CN108999413A - A method of roof purline being installed using single hoist cable more gib heads - Google Patents
A method of roof purline being installed using single hoist cable more gib heads Download PDFInfo
- Publication number
- CN108999413A CN108999413A CN201811142478.2A CN201811142478A CN108999413A CN 108999413 A CN108999413 A CN 108999413A CN 201811142478 A CN201811142478 A CN 201811142478A CN 108999413 A CN108999413 A CN 108999413A
- Authority
- CN
- China
- Prior art keywords
- roof purline
- hoist cable
- installation
- roof
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A method of roof purline being installed using single hoist cable more gib heads, belongs to industrial premises roof purline mounting technique field.Step: according to factory building roof purlin (4) clipping room away from the 3-5 gib head (3) of installation on crane (1) main hoist cable (2);When lifting, each gib head (3) fixes a roof purline (4);In installation, roof purline (4) is seated in installation site by off the hook, pole-climbing, the movement of contracting bar by crane (1) one by one;After the roof purline (4) of gib head (3) is all mounted on the roofing (5) of industrial premises (6) on main hoist cable (2), crane (1) back hook.The advantage is that roof purline installation effectiveness is made to improve several times, a large amount of set-up time is saved, and has saved a large amount of mechanical one-shift expenses, greatly reduces construction cost.
Description
Technical field
The invention belongs to industrial premises roof purline technical fields, in particular, provide a kind of using the more gib heads peaces of single hoist cable
The method for filling roof purline.
Background technique
When industrial premises roof purline is installed, typically single lifting is single in place.Due to roof purline quantity compared with
More, the lifting time is longer, and occupies a large amount of lifting machine machine-teams, and low efficiency is costly.
Summary of the invention
The purpose of the present invention is to provide a kind of methods using the more gib head installation roof purlines of single hoist cable, roll for 4.3m
In owner's factory building roof purlin installation process, face purlin quantity is more, and the lifting time is longer, and occupies a large amount of lifting machine platforms
Class, low efficiency, costly problem;Using the method for using the more gib head installation roof purlines of single hoist cable, i.e., hung in a master
Multiple lifting gib heads are installed, in mounting purlines, each gib head lifts a purlin, and is fitted in place purlin one by one on rope
Roofing installation site, purlin installation effectiveness improve several times, save a large amount of set-up time, and have saved a large amount of mechanical stages
Class greatly reduces construction cost, installs smoothly success, has accumulated invaluable experience for similar construction later.
The present invention according to factory building roof purlin clipping room away from installing multiple gib heads on the main hoist cable of crane, when lifting, each
Gib head fixes a roof purline, and in installation, crane is acted by off the hook, pole-climbing, contracting bar etc. and purlin is seated in installation one by one
Position, until crane back hook installs other purlins again after gib head roof purline is all mounted on industrial premises roofing.Specific steps
It is as follows:
The first step, according to 4 clipping room of factory building roof purlin away from the 3-5 gib head 3 (Fig. 1) of installation on the main hoist cable 2 of crane 1;
Second step, when lifting, each gib head 3 fixes a roof purline 4 (Fig. 2);
Third step, in installation, crane 1 is acted by off the hook, pole-climbing, contracting bar etc. roof purline 4 being seated in installation one by one
Position (Fig. 3);
4th step, after the roof purline 4 of gib head 3 is all mounted on the roofing 5 of industrial premises 6 on main hoist cable 2, crane 1
Back hook (Fig. 4).
This method makes roof purline installation effectiveness improve several times, saves a large amount of set-up time, and has saved a large amount of
Mechanical one-shift expense, greatly reduces construction cost, achieves good economic benefit for company.
Detailed description of the invention
Fig. 1 is to install multiple gib head figures on the main hoist cable of crane.
Fig. 2 is that multiple gib heads lift multiple roof purline figures simultaneously on main hoist cable.
Fig. 3 is that roof purline is seated in installation site figure one by one.
Fig. 4 is that roof purline is all mounted on the upper figure of roofing on main hoist cable gib head.
In figure, crane 1, main hoist cable 2, gib head 3, roof purline 4, roofing 5, industrial premises 6.
Specific embodiment
Fig. 1-Fig. 4 is a kind of specific embodiment of the invention.Specific embodiment is as follows:
The first step, according to 4 clipping room of factory building roof purlin away from installing multiple gib heads 3 on the main hoist cable 2 of crane 1;
Second step, when lifting, each gib head 3 fixes a roof purline 4;
Third step, in installation, crane 1 is acted by off the hook, pole-climbing, contracting bar etc. roof purline 4 being seated in installation one by one
Position;
4th step, after the roof purline 4 of gib head 3 is all mounted on the roofing 5 of industrial premises 6 on main hoist cable 2, crane 1
Back hook.
Claims (1)
1. a kind of method using the more gib head installation roof purlines of single hoist cable, which is characterized in that specific step is as follows:
The first step, according to factory building roof purlin (4) clipping room away from the 3-5 gib head (3) of installation on crane (1) main hoist cable (2);
Second step, when lifting, each gib head (3) fixes a roof purline (4);
Third step, in installation, crane (1) is acted by off the hook, pole-climbing, contracting bar roof purline (4) being seated in installation position one by one
It sets;
4th step, after the roof purline (4) of gib head (3) is all mounted on the roofing (5) of industrial premises (6) on main hoist cable (2),
Crane (1) back hook.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811142478.2A CN108999413A (en) | 2018-09-28 | 2018-09-28 | A method of roof purline being installed using single hoist cable more gib heads |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811142478.2A CN108999413A (en) | 2018-09-28 | 2018-09-28 | A method of roof purline being installed using single hoist cable more gib heads |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108999413A true CN108999413A (en) | 2018-12-14 |
Family
ID=64589771
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811142478.2A Pending CN108999413A (en) | 2018-09-28 | 2018-09-28 | A method of roof purline being installed using single hoist cable more gib heads |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108999413A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469336A (en) * | 2018-12-19 | 2019-03-15 | 北京首钢建设集团有限公司 | A kind of method that factory building roof and wall skin purlin utilize the installation of elevator bunchiness |
CN109653424A (en) * | 2018-12-30 | 2019-04-19 | 北京首钢建设集团有限公司 | It is a kind of using shoulder pole girder as switching suspender roof purline installation method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002155630A (en) * | 2000-11-22 | 2002-05-31 | Taisei Corp | Hanging-up method of steel frame roof purlin member |
CN202214187U (en) * | 2011-09-06 | 2012-05-09 | 六安长城钢结构有限公司 | Lifting appliance for mounting purlines |
CN202645024U (en) * | 2012-06-13 | 2013-01-02 | 江苏欧美钢结构幕墙科技有限公司 | Installing lifting device for steel structure purline |
CN202808173U (en) * | 2012-09-29 | 2013-03-20 | 南车石家庄车辆有限公司 | Lifting device special for lateral columns |
CN204675726U (en) * | 2015-01-31 | 2015-09-30 | 中建海峡建设发展有限公司 | Purlin lifting auxiliary device |
CN104989109A (en) * | 2015-07-20 | 2015-10-21 | 中博农畜牧科技股份有限公司 | Method for lifting roof girders and purlines at the same time |
CN204873423U (en) * | 2015-07-14 | 2015-12-16 | 安徽合力股份有限公司合肥铸锻厂 | Light casting is thrown ball and is hung many hoists with one |
CN105484502A (en) * | 2014-10-10 | 2016-04-13 | 五冶集团上海有限公司 | Combination installation method for steel structure roofing purlins and support bars of industrial factory building |
CN105863276A (en) * | 2015-01-19 | 2016-08-17 | 五冶集团上海有限公司 | Manual lifting device used for hoisting factory building roof rod member, and manufacturing method |
CN206625585U (en) * | 2017-04-10 | 2017-11-10 | 洛阳博创重科有限公司 | A kind of carrying pole device of purlin installation |
-
2018
- 2018-09-28 CN CN201811142478.2A patent/CN108999413A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002155630A (en) * | 2000-11-22 | 2002-05-31 | Taisei Corp | Hanging-up method of steel frame roof purlin member |
CN202214187U (en) * | 2011-09-06 | 2012-05-09 | 六安长城钢结构有限公司 | Lifting appliance for mounting purlines |
CN202645024U (en) * | 2012-06-13 | 2013-01-02 | 江苏欧美钢结构幕墙科技有限公司 | Installing lifting device for steel structure purline |
CN202808173U (en) * | 2012-09-29 | 2013-03-20 | 南车石家庄车辆有限公司 | Lifting device special for lateral columns |
CN105484502A (en) * | 2014-10-10 | 2016-04-13 | 五冶集团上海有限公司 | Combination installation method for steel structure roofing purlins and support bars of industrial factory building |
CN105863276A (en) * | 2015-01-19 | 2016-08-17 | 五冶集团上海有限公司 | Manual lifting device used for hoisting factory building roof rod member, and manufacturing method |
CN204675726U (en) * | 2015-01-31 | 2015-09-30 | 中建海峡建设发展有限公司 | Purlin lifting auxiliary device |
CN204873423U (en) * | 2015-07-14 | 2015-12-16 | 安徽合力股份有限公司合肥铸锻厂 | Light casting is thrown ball and is hung many hoists with one |
CN104989109A (en) * | 2015-07-20 | 2015-10-21 | 中博农畜牧科技股份有限公司 | Method for lifting roof girders and purlines at the same time |
CN206625585U (en) * | 2017-04-10 | 2017-11-10 | 洛阳博创重科有限公司 | A kind of carrying pole device of purlin installation |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469336A (en) * | 2018-12-19 | 2019-03-15 | 北京首钢建设集团有限公司 | A kind of method that factory building roof and wall skin purlin utilize the installation of elevator bunchiness |
CN109653424A (en) * | 2018-12-30 | 2019-04-19 | 北京首钢建设集团有限公司 | It is a kind of using shoulder pole girder as switching suspender roof purline installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201221193Y (en) | High altitude packway ceiling construction operating platform | |
CN108999413A (en) | A method of roof purline being installed using single hoist cable more gib heads | |
CN104895337B (en) | The installation method of large-size horizontal equipment in concrete frame | |
CN111021749A (en) | Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof | |
CN102718109A (en) | Method for transforming construction elevator into passenger-goods elevator | |
CN101264845A (en) | Crown block high altitude integrated suspension transposition construction method | |
CN107013013B (en) | Steel structure elevator shaft standard knot hoisting tool and process | |
CN216336266U (en) | Assembled building element hoist and mount construction platform structure | |
CN210457158U (en) | Curtain type mounting structure for quickly hoisting square concrete pier column hooping | |
CN211691536U (en) | Simple lifting mechanism for bare concrete exterior wall cladding | |
CN201040694Y (en) | Convenient movable material lifter | |
CN208830688U (en) | External wall of high-rise building maintenance device | |
CN103708374B (en) | The installation method of RH finery hydraulic jacking equipment | |
CN207226943U (en) | A kind of double crossbeam synchronous hoisting devices | |
CN204185121U (en) | One can assembled mobile haulage equipment | |
CN205000632U (en) | From masterplate work platform that climbs | |
CN105804087A (en) | Installation method for steel structure below large deep foundation pit supporting beam | |
CN113445777B (en) | Method for renewing and reforming waste gas exhaust drum shift of pickling plant | |
CN109083422A (en) | A method of riding track is overhauled using elevator and fixed pulley group installation roofing | |
CN111088982A (en) | Pipe jacking working well mounting structure | |
CN111377371B (en) | System and method for mounting travelling beam by means of factory building column in closed factory building | |
CN112272649A (en) | Elevator installation method and apparatus | |
CN204456689U (en) | A kind of work high above the ground sliding platform | |
CN213059891U (en) | Hoisting tool for wallboard | |
CN216042679U (en) | Unsettled pipeline mounting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181214 |