CN108978502A - A kind of induction type roadbed transverse drainage construction method - Google Patents

A kind of induction type roadbed transverse drainage construction method Download PDF

Info

Publication number
CN108978502A
CN108978502A CN201810913466.9A CN201810913466A CN108978502A CN 108978502 A CN108978502 A CN 108978502A CN 201810913466 A CN201810913466 A CN 201810913466A CN 108978502 A CN108978502 A CN 108978502A
Authority
CN
China
Prior art keywords
concrete
excavation
induction type
construction method
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810913466.9A
Other languages
Chinese (zh)
Inventor
朱晓颖
李月松
袁帅
王权势
司永艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810913466.9A priority Critical patent/CN108978502A/en
Publication of CN108978502A publication Critical patent/CN108978502A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of induction type roadbed transverse drainage construction methods, comprising the following steps: S1, construction material and mechanical preparation, S2, excavation of foundation pit, S3, mortar flag stone, S4, pipe laying, S5, concreting, S51, formwork erection, S52, concrete stirring, S53, concrete transport, S54, concrete drop, S55, concrete placings, S56, concrete curing, S57, demoulding.The induction type roadbed transverse drainage construction method, in the case where not changing existing highway road structure, pass through setting 100 Water penetrative flexible pipe of Φ and Φ 110HDPE transverse drain, after rainy season rainfall is larger, rainwater penetrates into roadbed, roadbed internal water can pass through 100 Water penetrative flexible pipe of Φ and the outflow of Φ 110HDPE transverse drain;The induction type roadbed transverse drainage construction method can effectively reduce the destruction of road structure caused by rain infiltration, be particularly suitable for summer short-term rainfall is big, the volume of traffic is big, can not close traffic be transformed on a large scale, the wet soft no side slope protection highway of the unsmooth subgrade soils of roadbed local draining.

Description

A kind of induction type roadbed transverse drainage construction method
Technical field
The present invention relates to a kind of embankment drainage system technical field, specifically a kind of induction type roadbed transverse drainage construction party Method.
Background technique
With social progress and economic rapid development, the construction of the communication in China especially highway is obtained Achievement highly visible.However due to various factors, has there is different degrees of disease in the highway that operation has been put into Evil, wherein disease caused by roadbed damaged or destroyed by flood is particularly acute.Subgrade drainage design is a more complicated job, and every highway is all Have the geographical environment of own, be related to along natural stream networks, field irrigation, environmental protection and water and soil conservation etc. a series of ask Topic, subgrade drainage design it is unreasonable, often can not embody its serious consequence at completion of works initial stage, but pushing away with the time The problem of shifting, design is worked as, can gradually show.Therefore, one kind is needed under conditions of not influencing to cover structure, is Built roadbed adds the technology of transverse drainage facility.
Summary of the invention
The purpose of the present invention is to provide a kind of induction type roadbed transverse drainage construction methods, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of induction type roadbed transverse drainage construction method, comprising the following steps:
S1, construction material and mechanical preparation: construction material includes 100 Water penetrative flexible pipe of Φ, Φ 110HDPE transverse drain and coagulation Soil;Construction machinery includes that 220 type road roller 1, electrorammer 1, red rock are built in SD16L bull-dozer 1, GR180 land leveller 1, Lip river Buddha's warrior attendant dumper 1, concrete tank 1, zl50 loader 1,1, excavator, 1, sprinkling truck, GPT3002LND whole station 1, instrument, NAL124 level 1 and 1 set of generating set;
S2, excavation of foundation pit: according to surveying setting-out and the position of central axis control stake, each central axis first is bundled in nylon wire It is firmly tensed in line traffic control stake and determines that control line is excavated on both sides according to underdrain cross dimensions, then use lime edge on former road surface Control line spills an excavation line, mini-excavator excavation pit is used according to excavation line, with small-sized ramming after excavation of foundation pit Machine tamps substrate, and measures substrate elevation;
S3, mortar flag stone: slabstone should be layered masonry;
S4, pipe laying: Φ 110HDPE pipe is installed in the foundation pit of excavation, pipeline is put into bottom of foundation ditch center, is being dug The Φ 110HDPE pipe of square section setting, must protrude into roadbed gutter 5cm, exit is covered with galvanized wire, prevents silt from entering pipe Road;Embankment section transverse drain is connected to side slope, and exit portion stretches out 5cm, prevents from blocking;
S5, concreting:
S51, formwork erection: after excavation of foundation pit acceptance(check), before concreting, template installation is carried out by structures size;
S52, concrete stirring: the concrete that structures pour will be used for and be stirred;
S53, concrete transport: work point is transported to from mixing station with mixer truck;
S54, concrete drop: concrete, which drops, to be carried out by chute, elephant trunk or vibrating spout;
S55, concrete placings: concreting is layered according to the planform of concrete, discharge way and vibrating method situation, sequence It pours;
S56, concrete curing: concrete placings are completed, and after concrete initial set, should carry out water seasoning, curing time is no less than 7 days;
S57, demoulding: concrete reach after some strength can form removal, to accelerate the turnover of template.
As a further solution of the present invention: in S3, the slabstone forms a working lining, each work with layer 2-3 building block The horizontal joint of layer is levelling.
As further scheme of the invention: in S3, each working lining perps is mutually staggered, and must not be penetrated through.
As further scheme of the invention: in S4, the Φ 110HDPE length of tube in the embankment section is 13.6m/ Road, the Φ 100PVC length of tube in excavation section are the road 12.3m/.
As further scheme of the invention: in S52, the concrete stirring is all made of mechanical stirring, must not employment Work is mixed and stirred.
As further scheme of the invention: in S53, the concrete horizontal transport near the building site uses trolley Or diesel dumper is transported, concrete vertical transport is transported using crane.
As further scheme of the invention: in S57, the striking time is 8-10 days.
Compared with prior art, the beneficial effects of the present invention are:
1, the induction type roadbed transverse drainage construction method passes through setting in the case where not changing existing highway road structure 100 Water penetrative flexible pipe of Φ and Φ 110HDPE transverse drain, after rainy season rainfall is larger, rainwater penetrates into roadbed, roadbed internal water It can be flowed out by 100 Water penetrative flexible pipe of Φ and Φ 110HDPE transverse drain.
2, the induction type roadbed transverse drainage construction method can effectively reduce the destruction of road structure caused by rain infiltration, Be particularly suitable for summer short-term rainfall is big, the volume of traffic is big, can not close traffic be transformed on a large scale, roadbed local draining not The wet soft no side slope protection highway of smooth subgrade soils.
Detailed description of the invention
Fig. 1 is the construction flow chart of induction type roadbed transverse drainage construction method.
Fig. 2 is the process flow chart of concreting in induction type roadbed transverse drainage construction method.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
Embodiment 1
A kind of induction type roadbed transverse drainage construction method referring to FIG. 1-2, comprising the following steps:
S1, construction material and mechanical preparation: construction material includes 100 Water penetrative flexible pipe of Φ, Φ 110HDPE transverse drain, coagulation Soil;Construction machinery includes that 220 type road roller 1, electrorammer 1, red rock are built in SD16L bull-dozer 1, GR180 land leveller 1, Lip river Buddha's warrior attendant dumper 1, concrete tank 1, zl50 loader 1,1, excavator, 1, sprinkling truck, GPT3002LND whole station 1, instrument, NAL124 level 1 and 1 set of generating set;
S2, excavation of foundation pit: according to surveying setting-out and the position of central axis control stake, each central axis first is bundled in nylon wire It is firmly tensed in line traffic control stake and determines that control line is excavated on both sides according to underdrain cross dimensions, then use lime edge on former road surface Control line spills an excavation line, mini-excavator excavation pit is used according to excavation line, with small-sized ramming after excavation of foundation pit Machine tamps substrate, and measures substrate elevation;
S3, mortar flag stone: slabstone should be layered masonry, and slabstone forms a working lining with 2 layers of building block, and the horizontal joint of each working lining is answered Substantially levelling, each working lining perps mutually staggers, and must not penetrate through;
S4, pipe laying: Φ 110HDPE pipe is installed in the foundation pit of excavation, pipeline is put into bottom of foundation ditch center, is being dug The Φ 110HDPE pipe of square section setting, must protrude into roadbed gutter 5cm, exit is covered with galvanized wire, prevents silt from entering pipe Road;Embankment section transverse drain is connected to side slope, and exit portion stretches out 5cm, prevents from blocking, the Φ 110HDPE pipe range in embankment section Degree is the road 13.6m/, and the Φ 100PVC length of tube in excavation section is the road 12.3m/;
S5, concreting:
S51, formwork erection: after excavation of foundation pit acceptance(check), before concreting, template installation should be carried out by structures size;
S52, concrete stirring: will be used for the concrete that structures pour and be stirred, and concrete stirring is all made of mechanical stirring, must not Manually mixed and stirred;
S53, concrete transport: being transported to work point from mixing station with mixer truck, the transport of concrete horizontal near building site using trolley or Diesel dumper is transported, and concrete vertical transport is transported using crane;
S54, concrete drop: concrete, which drops, to be carried out by chute, elephant trunk or vibrating spout;
S55, concrete placings: situations such as concreting should be according to the planform of concrete, discharge way and vibrating method, sequence Placement layer by layer;
S56, concrete curing: concrete placings are completed, and after concrete initial set, should carry out water seasoning, curing time is no less than 7 days;
S57, demoulding: concrete reach after some strength can form removal, to accelerate the turnover of template, striking time is 8 days.
Embodiment 2
A kind of induction type roadbed transverse drainage construction method referring to FIG. 1-2, comprising the following steps:
S1, construction material and mechanical preparation: construction material includes 100 Water penetrative flexible pipe of Φ, Φ 110HDPE transverse drain, coagulation Soil;Construction machinery includes that 220 type road roller 1, electrorammer 1, red rock are built in SD16L bull-dozer 1, GR180 land leveller 1, Lip river Buddha's warrior attendant dumper 1, concrete tank 1, zl50 loader 1,1, excavator, 1, sprinkling truck, GPT3002LND whole station 1, instrument, NAL124 level 1 and 1 set of generating set;
S2, excavation of foundation pit: according to surveying setting-out and the position of central axis control stake, each central axis first is bundled in nylon wire It is firmly tensed in line traffic control stake and determines that control line is excavated on both sides according to underdrain cross dimensions, then use lime edge on former road surface Control line spills an excavation line, mini-excavator excavation pit is used according to excavation line, with small-sized ramming after excavation of foundation pit Machine tamps substrate, and measures substrate elevation;
S3, mortar flag stone: slabstone should be layered masonry, and slabstone forms a working lining with 2 layers of building block, and the horizontal joint of each working lining is answered Substantially levelling, each working lining perps mutually staggers, and must not penetrate through;
S4, pipe laying: Φ 110HDPE pipe is installed in the foundation pit of excavation, pipeline is put into bottom of foundation ditch center, is being dug The Φ 110HDPE pipe of square section setting, must protrude into roadbed gutter 5cm, exit is covered with galvanized wire, prevents silt from entering pipe Road;Embankment section transverse drain is connected to side slope, and exit portion stretches out 5cm, prevents from blocking, the Φ 110HDPE pipe range in embankment section Degree is the road 13.6m/, and the Φ 100PVC length of tube in excavation section is the road 12.3m/;
S5, concreting:
S51, formwork erection: after excavation of foundation pit acceptance(check), before concreting, template installation should be carried out by structures size;
S52, concrete stirring: will be used for the concrete that structures pour and be stirred, and concrete stirring is all made of mechanical stirring, must not Manually mixed and stirred;
S53, concrete transport: being transported to work point from mixing station with mixer truck, the transport of concrete horizontal near building site using trolley or Diesel dumper is transported, and concrete vertical transport is transported using crane;
S54, concrete drop: concrete, which drops, to be carried out by chute, elephant trunk or vibrating spout;
S55, concrete placings: situations such as concreting should be according to the planform of concrete, discharge way and vibrating method, sequence Placement layer by layer;
S56, concrete curing: concrete placings are completed, and after concrete initial set, should carry out water seasoning, curing time is no less than 7 days;
S57, demoulding: concrete reach after some strength can form removal, to accelerate the turnover of template, striking time is 9 days.
Embodiment 3
A kind of induction type roadbed transverse drainage construction method referring to FIG. 1-2, comprising the following steps:
S1, construction material and mechanical preparation: construction material includes 100 Water penetrative flexible pipe of Φ, Φ 110HDPE transverse drain, coagulation Soil;Construction machinery includes that 220 type road roller 1, electrorammer 1, red rock are built in SD16L bull-dozer 1, GR180 land leveller 1, Lip river Buddha's warrior attendant dumper 1, concrete tank 1, zl50 loader 1,1, excavator, 1, sprinkling truck, GPT3002LND whole station 1, instrument, NAL124 level 1 and 1 set of generating set;
S2, excavation of foundation pit: according to surveying setting-out and the position of central axis control stake, each central axis first is bundled in nylon wire It is firmly tensed in line traffic control stake and determines that control line is excavated on both sides according to underdrain cross dimensions, then use lime edge on former road surface Control line spills an excavation line, mini-excavator excavation pit is used according to excavation line, with small-sized ramming after excavation of foundation pit Machine tamps substrate, and measures substrate elevation;
S3, mortar flag stone: slabstone should be layered masonry, and slabstone forms a working lining with 2 layers of building block, and the horizontal joint of each working lining is answered Substantially levelling, each working lining perps mutually staggers, and must not penetrate through;
S4, pipe laying: Φ 110HDPE pipe is installed in the foundation pit of excavation, pipeline is put into bottom of foundation ditch center, is being dug The Φ 110HDPE pipe of square section setting, must protrude into roadbed gutter 5cm, exit is covered with galvanized wire, prevents silt from entering pipe Road;Embankment section transverse drain is connected to side slope, and exit portion stretches out 5cm, prevents from blocking, the Φ 110HDPE pipe range in embankment section Degree is the road 13.6m/, and the Φ 100PVC length of tube in excavation section is the road 12.3m/;
S5, concreting:
S51, formwork erection: after excavation of foundation pit acceptance(check), before concreting, template installation should be carried out by structures size;
S52, concrete stirring: will be used for the concrete that structures pour and be stirred, and concrete stirring is all made of mechanical stirring, must not Manually mixed and stirred;
S53, concrete transport: being transported to work point from mixing station with mixer truck, the transport of concrete horizontal near building site using trolley or Diesel dumper is transported, and concrete vertical transport is transported using crane;
S54, concrete drop: concrete, which drops, to be carried out by chute, elephant trunk or vibrating spout;
S55, concrete placings: situations such as concreting should be according to the planform of concrete, discharge way and vibrating method, sequence Placement layer by layer;
S56, concrete curing: concrete placings are completed, and after concrete initial set, should carry out water seasoning, curing time is no less than 7 days;
S57, demoulding: concrete reach after some strength can form removal, to accelerate the turnover of template, striking time 10 It.
Embodiment 4
A kind of induction type roadbed transverse drainage construction method referring to FIG. 1-2, comprising the following steps:
S1, construction material and mechanical preparation: construction material includes 100 Water penetrative flexible pipe of Φ, Φ 110HDPE transverse drain, coagulation Soil;Construction machinery includes that 220 type road roller 1, electrorammer 1, red rock are built in SD16L bull-dozer 1, GR180 land leveller 1, Lip river Buddha's warrior attendant dumper 1, concrete tank 1, zl50 loader 1,1, excavator, 1, sprinkling truck, GPT3002LND whole station 1, instrument, NAL124 level 1 and 1 set of generating set;
S2, excavation of foundation pit: according to surveying setting-out and the position of central axis control stake, each central axis first is bundled in nylon wire It is firmly tensed in line traffic control stake and determines that control line is excavated on both sides according to underdrain cross dimensions, then use lime edge on former road surface Control line spills an excavation line, mini-excavator excavation pit is used according to excavation line, with small-sized ramming after excavation of foundation pit Machine tamps substrate, and measures substrate elevation;
S3, mortar flag stone: slabstone should be layered masonry, and slabstone forms a working lining with 3 layers of building block, and the horizontal joint of each working lining is answered Substantially levelling, each working lining perps mutually staggers, and must not penetrate through;
S4, pipe laying: Φ 110HDPE pipe is installed in the foundation pit of excavation, pipeline is put into bottom of foundation ditch center, is being dug The Φ 110HDPE pipe of square section setting, must protrude into roadbed gutter 5cm, exit is covered with galvanized wire, prevents silt from entering pipe Road;Embankment section transverse drain is connected to side slope, and exit portion stretches out 5cm, prevents from blocking, the Φ 110HDPE pipe range in embankment section Degree is the road 13.6m/, and the Φ 100PVC length of tube in excavation section is the road 12.3m/;
S5, concreting:
S51, formwork erection: after excavation of foundation pit acceptance(check), before concreting, template installation should be carried out by structures size;
S52, concrete stirring: will be used for the concrete that structures pour and be stirred, and concrete stirring is all made of mechanical stirring, must not Manually mixed and stirred;
S53, concrete transport: being transported to work point from mixing station with mixer truck, the transport of concrete horizontal near building site using trolley or Diesel dumper is transported, and concrete vertical transport is transported using crane;
S54, concrete drop: concrete, which drops, to be carried out by chute, elephant trunk or vibrating spout;
S55, concrete placings: situations such as concreting should be according to the planform of concrete, discharge way and vibrating method, sequence Placement layer by layer;
S56, concrete curing: concrete placings are completed, and after concrete initial set, should carry out water seasoning, curing time is no less than 7 days;
S57, demoulding: concrete reach after some strength can form removal, to accelerate the turnover of template, striking time 10 It.
Embodiment 5
A kind of induction type roadbed transverse drainage construction method referring to FIG. 1-2, comprising the following steps:
S1, construction material and mechanical preparation: construction material includes 100 Water penetrative flexible pipe of Φ, Φ 110HDPE transverse drain, coagulation Soil;Construction machinery includes that 220 type road roller 1, electrorammer 1, red rock are built in SD16L bull-dozer 1, GR180 land leveller 1, Lip river Buddha's warrior attendant dumper 1, concrete tank 1, zl50 loader 1,1, excavator, 1, sprinkling truck, GPT3002LND whole station 1, instrument, NAL124 level 1 and 1 set of generating set;
S2, excavation of foundation pit: according to surveying setting-out and the position of central axis control stake, each central axis first is bundled in nylon wire It is firmly tensed in line traffic control stake and determines that control line is excavated on both sides according to underdrain cross dimensions, then use lime edge on former road surface Control line spills an excavation line, mini-excavator excavation pit is used according to excavation line, with small-sized ramming after excavation of foundation pit Machine tamps substrate, and measures substrate elevation;
S3, mortar flag stone: slabstone should be layered masonry, and slabstone forms a working lining with 3 layers of building block, and the horizontal joint of each working lining is answered Substantially levelling, each working lining perps mutually staggers, and must not penetrate through;
S4, pipe laying: Φ 110HDPE pipe is installed in the foundation pit of excavation, pipeline is put into bottom of foundation ditch center, is being dug The Φ 110HDPE pipe of square section setting, must protrude into roadbed gutter 5cm, exit is covered with galvanized wire, prevents silt from entering pipe Road;Embankment section transverse drain is connected to side slope, and exit portion stretches out 5cm, prevents from blocking, the Φ 110HDPE pipe range in embankment section Degree is the road 13.6m/, and the Φ 100PVC length of tube in excavation section is the road 12.3m/;
S5, concreting:
S51, formwork erection: after excavation of foundation pit acceptance(check), before concreting, template installation should be carried out by structures size;
S52, concrete stirring: will be used for the concrete that structures pour and be stirred, and concrete stirring is all made of mechanical stirring, must not Manually mixed and stirred;
S53, concrete transport: being transported to work point from mixing station with mixer truck, the transport of concrete horizontal near building site using trolley or Diesel dumper is transported, and concrete vertical transport is transported using crane;
S54, concrete drop: concrete, which drops, to be carried out by chute, elephant trunk or vibrating spout;
S55, concrete placings: situations such as concreting should be according to the planform of concrete, discharge way and vibrating method, sequence Placement layer by layer;
S56, concrete curing: concrete placings are completed, and after concrete initial set, should carry out water seasoning, curing time is no less than 7 days;
S57, demoulding: concrete reach after some strength can form removal, to accelerate the turnover of template, striking time is 8 days.
The preferred embodiment of the patent is described in detail above, but this patent is not limited to above-mentioned embodiment party Formula within the knowledge of one of ordinary skill in the art can also be under the premise of not departing from this patent objective It makes a variety of changes.

Claims (7)

1. a kind of induction type roadbed transverse drainage construction method, which comprises the following steps:
S1, construction material and mechanical preparation: construction material includes 100 Water penetrative flexible pipe of Φ, Φ 110HDPE transverse drain and coagulation Soil;Construction machinery includes that 220 type road roller 1, electrorammer 1, red rock are built in SD16L bull-dozer 1, GR180 land leveller 1, Lip river Buddha's warrior attendant dumper 1, concrete tank 1, zl50 loader 1,1, excavator, 1, sprinkling truck, GPT3002LND whole station 1, instrument, NAL124 level 1 and 1 set of generating set;
S2, excavation of foundation pit: according to surveying setting-out and the position of central axis control stake, each central axis first is bundled in nylon wire It is firmly tensed in line traffic control stake and determines that control line is excavated on both sides according to underdrain cross dimensions, then use lime edge on former road surface Control line spills an excavation line, mini-excavator excavation pit is used according to excavation line, with small-sized ramming after excavation of foundation pit Machine tamps substrate, and measures substrate elevation;
S3, mortar flag stone: slabstone should be layered masonry;
S4, pipe laying: Φ 110HDPE pipe is installed in the foundation pit of excavation, pipeline is put into bottom of foundation ditch center, is being dug The Φ 110HDPE pipe of square section setting, must protrude into roadbed gutter 5cm, exit is covered with galvanized wire, embankment section transverse drain It is connected to side slope, exit portion stretches out 5cm;
S5, concreting:
S51, formwork erection: after excavation of foundation pit acceptance(check), before concreting, template installation is carried out by structures size;
S52, concrete stirring: the concrete that structures pour will be used for and be stirred;
S53, concrete transport: work point is transported to from mixing station with mixer truck;
S54, concrete drop: concrete, which drops, to be carried out by chute, elephant trunk or vibrating spout;
S55, concrete placings: concreting is layered according to the planform of concrete, discharge way and vibrating method situation, sequence It pours;
S56, concrete curing: concrete placings are completed, and after concrete initial set, carry out water seasoning, curing time is no less than 7 days;
S57, demoulding: concrete reaches after some strength form removal again.
2. induction type roadbed transverse drainage construction method according to claim 1, which is characterized in that in S3, the slabstone A working lining is formed with layer 2-3 building block, the horizontal joint of each working lining is levelling.
3. induction type roadbed transverse drainage construction method according to claim 2, which is characterized in that in S3, each work Make layer perps to mutually stagger, must not penetrate through.
4. induction type roadbed transverse drainage construction method according to claim 1 to 3, which is characterized in that in S4, institute The Φ 110HDPE length of tube for stating embankment section is the road 13.6m/, and the Φ 100PVC length of tube in excavation section is the road 12.3m/.
5. induction type roadbed transverse drainage construction method according to claim 4, which is characterized in that in S52, the coagulation Soil stirring is all made of mechanical stirring, must not manually be mixed and stirred.
6. induction type roadbed transverse drainage construction method according to claim 5, which is characterized in that in S53, the building site Neighbouring concrete horizontal transport is transported using trolley or diesel dumper, and concrete vertical transport is transported using crane.
7. induction type roadbed transverse drainage construction method according to claim 6, which is characterized in that in S57, the demoulding Time is 8-10 days.
CN201810913466.9A 2018-08-13 2018-08-13 A kind of induction type roadbed transverse drainage construction method Pending CN108978502A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810913466.9A CN108978502A (en) 2018-08-13 2018-08-13 A kind of induction type roadbed transverse drainage construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810913466.9A CN108978502A (en) 2018-08-13 2018-08-13 A kind of induction type roadbed transverse drainage construction method

Publications (1)

Publication Number Publication Date
CN108978502A true CN108978502A (en) 2018-12-11

Family

ID=64552515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810913466.9A Pending CN108978502A (en) 2018-08-13 2018-08-13 A kind of induction type roadbed transverse drainage construction method

Country Status (1)

Country Link
CN (1) CN108978502A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256684A (en) * 2015-09-08 2016-01-20 河南万里路桥集团股份有限公司 Embankment transverse draining construction method
CN205134481U (en) * 2015-10-14 2016-04-06 山东省交通规划设计院 Highway superelevation excavation highway section hydrocone type drainage system
CN205775706U (en) * 2016-07-01 2016-12-07 海南大学 A kind of novel without closed median strip drainage system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256684A (en) * 2015-09-08 2016-01-20 河南万里路桥集团股份有限公司 Embankment transverse draining construction method
CN205134481U (en) * 2015-10-14 2016-04-06 山东省交通规划设计院 Highway superelevation excavation highway section hydrocone type drainage system
CN205775706U (en) * 2016-07-01 2016-12-07 海南大学 A kind of novel without closed median strip drainage system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余亮明68774083: "路面横向排水施工方案", 《百度文库》 *

Similar Documents

Publication Publication Date Title
CN103774514B (en) A kind of prefabricated tubular pile embankment structure and construction method thereof
CN101597888B (en) Construction method of municipal drainage culvert sinking trough
CN108103871A (en) A kind of construction method of the roadbed foam concrete fill placement technique of neighbouring existing Subway Facilities
CN113774917B (en) Safe construction method for earth and rockfill excavation and side slope supporting engineering
CN104153371A (en) Grouting-to-stop-water construction method of underwater rubble bed
CN114411756A (en) Construction method and construction device for water-rich sand layer subway station open excavation foundation pit without precipitation
CN109706952A (en) Large-scale well-sinking construction method
CN108457289A (en) A kind of open caisson construction method of complex condition
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN107700497A (en) A kind of building basement pattern foundation pit supporting structure and earth excavation construction method
CN203684022U (en) Prefabricated pipe pile embankment structure
CN208023600U (en) A kind of caisson structure suitable for complex environment
CN109056804B (en) Comprehensive pipe rack foundation pit supporting structure and implementation method thereof
CN207828994U (en) It is a kind of draining and recharge constructing structure
CN109653223A (en) River anti-floating weighting board construction method
CN108978502A (en) A kind of induction type roadbed transverse drainage construction method
CN108570979A (en) A kind of construction method for building antiseepage composite foundation on dolomite stratigraph
CN108316237A (en) Revetment barricade
CN111472359A (en) Method for replacing and filling peat soil soft foundation box culvert foundation
CN111851185A (en) Self-compacting cement soil widening roadbed and construction method
CN111395363A (en) Foundation trench supporting process for secondary branch pipe network project construction
CN218540713U (en) Face way little space foundation ditch supporting device
CN115012362B (en) Construction process of flood drainage canal of deep silt layer of intertidal zone
CN220746471U (en) Roadbed treatment structure for geological region of soft mud layer
CN210946357U (en) Horizontal double escape canal structure of motor vehicle way

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211

RJ01 Rejection of invention patent application after publication