CN108952773A - A kind of tunnel and its construction method - Google Patents

A kind of tunnel and its construction method Download PDF

Info

Publication number
CN108952773A
CN108952773A CN201810806664.5A CN201810806664A CN108952773A CN 108952773 A CN108952773 A CN 108952773A CN 201810806664 A CN201810806664 A CN 201810806664A CN 108952773 A CN108952773 A CN 108952773A
Authority
CN
China
Prior art keywords
tunnel
water
collection chamber
retaining wall
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810806664.5A
Other languages
Chinese (zh)
Other versions
CN108952773B (en
Inventor
刘志建
赵磊
熊旭娅
聂登洪
李图钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Rui Tong Engineering Construction Group Co Ltd
Original Assignee
Sichuan Rui Tong Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Rui Tong Engineering Construction Group Co Ltd filed Critical Sichuan Rui Tong Engineering Construction Group Co Ltd
Priority to CN201810806664.5A priority Critical patent/CN108952773B/en
Publication of CN108952773A publication Critical patent/CN108952773A/en
Application granted granted Critical
Publication of CN108952773B publication Critical patent/CN108952773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/157Laggings making use of fluid cushions, e.g. the fluid containing a hardenable material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel and its construction methods, are related to road construction technical field, solve influence of the tunnel vulnerable to vehicle flowrate and speed in the prior art, crack occur, or even the problem of falling rocks occur.Its key points of the technical solution are that a kind of tunnel, including road and vault, the vault includes retaining wall layer and tunnel parietal layer from outside to inside, water collection chamber is provided between the retaining wall layer and tunnel parietal layer, and connecting column is provided between the retaining wall layer and tunnel parietal layer, there is the water injection hole for supplying water and flowing into water collection chamber on the retaining wall layer.Reach using water and space in water collection chamber, realized the function of noise reduction vibrationproof, has improved the purpose of tunnel safety performance.

Description

A kind of tunnel and its construction method
Technical field
The present invention relates to road construction technical fields, more specifically, being related to a kind of tunnel and its construction method.
Background technique
Tunnel road is built and passes through massif in mountain area, or builds and pass through river, lake in urban road, mainly for vehicle Passage.It is very stringent to its secured performance requirement since tunnel road is needed across massif or river, lake.Currently, tunnel After use, if passing vehicle speed per hour is higher or passing vehicle is excessive, generation noise is excessive in tunnel at this time for road road, and The vibration frequency received increases, then tunnel is easy to appear crack, or even the phenomenon that falling rocks occurs, influences traffic safety.
Summary of the invention
The first object of the present invention is to provide a kind of tunnel, and the structure of noise reduction vibration proof is provided in the wall in tunnel, is kept away The phenomenon that exempting from tunnel in the case where vehicle flowrate is excessive or speed is too fast, crack and falling rocks occur because of noise, improves the peace in tunnel Full performance.
The first purpose of above-mentioned technology of the invention has the technical scheme that a kind of tunnel, including road Road and vault, the vault include retaining wall layer and tunnel parietal layer from outside to inside, are provided with and catchment between the retaining wall layer and tunnel parietal layer Chamber, and connecting column is provided between the retaining wall layer and tunnel parietal layer, there is the note for supplying water and flowing into water collection chamber on the retaining wall layer Water hole.
By using above-mentioned technical proposal, water collection chamber is set in vault, and interior by the intracorporal soil in mountain by water injection hole Water is collected in water collection chamber, is prevented massif water quality to be lost, and is stored, and is also prevented from that massif water content is excessively high to cause massif sliding Slope;And the vibrational energy of tunnel is absorbed using the resiliency of water filled with water in water collection chamber, and do not have in the cavity of water, it is available The sound wave that the sound wave transmitting speed of air is less than solid transmits fast performance and achievees the purpose that noise reduction so that air absorbs partial noise; Connecting column is set simultaneously, it is ensured that the structural strength of vault, the problem of avoiding the occurrence of collapsing, avoid tunnel from crack occur, and then whole Body ensures the security performance in tunnel.
The further setting of the present invention is that the connecting column includes the column of shoring at water injection hole, described to shore column Offer the water stream channel of connection water injection hole and water collection chamber.
By using above-mentioned technical proposal, column is shored in setting at water injection hole, because of the presence of water injection hole, is caused at retaining wall layer There is stress breach, and make up corresponding stress breach using column is shored, avoids the problem that occurring crack at water injection hole.
The further setting of the present invention is, corrugated steel is provided in the water collection chamber, and the corrugated steel has It contradicts the wave crest of retaining wall layer and contradicts the trough of tunnel parietal layer.
By using above-mentioned technical proposal, corrugated steel is set, and using the presence of wave crest and trough, so that corrugated steel Crushing resistance with higher improves anti-seismic performance to improve the structural strength in vault.
The further setting of the present invention is that the corrugated steel is wrapped with acoustical cotton
By using above-mentioned technical proposal, acoustical cotton can be used for absorbing the noise in tunnel, and utilize the flexibility of itself, loss vibration Kinetic energy improves the structural strength of vault to reduce the vibration frequency at tunnel vault.
The further setting of the present invention is that the tunnel parietal layer is equipped with the sluice being connected with water collection chamber at road Switch, and be provided in the water collection chamber and switch the suction pump being connected with sluice.
By using above-mentioned technical proposal, sluice switch and suction pump are set, so that the water in water collection chamber is discharged, improve collection The multifunctionality of water in water cavity, can be used for putting out a fire or cooling down sprinkling, it is ensured that the safety at where tunnel.
The further setting of the present invention is, the water proof pocket of connection water injection hole and suction pump is equipped in the water collection chamber Bag, and the water proof pocket is made of two rubber membrane sweat solderings.
By using above-mentioned technical proposal, water proof pocket is set, damage of the moisture to structure at vault, while water proof are prevented Pocket can deformation rubber membrane can be made to squeeze and absorbed in acoustical cotton then when suction pump carries out vacuumize process to water proof pocket Moisture, to squeeze out remaining moisture, consequently facilitating dry water proof pocket.
The second object of the present invention is to provide a kind of method for tunnel construction, for above-mentioned tunnel, convenient construction and the letter of constructing It is single.
The second purpose of above-mentioned technology of the invention has the technical scheme that a kind of constructing tunnel side Method, application and construction include the following steps in a kind of above-described tunnel, S1, excavate logical Tunnel;S2, it is built using steel plate For pouring the space of retaining wall layer, and the space of reserved water collection chamber and one end of pre-buried connecting column;S3, successively installation fitting shield The rubber membrane of parietal layer, the corrugated steel for being enclosed with acoustical cotton and be bonded tunnel parietal layer rubber membrane, and after sweat soldering formed every Water pocket installs the suction pump being connected with water proof pocket;S4, the space for pouring tunnel parietal layer is built using steel plate, and buried The other end of connecting column, and the through-hole at reserved sluice switch place;S5, connection suction pump and sluice switch.
By using above-mentioned technical proposal, to form water collection chamber, and water proof pocket is installed conveniently, so that wave in water collection chamber Line steel plate etc. is compact-sized between vault, improves vault construction intensity, and ensure the security performance in tunnel.
In conclusion the invention has the following advantages: water collection chamber is arranged in vault, and by water injection hole by mountain The intracorporal soil water is collected in water collection chamber, and absorbs the vibration of tunnel using the resiliency of water filled with water in water collection chamber Can, and do not have in the cavity of water, fast performance is transmitted using the sound wave that the sound wave transmitting speed of air is less than solid, so that air is inhaled Receiving portions noise, achievees the purpose that noise reduction;Connecting column is set simultaneously, it is ensured that the structural strength of vault avoids the occurrence of asking for collapsing Topic avoids tunnel from crack, and then the whole security performance for ensuring tunnel occur.
Detailed description of the invention
Fig. 1 is the schematic diagram in tunnel in embodiment one;
Fig. 2 is the cross-sectional view in tunnel in embodiment one;
Fig. 3 is the enlarged drawing in Fig. 2 at A.
In figure, 1, road;2, vault;21, retaining wall layer;211, water injection hole;22, tunnel parietal layer;2a, notch board;3, water collection chamber;4, Water proof pocket;5, connecting column;5a, column is shored;5a1, water stream channel;5b, support column;51, embedded section;52, supporting section;6, ripple Steel plate;7, acoustical cotton;8, suction pump;9, sluice switchs.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
As shown in Figure 1, a kind of tunnel, including the vault 2 for the current road 1 of vehicle and arch, vault 2 includes 21 He of retaining wall layer Tunnel parietal layer 22, retaining wall layer 21 is with respect to tunnel parietal layer 22 closer to massif, then retaining wall layer 21 is located at the outside in tunnel, 22 conduct of tunnel parietal layer The inner wall in tunnel.
As shown in connection with fig. 2, there is a water collection chamber 3, water collection chamber 3 is by retaining wall layer 21 between retaining wall layer 21 and tunnel parietal layer 22 Recess portion and the recess portion of tunnel parietal layer 22 be composed, there is a deformable water proof pocket 4 in water collection chamber 3, water proof pocket 4 by Two rubber membrane sweat solderings form, and rubber membrane is mainly made of PP material.
As shown in connection with fig. 3, connecting column 5 is provided between retaining wall layer 21 and tunnel parietal layer 22, connecting column 5 runs through water proof pocket 4, And it is filled at the gap between water proof pocket 4 and connecting column 5 through epoxy resin adhesion.Connecting column 5 includes being located at the top of vault 2 The supporting section 52 shored column 5a and remaining support column 5b, shore column 5a and support column 5b and include in water collection chamber 3 And it is embedded in the embedded section 51 in retaining wall layer 21 and tunnel parietal layer 22, the diameter of supporting section 52 is greater than the diameter of embedded section 51.Branch External screw thread is provided on the embedded section 51 of dagger 5b.
The embedded section 51 being located in retaining wall layer 21 in column 5a is shored through retaining wall layer 21, and from the end face of the embedded section 51 The cavity being axially arranged along it is offered, cavity extends to the supporting section 52 for shoring column 5a, shores column 5a supporting section 52 Side-walls offer the through-hole for communicating cavity and water collection chamber 3, to form water stream channel 5a1, and are formed at retaining wall layer 21 One water injection hole 211, so that the soil water in massif flows into water collection chamber 3.
One is provided in water proof pocket 4 for the perforative corrugated steel 6 of connecting column 5, the longitudinal section of corrugated steel 6 is in wave Wave-like, so that corrugated steel 6 has multiple wave crests and multiple troughs, wave crest and the setting of trough interval, and wave crest contradicts retaining wall Layer 21, trough contradicts tunnel parietal layer 22, to improve the structural strength in vault 2, improves anti-seismic performance.The two sides of corrugated steel 6 Adhesion is fixed with acoustical cotton 7, can be used for absorbing the noise in tunnel, and using the flexibility of itself, vibrational energy is lost, to reduce Vibration frequency at tunnel vault 2 improves the structural strength of vault 2.
Tunnel parietal layer 22 is equipped with sluice switch 9 towards the side in tunnel, and sluice switch 9 is arranged close to road 1, with person who happens to be on hand for an errand Operation, sluice switch 9 can also be fire hydrant.Outside in water collection chamber 3 positioned at water proof pocket 4 is additionally provided with a suction pump 8, takes out One end of water pump 8 is connected with water proof pocket 4, and the other end of suction pump 8 is connected through tunnel parietal layer 22 with sluice switch 9, to arrange Put the ponding in water collection chamber 3.
Embodiment two:
A kind of method for tunnel construction, a kind of tunnel described in application and construction embodiment one, comprising the following steps:
S1, Tunnel is dug through using rock tunnel(ling) machine, and fishing net is fixed on to the inner wall of Tunnel in time during digging through Place, avoids unexpected falling rocks.
S2, fence is built by the way of steel plate supporting, form the space of molding retaining wall layer 21, need at this time on the steel plate Need to contradict the inner wall of Tunnel, and the half of reserved water collection chamber 3 through the embedded section 51 for being fixedly connected with column 5, and shoring column 5a Space, into the space enclosed, high pressure injects concrete, is cooled into retaining wall layer 21, connecting column 5 has been embedded in retaining wall at this time In layer 21.
S3, it is arranged one piece of rubber membrane on the connecting column 5 of retaining wall layer 21, and fixes the rubber membrane and connecting column 5;Again even It connects and is arranged corrugated steel 6 on column 5, and before this, the two sides of corrugated steel 6 are with adhesion acoustical cotton 7;It is covered on connecting column 5 again If another piece of rubber membrane, using hot melt gun, by two rubber membrane sweat solderings, to form water proof pocket 4;On retaining wall layer 21 It is outer through bolt fixed installation suction pump 8 positioned at water proof pocket 4, and one end of suction pump 8 is connected with water proof pocket 4.
S4, continue to build fence by the way of steel plate supporting, form the space of molding tunnel parietal layer 22;It is needed at this time in steel The preserved pipeline being pierced by for 8 other end of suction pump, and another half space of reserved water collection chamber 3 are installed on plate;To the sky enclosed Interior high pressure injects concrete, is cooled into tunnel parietal layer 22, the other end of connecting column 5 has been embedded in tunnel parietal layer 22 at this time.
S5, sluice switch 9 is installed outside tunnel parietal layer 22, after being connected to suction pump 8 and sluice switch 9, takes out preserved pipeline, and Smear concrete sealing.
In S2 and S4, the steel plate in reserved 3 space of water collection chamber is that the notch board 2a(with recess portion is detailed in Fig. 2 and Fig. 3), at It is dismountable after type retaining wall layer 21, but will be fixed in water collection chamber 3 after forming tunnel parietal layer 22.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (7)

1. a kind of tunnel, including road (1) and vault (2), it is characterised in that: the vault (2) includes retaining wall layer from outside to inside (21) and tunnel parietal layer (22) it, is provided with water collection chamber (3) between the retaining wall layer (21) and tunnel parietal layer (22), and the retaining wall layer (21) it is provided between tunnel parietal layer (22) connecting column (5), has on the retaining wall layer (21) and supply water in inflow water collection chamber (3) Water injection hole (211).
2. a kind of tunnel according to claim 1, it is characterised in that: the connecting column (5) includes being located at water injection hole (211) Place is shored column (5a), the water stream channel (5a1) shored column (5a) and offer connection water injection hole (211) and water collection chamber (3).
3. a kind of tunnel according to claim 1, it is characterised in that: be provided with corrugated steel in the water collection chamber (3) (6), and the corrugated steel (6) has the wave crest for contradicting retaining wall layer (21) and contradicts the trough of tunnel parietal layer (22).
4. a kind of tunnel according to claim 3, it is characterised in that: the corrugated steel (6) is wrapped with acoustical cotton (7)。
5. a kind of tunnel according to claim 1, it is characterised in that: the tunnel parietal layer (22) is installed at road (1) There is the sluice being connected with water collection chamber (3) to switch (9), and is provided with the pumping being connected with sluice switch (9) in the water collection chamber (3) Water pump (8).
6. a kind of tunnel according to claim 5, it is characterised in that: be equipped with connection water injection hole in the water collection chamber (3) (211) and the water proof pocket (4) of suction pump (8), and the water proof pocket (4) is made of two rubber membrane sweat solderings.
7. a kind of method for tunnel construction, it is characterised in that: application and construction in a kind of tunnel described in any one of claims 1-6, Include the following steps,
S1, logical Tunnel is excavated;
S2, the space for pouring retaining wall layer (21), and the space of reserved water collection chamber (3) and pre-buried connection are built using steel plate One end of column (5);
S3, the successively rubber membrane of installation fitting retaining wall layer (21), the corrugated steel (6) for being enclosed with acoustical cotton (7) and fitting tunnel The rubber membrane of parietal layer (22), and water proof pocket (4) are formed after sweat soldering, the suction pump being connected with water proof pocket (4) is installed (8);
S4, the space for pouring tunnel parietal layer (22), and the other end of embedded connecting column (5), and reserved water are built using steel plate Lock switchs the through-hole at (9) place;
S5, connection suction pump (8) and sluice switch (9).
CN201810806664.5A 2018-07-20 2018-07-20 Tunnel and construction method thereof Active CN108952773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810806664.5A CN108952773B (en) 2018-07-20 2018-07-20 Tunnel and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810806664.5A CN108952773B (en) 2018-07-20 2018-07-20 Tunnel and construction method thereof

Publications (2)

Publication Number Publication Date
CN108952773A true CN108952773A (en) 2018-12-07
CN108952773B CN108952773B (en) 2020-08-07

Family

ID=64495511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810806664.5A Active CN108952773B (en) 2018-07-20 2018-07-20 Tunnel and construction method thereof

Country Status (1)

Country Link
CN (1) CN108952773B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538253A (en) * 2018-12-13 2019-03-29 天地科技股份有限公司 A kind of active permanent support device of supporting construction and steel arch-shelf

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1276814A1 (en) * 1985-06-05 1986-12-15 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела Twin-layer yieldable support
CN2265396Y (en) * 1996-12-30 1997-10-22 王继忠 Vibration damping and insulating arrangement for ground foundation treatment
RU2099534C1 (en) * 1995-06-13 1997-12-20 Акционерное общество открытого типа Научно-исследовательский проектно-изыскательский институт транспортного строительства "Ленметрогипротранс" Method for support of underground working in water-logged frozen grounds
CN102678135A (en) * 2012-01-17 2012-09-19 青岛市地下铁道公司 Vibration reduction protection tunnel with constrained damping structure and construction method of tunnel
JP2016183516A (en) * 2015-03-26 2016-10-20 大成建設株式会社 Tunnel structure and tunnel construction method
CN206016819U (en) * 2016-08-19 2017-03-15 中铁十六局集团第三工程有限公司 Tunnel structure with multifunctional characteristic
CN206035499U (en) * 2016-06-24 2017-03-22 中国电建集团华东勘测设计研究院有限公司 Adaptable shield tunnel structure of damping shock insulation
CN206034673U (en) * 2016-06-15 2017-03-22 国网江西省电力科学研究院 Acoustic wall of making an uproar falls
CN206737927U (en) * 2017-04-18 2017-12-12 中铁十二局集团第二工程有限公司 A kind of shield duct piece with buffering function of seismic resistance
CN207131415U (en) * 2017-08-11 2018-03-23 中铁十六局北京轨道交通工程建设有限公司 A kind of track engineering shield tunnel pipe of concrete chip architecture
CN107842372A (en) * 2017-11-22 2018-03-27 浙江海洋大学 A kind of tunnel structure of high-strength anti-seismic
CN107882296A (en) * 2017-12-14 2018-04-06 成都千里之行科技有限公司 One kind building sound insulation damping ground

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1276814A1 (en) * 1985-06-05 1986-12-15 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела Twin-layer yieldable support
RU2099534C1 (en) * 1995-06-13 1997-12-20 Акционерное общество открытого типа Научно-исследовательский проектно-изыскательский институт транспортного строительства "Ленметрогипротранс" Method for support of underground working in water-logged frozen grounds
CN2265396Y (en) * 1996-12-30 1997-10-22 王继忠 Vibration damping and insulating arrangement for ground foundation treatment
CN102678135A (en) * 2012-01-17 2012-09-19 青岛市地下铁道公司 Vibration reduction protection tunnel with constrained damping structure and construction method of tunnel
JP2016183516A (en) * 2015-03-26 2016-10-20 大成建設株式会社 Tunnel structure and tunnel construction method
CN206034673U (en) * 2016-06-15 2017-03-22 国网江西省电力科学研究院 Acoustic wall of making an uproar falls
CN206035499U (en) * 2016-06-24 2017-03-22 中国电建集团华东勘测设计研究院有限公司 Adaptable shield tunnel structure of damping shock insulation
CN206016819U (en) * 2016-08-19 2017-03-15 中铁十六局集团第三工程有限公司 Tunnel structure with multifunctional characteristic
CN206737927U (en) * 2017-04-18 2017-12-12 中铁十二局集团第二工程有限公司 A kind of shield duct piece with buffering function of seismic resistance
CN207131415U (en) * 2017-08-11 2018-03-23 中铁十六局北京轨道交通工程建设有限公司 A kind of track engineering shield tunnel pipe of concrete chip architecture
CN107842372A (en) * 2017-11-22 2018-03-27 浙江海洋大学 A kind of tunnel structure of high-strength anti-seismic
CN107882296A (en) * 2017-12-14 2018-04-06 成都千里之行科技有限公司 One kind building sound insulation damping ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538253A (en) * 2018-12-13 2019-03-29 天地科技股份有限公司 A kind of active permanent support device of supporting construction and steel arch-shelf

Also Published As

Publication number Publication date
CN108952773B (en) 2020-08-07

Similar Documents

Publication Publication Date Title
CN104213921B (en) Based on the freezing type coal uncovering method of hydraulic slotted liner technique
CN104358575A (en) Sealing device for slurry shield starting of water-rich sand layer and sealing control method for starting
CN105697034A (en) Grouting system and grouting method used for composite lining structure backfill and grouting
CN108952773A (en) A kind of tunnel and its construction method
CN109026143A (en) A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing
CN104389634B (en) A kind of mine vertical shaft sieve well shaft wall structure and controlled trapping method thereof
CN106640191B (en) A kind of double cabin rubber bag apparatus of self-locking aqueous vapor for tunnel flood-fighting
CN108547649A (en) A kind of simplified large deformation energy-absorption anchor rod of structure
JP4182548B2 (en) Shield tunnel
CN107559532A (en) A kind of skyscraper drainage system noise reduction energy dissipating PVC pipe
CN203050780U (en) Pipe-jacking ground-water lowering device of low-permeability saturated silty sand stratum tunnel construction
CN109505607B (en) Full-length reinforced freezing pipe for reinforcing grouting by fiber mesh in double-layer cavity and construction method
CN218291937U (en) Slip casting stock suitable for regional support of infiltration
CN207364528U (en) A kind of skyscraper drainage system noise reduction energy dissipating PVC pipe
CN103352702B (en) A kind of shield structure receives construction in hole
CN105275001A (en) Novel replaceable hard and rigid combined double-layer curved-grain net-shaped pervious pipe for slope
CN210289836U (en) Advanced drainage structure of rich water tunnel construction
CN202360109U (en) Composite-lining fully-closed waterproof construction
CN205477669U (en) A slip casting system that is used for combined type lining cutting structure to backfill slip casting behind one's back
CN111441775B (en) Rapid grouting arching reinforcement method before excavation of tunnel in stratum with poor groutability and difficult self-stabilization
CN204626420U (en) A kind of flag-shaped foundation pit enclosure structure
CN211230518U (en) Hollow pressure grouting anchor rod
CN209838411U (en) Plugging gas escape channel
CN209243728U (en) A kind of OPT interlocking pile slip casting around pile pipe device
CN208122810U (en) A kind of tunnel boring water burst blocking device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant