CN108978396A - Construction site integrates simple temporary road and construction method - Google Patents

Construction site integrates simple temporary road and construction method Download PDF

Info

Publication number
CN108978396A
CN108978396A CN201810850231.XA CN201810850231A CN108978396A CN 108978396 A CN108978396 A CN 108978396A CN 201810850231 A CN201810850231 A CN 201810850231A CN 108978396 A CN108978396 A CN 108978396A
Authority
CN
China
Prior art keywords
road
rope hook
counterbore
construction
tail portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810850231.XA
Other languages
Chinese (zh)
Other versions
CN108978396B (en
Inventor
周芳
周曙东
陈家冬
尚学伟
周浩达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Foundation Engineering Co Ltd
Original Assignee
Jiangsu Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Foundation Engineering Co Ltd filed Critical Jiangsu Foundation Engineering Co Ltd
Priority to CN201810850231.XA priority Critical patent/CN108978396B/en
Publication of CN108978396A publication Critical patent/CN108978396A/en
Application granted granted Critical
Publication of CN108978396B publication Critical patent/CN108978396B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/08Temporary pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • E01C11/26Permanently installed heating or blowing devices ; Mounting thereof
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/08Temporary pavings
    • E01C9/083Temporary pavings made of metal, e.g. plates, network

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention discloses a kind of construction sites to integrate simple temporary road, belong to the realm of building construction, being intended to provide one kind can recycle, and it is quick for installation, the temporary road that can quickly come into operation, its key points of the technical solution are that including several rectangular substrates, it is characterised in that: wherein adjacent two sides are equipped with rope hook to the substrate, and in addition adjacent two sides are equipped with the grommet part cooperated with rope hook;It is equipped with the first counterbore for placing rope hook tail portion corresponding to the position of rope hook on the substrate, the elastic locking component for being mounted on rope hook in the first counterbore is equipped in the first counterbore;Corresponding to the second counterbore being equipped at the position of grommet part for placing grommet part tail portion, the interior mounting assembly being equipped with for being mounted on grommet part in the second counterbore of the second counterbore on the substrate.The invention discloses the construction methods that a kind of construction site integrates simple temporary road, belong to the realm of building construction, have it is quick for installation, the advantages of can quickly coming into operation.

Description

Construction site integrates simple temporary road and construction method
Technical field
The present invention relates to the realm of building construction, in particular to a kind of construction site integrates simple temporary road and construction party Method.
Background technique
The temporary road at building engineering construction scene is all the plain concrete or reinforcing bar using thickness in 120mm~200mm at present The cast-in-place mode of concrete is constructed, the disadvantage is that technique is more, needs to transport reinforcing bar, concrete material, supporting module, scene is needed to pour Build concrete, the series of processes such as light are received at scene, therefore it is more to put into labour, machinery, material;In addition to this, this cast-in-place to face Shi Daolu will carry out live maintenance after constructing at the scene, and on-site cutting temperature joint is also wanted after maintenance, to duration benefit and economic effect Should all have a certain impact --- cause the increase of cost larger;Moreover, site operation temporary road is not due to being to concentrate module Regularization production, causes the temporary road final product quality of the construction at scene not can guarantee, such as Uneven road, the quality such as road surface dusting Disadvantage;Finally, since temporary road is cast-in-place road surface, therefore can not have enough to meet the need after engineering, can only discard or abolish, and Need it is artificial, mechanical cleared up, this generates certain expense again, is waste and pollution to resource and environment.
Summary of the invention
The first object of the present invention is to provide a kind of construction site and integrates simple temporary road, and having can recycle, And it is quick for installation, the advantages of can quickly coming into operation.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of construction site integrates simple temporary road, including several rectangular substrates, the substrate wherein adjacent two sides Equipped with rope hook, in addition adjacent two sides are equipped with the grommet part cooperated with rope hook;
It is equipped with the first counterbore for placing rope hook tail portion corresponding to the position of rope hook on the substrate, is set in the first counterbore There is the elastic locking component for being mounted on rope hook in the first counterbore;
Corresponding to being equipped with the second counterbore for placing grommet part tail portion at the position of grommet part on the substrate, in the second counterbore Equipped with the mounting assembly for being mounted on grommet part in the second counterbore.
By using above-mentioned technical proposal, when installation, rope hook is mounted in the first counterbore by elastic locking component, Then grommet part is mounted in the second counterbore again by mounting assembly, passes through rope hook and grommet between two pieces of adjacent substrates Part links together.Not only installation and removal are convenient, but also can recycle.
Further, the first counterbore inner wall is carved with internal screw thread, and the springy locking member includes being arranged in the first counterbore Interior external screw thread cylinder;
In hook-shaped at the top of the rope hook, tail portion is in the shape of a rod, and rope hook tail portion is protruded into external screw thread cylinder, and in rope hook tail portion spiral shell It is connected to stop nut, rope hook tail portion is arranged with reset spring, and reset spring one end and stop nut contradict, the other end and outer spiral shell Line cylinder contradicts.
By using above-mentioned technical proposal, when installation, first rope hook tail portion is inserted into external screw thread cylinder, then in rope hook Tail portion covers upper reset spring, and is spirally connected stop nut in rope hook tail end, and finally external screw thread cylinder is inserted in the first counterbore.
Further, the second counterbore inner wall is carved with internal screw thread, and the grommet part includes ring body and rotates company with ring body The threaded rod connect, threaded rod are installed with rotating nuts towards ring body one end.
By using above-mentioned technical proposal, when installation, rope hook is first hooked into ring body, then screws rotation spiral shell using spanner Mother, so that threaded rod is screwed into the second counterbore.
Further, the substrate, which corresponds at the position of grommet part, is arranged to groove, groove for accommodate grommet part with The link position of rope hook.
By using above-mentioned technical proposal, when installation, the junction of grommet part and rope hook is located in groove, so that Adjacent two pieces of substrates can fit together completely, reduce gap.
The second object of the present invention is to provide the construction method that a kind of construction site integrates simple temporary road, has installation Fast, the advantages of can quickly coming into operation.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of construction site integrates the construction method of simple temporary road, including above-mentioned temporary road, it is characterised in that: specific Steps are as follows:
S1: using total station to temporary construction road construction unwrapping wire;
S2: first being flattened with road surface of the excavator to construction road, is then carried out again with road surface of the road roller to construction road Compacting;
S3: stabilized with inorganic binder base being paved on the road surface of construction road, is then compacted with road roller, is then air-dried;
S4: substrate block-by-block is mounted on construction road, and adjacent substrate is attached by rope hook and grommet part;
S5: in the both sides laying road dental calculus of temporary road.
By using above-mentioned technical proposal, first the road surface of construction road is flattened, then substrate block-by-block is mounted on again and is applied It on work road, can guarantee the flatness of temporary road in this way, and after use, can be recycled use.The most way of escape Dental calculus can be displaced with restricting substrate, keep the stability of substrate.
Further, stabilized with inorganic binder layer paves in S3, and specific step is as follows for step:
S31: pave on construction road road surface earth material first, when the water content in earth material is less than 1%, sprinkles water in earth material bored Material, then pave on earth material cement, is flattened and is compacted finally by road roller.
By using above-mentioned technical proposal, regard earth material and cement mixing as base, by road roller by road surface flatten with Compacting can guarantee the flatness on road surface.
Further, in S4, it is as follows that substrate connects specific installation steps:
S41: rope hook tail portion is inserted into external screw thread cylinder, covers upper reset spring in rope hook tail portion, and in rope hook tail portion spiral shell Stop nut is connect, then external thread sleeve is screwed into the first counterbore;
S42: rope hook and grommet part are hooked together, then screw rotating nuts using spanner threaded rod is screwed into second and sink In hole.
By using above-mentioned technical proposal, so that temporary road is convenient for disassembly and assembly, facilitates recycling and utilize again.
Further, specific steps further include S6:
In temporary road both sides, a cleaning sprayer is installed at the position of 5m, spray head is using orientation spray head.
By using above-mentioned technical proposal, since temporary road is arranged in construction site, so passing through setting cleaning spray Head cleans the road surface of temporary road, it is ensured that the cleaning on temporary road road surface.
In conclusion the invention has the following advantages:
1. having abandoned the mode of previous cast in situs by the setting of substrate, it may be recovered and utilize;
2. passing through the setting of rope hook and grommet part, facilitates substrate to be installed together, reduce the gap between two pieces of substrates;
3. by the setting of cleaning sprayer, when more dust is assembled on the road surface of temporary road, can by cleaning sprayer into Row cleaning.
Detailed description of the invention
Fig. 1 is the schematic diagram of temporary road in embodiment;
Fig. 2 is in embodiment for embodying the schematic diagram of substrate;
Fig. 3 is in embodiment for embodying the schematic diagram of rope hook and flexible connector;
Fig. 4 is in embodiment for embodying the schematic diagram of grommet part;
Fig. 5 is in embodiment for embodying the schematic diagram of connecting plate;
Fig. 6 is in embodiment for embodying the schematic diagram for the temporary road entirety that construction is completed.
In figure, 1, temporary road;11, substrate;12, the first counterbore;13, the second counterbore;14, groove;15, threaded hole;16, Connecting plate;17, round rectangle slot;2, rope hook;3, grommet part;31, ring body;32, threaded rod;33, rotating nuts;4, snap lock Determine part;41, external screw thread cylinder;42, reset spring;43, stop nut;5, road dental calculus;6, cleaning sprayer.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Wherein identical components are presented with like reference characters.It should be noted that word used in the following description Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" refers respectively to the direction towards or away from geometric center of specific component.
Embodiment: a kind of construction site integrates simple temporary road, as illustrated in fig. 1 and 2, if temporary road 1 is by stem substrate 11 are spliced, and substrate 11 is made of steel plate.11 therein two sides of substrate are equipped with several rope hooks 2, and in addition adjacent two Side is equipped with the grommet part 3 cooperate with rope hook 2, and two pieces of adjacent substrates 11 pass through grommet part 3 and rope hook 2 is connected It connects.
As shown in figure 3, tail portion is in the shape of a rod in hook-shaped at the top of rope hook 2.Correspond at the position of rope hook 2 on substrate 11 Equipped with the first counterbore 12 for being put into 2 tail portion of rope hook, removably springy locking member 4, rope hook are equipped in the first counterbore 12 2 tail portion of part is packed into the first counterbore 12 by springy locking member 4, and rope hook 2 is so removably mounted on the first counterbore 12 It is interior, it is easy for installation.
As shown in figure 3, being carved with internal screw thread in the first counterbore 12, springy locking member 4 includes external screw thread cylinder 41, external screw thread cylinder 41 Top is arranged to disc-shape, and the sliding of 2 tail portion of rope hook is threaded through in external screw thread cylinder 41, and rope hook 2 is pierced by external screw thread cylinder 41 Part is arranged with reset spring 42, and the tail end of rope hook 2 is carved with screw thread, and is arranged with stop nut 43 in its tail end, resets bullet 42 one end of spring contacts stop nut 43, and the other end contacts external thread sleeve.Then external screw thread cylinder 41 is screwed into the first counterbore 12 again It is interior.
As shown in figure 4,13 inner wall of the second counterbore is carved with internal screw thread, grommet part 3 includes rounded ring body 31 and rounded ring body 31 The threaded rod 32 of rotation connection, threaded rod 32 are installed with rotating nuts 33 towards 31 one end of ring body.When installation, by rope hook 2 with Grommet part 3 hooks together, then screws rotating nuts 33 using spanner, threaded rod 32 is screwed into the second counterbore 13.Due to The elastic force of reset spring 42, so that two pieces of substrates 11 are close to each other.Further, since in actual use, engineering truck carries Weight is larger, and the scalability of reset spring 42 makes temporary road 1 have certain ductility, and road surface is avoided to be pressurized by larger Crust deformation.
As shown in Figures 2 and 4, substrate 11 is corresponding to groove 14 is arranged at the position of grommet part 3, when grommet part 3 and rope hook The hook of part 2 is contained in groove 14 afterwards together, to avoid that there are gaps with rope hook 2 due to grommet part 3, so that two pieces of phases Adjacent substrate 11 can be closely adhered to together.
As shown in figure 5, in addition, four edges in substrate 11 are also provided with threaded hole 15, the screw thread of adjacent substrate 11 It is equipped with connecting plate 16 between hole 15, round rectangle slot 17 is equipped in connecting plate 16, and is equipped with fixing bolt and penetrates round rectangle slot 17 and threaded hole 15, substrate 11 is further connected, is 16 He of connecting plate when the connection of grommet part 3 and rope hook 2 goes wrong Fixing bolt plays the role of guarantee.
A kind of construction site integrates the construction method of simple temporary road 1, including above-mentioned temporary road 1, such as Fig. 1~6 It is shown, the specific steps are as follows:
S1: using total station to temporary construction road construction unwrapping wire.
S2: first flattening construction road road surface with excavator, removes the large rock mass on construction road road surface, then makes Construction road surface is compacted with road roller, guarantees surface evenness.
S3: stabilized with inorganic binder base is paved on the road surface of construction road, then with road roller by pavement compaction, And it air-dries.
Wherein, specific steps further include S31 in S3: first in the pavement spread earth material of construction road, when in earth material When water content is less than 1%, sprinkle water in earth material 6 hours of shelving, then pave on earth material cement and is stirred with earth material, And pass through road roller for pavement compaction.
S4: 11 block-by-block of substrate is mounted on construction road, and adjacent substrate 11 is carried out by rope hook 2 and grommet part 3 Connection.
Wherein, specific step is as follows in S4:
S41: 2 tail portion of rope hook is inserted into external screw thread cylinder 41, covers upper reset spring 42 in 2 tail portion of rope hook, and in rope hook 2 Tail portion is spirally connected stop nut 43, and then external thread sleeve is screwed into the first counterbore 12;
S42: rope hook 2 and grommet part 3 are hooked together, then screw rotating nuts using spanner and threaded rod 32 is screwed into the In two counterbores 13.
S5: in the both sides laying road dental calculus 5 of temporary road 1.Road dental calculus 5 can limit the displacement of temporary road 1, keep interim The stability of road 1.
S6: in 1 both sides of temporary road, a cleaning sprayer 6 is installed at the position of 5m, spray head is using orientation spray head. Since temporary road 1 is arranged in construction site, so being carried out to the road surface of temporary road 1 clear by setting cleaning sprayer 6 It washes, it is ensured that the cleaning on 1 road surface of temporary road.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (8)

1. a kind of construction site integrates simple temporary road, including several rectangular substrates (11), it is characterised in that: the substrate (11) wherein adjacent two sides are equipped with rope hook (2), and in addition adjacent two sides are equipped with the grommet cooperated with rope hook (2) Part (3);
Position on the substrate (11) corresponding to rope hook (2) is equipped with the first counterbore for placing rope hook (2) tail portion (12), the elastic locking component for being mounted on rope hook (2) in the first counterbore (12) is equipped in the first counterbore (12);
Corresponding to the second counterbore being equipped at the position of grommet part (3) for placing grommet part (3) tail portion on the substrate (11) (13), the mounting assembly for being mounted on grommet part (3) in the second counterbore (13) is equipped in the second counterbore (13).
2. a kind of construction site according to claim 1 integrates simple temporary road, it is characterised in that: first counterbore (12) inner wall is carved with internal screw thread, and the springy locking member (4) includes the external screw thread cylinder (41) being arranged in the first counterbore (12);
In hook-shaped at the top of the rope hook (2), tail portion is in the shape of a rod, and rope hook (2) tail portion is protruded into external screw thread cylinder (41), and in rope Hook (2) tail portion is bolted with stop nut (43), and rope hook (2) tail portion is arranged with reset spring (42), reset spring (42) one End is contradicted with stop nut (43), and the other end and external screw thread cylinder (41) contradict.
3. a kind of construction site according to claim 2 integrates simple temporary road, it is characterised in that: second counterbore (13) inner wall is carved with internal screw thread, and the grommet part (3) includes ring body (31) and the threaded rod (32) with ring body (31) rotation connection, Threaded rod (32) is installed with rotating nuts (33) towards ring body (31) one end.
4. a kind of construction site according to claim 3 integrates simple temporary road, it is characterised in that: the substrate (11) It is arranged at position corresponding to grommet part (3) groove (14), groove (14) is used to accommodate grommet part (3) and rope hook (2) Link position.
5. a kind of construction site integrates the construction method of simple temporary road, including temporary road as claimed in claim 4 (1), It is characterized by: specific step is as follows:
S1: using total station to temporary construction road construction unwrapping wire;
S2: first being flattened with road surface of the excavator to construction road, is then carried out again with road surface of the road roller to construction road Compacting;
S3: stabilized with inorganic binder base being paved on the road surface of construction road, is then compacted with road roller, is then air-dried;
S4: substrate (11) block-by-block is mounted on construction road, and adjacent substrate (11) passes through rope hook (2) and grommet part (3) It is attached;
S5: in the both sides laying road dental calculus (5) of temporary road (1).
6. the construction method that a kind of construction site according to claim 5 integrates simple temporary road, it is characterised in that: Stabilized with inorganic binder layer paves in S3, and specific step is as follows for step:
S31: pave on construction road road surface earth material first, when the water content in earth material is less than 1%, sprinkles water in earth material bored Material, then pave on earth material cement, is flattened and is compacted finally by road roller.
7. the construction method that a kind of construction site according to claim 5 integrates simple temporary road, it is characterised in that: In S4, it is as follows that substrate (11) connects specific installation steps:
S41: by rope hook (2) tail portion insertion external screw thread cylinder (41), covering upper reset spring (42) in rope hook (2) tail portion, and It is spirally connected stop nut (43) in rope hook (2) tail portion, then external thread sleeve is screwed into the first counterbore (12);
S42: rope hook (2) and grommet part (3) are hooked together, then screw rotating nuts (33) for threaded rod using spanner (32) it is screwed into the second counterbore (13).
8. the construction method that a kind of construction site according to claim 5 integrates simple temporary road, it is characterised in that: tool Body step further includes S6:
In temporary road (1) both sides, a cleaning sprayer (6) is installed at the position of 5m, spray head is using orientation spray head.
CN201810850231.XA 2018-07-28 2018-07-28 Building site integrated simple temporary road and construction method Active CN108978396B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810850231.XA CN108978396B (en) 2018-07-28 2018-07-28 Building site integrated simple temporary road and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810850231.XA CN108978396B (en) 2018-07-28 2018-07-28 Building site integrated simple temporary road and construction method

Publications (2)

Publication Number Publication Date
CN108978396A true CN108978396A (en) 2018-12-11
CN108978396B CN108978396B (en) 2021-06-01

Family

ID=64552059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810850231.XA Active CN108978396B (en) 2018-07-28 2018-07-28 Building site integrated simple temporary road and construction method

Country Status (1)

Country Link
CN (1) CN108978396B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005619A (en) * 2019-08-30 2020-04-14 中国二十冶集团有限公司 Enclosing device for temporary paving road and using method thereof
CN111605368A (en) * 2020-05-25 2020-09-01 广东电网有限责任公司 Escaping device
CN112376366A (en) * 2020-12-23 2021-02-19 周云根 Pavement hardening device for building construction site and construction method
CN112523027A (en) * 2020-12-23 2021-03-19 周云根 Construction dirt road surface hardening device
CN112962386A (en) * 2021-02-10 2021-06-15 索新科技(北京)有限公司 ADG steel floor unit and laying method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07317009A (en) * 1994-05-24 1995-12-05 Fujita Corp Pavement method of steep slope road and pavement mat
CN103194947A (en) * 2013-04-25 2013-07-10 中建四局第六建筑工程有限公司 Recyclable temporary road subgrade block
CN203653063U (en) * 2013-11-06 2014-06-18 无锡市康晖机械制造有限公司 Lifting spring
CN205576662U (en) * 2016-04-05 2016-09-14 中交第二航务工程局有限公司 Interlocking -type concrete road base plate
CN205741809U (en) * 2016-03-30 2016-11-30 徐建华 The permeable road structure of a kind of footpath and water-permeable brick
CN108277716A (en) * 2018-03-23 2018-07-13 中交雄安投资有限公司 A kind of recyclable assembly concrete Prefabricated road and its construction technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07317009A (en) * 1994-05-24 1995-12-05 Fujita Corp Pavement method of steep slope road and pavement mat
CN103194947A (en) * 2013-04-25 2013-07-10 中建四局第六建筑工程有限公司 Recyclable temporary road subgrade block
CN203653063U (en) * 2013-11-06 2014-06-18 无锡市康晖机械制造有限公司 Lifting spring
CN205741809U (en) * 2016-03-30 2016-11-30 徐建华 The permeable road structure of a kind of footpath and water-permeable brick
CN205576662U (en) * 2016-04-05 2016-09-14 中交第二航务工程局有限公司 Interlocking -type concrete road base plate
CN108277716A (en) * 2018-03-23 2018-07-13 中交雄安投资有限公司 A kind of recyclable assembly concrete Prefabricated road and its construction technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王志明: "可周转装配式重载型钢板临时施工道路在项目文明施工中的应用", 《企业科技与发展》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005619A (en) * 2019-08-30 2020-04-14 中国二十冶集团有限公司 Enclosing device for temporary paving road and using method thereof
CN111605368A (en) * 2020-05-25 2020-09-01 广东电网有限责任公司 Escaping device
CN112376366A (en) * 2020-12-23 2021-02-19 周云根 Pavement hardening device for building construction site and construction method
CN112523027A (en) * 2020-12-23 2021-03-19 周云根 Construction dirt road surface hardening device
CN112962386A (en) * 2021-02-10 2021-06-15 索新科技(北京)有限公司 ADG steel floor unit and laying method thereof

Also Published As

Publication number Publication date
CN108978396B (en) 2021-06-01

Similar Documents

Publication Publication Date Title
CN108978396A (en) Construction site integrates simple temporary road and construction method
RU2375523C1 (en) Formwork for constructing reinforcing covering of construction made from corrugated steel plates
KR100877328B1 (en) Construction method for street lamp and reclaiming box therefor
KR102061224B1 (en) Sectionally devided precast box culverts and the construction method thereof
JP2015224478A (en) Abutted-type expansion/contraction device for road bridge, and construction and repair methods therefor
CN209144600U (en) A kind of Prefabricated road plate and temporary road
CN104652364A (en) Construction method of vertical water-sealing structure for water conservancy project
CN104018425A (en) Quickly replaceable bridge expansion joint device and mounting method thereof
CN103711056A (en) Steel tool type temporary construction road and construction method thereof
CN105463986B (en) Construction method of bridge expansion joint
US6898910B2 (en) Precast composite header joint system and a method for forming and installing the same
CN110747907A (en) Multifunctional well cover for pavement paving construction and construction method
JP2018009430A (en) Device and method for constructing retaining wall in disaster-relief work
CN111851570A (en) Reinforced concrete retaining wall mold and mounting method thereof
CN113445728B (en) Concrete pouring die for civil engineering construction
JP3439436B2 (en) Raising method of concrete frame
CN107034759A (en) Steel plate road surface structure and construction method
CN106192656B (en) A kind of stagger arrangement link floor file block and its production method
CN105370035A (en) Manufacturing method of water-bag-type concrete-project deformation-joint water-stopping cavity film
CN114635712A (en) Construction process for double-line large-section split lining trolley in underground excavation section of subway
CN209741907U (en) Utility tunnel sump pit steel grating mounting structure
CN205159976U (en) Scalable terminal box
CN107856820B (en) Ship pier distribution method
CN212054094U (en) A protection machanism for foundation ditch is all around
CN215829578U (en) Horizontal steel support of removable multi-functional escape canal of water delivery main canal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant