CN108952752A - A kind of combined type highway Tunnel Portal Structures suitable for big bias landform - Google Patents

A kind of combined type highway Tunnel Portal Structures suitable for big bias landform Download PDF

Info

Publication number
CN108952752A
CN108952752A CN201811010206.7A CN201811010206A CN108952752A CN 108952752 A CN108952752 A CN 108952752A CN 201811010206 A CN201811010206 A CN 201811010206A CN 108952752 A CN108952752 A CN 108952752A
Authority
CN
China
Prior art keywords
tunnel
combined type
cushion cap
portal
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811010206.7A
Other languages
Chinese (zh)
Inventor
洪开荣
刘永胜
金星亮
张聚文
崔志宾
陈茜
卫智成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
CRTG Survey and Design Institute Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, CRTG Survey and Design Institute Co Ltd filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201811010206.7A priority Critical patent/CN108952752A/en
Publication of CN108952752A publication Critical patent/CN108952752A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of combined type highway Tunnel Portal Structures suitable for big bias landform, pile foundation group including two-row spacing setting, it include multiple pile foundations in each campshed base group, the upper surface of each pile foundation is located at same level, be provided with a cushion cap on the upper surface of multiple pile foundations, cushion cap with tunnel bottom flush;Multiple pile foundations are arranged by the excavation direction in sides adjacent side slope lower towards the tunnel of tunnel excavation, and parallel with tunnel;Ear wall is provided on cushion cap, the wall surface of ear wall close to tunnel side fits with Tunnel, ear coping is higher than the height of tunnel vault, space is formed between side slope eminence massif, the space is reinforced using cement stabilized macadam filling, in conjunction with the side slope lower massif of lower section, formed at the excavation of tunnel portal.This is suitable for the combined type highway Tunnel Portal Structures of big bias landform, reduces high slope problem and solves the problems, such as the hanging portal structure of tunnel basis, which avoids high brush slope problem and can arbitrarily move portal position according to landform combination roadbed side slope.

Description

A kind of combined type highway Tunnel Portal Structures suitable for big bias landform
Technical field
The invention belongs to vcehicular tunnel portal design fields, and in particular to a kind of combination suitable for big bias landform Formula vcehicular tunnel portal structure.
Background technique
It is alpine terrain landforms complexity, ecological environment frailty, sensitive to the development activities of the mankind, cause mountainous area highway to be built If the destruction to environment is increasingly severe, one of relatively distinct issues are the high face-upward slope problems of tunnel portal.Mountain area is high The line position of fast vcehicular tunnel especially short tunnel is limited to the control of general route, and hole is frequently located in big bias landform and weakness Area cracked.
High slope tunnel face-upward slope excavates, and is easily destroyed slope foot, breaks the existing balance of side slope, so that it is sliding to induce side slope It is dynamic, tunnel portal and barrel structure are destroyed, tunnel safety is jeopardized.Once landslide accident, which occurs, can seriously affect tunnel structure, very To tunnel is directly destroyed, cause casualties and property loss.
At present for high face-upward slope tunnel processing, generally take brush slope processing, if brush slope cross high pass design umbrella arch, Excavation slope is reduced using modes such as hangar tunnels, if still descending grade effect is unobvious, brush slope is avoided by mobile portal position, but move There may be new problem, such as tunnel basis are hanging for dynamic portal.For empty in foundation processing, it can fill out using changing, apply expansion Base, but for the portal structure at slope foot, processing in this way can disturb slope foot, be easy to cause landslide, threaten construction safety.
It which type of portal structure to solve the problems, such as high slope bias and empty in foundation using, accomplishes big bias high slope tunnel Road " zero ", which excavates, solves safety problem, is one of the important subject of tunnel structure and construction.
Summary of the invention
Technical problem to be solved by the present invention lies in view of the above shortcomings of the prior art, provide a kind of be suitable for greatly partially The combined type highway Tunnel Portal Structures of landform are pressed, high slope problem is reduced and solve the problems, such as the hanging portal knot of tunnel basis Structure, the portal structure avoid high brush slope problem and can arbitrarily move portal position according to landform combination roadbed side slope, are one The general portal structure design scheme of kind processing high slope tunnel problem.
In order to solve the above technical problems, the technical solution adopted by the present invention is that, a kind of combination suitable for big bias landform Formula vcehicular tunnel portal structure includes multiple pile foundations, each pile foundation in each campshed base group including the pile foundation group that two-row spacing is arranged Upper surface be located at same level, be provided with a cushion cap on the upper surface of multiple pile foundations, cushion cap with tunnel bottom flush; Multiple pile foundations are arranged by the excavation direction in sides adjacent side slope lower towards the tunnel of tunnel excavation, and parallel with tunnel, directly It is located in soil body basis to the front end of the cushion cap of carrying;Ear wall, wall surface and tunnel of the ear wall close to tunnel side are provided on cushion cap Road preliminary bracing fits, and the end towards tunnel excavation direction of ear wall is seated in soil body basis;Ear coping is high Space is formed between the height of tunnel vault, with side slope eminence massif, which is reinforced using cement stabilized macadam filling, under Fang Bianpo lower massif combines, and is formed at the excavation of tunnel portal.
Further, after cement stabilized macadam filling is reinforced, top forms an inclined surface, which is located at ear wall side Lower than opposite side, and at tunnel vault cement stabilized macadam with a thickness of 2-5m.
Further, shield arch is horizontally arranged in the space, the one end for protecting arch is arranged on ear wall.
Further, breast boards is provided between two neighboring pile foundation in same row.
A kind of combined type highway Tunnel Portal Structures suitable for big bias landform of the present invention have the advantages that 1. can High slope problem effectively is avoided, is not limited by the hanging problem of tunnel basis, arbitrarily can be carried out portal pile No. according to roadbed side slope It is mobile, thus avoid the risk on high brush slope, also alleviate the technical problem of roadbed Design of High Slope, tunnel excavation is close to " zero " It excavates, guarantees original state of side slope, avoid excessive artificial destruction.2. tunnel is using ear wall as bias-voltage retaining wall structure.3. Reinforcement protection is carried out to tunnel structure using umbrella arch structure, prevents high slope bias effect from causing the destruction of tunnel structure. 4. do not need to excavate slope foot, because without caused by havoc, guarantee slope stability.5. using cement stabilized macadam It is backfilled, avoids being rolled using heavy-duty machinery.6. pile foundation uses double-row pile, effectively avoid portal structure under high slope Problem of toppling under sliding thrust, is strengthened using the resistance to capsizing of double-row pile portal structure.
Detailed description of the invention
Fig. 1 is a kind of sectional schematic diagram of the combined type highway Tunnel Portal Structures suitable for big bias landform of the present invention.
Fig. 2 is a kind of skiagraph of the combined type highway Tunnel Portal Structures suitable for big bias landform of the present invention.
Fig. 3 is the structural schematic diagram of middle ear wall of the present invention.
Wherein: 1. pile foundations;2. cushion cap;3. ear wall;4. shield arch;5. breast boards.
Specific embodiment
A kind of combined type highway Tunnel Portal Structures suitable for big bias landform of the present invention, as illustrated in fig. 1 and 2, including The pile foundation group of two-row spacing setting includes multiple pile foundations 1 in each campshed base group, and the upper surface of each pile foundation 1 is located at same level Face, is provided with a cushion cap 2 on the upper surface of multiple pile foundations 1, cushion cap 2 with tunnel bottom flush;Multiple pile foundations 1 are opened by tunnel The excavation direction in sides adjacent side slope lower towards tunnel at digging is arranged, and parallel with tunnel, until before the cushion cap 2 of carrying It sits up straight and falls in soil body basis;As shown in figure 3, being provided with ear wall 3 on cushion cap 2, dowel is connected between cushion cap 2 and ear wall 3.Ear The wall surface of wall 3 close to tunnel side fits with Tunnel, and the end towards tunnel excavation direction of ear wall 3 is seated In soil body basis;The top of ear wall 3 is higher than the height of tunnel vault, forms space between side slope eminence massif, which uses Cement stabilized macadam filling is reinforced, and in conjunction with the side slope lower massif of lower section, is formed at the excavation of tunnel portal.
After being reinforced using cement stabilized macadam filling, top forms an inclined surface, which is located at 3 side of ear wall lower than phase Opposite side, and at tunnel vault cement stabilized macadam with a thickness of 2-5m.Shield arch 4 is horizontally arranged in space, one end of the shield arch 4 is set It sets on ear wall 3.Breast boards 5 is provided between the two neighboring pile foundation 1 in same row.
In conjunction with Fig. 1 and 2, steps are as follows for the Specific construction of Tunnel Portal Structures:
Step 1: applying pile foundation 1 in stake coordinate position, the distance between pile foundation 1 should meet " technical code for building pile foundation " Requirement.
Step 2: applying cushion cap 2 after the completion of applying pile foundation 1 in pile foundation 1, ear wall 3 then being applied on cushion cap 2.
Step 3: applying shield arch 4, and reinforcement protection is carried out to interim side slope.
Step 4: cement stabilized macadam backfills.
After completing above-mentioned steps, then implements soil excavation, apply tunnel structure.
Since landform is the big bias of high slope, using double-row pile, to avoid construction risk between stake stake, using jump stake mode Pile foundation is applied, the disturbance to original side slope is avoided in construction as far as possible, and real-time monitoring is carried out to massif, pays close attention to massif side slope Safety the non-digging that pops can be considered as according to geological conditions to accomplish the protection to massif and surrounding enviroment.
Be proven: pile foundation 1, cushion cap 2 and the combined Tunnel Portal Structures of ear wall 3 can fundamentally solve big partially Pressure, high slope tunnel portal design challenges, can arbitrarily move portal pile No. according to landform, not by high slope and empty in foundation Limitation, it is poor especially suitable for country rock, it high slope and requires to excavate massif and influences small engineering, can will excavate influences drop to most Low requirement, intimate " zero " excavate.

Claims (4)

1. a kind of combined type highway Tunnel Portal Structures suitable for big bias landform, which is characterized in that set including two-row spacing The pile foundation group set includes multiple pile foundations (1) that the upper surface of each pile foundation (1) is located at same level in each campshed base group, And a cushion cap (2) are provided on multiple pile foundations (1);The cushion cap (2) and tunnel bottom flush;
Multiple pile foundations (1) are arranged by the excavation direction in sides adjacent side slope lower towards the tunnel of tunnel excavation, and and tunnel Road is parallel, until the front end of the cushion cap (2) of carrying is located in soil body basis;
It is provided with ear wall (3) on the cushion cap (2), the wall surface of ear wall (3) close to the tunnel side is affixed with Tunnel It closes, and the end towards tunnel excavation direction of the ear wall (3) is seated in soil body basis;The top of the ear wall (3) is high Space is formed between the height of tunnel vault, with side slope eminence massif, which is reinforced using cement stabilized macadam filling, under Fang Bianpo lower massif combines, and is formed at the excavation of tunnel portal.
2. a kind of combined type highway Tunnel Portal Structures suitable for big bias landform according to claim 1, feature It is, after cement stabilized macadam filling is reinforced, top forms an inclined surface, which is located at ear wall (3) side and is lower than opposite side, And at tunnel vault cement stabilized macadam with a thickness of 2-5m.
3. a kind of combined type highway Tunnel Portal Structures suitable for big bias landform according to claim 1 or 2, special Sign is, shield arch (4) is horizontally arranged in the space, and one end of the shield arch (4) is arranged on ear wall (3).
4. a kind of combined type highway Tunnel Portal Structures suitable for big bias landform according to claim 3, feature It is, is provided with breast boards (5) between the two neighboring pile foundation (1) in same row.
CN201811010206.7A 2018-08-31 2018-08-31 A kind of combined type highway Tunnel Portal Structures suitable for big bias landform Pending CN108952752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811010206.7A CN108952752A (en) 2018-08-31 2018-08-31 A kind of combined type highway Tunnel Portal Structures suitable for big bias landform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811010206.7A CN108952752A (en) 2018-08-31 2018-08-31 A kind of combined type highway Tunnel Portal Structures suitable for big bias landform

Publications (1)

Publication Number Publication Date
CN108952752A true CN108952752A (en) 2018-12-07

Family

ID=64475043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811010206.7A Pending CN108952752A (en) 2018-08-31 2018-08-31 A kind of combined type highway Tunnel Portal Structures suitable for big bias landform

Country Status (1)

Country Link
CN (1) CN108952752A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811773A (en) * 2019-03-01 2019-05-28 中铁十九局集团第五工程有限公司 A kind of unsymmetrial loading tunnel hole excavate safeguard structure and its construction method
CN112523113A (en) * 2020-12-22 2021-03-19 西安世纪金属结构有限公司 Reinforced assembled corrugated steel shed tunnel structure
CN115324108A (en) * 2022-07-19 2022-11-11 中建五局土木工程有限公司 Construction method of light and dark double-arch bias tunnel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101324071A (en) * 2008-07-30 2008-12-17 中国科学院武汉岩土力学研究所 Pervious rib type arch beam tunnel
CN103206219A (en) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN203308470U (en) * 2013-05-28 2013-11-27 山西省交通科学研究院 Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN105626083A (en) * 2016-01-07 2016-06-01 安徽省交通控股集团有限公司 Construction method for permeable ribbed multiple-arch tunnel
CN205502063U (en) * 2016-04-01 2016-08-24 自贡市城市规划设计研究院有限责任公司 Combined type retaining structure
CN106321106A (en) * 2015-06-30 2017-01-11 中交二公局第六工程有限公司 Construction method for tunnel-entering of tunnel weak surrounding rock and semi-open and semi-underground bias section portal abutment
CN108412503A (en) * 2018-04-02 2018-08-17 中国十九冶集团有限公司 Bias shallow-buried tunnel portal construction protection structure and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101324071A (en) * 2008-07-30 2008-12-17 中国科学院武汉岩土力学研究所 Pervious rib type arch beam tunnel
CN103206219A (en) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN203308470U (en) * 2013-05-28 2013-11-27 山西省交通科学研究院 Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN106321106A (en) * 2015-06-30 2017-01-11 中交二公局第六工程有限公司 Construction method for tunnel-entering of tunnel weak surrounding rock and semi-open and semi-underground bias section portal abutment
CN105626083A (en) * 2016-01-07 2016-06-01 安徽省交通控股集团有限公司 Construction method for permeable ribbed multiple-arch tunnel
CN205502063U (en) * 2016-04-01 2016-08-24 自贡市城市规划设计研究院有限责任公司 Combined type retaining structure
CN108412503A (en) * 2018-04-02 2018-08-17 中国十九冶集团有限公司 Bias shallow-buried tunnel portal construction protection structure and construction method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
叶彩娟: "包头至西安铁路柳树店明洞边坡桩板墙加固工程设计", 《铁道标准设计》 *
李浩等: "异型护拱法在半坞连拱隧道进洞处理中的应用", 《公路交通科技(应用技术版)》 *
程刚: "望江岭隧道出口进洞施工技术", 《施工技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811773A (en) * 2019-03-01 2019-05-28 中铁十九局集团第五工程有限公司 A kind of unsymmetrial loading tunnel hole excavate safeguard structure and its construction method
CN109811773B (en) * 2019-03-01 2023-12-26 中铁十九局集团第五工程有限公司 Bias tunnel portal excavation protection structure and construction method thereof
CN112523113A (en) * 2020-12-22 2021-03-19 西安世纪金属结构有限公司 Reinforced assembled corrugated steel shed tunnel structure
CN115324108A (en) * 2022-07-19 2022-11-11 中建五局土木工程有限公司 Construction method of light and dark double-arch bias tunnel

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN100582386C (en) Construction method of pervious rib type arch beam tunnel
CN110318770A (en) A kind of hazy start tunneling method of vcehicular tunnel
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN102140918A (en) Loess tunnel construction method
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN103774675A (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN207130754U (en) The large-span arch bridge combined type pile foundation construction of two-way cooperative bearing
CN108952752A (en) A kind of combined type highway Tunnel Portal Structures suitable for big bias landform
CN102852525A (en) Underground tunnel enlarging and excavating method from small section of single-line tunnel to large section of double-line tunnel
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN103321234B (en) Constructing method of load-bearing structure built on high slope or geological complex area
CN109853399B (en) Large-section inclined tunnel type arch support structure for arch bridge and construction method thereof
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN203716156U (en) Pit-in-pit city gate hole type excavation construction structure in deep foundation pit
CN109610481A (en) A kind of supporting improvement construction method for tunnel portal concordant strong-weathered rock matter high gradient slope
CN107740446A (en) Combined construction method of the passive supplement in existing building basis with underpining system in hole
CN205260048U (en) Penetrating rib formula arcading tunnel
CN105275483B (en) A kind of big arch section method for digging of city offspur tunnel
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN203625911U (en) Soil discharging construction structure with pit-in-pit door opening arranged in deep foundation pit
CN102966074B (en) Artificial channel bank protection structure and method for constructing same
CN103089272B (en) A kind of construction method being positioned at mountain slope toe tunnel
CN210530876U (en) Shallow bias voltage tunnel supporting construction that buries of offset type
CN204877495U (en) Secretly dig into hole supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 511400 No. 2, West Side of Industrial Fourth Road, Mingzhuwan Starting Zone, Nansha District, Guangzhou City, Guangdong Province

Applicant after: China Railway Tunnel Bureau Group Co Ltd

Applicant after: China Railway Tunnel Survey and Design Research Institute Co., Ltd.

Address before: 471000 No.3 Hospital of Zhuangyuan Honglu, Laocheng District, Luoyang City, Henan Province

Applicant before: China Railway Tunnel Bureau Group Co Ltd

Applicant before: China Railway Tunnel Survey and Design Research Institute Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207

RJ01 Rejection of invention patent application after publication