夹具以及安装和更换的方法 | |
CN104600626A (zh) | 一种高压线高空维护吊篮装置 | |
CN207106242U (zh) | 一种吊悬滑轮悬挂装置 | |
JP2004171946A (ja) | 碍子装置の全部または一部分の交換方法およびこの交換方法に使用する支持具 | |
CN206022671U (zh) | 电气设备直立引线挂接地线导体端安装器 | |
CN107026422A (zh) | 一种海洋工程设备之间整束活动电缆连接的工装 | |
CN210404342U (zh) | 一种防雷接地电阻稳固器 | |
CN106115504A (zh) | 一种吊具 | |
CN109687372B (zh) | 一种适用于输电线路的紧固装置及笼式硬跳线的连接方法 | |
CN210628531U (zh) | 一种t型无螺栓接地线夹 | |
CN206640281U (zh) | 一种海洋工程设备之间整束活动电缆连接的工装 | |
CN206510783U (zh) | 一种低净空隧道出入口处接触网腕臂装置 | |
CN207516475U (zh) | 一种电力谐波在线监测装置 | |
CN206658002U (zh) | 1000kV特高压交流导线线夹更换工具 | |
CN207134580U (zh) | 并沟线夹绝缘操作杆 | |
CN202797761U (zh) | 带电作业辅助装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: Shen Gang street of Jiangyin city in Jiangsu province 214443 Wuxi city Shen Zhuang Road No. 3 Applicant after: Vision Energy Co.,Ltd. Address before: 8, B, building 200051, block SOHO, Zhongshan square, 1065 West Zhongshan Road, Shanghai, Changning District Applicant before: Envision Energy (Denmark) APS |
|
GR01 | Patent grant | ||