CN108978396A - Construction site integrates simple temporary road and construction method - Google Patents
Construction site integrates simple temporary road and construction method Download PDFInfo
- Publication number
- CN108978396A CN108978396A CN201810850231.XA CN201810850231A CN108978396A CN 108978396 A CN108978396 A CN 108978396A CN 201810850231 A CN201810850231 A CN 201810850231A CN 108978396 A CN108978396 A CN 108978396A
- Authority
- CN
- China
- Prior art keywords
- road
- rope hook
- counterbore
- construction
- tail portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/222—Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
- E01C11/26—Permanently installed heating or blowing devices ; Mounting thereof
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
- E01C9/083—Temporary pavings made of metal, e.g. plates, network
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
The invention discloses a kind of construction sites to integrate simple temporary road, belong to the realm of building construction, being intended to provide one kind can recycle, and it is quick for installation, the temporary road that can quickly come into operation, its key points of the technical solution are that including several rectangular substrates, it is characterised in that: wherein adjacent two sides are equipped with rope hook to the substrate, and in addition adjacent two sides are equipped with the grommet part cooperated with rope hook;It is equipped with the first counterbore for placing rope hook tail portion corresponding to the position of rope hook on the substrate, the elastic locking component for being mounted on rope hook in the first counterbore is equipped in the first counterbore;Corresponding to the second counterbore being equipped at the position of grommet part for placing grommet part tail portion, the interior mounting assembly being equipped with for being mounted on grommet part in the second counterbore of the second counterbore on the substrate.The invention discloses the construction methods that a kind of construction site integrates simple temporary road, belong to the realm of building construction, have it is quick for installation, the advantages of can quickly coming into operation.
Description
Technical field
The present invention relates to the realm of building construction, in particular to a kind of construction site integrates simple temporary road and construction party
Method.
Background technique
The temporary road at building engineering construction scene is all the plain concrete or reinforcing bar using thickness in 120mm~200mm at present
The cast-in-place mode of concrete is constructed, the disadvantage is that technique is more, needs to transport reinforcing bar, concrete material, supporting module, scene is needed to pour
Build concrete, the series of processes such as light are received at scene, therefore it is more to put into labour, machinery, material;In addition to this, this cast-in-place to face
Shi Daolu will carry out live maintenance after constructing at the scene, and on-site cutting temperature joint is also wanted after maintenance, to duration benefit and economic effect
Should all have a certain impact --- cause the increase of cost larger;Moreover, site operation temporary road is not due to being to concentrate module
Regularization production, causes the temporary road final product quality of the construction at scene not can guarantee, such as Uneven road, the quality such as road surface dusting
Disadvantage;Finally, since temporary road is cast-in-place road surface, therefore can not have enough to meet the need after engineering, can only discard or abolish, and
Need it is artificial, mechanical cleared up, this generates certain expense again, is waste and pollution to resource and environment.
Summary of the invention
The first object of the present invention is to provide a kind of construction site and integrates simple temporary road, and having can recycle,
And it is quick for installation, the advantages of can quickly coming into operation.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of construction site integrates simple temporary road, including several rectangular substrates, the substrate wherein adjacent two sides
Equipped with rope hook, in addition adjacent two sides are equipped with the grommet part cooperated with rope hook;
It is equipped with the first counterbore for placing rope hook tail portion corresponding to the position of rope hook on the substrate, is set in the first counterbore
There is the elastic locking component for being mounted on rope hook in the first counterbore;
Corresponding to being equipped with the second counterbore for placing grommet part tail portion at the position of grommet part on the substrate, in the second counterbore
Equipped with the mounting assembly for being mounted on grommet part in the second counterbore.
By using above-mentioned technical proposal, when installation, rope hook is mounted in the first counterbore by elastic locking component,
Then grommet part is mounted in the second counterbore again by mounting assembly, passes through rope hook and grommet between two pieces of adjacent substrates
Part links together.Not only installation and removal are convenient, but also can recycle.
Further, the first counterbore inner wall is carved with internal screw thread, and the springy locking member includes being arranged in the first counterbore
Interior external screw thread cylinder;
In hook-shaped at the top of the rope hook, tail portion is in the shape of a rod, and rope hook tail portion is protruded into external screw thread cylinder, and in rope hook tail portion spiral shell
It is connected to stop nut, rope hook tail portion is arranged with reset spring, and reset spring one end and stop nut contradict, the other end and outer spiral shell
Line cylinder contradicts.
By using above-mentioned technical proposal, when installation, first rope hook tail portion is inserted into external screw thread cylinder, then in rope hook
Tail portion covers upper reset spring, and is spirally connected stop nut in rope hook tail end, and finally external screw thread cylinder is inserted in the first counterbore.
Further, the second counterbore inner wall is carved with internal screw thread, and the grommet part includes ring body and rotates company with ring body
The threaded rod connect, threaded rod are installed with rotating nuts towards ring body one end.
By using above-mentioned technical proposal, when installation, rope hook is first hooked into ring body, then screws rotation spiral shell using spanner
Mother, so that threaded rod is screwed into the second counterbore.
Further, the substrate, which corresponds at the position of grommet part, is arranged to groove, groove for accommodate grommet part with
The link position of rope hook.
By using above-mentioned technical proposal, when installation, the junction of grommet part and rope hook is located in groove, so that
Adjacent two pieces of substrates can fit together completely, reduce gap.
The second object of the present invention is to provide the construction method that a kind of construction site integrates simple temporary road, has installation
Fast, the advantages of can quickly coming into operation.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of construction site integrates the construction method of simple temporary road, including above-mentioned temporary road, it is characterised in that: specific
Steps are as follows:
S1: using total station to temporary construction road construction unwrapping wire;
S2: first being flattened with road surface of the excavator to construction road, is then carried out again with road surface of the road roller to construction road
Compacting;
S3: stabilized with inorganic binder base being paved on the road surface of construction road, is then compacted with road roller, is then air-dried;
S4: substrate block-by-block is mounted on construction road, and adjacent substrate is attached by rope hook and grommet part;
S5: in the both sides laying road dental calculus of temporary road.
By using above-mentioned technical proposal, first the road surface of construction road is flattened, then substrate block-by-block is mounted on again and is applied
It on work road, can guarantee the flatness of temporary road in this way, and after use, can be recycled use.The most way of escape
Dental calculus can be displaced with restricting substrate, keep the stability of substrate.
Further, stabilized with inorganic binder layer paves in S3, and specific step is as follows for step:
S31: pave on construction road road surface earth material first, when the water content in earth material is less than 1%, sprinkles water in earth material bored
Material, then pave on earth material cement, is flattened and is compacted finally by road roller.
By using above-mentioned technical proposal, regard earth material and cement mixing as base, by road roller by road surface flatten with
Compacting can guarantee the flatness on road surface.
Further, in S4, it is as follows that substrate connects specific installation steps:
S41: rope hook tail portion is inserted into external screw thread cylinder, covers upper reset spring in rope hook tail portion, and in rope hook tail portion spiral shell
Stop nut is connect, then external thread sleeve is screwed into the first counterbore;
S42: rope hook and grommet part are hooked together, then screw rotating nuts using spanner threaded rod is screwed into second and sink
In hole.
By using above-mentioned technical proposal, so that temporary road is convenient for disassembly and assembly, facilitates recycling and utilize again.
Further, specific steps further include S6:
In temporary road both sides, a cleaning sprayer is installed at the position of 5m, spray head is using orientation spray head.
By using above-mentioned technical proposal, since temporary road is arranged in construction site, so passing through setting cleaning spray
Head cleans the road surface of temporary road, it is ensured that the cleaning on temporary road road surface.
In conclusion the invention has the following advantages:
1. having abandoned the mode of previous cast in situs by the setting of substrate, it may be recovered and utilize;
2. passing through the setting of rope hook and grommet part, facilitates substrate to be installed together, reduce the gap between two pieces of substrates;
3. by the setting of cleaning sprayer, when more dust is assembled on the road surface of temporary road, can by cleaning sprayer into
Row cleaning.
Detailed description of the invention
Fig. 1 is the schematic diagram of temporary road in embodiment;
Fig. 2 is in embodiment for embodying the schematic diagram of substrate;
Fig. 3 is in embodiment for embodying the schematic diagram of rope hook and flexible connector;
Fig. 4 is in embodiment for embodying the schematic diagram of grommet part;
Fig. 5 is in embodiment for embodying the schematic diagram of connecting plate;
Fig. 6 is in embodiment for embodying the schematic diagram for the temporary road entirety that construction is completed.
In figure, 1, temporary road;11, substrate;12, the first counterbore;13, the second counterbore;14, groove;15, threaded hole;16,
Connecting plate;17, round rectangle slot;2, rope hook;3, grommet part;31, ring body;32, threaded rod;33, rotating nuts;4, snap lock
Determine part;41, external screw thread cylinder;42, reset spring;43, stop nut;5, road dental calculus;6, cleaning sprayer.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Wherein identical components are presented with like reference characters.It should be noted that word used in the following description
Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and
"outside" refers respectively to the direction towards or away from geometric center of specific component.
Embodiment: a kind of construction site integrates simple temporary road, as illustrated in fig. 1 and 2, if temporary road 1 is by stem substrate
11 are spliced, and substrate 11 is made of steel plate.11 therein two sides of substrate are equipped with several rope hooks 2, and in addition adjacent two
Side is equipped with the grommet part 3 cooperate with rope hook 2, and two pieces of adjacent substrates 11 pass through grommet part 3 and rope hook 2 is connected
It connects.
As shown in figure 3, tail portion is in the shape of a rod in hook-shaped at the top of rope hook 2.Correspond at the position of rope hook 2 on substrate 11
Equipped with the first counterbore 12 for being put into 2 tail portion of rope hook, removably springy locking member 4, rope hook are equipped in the first counterbore 12
2 tail portion of part is packed into the first counterbore 12 by springy locking member 4, and rope hook 2 is so removably mounted on the first counterbore 12
It is interior, it is easy for installation.
As shown in figure 3, being carved with internal screw thread in the first counterbore 12, springy locking member 4 includes external screw thread cylinder 41, external screw thread cylinder 41
Top is arranged to disc-shape, and the sliding of 2 tail portion of rope hook is threaded through in external screw thread cylinder 41, and rope hook 2 is pierced by external screw thread cylinder 41
Part is arranged with reset spring 42, and the tail end of rope hook 2 is carved with screw thread, and is arranged with stop nut 43 in its tail end, resets bullet
42 one end of spring contacts stop nut 43, and the other end contacts external thread sleeve.Then external screw thread cylinder 41 is screwed into the first counterbore 12 again
It is interior.
As shown in figure 4,13 inner wall of the second counterbore is carved with internal screw thread, grommet part 3 includes rounded ring body 31 and rounded ring body 31
The threaded rod 32 of rotation connection, threaded rod 32 are installed with rotating nuts 33 towards 31 one end of ring body.When installation, by rope hook 2 with
Grommet part 3 hooks together, then screws rotating nuts 33 using spanner, threaded rod 32 is screwed into the second counterbore 13.Due to
The elastic force of reset spring 42, so that two pieces of substrates 11 are close to each other.Further, since in actual use, engineering truck carries
Weight is larger, and the scalability of reset spring 42 makes temporary road 1 have certain ductility, and road surface is avoided to be pressurized by larger
Crust deformation.
As shown in Figures 2 and 4, substrate 11 is corresponding to groove 14 is arranged at the position of grommet part 3, when grommet part 3 and rope hook
The hook of part 2 is contained in groove 14 afterwards together, to avoid that there are gaps with rope hook 2 due to grommet part 3, so that two pieces of phases
Adjacent substrate 11 can be closely adhered to together.
As shown in figure 5, in addition, four edges in substrate 11 are also provided with threaded hole 15, the screw thread of adjacent substrate 11
It is equipped with connecting plate 16 between hole 15, round rectangle slot 17 is equipped in connecting plate 16, and is equipped with fixing bolt and penetrates round rectangle slot
17 and threaded hole 15, substrate 11 is further connected, is 16 He of connecting plate when the connection of grommet part 3 and rope hook 2 goes wrong
Fixing bolt plays the role of guarantee.
A kind of construction site integrates the construction method of simple temporary road 1, including above-mentioned temporary road 1, such as Fig. 1~6
It is shown, the specific steps are as follows:
S1: using total station to temporary construction road construction unwrapping wire.
S2: first flattening construction road road surface with excavator, removes the large rock mass on construction road road surface, then makes
Construction road surface is compacted with road roller, guarantees surface evenness.
S3: stabilized with inorganic binder base is paved on the road surface of construction road, then with road roller by pavement compaction,
And it air-dries.
Wherein, specific steps further include S31 in S3: first in the pavement spread earth material of construction road, when in earth material
When water content is less than 1%, sprinkle water in earth material 6 hours of shelving, then pave on earth material cement and is stirred with earth material,
And pass through road roller for pavement compaction.
S4: 11 block-by-block of substrate is mounted on construction road, and adjacent substrate 11 is carried out by rope hook 2 and grommet part 3
Connection.
Wherein, specific step is as follows in S4:
S41: 2 tail portion of rope hook is inserted into external screw thread cylinder 41, covers upper reset spring 42 in 2 tail portion of rope hook, and in rope hook 2
Tail portion is spirally connected stop nut 43, and then external thread sleeve is screwed into the first counterbore 12;
S42: rope hook 2 and grommet part 3 are hooked together, then screw rotating nuts using spanner and threaded rod 32 is screwed into the
In two counterbores 13.
S5: in the both sides laying road dental calculus 5 of temporary road 1.Road dental calculus 5 can limit the displacement of temporary road 1, keep interim
The stability of road 1.
S6: in 1 both sides of temporary road, a cleaning sprayer 6 is installed at the position of 5m, spray head is using orientation spray head.
Since temporary road 1 is arranged in construction site, so being carried out to the road surface of temporary road 1 clear by setting cleaning sprayer 6
It washes, it is ensured that the cleaning on 1 road surface of temporary road.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (8)
1. a kind of construction site integrates simple temporary road, including several rectangular substrates (11), it is characterised in that: the substrate
(11) wherein adjacent two sides are equipped with rope hook (2), and in addition adjacent two sides are equipped with the grommet cooperated with rope hook (2)
Part (3);
Position on the substrate (11) corresponding to rope hook (2) is equipped with the first counterbore for placing rope hook (2) tail portion
(12), the elastic locking component for being mounted on rope hook (2) in the first counterbore (12) is equipped in the first counterbore (12);
Corresponding to the second counterbore being equipped at the position of grommet part (3) for placing grommet part (3) tail portion on the substrate (11)
(13), the mounting assembly for being mounted on grommet part (3) in the second counterbore (13) is equipped in the second counterbore (13).
2. a kind of construction site according to claim 1 integrates simple temporary road, it is characterised in that: first counterbore
(12) inner wall is carved with internal screw thread, and the springy locking member (4) includes the external screw thread cylinder (41) being arranged in the first counterbore (12);
In hook-shaped at the top of the rope hook (2), tail portion is in the shape of a rod, and rope hook (2) tail portion is protruded into external screw thread cylinder (41), and in rope
Hook (2) tail portion is bolted with stop nut (43), and rope hook (2) tail portion is arranged with reset spring (42), reset spring (42) one
End is contradicted with stop nut (43), and the other end and external screw thread cylinder (41) contradict.
3. a kind of construction site according to claim 2 integrates simple temporary road, it is characterised in that: second counterbore
(13) inner wall is carved with internal screw thread, and the grommet part (3) includes ring body (31) and the threaded rod (32) with ring body (31) rotation connection,
Threaded rod (32) is installed with rotating nuts (33) towards ring body (31) one end.
4. a kind of construction site according to claim 3 integrates simple temporary road, it is characterised in that: the substrate (11)
It is arranged at position corresponding to grommet part (3) groove (14), groove (14) is used to accommodate grommet part (3) and rope hook (2)
Link position.
5. a kind of construction site integrates the construction method of simple temporary road, including temporary road as claimed in claim 4 (1),
It is characterized by: specific step is as follows:
S1: using total station to temporary construction road construction unwrapping wire;
S2: first being flattened with road surface of the excavator to construction road, is then carried out again with road surface of the road roller to construction road
Compacting;
S3: stabilized with inorganic binder base being paved on the road surface of construction road, is then compacted with road roller, is then air-dried;
S4: substrate (11) block-by-block is mounted on construction road, and adjacent substrate (11) passes through rope hook (2) and grommet part (3)
It is attached;
S5: in the both sides laying road dental calculus (5) of temporary road (1).
6. the construction method that a kind of construction site according to claim 5 integrates simple temporary road, it is characterised in that:
Stabilized with inorganic binder layer paves in S3, and specific step is as follows for step:
S31: pave on construction road road surface earth material first, when the water content in earth material is less than 1%, sprinkles water in earth material bored
Material, then pave on earth material cement, is flattened and is compacted finally by road roller.
7. the construction method that a kind of construction site according to claim 5 integrates simple temporary road, it is characterised in that:
In S4, it is as follows that substrate (11) connects specific installation steps:
S41: by rope hook (2) tail portion insertion external screw thread cylinder (41), covering upper reset spring (42) in rope hook (2) tail portion, and
It is spirally connected stop nut (43) in rope hook (2) tail portion, then external thread sleeve is screwed into the first counterbore (12);
S42: rope hook (2) and grommet part (3) are hooked together, then screw rotating nuts (33) for threaded rod using spanner
(32) it is screwed into the second counterbore (13).
8. the construction method that a kind of construction site according to claim 5 integrates simple temporary road, it is characterised in that: tool
Body step further includes S6:
In temporary road (1) both sides, a cleaning sprayer (6) is installed at the position of 5m, spray head is using orientation spray head.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810850231.XA CN108978396B (en) | 2018-07-28 | 2018-07-28 | Building site integrated simple temporary road and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810850231.XA CN108978396B (en) | 2018-07-28 | 2018-07-28 | Building site integrated simple temporary road and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108978396A true CN108978396A (en) | 2018-12-11 |
CN108978396B CN108978396B (en) | 2021-06-01 |
Family
ID=64552059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810850231.XA Active CN108978396B (en) | 2018-07-28 | 2018-07-28 | Building site integrated simple temporary road and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978396B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111005619A (en) * | 2019-08-30 | 2020-04-14 | 中国二十冶集团有限公司 | Enclosing device for temporary paving road and using method thereof |
CN111605368A (en) * | 2020-05-25 | 2020-09-01 | 广东电网有限责任公司 | Escaping device |
CN112376366A (en) * | 2020-12-23 | 2021-02-19 | 周云根 | Pavement hardening device for building construction site and construction method |
CN112523027A (en) * | 2020-12-23 | 2021-03-19 | 周云根 | Construction dirt road surface hardening device |
CN112962386A (en) * | 2021-02-10 | 2021-06-15 | 索新科技(北京)有限公司 | ADG steel floor unit and laying method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07317009A (en) * | 1994-05-24 | 1995-12-05 | Fujita Corp | Pavement method of steep slope road and pavement mat |
CN103194947A (en) * | 2013-04-25 | 2013-07-10 | 中建四局第六建筑工程有限公司 | Recyclable temporary road subgrade block |
CN203653063U (en) * | 2013-11-06 | 2014-06-18 | 无锡市康晖机械制造有限公司 | Lifting spring |
CN205576662U (en) * | 2016-04-05 | 2016-09-14 | 中交第二航务工程局有限公司 | Interlocking -type concrete road base plate |
CN205741809U (en) * | 2016-03-30 | 2016-11-30 | 徐建华 | The permeable road structure of a kind of footpath and water-permeable brick |
CN108277716A (en) * | 2018-03-23 | 2018-07-13 | 中交雄安投资有限公司 | A kind of recyclable assembly concrete Prefabricated road and its construction technology |
-
2018
- 2018-07-28 CN CN201810850231.XA patent/CN108978396B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07317009A (en) * | 1994-05-24 | 1995-12-05 | Fujita Corp | Pavement method of steep slope road and pavement mat |
CN103194947A (en) * | 2013-04-25 | 2013-07-10 | 中建四局第六建筑工程有限公司 | Recyclable temporary road subgrade block |
CN203653063U (en) * | 2013-11-06 | 2014-06-18 | 无锡市康晖机械制造有限公司 | Lifting spring |
CN205741809U (en) * | 2016-03-30 | 2016-11-30 | 徐建华 | The permeable road structure of a kind of footpath and water-permeable brick |
CN205576662U (en) * | 2016-04-05 | 2016-09-14 | 中交第二航务工程局有限公司 | Interlocking -type concrete road base plate |
CN108277716A (en) * | 2018-03-23 | 2018-07-13 | 中交雄安投资有限公司 | A kind of recyclable assembly concrete Prefabricated road and its construction technology |
Non-Patent Citations (1)
Title |
---|
王志明: "可周转装配式重载型钢板临时施工道路在项目文明施工中的应用", 《企业科技与发展》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111005619A (en) * | 2019-08-30 | 2020-04-14 | 中国二十冶集团有限公司 | Enclosing device for temporary paving road and using method thereof |
CN111605368A (en) * | 2020-05-25 | 2020-09-01 | 广东电网有限责任公司 | Escaping device |
CN112376366A (en) * | 2020-12-23 | 2021-02-19 | 周云根 | Pavement hardening device for building construction site and construction method |
CN112523027A (en) * | 2020-12-23 | 2021-03-19 | 周云根 | Construction dirt road surface hardening device |
CN112962386A (en) * | 2021-02-10 | 2021-06-15 | 索新科技(北京)有限公司 | ADG steel floor unit and laying method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108978396B (en) | 2021-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978396A (en) | Construction site integrates simple temporary road and construction method | |
RU2375523C1 (en) | Formwork for constructing reinforcing covering of construction made from corrugated steel plates | |
KR100877328B1 (en) | Construction method for street lamp and reclaiming box therefor | |
KR102061224B1 (en) | Sectionally devided precast box culverts and the construction method thereof | |
JP2015224478A (en) | Abutted-type expansion/contraction device for road bridge, and construction and repair methods therefor | |
CN209144600U (en) | A kind of Prefabricated road plate and temporary road | |
CN104652364A (en) | Construction method of vertical water-sealing structure for water conservancy project | |
CN104018425A (en) | Quickly replaceable bridge expansion joint device and mounting method thereof | |
CN103711056A (en) | Steel tool type temporary construction road and construction method thereof | |
CN105463986B (en) | Construction method of bridge expansion joint | |
US6898910B2 (en) | Precast composite header joint system and a method for forming and installing the same | |
CN110747907A (en) | Multifunctional well cover for pavement paving construction and construction method | |
JP2018009430A (en) | Device and method for constructing retaining wall in disaster-relief work | |
CN111851570A (en) | Reinforced concrete retaining wall mold and mounting method thereof | |
CN113445728B (en) | Concrete pouring die for civil engineering construction | |
JP3439436B2 (en) | Raising method of concrete frame | |
CN107034759A (en) | Steel plate road surface structure and construction method | |
CN106192656B (en) | A kind of stagger arrangement link floor file block and its production method | |
CN105370035A (en) | Manufacturing method of water-bag-type concrete-project deformation-joint water-stopping cavity film | |
CN114635712A (en) | Construction process for double-line large-section split lining trolley in underground excavation section of subway | |
CN209741907U (en) | Utility tunnel sump pit steel grating mounting structure | |
CN205159976U (en) | Scalable terminal box | |
CN107856820B (en) | Ship pier distribution method | |
CN212054094U (en) | A protection machanism for foundation ditch is all around | |
CN215829578U (en) | Horizontal steel support of removable multi-functional escape canal of water delivery main canal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |