It is a kind of agricultural in tealeaves lift screening installation
Technical field
The present invention relates to tealeaves lift screening installations in a kind of screening installation more particularly to a kind of agricultural.
Background technique
The tealeaves picked is packed after being sorted again after drying, and it is usually big that present people, which sort tealeaves,
The tealeaves heap of amount on the table, then allows multiple staff to carry out naked eyes together and identifies sorting.Since the tealeaves dried is smaller,
Artificial separation cannot accurately identify tealeaves not of uniform size, not can be carried out multipass sort and sort less accurate;And
People need to sort a large amount of tealeaves, heavy workload, and staff is easy to influence working efficiency because of work fatigue.
Summary of the invention
It not can be carried out multipass sort to overcome present artificial separation tealeaves to exist, sort less accurate disadvantage, therefore,
Technical problem of the invention are as follows: multipass sort can automatically be carried out by providing one kind, sort tealeaves liter in more accurately agricultural
Drop formula screening installation.
Technical solution: it is a kind of agricultural in tealeaves lift screening installation, include erecting bed, placing box, mounting rod, first
Sliding rail, the first sliding block, big screen box, the first guide sleeve, decelerating motor, small belt pulley, strut, bearing block, bull stick, big belt pulley,
Flat belt, the second guide sleeve, connecting rod, small screen box, guide rod and fixed block, erecting bed top center are placed with placing box, peace
Left and right two is respectively connected with mounting rod on rear side of dress platform, and two mounting rod inside upper parts are equipped with the first sliding rail, on the first sliding rail
Slidingtype is connected with the first sliding block, big screen box is equipped between the first sliding block of the left and right sides, on rear side of big screen box in the middle part of outer wall
Bilateral symmetry formula is equipped with the first guide sleeve, and slidingtype is connected with guide rod in the first guide sleeve, the guide rod top of the left and right sides
Between be equipped with small screen box, the sieve pore of small screen box is greater than the sieve pore of big screen box, and middle part, which is equipped with, on front side of the mounting rod on right side slows down
Motor is connected with small belt pulley on the output shaft of decelerating motor, and small belt pulley is located at the mounting rod right on right side, the left and right sides
First sliding rail upper back is respectively connected with strut, and strut top is equipped with bearing block, is connected between the bearing block of the left and right sides
Bull stick, bull stick right end are equipped with big belt pulley, and big belt pulley and small belt pulley are located on same vertical line, big belt pulley and belt lace
It is wound with flat belt between wheel, slidingtype sets that there are three the second guide sleeves in the middle part of bull stick, and the second guide sleeve bottom is respectively connected with connecting rod, small
Middle part and big screen box front side left and right two are equipped with fixed block on front side of screen box, and connecting rod lower end is hinged on corresponding solid
Determine at the top of block.
Furthermore, it is therefore particularly preferred that further include having disk, the second sliding rail, the second sliding block, blade, the first spring and first
Wirerope, bull stick left end are equipped with disk, and erecting bed top left side is equipped with the second sliding rail, and the mounting rod that the second sliding rail is located at left side is left
Square, slidingtype is connected with the second sliding block on the second sliding rail, and blade, the second sliding block downside and erecting bed top are equipped on the right side of the second sliding block
The first spring is connected between portion, disk left side is intermediate to be connected with the first wirerope, and the lower end of the first wirerope is connected to second
On the upside of sliding block.
Furthermore, it is therefore particularly preferred that further include have the second wirerope, directive wheel, third sliding rail, third sliding block, block and
Second spring, erecting bed top center is embedded to be equipped with third sliding rail, and slidingtype is connected with third sliding block on third sliding rail, places
Case is connect with third sliding block, and erecting bed top left side is equipped with directive wheel, directive wheel be located at the second sliding rail and left side mounting rod it
Between, the second wirerope is connected on the downside of blade, the second wirerope bypasses directive wheel, and the right end of the second wirerope is connected to placing box
Left side, erecting bed top right side are equipped with block, and block is located at the mounting rod right on right side, and block left lower and big screen box are right
Second spring is connected between side.
Furthermore, it is therefore particularly preferred that further include having the first cover board, fixed link and drawstring, the is placed on the upside of small screen box
One cover board, the first cover board downside left and right two are respectively connected with drawstring, and two wall top of small screen box or so is equipped with fixed link, left and right
The drawstring of two sides is rotating around in the fixed link of the left and right sides.
Furthermore, it is therefore particularly preferred that further include having the second cover board, the first magnetic patch and the second magnetic patch, put on the upside of big screen box
It is equipped with the second cover board, left and right two is equipped with the first magnetic patch on the downside of the second cover board, and two wall tops of left and right are equipped with the in placing box
Two magnetic patch, the second magnetic patch are contacted and are worked in coordination with the first magnetic patch.
When staff is using equipment sorting tealeaves, first the tealeaves to be sorted is packed into small screen box, small sieve
Select lesser tealeaves in case that can fall into big screen box, lesser tealeaves can be fallen into placing box in big screen box, together
When staff need to open decelerating motor, decelerating motor drives small belt pulley rotation, and small belt pulley is driven greatly by flat belt
Pulley rotation, bull stick rotate with it, and bull stick can be driven on big screen box and small screen box by the second guide sleeve and connecting rod
Lower movement, thus can make shaker screen that the tealeaves in case and small screen box be selected sufficiently to shake, so that tealeaves be made preferably to be divided
Choosing.Decelerating motor is closed after the completion of sorting, then the well-graded tealeaves in big screen box, small screen box and placing box is packed into not
In same packaging.
Bull stick can be disc-rotated, and the first wirerope drives the second sliding block to move up and down immediately, and the first spring, which is done, to be stretched
Contracting movement, blade move up and down therewith, and blade up and down motion can produce wind-force, and the wind-force of generation can be the dust in tealeaves
It blows away, keeps tealeaves cleaner.
Blade can drive placing box side-to-side movement by the second wirerope while up and down motion, when blade moves upwards
When, the second wirerope can drive placing box to move downward, and second spring is stretched, when blade moves downward, second spring
It resets, under the action of second spring elastic force, placing box is moved right.Blade, which constantly moves up and down, can just be such that placing box continues
Side-to-side movement can thus pave the tealeaves in placing box, prevent the tealeaves local accumulation in placing box excessively high and flow out.
After staff installs tealeaves in small screen box, can the first cover plate lid on small screen box, then left and right
The drawstring of two sides is tied up to respectively in the fixed link of the left and right sides, thus can preferably fix the first cover board.First cover board
Small screen box is covered, tealeaves is thrown out of when can prevent small screen box from moving up and down in this way.
Second cover board can cover big screen box, and the first magnetic patch and the second magnetic patch can preferably fix the second cover board,
In this way it is prevented that the tealeaves in placing box makes moist.
The utility model has the advantages that the present invention is greater than big screen box by the way that big screen box and small screen box, the sieve pore of small screen box is arranged
Sieve pore, thus can to tealeaves carry out multipass sort, make separating effect more preferably.Blade is set, and blade constantly moves up and down can
To generate wind-force, the wind-force of generation can be blown away the dust in tealeaves, to keep tealeaves cleaner.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
Fig. 4 is the 4th kind of schematic view of the front view of the invention.
Fig. 5 is the 5th kind of schematic view of the front view of the invention.
In figure: 1, erecting bed, 2, placing box, 3, mounting rod, the 4, first sliding rail, the 5, first sliding block, 6, big screen box, 7,
First guide sleeve, 8, decelerating motor, 9, small belt pulley, 10, strut, 11, bearing block, 12, bull stick, 13, big belt pulley, 14, flat skin
Band, the 15, second guide sleeve, 16, connecting rod, 17, small screen box, 18, guide rod, 19, fixed block, 20, disk, the 21, second sliding rail,
22, the second sliding block, 23, blade, the 24, first spring, the 25, first wirerope, the 26, second wirerope, 27, directive wheel, 28, third
Sliding rail, 29, third sliding block, 30, block, 31, second spring, the 32, first cover board, 33, fixed link, 34, drawstring, the 35, second lid
Plate, the 36, first magnetic patch, the 37, second magnetic patch.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment and join
According to attached drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair
Bright range.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid this is unnecessarily obscured
The concept of invention.
Embodiment 1
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural
One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5
Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace
Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1
Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it
Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7
Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides
Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8
It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects
It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides
Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley
It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company
Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal
It is hinged on corresponding 19 top of fixed block.
Embodiment 2
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural
One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5
Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace
Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1
Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it
Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7
Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides
Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8
It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects
It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides
Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley
It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company
Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal
It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25,
12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side
3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22
Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel
The lower end of cord 25 is connected to 22 upside of the second sliding block.
Embodiment 3
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural
One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5
Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace
Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1
Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it
Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7
Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides
Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8
It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects
It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides
Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley
It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company
Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal
It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25,
12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side
3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22
Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel
The lower end of cord 25 is connected to 22 upside of the second sliding block.
It further include having the second wirerope 26, directive wheel 27, third sliding rail 28, third sliding block 29, block 30 and second spring
31,1 top center of erecting bed is embedded to be equipped with third sliding rail 28, and slidingtype is connected with third sliding block 29 on third sliding rail 28, puts
It sets case 2 to connect with third sliding block 29,1 top left side of erecting bed is equipped with directive wheel 27, and directive wheel 27 is located at the second sliding rail 21 and a left side
Between the mounting rod 3 of side, the second wirerope 26 is connected on the downside of blade 23, the second wirerope 26 bypasses directive wheel 27, the second steel
The right end of cord 26 is connected to 2 left side of placing box, and 1 top right side of erecting bed is equipped with block 30, and block 30 is located at the installation on right side
3 right of bar, 30 left lower of block and big screen box are connected with second spring 31 between 6 right side.
Embodiment 4
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural
One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5
Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace
Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1
Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it
Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7
Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides
Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8
It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects
It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides
Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley
It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company
Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal
It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25,
12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side
3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22
Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel
The lower end of cord 25 is connected to 22 upside of the second sliding block.
It further include having the second wirerope 26, directive wheel 27, third sliding rail 28, third sliding block 29, block 30 and second spring
31,1 top center of erecting bed is embedded to be equipped with third sliding rail 28, and slidingtype is connected with third sliding block 29 on third sliding rail 28, puts
It sets case 2 to connect with third sliding block 29,1 top left side of erecting bed is equipped with directive wheel 27, and directive wheel 27 is located at the second sliding rail 21 and a left side
Between the mounting rod 3 of side, the second wirerope 26 is connected on the downside of blade 23, the second wirerope 26 bypasses directive wheel 27, the second steel
The right end of cord 26 is connected to 2 left side of placing box, and 1 top right side of erecting bed is equipped with block 30, and block 30 is located at the installation on right side
3 right of bar, 30 left lower of block and big screen box are connected with second spring 31 between 6 right side.
Further include having the first cover board 32, fixed link 33 and drawstring 34, the first cover board 32 is placed on the upside of small screen box 17, the
Left and right two is respectively connected with drawstring 34 on the downside of one cover board 32, and small 17 or so two wall top of screen box is equipped with fixed link 33, left and right
The drawstring 34 of two sides is rotating around in the fixed link 33 of the left and right sides.
Embodiment 5
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural
One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5
Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace
Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1
Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it
Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7
Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides
Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8
It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects
It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides
Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley
It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company
Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal
It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25,
12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side
3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22
Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel
The lower end of cord 25 is connected to 22 upside of the second sliding block.
It further include having the second wirerope 26, directive wheel 27, third sliding rail 28, third sliding block 29, block 30 and second spring
31,1 top center of erecting bed is embedded to be equipped with third sliding rail 28, and slidingtype is connected with third sliding block 29 on third sliding rail 28, puts
It sets case 2 to connect with third sliding block 29,1 top left side of erecting bed is equipped with directive wheel 27, and directive wheel 27 is located at the second sliding rail 21 and a left side
Between the mounting rod 3 of side, the second wirerope 26 is connected on the downside of blade 23, the second wirerope 26 bypasses directive wheel 27, the second steel
The right end of cord 26 is connected to 2 left side of placing box, and 1 top right side of erecting bed is equipped with block 30, and block 30 is located at the installation on right side
3 right of bar, 30 left lower of block and big screen box are connected with second spring 31 between 6 right side.
Further include having the first cover board 32, fixed link 33 and drawstring 34, the first cover board 32 is placed on the upside of small screen box 17, the
Left and right two is respectively connected with drawstring 34 on the downside of one cover board 32, and small 17 or so two wall top of screen box is equipped with fixed link 33, left and right
The drawstring 34 of two sides is rotating around in the fixed link 33 of the left and right sides.
Further include having the second cover board 35, the first magnetic patch 36 and the second magnetic patch 37, is placed with the second cover board on the upside of big screen box 6
35, left and right two is equipped with the first magnetic patch 36 on the downside of the second cover board 35, and two wall tops of left and right are equipped with the second magnetic patch in placing box 2
37, the second magnetic patch 37 is contacted and is worked in coordination with the first magnetic patch 36.
When staff is using equipment sorting tealeaves, first the tealeaves to be sorted is packed into small screen box 17, it is small
Lesser tealeaves can be fallen into big screen box 6 in screen box 17, and lesser tealeaves can fall into placing box in big screen box 6
In 2, the personnel of working at the same time need to open decelerating motor 8, and decelerating motor 8 drives small belt pulley 9 to rotate, and small belt pulley 9 passes through flat
Belt 14 drives big belt pulley 13 to rotate, and bull stick 12 rotates with it, and bull stick 12 can pass through 16 band of the second guide sleeve 15 and connecting rod
It moves big screen box 6 and small screen box 17 moves up and down, thus shaker screen can be made to select the tealeaves in case 6 and small screen box 17 abundant
It shakes, so that tealeaves be made preferably to be sorted.Decelerating motor 8 is closed after the completion of sorting, then big screen box 6, small screen box
17 and placing box 2 in well-graded tealeaves be packed into different packagings.
Bull stick 12 can drive disk 20 to rotate, and the first wirerope 25 drives the second sliding block 22 to move up and down immediately, and first
Spring 24 does stretching motion, and blade 23 moves up and down therewith, and the up and down motion of blade 23 can produce wind-force, and the wind-force of generation can be with
Dust in tealeaves is blown away, keeps tealeaves cleaner.
Blade 23 can drive 2 side-to-side movement of placing box by the second wirerope 26 while up and down motion, when blade 23
When moving upwards, the second wirerope 26 can drive placing box 2 to move downward, and second spring 31 is stretched, when blade 23 is downward
When movement, second spring 31 resets, and under the action of 31 elastic force of second spring, placing box 2 is moved right.Blade 23 is constantly up and down
Movement can just make placing box 2 continue side-to-side movement, the tealeaves in placing box 2 can thus be paved, be prevented in placing box 2
Tealeaves local accumulation it is excessively high and flow out.
After staff installs tealeaves in small screen box 17, the first cover board 32 can be covered on small screen box 17, then
The drawstring 34 of the left and right sides is tied up in the fixed link 33 of the left and right sides respectively, thus can preferably fix the first cover board
32.First cover board 32 covers small screen box 17, and tealeaves is thrown out of when can prevent small screen box 17 from moving up and down in this way.
Second cover board 35 can cover big screen box 6, and the first magnetic patch 36 and the second magnetic patch 37 can preferably fix
Two cover boards 35, in this way it is prevented that the tealeaves in placing box 2 makes moist.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than protects to the present invention
The limitation of range is protected, although the invention is described in detail with reference to the preferred embodiments, those skilled in the art should
Understand, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the essence of technical solution of the present invention
And range.