CN108940837A - It is a kind of agricultural in tealeaves lift screening installation - Google Patents

It is a kind of agricultural in tealeaves lift screening installation Download PDF

Info

Publication number
CN108940837A
CN108940837A CN201810787860.2A CN201810787860A CN108940837A CN 108940837 A CN108940837 A CN 108940837A CN 201810787860 A CN201810787860 A CN 201810787860A CN 108940837 A CN108940837 A CN 108940837A
Authority
CN
China
Prior art keywords
screen box
tealeaves
sliding rail
block
belt pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810787860.2A
Other languages
Chinese (zh)
Other versions
CN108940837B (en
Inventor
赖娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xianfeng Baoquan Tea Co ltd
Zhongou Hubei Intellectual Property Service Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810787860.2A priority Critical patent/CN108940837B/en
Publication of CN108940837A publication Critical patent/CN108940837A/en
Application granted granted Critical
Publication of CN108940837B publication Critical patent/CN108940837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/28Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens
    • B07B1/34Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens jigging or moving to-and-fro perpendicularly or approximately perpendiculary to the plane of the screen
    • B07B1/343Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens jigging or moving to-and-fro perpendicularly or approximately perpendiculary to the plane of the screen with mechanical drive elements other than electromagnets
    • AHUMAN NECESSITIES
    • A23FOODS OR FOODSTUFFS; TREATMENT THEREOF, NOT COVERED BY OTHER CLASSES
    • A23FCOFFEE; TEA; THEIR SUBSTITUTES; MANUFACTURE, PREPARATION, OR INFUSION THEREOF
    • A23F3/00Tea; Tea substitutes; Preparations thereof
    • A23F3/06Treating tea before extraction; Preparations produced thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/42Drive mechanisms, regulating or controlling devices, or balancing devices, specially adapted for screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/46Constructional details of screens in general; Cleaning or heating of screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/46Constructional details of screens in general; Cleaning or heating of screens
    • B07B1/4609Constructional details of screens in general; Cleaning or heating of screens constructional details of screening surfaces or meshes
    • B07B1/4663Multi-layer screening surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B5/00Cleaning by methods involving the use of air flow or gas flow
    • B08B5/02Cleaning by the force of jets, e.g. blowing-out cavities
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B2201/00Details applicable to machines for screening using sieves or gratings
    • B07B2201/04Multiple deck screening devices comprising one or more superimposed screens

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Polymers & Plastics (AREA)
  • Combined Means For Separation Of Solids (AREA)

Abstract

The present invention relates to tealeaves lift screening installations in a kind of screening installation more particularly to a kind of agricultural.Therefore, technical problem of the invention are as follows: multipass sort can automatically be carried out by providing one kind, sort tealeaves lift screening installation in more accurately agricultural.Technical solution: it is a kind of agricultural in tealeaves lift screening installation, include erecting bed, placing box, mounting rod, the first sliding rail, the first sliding block, big screen box, the first guide sleeve, decelerating motor, small belt pulley, strut, bearing block etc.;Erecting bed top center is placed with placing box, and left and right two is respectively connected with mounting rod on rear side of erecting bed, and two mounting rod inside upper parts are equipped with the first sliding rail.The present invention is greater than the sieve pore of big screen box by the way that big screen box and small screen box, the sieve pore of small screen box is arranged, and thus can carry out multipass sort to tealeaves, make separating effect more preferably.Blade is set, and blade, which constantly moves up and down, can produce wind-force, and the wind-force of generation can blow away the dust in tealeaves, to keep tealeaves cleaner.

Description

It is a kind of agricultural in tealeaves lift screening installation
Technical field
The present invention relates to tealeaves lift screening installations in a kind of screening installation more particularly to a kind of agricultural.
Background technique
The tealeaves picked is packed after being sorted again after drying, and it is usually big that present people, which sort tealeaves, The tealeaves heap of amount on the table, then allows multiple staff to carry out naked eyes together and identifies sorting.Since the tealeaves dried is smaller, Artificial separation cannot accurately identify tealeaves not of uniform size, not can be carried out multipass sort and sort less accurate;And People need to sort a large amount of tealeaves, heavy workload, and staff is easy to influence working efficiency because of work fatigue.
Summary of the invention
It not can be carried out multipass sort to overcome present artificial separation tealeaves to exist, sort less accurate disadvantage, therefore, Technical problem of the invention are as follows: multipass sort can automatically be carried out by providing one kind, sort tealeaves liter in more accurately agricultural Drop formula screening installation.
Technical solution: it is a kind of agricultural in tealeaves lift screening installation, include erecting bed, placing box, mounting rod, first Sliding rail, the first sliding block, big screen box, the first guide sleeve, decelerating motor, small belt pulley, strut, bearing block, bull stick, big belt pulley, Flat belt, the second guide sleeve, connecting rod, small screen box, guide rod and fixed block, erecting bed top center are placed with placing box, peace Left and right two is respectively connected with mounting rod on rear side of dress platform, and two mounting rod inside upper parts are equipped with the first sliding rail, on the first sliding rail Slidingtype is connected with the first sliding block, big screen box is equipped between the first sliding block of the left and right sides, on rear side of big screen box in the middle part of outer wall Bilateral symmetry formula is equipped with the first guide sleeve, and slidingtype is connected with guide rod in the first guide sleeve, the guide rod top of the left and right sides Between be equipped with small screen box, the sieve pore of small screen box is greater than the sieve pore of big screen box, and middle part, which is equipped with, on front side of the mounting rod on right side slows down Motor is connected with small belt pulley on the output shaft of decelerating motor, and small belt pulley is located at the mounting rod right on right side, the left and right sides First sliding rail upper back is respectively connected with strut, and strut top is equipped with bearing block, is connected between the bearing block of the left and right sides Bull stick, bull stick right end are equipped with big belt pulley, and big belt pulley and small belt pulley are located on same vertical line, big belt pulley and belt lace It is wound with flat belt between wheel, slidingtype sets that there are three the second guide sleeves in the middle part of bull stick, and the second guide sleeve bottom is respectively connected with connecting rod, small Middle part and big screen box front side left and right two are equipped with fixed block on front side of screen box, and connecting rod lower end is hinged on corresponding solid Determine at the top of block.
Furthermore, it is therefore particularly preferred that further include having disk, the second sliding rail, the second sliding block, blade, the first spring and first Wirerope, bull stick left end are equipped with disk, and erecting bed top left side is equipped with the second sliding rail, and the mounting rod that the second sliding rail is located at left side is left Square, slidingtype is connected with the second sliding block on the second sliding rail, and blade, the second sliding block downside and erecting bed top are equipped on the right side of the second sliding block The first spring is connected between portion, disk left side is intermediate to be connected with the first wirerope, and the lower end of the first wirerope is connected to second On the upside of sliding block.
Furthermore, it is therefore particularly preferred that further include have the second wirerope, directive wheel, third sliding rail, third sliding block, block and Second spring, erecting bed top center is embedded to be equipped with third sliding rail, and slidingtype is connected with third sliding block on third sliding rail, places Case is connect with third sliding block, and erecting bed top left side is equipped with directive wheel, directive wheel be located at the second sliding rail and left side mounting rod it Between, the second wirerope is connected on the downside of blade, the second wirerope bypasses directive wheel, and the right end of the second wirerope is connected to placing box Left side, erecting bed top right side are equipped with block, and block is located at the mounting rod right on right side, and block left lower and big screen box are right Second spring is connected between side.
Furthermore, it is therefore particularly preferred that further include having the first cover board, fixed link and drawstring, the is placed on the upside of small screen box One cover board, the first cover board downside left and right two are respectively connected with drawstring, and two wall top of small screen box or so is equipped with fixed link, left and right The drawstring of two sides is rotating around in the fixed link of the left and right sides.
Furthermore, it is therefore particularly preferred that further include having the second cover board, the first magnetic patch and the second magnetic patch, put on the upside of big screen box It is equipped with the second cover board, left and right two is equipped with the first magnetic patch on the downside of the second cover board, and two wall tops of left and right are equipped with the in placing box Two magnetic patch, the second magnetic patch are contacted and are worked in coordination with the first magnetic patch.
When staff is using equipment sorting tealeaves, first the tealeaves to be sorted is packed into small screen box, small sieve Select lesser tealeaves in case that can fall into big screen box, lesser tealeaves can be fallen into placing box in big screen box, together When staff need to open decelerating motor, decelerating motor drives small belt pulley rotation, and small belt pulley is driven greatly by flat belt Pulley rotation, bull stick rotate with it, and bull stick can be driven on big screen box and small screen box by the second guide sleeve and connecting rod Lower movement, thus can make shaker screen that the tealeaves in case and small screen box be selected sufficiently to shake, so that tealeaves be made preferably to be divided Choosing.Decelerating motor is closed after the completion of sorting, then the well-graded tealeaves in big screen box, small screen box and placing box is packed into not In same packaging.
Bull stick can be disc-rotated, and the first wirerope drives the second sliding block to move up and down immediately, and the first spring, which is done, to be stretched Contracting movement, blade move up and down therewith, and blade up and down motion can produce wind-force, and the wind-force of generation can be the dust in tealeaves It blows away, keeps tealeaves cleaner.
Blade can drive placing box side-to-side movement by the second wirerope while up and down motion, when blade moves upwards When, the second wirerope can drive placing box to move downward, and second spring is stretched, when blade moves downward, second spring It resets, under the action of second spring elastic force, placing box is moved right.Blade, which constantly moves up and down, can just be such that placing box continues Side-to-side movement can thus pave the tealeaves in placing box, prevent the tealeaves local accumulation in placing box excessively high and flow out.
After staff installs tealeaves in small screen box, can the first cover plate lid on small screen box, then left and right The drawstring of two sides is tied up to respectively in the fixed link of the left and right sides, thus can preferably fix the first cover board.First cover board Small screen box is covered, tealeaves is thrown out of when can prevent small screen box from moving up and down in this way.
Second cover board can cover big screen box, and the first magnetic patch and the second magnetic patch can preferably fix the second cover board, In this way it is prevented that the tealeaves in placing box makes moist.
The utility model has the advantages that the present invention is greater than big screen box by the way that big screen box and small screen box, the sieve pore of small screen box is arranged Sieve pore, thus can to tealeaves carry out multipass sort, make separating effect more preferably.Blade is set, and blade constantly moves up and down can To generate wind-force, the wind-force of generation can be blown away the dust in tealeaves, to keep tealeaves cleaner.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
Fig. 4 is the 4th kind of schematic view of the front view of the invention.
Fig. 5 is the 5th kind of schematic view of the front view of the invention.
In figure: 1, erecting bed, 2, placing box, 3, mounting rod, the 4, first sliding rail, the 5, first sliding block, 6, big screen box, 7, First guide sleeve, 8, decelerating motor, 9, small belt pulley, 10, strut, 11, bearing block, 12, bull stick, 13, big belt pulley, 14, flat skin Band, the 15, second guide sleeve, 16, connecting rod, 17, small screen box, 18, guide rod, 19, fixed block, 20, disk, the 21, second sliding rail, 22, the second sliding block, 23, blade, the 24, first spring, the 25, first wirerope, the 26, second wirerope, 27, directive wheel, 28, third Sliding rail, 29, third sliding block, 30, block, 31, second spring, the 32, first cover board, 33, fixed link, 34, drawstring, the 35, second lid Plate, the 36, first magnetic patch, the 37, second magnetic patch.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment and join According to attached drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair Bright range.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid this is unnecessarily obscured The concept of invention.
Embodiment 1
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5 Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1 Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7 Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8 It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal It is hinged on corresponding 19 top of fixed block.
Embodiment 2
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5 Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1 Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7 Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8 It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25, 12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side 3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22 Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel The lower end of cord 25 is connected to 22 upside of the second sliding block.
Embodiment 3
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5 Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1 Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7 Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8 It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25, 12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side 3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22 Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel The lower end of cord 25 is connected to 22 upside of the second sliding block.
It further include having the second wirerope 26, directive wheel 27, third sliding rail 28, third sliding block 29, block 30 and second spring 31,1 top center of erecting bed is embedded to be equipped with third sliding rail 28, and slidingtype is connected with third sliding block 29 on third sliding rail 28, puts It sets case 2 to connect with third sliding block 29,1 top left side of erecting bed is equipped with directive wheel 27, and directive wheel 27 is located at the second sliding rail 21 and a left side Between the mounting rod 3 of side, the second wirerope 26 is connected on the downside of blade 23, the second wirerope 26 bypasses directive wheel 27, the second steel The right end of cord 26 is connected to 2 left side of placing box, and 1 top right side of erecting bed is equipped with block 30, and block 30 is located at the installation on right side 3 right of bar, 30 left lower of block and big screen box are connected with second spring 31 between 6 right side.
Embodiment 4
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5 Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1 Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7 Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8 It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25, 12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side 3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22 Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel The lower end of cord 25 is connected to 22 upside of the second sliding block.
It further include having the second wirerope 26, directive wheel 27, third sliding rail 28, third sliding block 29, block 30 and second spring 31,1 top center of erecting bed is embedded to be equipped with third sliding rail 28, and slidingtype is connected with third sliding block 29 on third sliding rail 28, puts It sets case 2 to connect with third sliding block 29,1 top left side of erecting bed is equipped with directive wheel 27, and directive wheel 27 is located at the second sliding rail 21 and a left side Between the mounting rod 3 of side, the second wirerope 26 is connected on the downside of blade 23, the second wirerope 26 bypasses directive wheel 27, the second steel The right end of cord 26 is connected to 2 left side of placing box, and 1 top right side of erecting bed is equipped with block 30, and block 30 is located at the installation on right side 3 right of bar, 30 left lower of block and big screen box are connected with second spring 31 between 6 right side.
Further include having the first cover board 32, fixed link 33 and drawstring 34, the first cover board 32 is placed on the upside of small screen box 17, the Left and right two is respectively connected with drawstring 34 on the downside of one cover board 32, and small 17 or so two wall top of screen box is equipped with fixed link 33, left and right The drawstring 34 of two sides is rotating around in the fixed link 33 of the left and right sides.
Embodiment 5
Tealeaves lift screening installation includes as shown in Figs. 1-5 erecting bed 1, placing box 2, mounting rod 3, the in a kind of agricultural One sliding rail 4, big screen box 6, the first guide sleeve 7, decelerating motor 8, small belt pulley 9, strut 10, bearing block 11, turns first sliding block 5 Bar 12, big belt pulley 13, flat belt 14, the second guide sleeve 15, connecting rod 16, small screen box 17, guide rod 18 and fixed block 19, peace Dress 1 top center of platform is placed with placing box 2, and left and right two is respectively connected with mounting rod 3, two 3 insides of mounting rod on rear side of erecting bed 1 Top is equipped with the first sliding rail 4, and slidingtype is connected with the first sliding block 5 on the first sliding rail 4, the first sliding block 5 of the left and right sides it Between be equipped with big screen box 6, bilateral symmetry formula is equipped with the first guide sleeve 7 in the middle part of 6 rear side outer wall of big screen box, sliding in the first guide sleeve 7 Dynamic formula is connected with guide rod 18, is equipped with small screen box 17, the sieve pore of small screen box 17 between 18 top of guide rod of the left and right sides Greater than the sieve pore of big screen box 6, the 3 front side middle part of mounting rod on right side is equipped with decelerating motor 8, connects on the output shaft of decelerating motor 8 It is connected to small belt pulley 9, small belt pulley 9 is located at 3 right of mounting rod on right side, and 4 upper back of the first sliding rail of the left and right sides connects It is connected to strut 10,10 top of strut is equipped with bearing block 11, bull stick 12, bull stick 12 are connected between the bearing block 11 of the left and right sides Right end is equipped with big belt pulley 13, and big belt pulley 13 and small belt pulley 9 are located on same vertical line, big belt pulley 13 and small belt pulley It is wound with flat belt 14 between 9,12 middle part slidingtype of bull stick sets that there are three the second guide sleeves 15, and 15 bottom of the second guide sleeve is respectively connected with company Extension bar 16, small 17 front side middle part of screen box are equipped with fixed block 19 with left and right two on front side of big screen box 6, and 16 lower end of connecting rod is equal It is hinged on corresponding 19 top of fixed block.
It further include having disk 20, the second sliding rail 21, the second sliding block 22, blade 23, the first spring 24 and the first wirerope 25, 12 left end of bull stick is equipped with disk 20, and 1 top left side of erecting bed is equipped with the second sliding rail 21, and the second sliding rail 21 is located at the mounting rod in left side 3 lefts, slidingtype is connected with the second sliding block 22 on the second sliding rail 21, is equipped with blade 23, the second sliding block 22 on the right side of the second sliding block 22 Downside and erecting bed are connected with the first spring 24 between 1 top, and 20 left side of disk is intermediate to be connected with the first wirerope 25, the first steel The lower end of cord 25 is connected to 22 upside of the second sliding block.
It further include having the second wirerope 26, directive wheel 27, third sliding rail 28, third sliding block 29, block 30 and second spring 31,1 top center of erecting bed is embedded to be equipped with third sliding rail 28, and slidingtype is connected with third sliding block 29 on third sliding rail 28, puts It sets case 2 to connect with third sliding block 29,1 top left side of erecting bed is equipped with directive wheel 27, and directive wheel 27 is located at the second sliding rail 21 and a left side Between the mounting rod 3 of side, the second wirerope 26 is connected on the downside of blade 23, the second wirerope 26 bypasses directive wheel 27, the second steel The right end of cord 26 is connected to 2 left side of placing box, and 1 top right side of erecting bed is equipped with block 30, and block 30 is located at the installation on right side 3 right of bar, 30 left lower of block and big screen box are connected with second spring 31 between 6 right side.
Further include having the first cover board 32, fixed link 33 and drawstring 34, the first cover board 32 is placed on the upside of small screen box 17, the Left and right two is respectively connected with drawstring 34 on the downside of one cover board 32, and small 17 or so two wall top of screen box is equipped with fixed link 33, left and right The drawstring 34 of two sides is rotating around in the fixed link 33 of the left and right sides.
Further include having the second cover board 35, the first magnetic patch 36 and the second magnetic patch 37, is placed with the second cover board on the upside of big screen box 6 35, left and right two is equipped with the first magnetic patch 36 on the downside of the second cover board 35, and two wall tops of left and right are equipped with the second magnetic patch in placing box 2 37, the second magnetic patch 37 is contacted and is worked in coordination with the first magnetic patch 36.
When staff is using equipment sorting tealeaves, first the tealeaves to be sorted is packed into small screen box 17, it is small Lesser tealeaves can be fallen into big screen box 6 in screen box 17, and lesser tealeaves can fall into placing box in big screen box 6 In 2, the personnel of working at the same time need to open decelerating motor 8, and decelerating motor 8 drives small belt pulley 9 to rotate, and small belt pulley 9 passes through flat Belt 14 drives big belt pulley 13 to rotate, and bull stick 12 rotates with it, and bull stick 12 can pass through 16 band of the second guide sleeve 15 and connecting rod It moves big screen box 6 and small screen box 17 moves up and down, thus shaker screen can be made to select the tealeaves in case 6 and small screen box 17 abundant It shakes, so that tealeaves be made preferably to be sorted.Decelerating motor 8 is closed after the completion of sorting, then big screen box 6, small screen box 17 and placing box 2 in well-graded tealeaves be packed into different packagings.
Bull stick 12 can drive disk 20 to rotate, and the first wirerope 25 drives the second sliding block 22 to move up and down immediately, and first Spring 24 does stretching motion, and blade 23 moves up and down therewith, and the up and down motion of blade 23 can produce wind-force, and the wind-force of generation can be with Dust in tealeaves is blown away, keeps tealeaves cleaner.
Blade 23 can drive 2 side-to-side movement of placing box by the second wirerope 26 while up and down motion, when blade 23 When moving upwards, the second wirerope 26 can drive placing box 2 to move downward, and second spring 31 is stretched, when blade 23 is downward When movement, second spring 31 resets, and under the action of 31 elastic force of second spring, placing box 2 is moved right.Blade 23 is constantly up and down Movement can just make placing box 2 continue side-to-side movement, the tealeaves in placing box 2 can thus be paved, be prevented in placing box 2 Tealeaves local accumulation it is excessively high and flow out.
After staff installs tealeaves in small screen box 17, the first cover board 32 can be covered on small screen box 17, then The drawstring 34 of the left and right sides is tied up in the fixed link 33 of the left and right sides respectively, thus can preferably fix the first cover board 32.First cover board 32 covers small screen box 17, and tealeaves is thrown out of when can prevent small screen box 17 from moving up and down in this way.
Second cover board 35 can cover big screen box 6, and the first magnetic patch 36 and the second magnetic patch 37 can preferably fix Two cover boards 35, in this way it is prevented that the tealeaves in placing box 2 makes moist.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than protects to the present invention The limitation of range is protected, although the invention is described in detail with reference to the preferred embodiments, those skilled in the art should Understand, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the essence of technical solution of the present invention And range.

Claims (5)

1. tealeaves lift screening installation in a kind of agricultural, which is characterized in that include erecting bed, placing box, mounting rod, first Sliding rail, the first sliding block, big screen box, the first guide sleeve, decelerating motor, small belt pulley, strut, bearing block, bull stick, big belt pulley, Flat belt, the second guide sleeve, connecting rod, small screen box, guide rod and fixed block, erecting bed top center are placed with placing box, peace Left and right two is respectively connected with mounting rod on rear side of dress platform, and two mounting rod inside upper parts are equipped with the first sliding rail, on the first sliding rail Slidingtype is connected with the first sliding block, big screen box is equipped between the first sliding block of the left and right sides, on rear side of big screen box in the middle part of outer wall Bilateral symmetry formula is equipped with the first guide sleeve, and slidingtype is connected with guide rod in the first guide sleeve, the guide rod top of the left and right sides Between be equipped with small screen box, the sieve pore of small screen box is greater than the sieve pore of big screen box, and middle part, which is equipped with, on front side of the mounting rod on right side slows down Motor is connected with small belt pulley on the output shaft of decelerating motor, and small belt pulley is located at the mounting rod right on right side, the left and right sides First sliding rail upper back is respectively connected with strut, and strut top is equipped with bearing block, is connected between the bearing block of the left and right sides Bull stick, bull stick right end are equipped with big belt pulley, and big belt pulley and small belt pulley are located on same vertical line, big belt pulley and belt lace It is wound with flat belt between wheel, slidingtype sets that there are three the second guide sleeves in the middle part of bull stick, and the second guide sleeve bottom is respectively connected with connecting rod, small Middle part and big screen box front side left and right two are equipped with fixed block on front side of screen box, and connecting rod lower end is hinged on corresponding solid Determine at the top of block.
2. tealeaves lift screening installation in a kind of agricultural described in accordance with the claim 1, which is characterized in that further include having circle Disk, the second sliding rail, the second sliding block, blade, the first spring and the first wirerope, bull stick left end are equipped with disk, erecting bed top left Side is equipped with the second sliding rail, and the second sliding rail is located at the mounting rod left in left side, and slidingtype is connected with the second sliding block on the second sliding rail, the It is equipped with blade on the right side of two sliding blocks, is connected with the first spring on the downside of the second sliding block between erecting bed top, disk left side is intermediate to be connected It is connected to the first wirerope, the lower end of the first wirerope is connected on the upside of the second sliding block.
3. tealeaves lift screening installation in a kind of agricultural according to claim 2, which is characterized in that further include having second Wirerope, directive wheel, third sliding rail, third sliding block, block and second spring, the embedded third that is equipped in erecting bed top center are slided Rail, slidingtype is connected with third sliding block on third sliding rail, and placing box is connect with third sliding block, and erecting bed top left side is equipped with guiding Wheel, for directive wheel positioned at the second sliding rail and the mounting rod in left side between, blade downside is connected with the second wirerope, the second wirerope around Directive wheel is crossed, the right end of the second wirerope is connected on the left of placing box, and erecting bed top right side is equipped with block, and block is located at right side Mounting rod right, on the right side of block left lower and big screen box between be connected with second spring.
4. tealeaves lift screening installation in a kind of agricultural described in accordance with the claim 3, which is characterized in that further include having first Cover board, fixed link and drawstring, small screen box upside are placed with the first cover board, and left and right two is respectively connected with drawing on the downside of the first cover board Rope, two wall top of small screen box or so are equipped with fixed link, and the drawstring of the left and right sides is rotating around in the fixed link of the left and right sides.
5. tealeaves lift screening installation in a kind of agricultural according to claim 4, which is characterized in that further include having second Cover board, the first magnetic patch and the second magnetic patch, big screen box upside are placed with the second cover board, and left and right two is equipped on the downside of the second cover board First magnetic patch, two wall tops of the interior left and right of placing box are equipped with the second magnetic patch, and the second magnetic patch is contacted and worked in coordination with the first magnetic patch.
CN201810787860.2A 2018-07-18 2018-07-18 Tealeaves over-and-under type sorting facilities in agricultural Active CN108940837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810787860.2A CN108940837B (en) 2018-07-18 2018-07-18 Tealeaves over-and-under type sorting facilities in agricultural

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810787860.2A CN108940837B (en) 2018-07-18 2018-07-18 Tealeaves over-and-under type sorting facilities in agricultural

Publications (2)

Publication Number Publication Date
CN108940837A true CN108940837A (en) 2018-12-07
CN108940837B CN108940837B (en) 2021-06-04

Family

ID=64496131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810787860.2A Active CN108940837B (en) 2018-07-18 2018-07-18 Tealeaves over-and-under type sorting facilities in agricultural

Country Status (1)

Country Link
CN (1) CN108940837B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112514639A (en) * 2020-12-29 2021-03-19 王玲 From screening type cereal reaps with dragging collection device based on selection by winnowing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100872744B1 (en) * 2008-07-24 2008-12-09 (주)상원엔텍 The density sorter of aggregate
CN107262368A (en) * 2017-07-19 2017-10-20 乐陵市鑫地园金银花种植专业合作社 New and effective chemical fertilizer screening machine
CN107649369A (en) * 2017-09-16 2018-02-02 深圳诺智研机械研究设计有限公司 A kind of agricultural uses Chinese chestnut screening plant
CN107716451A (en) * 2017-10-20 2018-02-23 南昌安润科技有限公司 A kind of electronic component circuit board cleaner
CN207126808U (en) * 2017-08-12 2018-03-23 安徽立顿生物药业有限公司 A kind of energy-saving health-care tea screening plant
CN207385943U (en) * 2017-09-15 2018-05-22 朱海玲 A kind of efficient agricultural product screening device
CN108097582A (en) * 2017-12-19 2018-06-01 董爱民 A kind of reciprocal lift screening plant

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100872744B1 (en) * 2008-07-24 2008-12-09 (주)상원엔텍 The density sorter of aggregate
CN107262368A (en) * 2017-07-19 2017-10-20 乐陵市鑫地园金银花种植专业合作社 New and effective chemical fertilizer screening machine
CN207126808U (en) * 2017-08-12 2018-03-23 安徽立顿生物药业有限公司 A kind of energy-saving health-care tea screening plant
CN207385943U (en) * 2017-09-15 2018-05-22 朱海玲 A kind of efficient agricultural product screening device
CN107649369A (en) * 2017-09-16 2018-02-02 深圳诺智研机械研究设计有限公司 A kind of agricultural uses Chinese chestnut screening plant
CN107716451A (en) * 2017-10-20 2018-02-23 南昌安润科技有限公司 A kind of electronic component circuit board cleaner
CN108097582A (en) * 2017-12-19 2018-06-01 董爱民 A kind of reciprocal lift screening plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112514639A (en) * 2020-12-29 2021-03-19 王玲 From screening type cereal reaps with dragging collection device based on selection by winnowing
CN112514639B (en) * 2020-12-29 2022-07-19 安徽省双美农业科技有限公司 From screening type cereal reaps with dragging collection device based on selection by winnowing

Also Published As

Publication number Publication date
CN108940837B (en) 2021-06-04

Similar Documents

Publication Publication Date Title
CN207531376U (en) A kind of blueberry picking and sorting equipment
CN206716476U (en) A kind of grain multipass sort combined cleaning sieve
CN109225821A (en) A kind of seed screening plant being conveniently replaceable sieve
CN107971219A (en) A kind of tea screening device
CN108940837A (en) It is a kind of agricultural in tealeaves lift screening installation
CN111422399B (en) Navel orange letter sorting packing plant is used in electronics commerce commodity circulation
CN107321617B (en) One kind hanging dry jujube harvest auxiliary device
CN208131473U (en) A kind of tea processing Winnowing impurity-removing device
CN106824788A (en) A kind of grain multipass sort combined cleaning sieve
CN103754415B (en) Fruit classification and packaging machine
CN108214789A (en) A kind of quick splitting device of wood for agricultural purposes
CN106732878B (en) A kind of quick shelling robot of paddy
CN112655375A (en) Be used for red date to collect screening encapsulation equipment after natural air-drying
CN107790373A (en) A kind of tea processing screening machine
CN203652167U (en) Classifying and packing machine for fruits
CN107252781B (en) A kind of millet dries rear screening installation
CN207887517U (en) A kind of tea screening device
CN206746991U (en) A kind of dual-purpose crops automatic vibrating screen separator in car land
CN206676719U (en) Adjustable citrus screens servicing unit
CN108499834B (en) Flexible mesh belt type airflow suspension tea sorting equipment
CN205550862U (en) Seed sorter
CN210497206U (en) Be applied to sorting device of tea processing
CN209274972U (en) A kind of egg screening boxing apparatus
CN209218647U (en) A kind of winter jujube picking machine
CN106824769A (en) The dual-purpose crops automatic vibrating screen separator in car land

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210422

Address after: 311800, Shaoxing City, Zhejiang province Zhuji city outside town Pu Village

Applicant after: Zhuji Jianfu Electromechanical Factory

Address before: 330009 Nanchang Institute of Traditional Chinese Pediatrics, 290 Zhanqian West Road, Xihu District, Nanchang City, Jiangxi Province

Applicant before: Lai Juan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210513

Address after: 445600 Xiaocun Industrial Park, Xianfeng County, Enshi Tujia and Miao Autonomous Prefecture, Hubei Province

Applicant after: Xianfeng Baoquan Tea Co.,Ltd.

Address before: Room 26, 6 / F, unit 1, Zhongnan SOHO City, Wen'an street, dingziqiao Road, Wuchang District, Wuhan City, Hubei Province

Applicant before: Zhongou (Hubei) Intellectual Property Service Co.,Ltd.

Effective date of registration: 20210513

Address after: Room 26, 6 / F, unit 1, Zhongnan SOHO City, Wen'an street, dingziqiao Road, Wuchang District, Wuhan City, Hubei Province

Applicant after: Zhongou (Hubei) Intellectual Property Service Co.,Ltd.

Address before: 311800 Waipu village, Lipu Town, Zhuji City, Shaoxing City, Zhejiang Province

Applicant before: Zhuji Jianfu Electromechanical Factory

GR01 Patent grant
GR01 Patent grant