CN108917638A - The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool - Google Patents

The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool Download PDF

Info

Publication number
CN108917638A
CN108917638A CN201811114196.1A CN201811114196A CN108917638A CN 108917638 A CN108917638 A CN 108917638A CN 201811114196 A CN201811114196 A CN 201811114196A CN 108917638 A CN108917638 A CN 108917638A
Authority
CN
China
Prior art keywords
tunnel
deformation
vehicle
section
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811114196.1A
Other languages
Chinese (zh)
Inventor
熊必涛
潘卫清
骆钧炎
阮世平
张初航
黄奕筱
沈艳婷
刘夏吟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Lover Health Science and Technology Development Co Ltd
Original Assignee
Zhejiang Lover Health Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Lover Health Science and Technology Development Co Ltd filed Critical Zhejiang Lover Health Science and Technology Development Co Ltd
Priority to CN201811114196.1A priority Critical patent/CN108917638A/en
Publication of CN108917638A publication Critical patent/CN108917638A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/16Measuring arrangements characterised by the use of optical techniques for measuring the deformation in a solid, e.g. optical strain gauge
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/058Safety, monitoring
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/16Plc to applications
    • G05B2219/163Domotique, domestic, home control, automation, smart, intelligent house

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

The invention belongs to subway tunnel three dimensional detection technical fields, a kind of mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool is disclosed, laser range finder, obliquity sensor, high-precision rotary platform, PLC controller are integrated jointly for high speed ranging, angle measurement, rotatable laser ranging system;Tunnel contour is measured with discrete multipoint system;In combination with the photoelectric encoder being installed on the measuring wheel of Tunnel testing vehicle bottom, obtain fixed displacement amount of the detection vehicle along tunnel axis direction between initial position and traveling-position, trigger, the data of specific position in tunnel that will test are transmitted to host computer by wireless communicator.The present invention makes a breakthrough in the practical technique novel aspects of the on-line monitoring of tunnel structure safety, and the technical system for formation rail traffic facility reliability design and analysis, test, evaluation lays the foundation, and obtaining in numerous areas has practicability.

Description

The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool
Technical field
The invention belongs to subway tunnel three dimensional detection technical field more particularly to a kind of subway tunnels based on datum tool The mounted measuring apparatus for vehicle of 3 d deformation monitoring.
Background technique
Currently, the prior art commonly used in the trade is such:
Deformation monitoring has different measurement methods as a kind of novel high-tech technology.Photogrammetric technology is main For the special measurement of large size of the deformation monitoring of large area, such as constructing tunnel plane.Utilize digital close range photogrammetry technology Tunnel ground is carried out accurately to dissect measurement and intellectual technologyization analysis with the form of laser scanning, comprehensive geo-statistic tunnel is applied The deformation on ground between duration.
Convergence monitoring method is suitable for the monitoring measurement in the tunnel of big cross section, but since the equipment of needs is excessive, such as Platform truck etc., so that technology is complicated, it is inconvenient for operation.In the construction process, if tunnel is subjected to displacement, it is divided into " surface subsidence Displacement " and " tunnel perimeter deflection " two kinds of situations.First is that surface subsidence displacement monitoring.Monitoring is buried in the hole location in tunnel to survey Point is measured, sagging deformation occurs for observing construction period earth's surface, the benchmark of general setting three or so is comprehensive The monitoring data of several points are analyzed, and the sinkage of earth's surface is calculated.Second is that tunnel perimeter deflection.Generally monitoring is measured Point and benchmark are set on the two sidewalls in tunnel, monitor the convergent of the tunnel section of entire tunnel perimeter.
Subway is the abbreviation of underground railway traffic, belongs to track transportation industry.Subway is utilized in underground and holes, and uses The mode of transportation of rail electric locomotive traction is removed for convenience of passenger, is built outside a disengaging exit on ground every a distance, one As be not take up the soil and space in city, neither ground composing environment is polluted, and the noisy of city can be hidden for passenger and provided Good environment.Subway is a kind of independent rail transit system, and operating normally is not influenced by surface road is crowded, can be fast Victory, cosily transports passenger at safety.Rail traffic is mainstream and the direction of Modern City Traffic, and freight volume is big, and speed is fast, is done Disturb small, low energy consumption, is known as the main artery of modern city, is the significant mark that a city incorporates international big city modern transportation Will, it is not only a national national power and the strength of scientific and technological level shows, and is to solve city traffic pressure most Effective mode.
In recent years, Chinese metro industry is quickly grown.In short time, only Beijing, Shanghai, these three cities of Guangzhou are every year To put more than 40 kilometers of routes into operation respectively.According to parties concerned's introduction, by 2015, national metro operation total kilometrage will be up to 3000 Kilometer, and the year two thousand twenty, will have 40 urban construction subways, general planning mileage is 4.3 times of current total kilometrage up to 7000 kilometers. This development progress is that never have on Chinese history, and rare in the world.But due to urban rail transit in China Developing history is shorter, experience is also insufficient, and in addition, the manufacture that China not yet sets up independent urban track traffic produces Industry, at present other than civil engineering, the systems such as vehicle, signal of communication, control of nearly all urban track traffic and shield etc. Facility, equipment are all from country variant introduction or so-called domestic assembling.The rail traffic system that these standards are different, standard is different System, it is possible to leave the problem of can not be ignored and security risk to construction and operation management.
Subway is the complication system of carrying highly dense crowd quick in small space a kind of, and narrow space determines it The difficulty and complexity of management measure;It runs at high speed and has more highlighted the importance of system various aspects cooperation, each system Each details may be to influence the factor of safety;It is densely-populated that determine rail traffic once accident occurs be exactly huge Big danger and disaster;The safety of rail traffic and planning, construction, each stage close association of operation determine rail traffic again The systematicness and globality of safety management.Safety accident once occurs for these explanations, urban track traffic, and consequence will be extremely tight Weight.Therefore, the safety problem of subway is particularly important.
Safety problem during shield tunnel construction and metro operation is mainly manifested in the following aspects:It crouches under tunnel soft Soil layer softens under Long-term Vibration load action to be caused to settle;Tunnel adjacent building construction activities cause tunnel deformation;Section tunnel Sleeping soil layer soil erosion damaging property linear deformation under road;When tunnel passes through different soil property situation areas, soil body physical mechanics Nature difference causes tunnel structure to generate differential settlement under action of long-term load;Shield Tunnel in Soft Soil differential settlement causes Segment joint opens, subgrade of metro and section of jurisdiction removing crack, and portion percolating water occurs, emits mud and local failure, influences tunnel The normal use and metro operation in road.
The health monitoring in tunnel can be divided into two stages:Construction stage and operation stage.Currently, being applied both at home and abroad for tunnel The own comparative maturity of the monitoring technology in work stage, but it is far from enough to the monitoring attention degree during tunnel operation.In fact, fortune Battalion's stage, the health monitoring in tunnel should more be paid attention to because time span is big, influence factor is complicated, disaster social influence is big.Tunnel is strong Health monitoring includes that tunnel structure corrodes monitoring, structural deformation monitoring, structural internal force measure and ambient conditions monitoring, especially structure Deformation monitoring is extremely important, and monitoring content is mainly the convergent deformation of the Longitudinal Settlement in tunnel, lateral displacement and section.
Settlement observation analysis discovery to built subway tunnel, the tunnel in soft soil layer is in long-term operation In, it generally can all continue to increase Longitudinal Settlement, which accounts for the major part of total settlement.For example, from nineteen ninety-five to 1999 Between, Shanghai Underground No.1 line People Square Station to Xin Zha way station section subway tunnel largest cumulative settling amount has been more than 145 millimeters; Huang Po way station is to the differential settlement of People Square Station running tunnel close to 90 millimeters, only in 1998-1999 year difference settling amount Just up to 21 millimeters.Tunnel differential settlement can make tunnel generate the comfort that bending deformation influences the smooth and passenger of track, and Cause tunnel seam to be opened, to be further exacerbated by infiltration, or even leakage mud, the structure in tunnel, connector and normal operation are caused It threatens.For example, the destruction that the intercontinental sewage treatment pipeline for being located at California, USA occurs was precisely due to tunnel generated Big longitudinal inhomogeneous deformation, so that joint cracking, muddy water is poured in, and pipeline is caused finally to destroy and surface collapse.Therefore necessary Pay attention to development of the linear deformation in tunnel in long-term operation, and from design, construction, Control Engineering, ambient enviroment shadow Ring etc. gives comprehensively control.
For the convergent deformation monitoring of tunnel cross-section, foreign countries have now been developed a kind of Tunnel testing vehicle, are exclusively used in subway and stop Tunnel deformation status information is acquired between duration.Detection vehicle passes through the corresponding information of place and is just collected, and special via diagnosis Family carries out network analysis.
China has also introduced such equipment in more tunnels, carries out the monitoring of tunnel cross-section deformation, achieves preferable Effect.At high cost, data volume is few, and precision is low, and labor intensity is big, is unable to on-line measurement and early warning.
Currently, the subway line for the thousands of miles mileage that China has opened, the subway line built and established also are advised Mould is huge, and the high density of subway population and high risk once accident occurs have been doomed metro safety problem and can not have been neglected Depending on.During subway work and operation, the cross section deformation in tunnel is the key factor for influencing subway tunnel safety, when tunnel is disconnected After face deforms more than certain value, it may occur that collapse equal danger.
In conclusion problem of the existing technology is:
1) monitoring efficiency is low:Detection for the Longitudinal Settlement in tunnel, lateral displacement and section convergent deformation, traditional monitoring The mode of artificial periodic monitoring is mostly used to carry out, since its observation time is long, observation period and frequency limited are not suitable in tunnel It is used under operation state.
Meanwhile with the raising that analysis requires, tunnel operation phase health monitoring systems need to have long-term online, automatic in real time The functions such as monitoring, since monitoring project is more, route is long, measuring point is more, data volume is big, existing monitoring mode and means oneself cannot expire Sufficient requirement of engineering.
2) monitoring cost is high:Traditional subway tunnel monitoring, needs by the tunnel or subway operating personnel of profession in subway Each monitoring point is arrived in the vehicle non-operation period, detection device is set up, according to the detection program of standard to each tunnel cross-section Upper each point measures, record the tunnel cross-section on starting point distance z and tunnel cross-section each point from rail center (or Rangefinder position) distance and angle, then these information are converted into absolute three data for describing entire Metro Space (x,y,z).It can be seen that the human input cost of monitoring works is relatively high, the labor intensity of technical staff is also very big.Due to setting The excess loss of repeatedly mobile carrying and the calibration of standby needs, equipment and sensor is big, and corresponding equipment is paid also big.Generally It sees, will lead to monitoring cost height.
3) monitoring accuracy is poor:The method and instrument that the monitoring of early stage subway tunnel uses mostly are classical ground survey methods With the traditional instruments such as level, theodolite.It is also developed rapidly with technological progress, corresponding monitoring technology with the development of the times, There are some new monitoring technology to occur.Such as the multisensor displacement monitoring technology based on hydrostatic level, it is received based on Ba Saite The displacement monitoring technology for holding back system, displacement monitoring technology and terrestrial photogrammetric survey technology based on fixed automatic inclinometer Etc., these technologies improve the convenience, agility and accuracy of measurement to a certain extent, but are still difficult to meet the modern times The construction of subway neutralizes the detection requirement after being completed.If precision is in a centimetre level, and tunnel monitoring will be in mm or even following.Some Monitoring technology needs install sensor array on tunnel section, have certain destruction to tunnel, and sensor itself is installed The long-term reliability of structure also will affect monitoring accuracy.
4) information-based degree of integration is low:The trend of subway tunnel monitoring should be towards the side of automation, informationization and wisdom To development.Monitoring the degree of automation is not high at present, and Data Integration is imperfect, " information island " phenomenon is presented, to track health shape The judgement of condition largely needs those of skill in the art to participate in, intelligent, wisdomization deficiency.Since the device for being respectively adopted different is set Standby and data interchange platform, mutual information are difficult effectively to be transmitted and shared.These all provide traffic information Source is more dispersed, and segmentation situation is serious, and information island phenomenon is obvious.Cause to lack work compound, nothing between each department, department Method, which is realized, to have complementary advantages, and is also unable to get to the special circumstances of appearance and timely and effectively handles.
Solve the difficulty and meaning of above-mentioned technical problem:
The difficulty for solving above-mentioned technical problem has:The research of academia and engineering circles has been obtained as technology develops some Concern, is partially resolved, proposes some targeted schemes, but due to the complexity of subway tunnel 3 d deformation monitoring Property and particularity, the problem is still without systematic solution.
Bring meaning is after solving above-mentioned technical problem:It is the direction of the following monitoring development using full-automatic monitoring, The present invention reduces artificial subjective factors to the greatest extent, is continuously or periodically monitored using high precision apparatus.Not only greatly reduce The human input cost of monitoring works reduces the labor intensity of technical staff, improves working efficiency.Meanwhile also achieving biography The real-time monitoring that system personal monitoring can not accomplish, improves the validity and reliability of monitoring data.It is measured using modern instrument The electronization of 3 d deformation monitoring is realized, the function of early detection instrument is not only retained but also upgraded.As rotation motor drives Target measurement can automatically continuously be tracked by moving it, and without being manually operated, and it is with programing function, can be for predetermined Target is programmed default, realization automatic operation.The informationization of subway tunnel 3 d deformation monitoring is improved, with ' sensor ' Based on Intelligent information acquisition, by the number spaceization of signal and information processing based on, with ' be able to achieve people, machine, object it is complete and mutual The full networking of connection ' ' ' it is information exchange and resource sharing platform, realize the control and management process intelligence of track 3 d deformation monitoring Intelligentization.
Summary of the invention
In view of the problems of the existing technology, the present invention provides a kind of subway tunnel 3 D deformation based on datum tool The mounted measuring apparatus for vehicle of monitoring.
The invention is realized in this way a kind of vehicle load measurement of subway tunnel 3 d deformation monitoring based on datum tool fills It sets, including:
Laser range finder, obliquity sensor, high-precision rotary platform, photoelectric encoder, PLC controller and wireless communicator;
Laser range finder, obliquity sensor are installed on high-precision rotary platform;
High-precision rotary platform is fixed by the bracket in measurement vehicle main body;
Photoelectric encoder is installed on the vehicle bottom measuring wheel of measurement vehicle main body, and PLC controller is installed on measurement vehicle main body one Side, wireless communicator are mounted on measurement vehicle main body top;
Laser range finder, obliquity sensor, high-precision rotary platform, PLC controller are integrated jointly for high speed ranging, are surveyed Angle, rotatable laser ranging system;Tunnel contour is measured with discrete multipoint system;
Laser ranging system combination photoelectric encoder obtains detection vehicle initial position and traveling position along tunnel axis direction Fixed displacement amount between setting triggers the program built in PLC controller, and the data of specific position in tunnel that will test are passed through Wireless communicator is transmitted to host computer;
The mounted measuring apparatus for vehicle of the subway tunnel 3 d deformation monitoring based on datum tool further comprises:Positioned at tunnel The station level data processing system at road section both ends, for being analyzed and processed, obtaining the profile of Tunnel testing section and being intended It closes;Station level data processing system carries out adjacent sections relative displacement detection using distributed intelligence network, passes through positioning datum Transmitting, obtains the absolute displacement amount of each monitoring section;
And it is monitored using laser range finder and analyzes tunnel cross-section deformation;By dividing displacement and variation tendency Analysis carries out the early warning of tunnel deformation state.
Another object of the present invention is to provide a kind of pre- police of subway tunnel 3 d deformation monitoring based on datum tool Method includes:
1) mounted measuring apparatus for vehicle for carrying out the tunnel deformation of datum tool is constituted;To tunnel structure under track operating environment Laser measurement sensor network geometric configuration is established, the transmitting of tunnel shape changing detection and positioning datum is carried out;
The transmission mechanism for establishing measured data and station level data processing system, constructs the theoretical mould of tunnel three-dimensional measurement Type;
The longitudinal register system of integrated detection vehicle, carries out the position of each Measure section in tunnel, judge Measure section away from Measure the accurate distance of initial position;
Establish the collection of laser ranging system, data transmission system, vehicle positioning system, real-time data acquisition and feedback system It is matched at scheme and key parameter;Carry out detection error analysis, profile comparison and early warning troubleshooting;
2) acquisition of tunnel cross-section measurement data and analysis are carried out:
Progress multisensor syste calibration, sensor self-stabilization system, sensor network configuration, laser ranging system are same Step, the storage of multisensor mass data transfers, multisensor data fusion processing, tunnel deformation analysis are issued with early warning, building The data transmission mechanism in section station-keeping data domain and station level monitoring computer real-time, interactive;And passed through by station level monitoring system Each communication interface software is configured and is modified to the software parameter of each integrated tunnel cross-section deformation detection school bus;
3) tunnel cross-section deformation detection is carried out:
Cross section deformation measuring instrument is integrated in vehicle mounted integrated system;Carry out cross section deformation measurement, damping supporting detection, longitudinal direction Positioning system, detection control and data prediction;Vehicle mounted integrated system is communicated by wireless network and host computer;
4) it stores, analyzes and issue tunnel-type change information, form tunnel deformation early warning mechanism.
Further, step 4), including:
Spatial database is established to store and issue tunnel deformation information;
The data for acquiring simultaneously convergence analysis multisensor carry out Three-Dimensional Dynamic modeling to tested tunnel;By to each observation The analysis of point historical data generates early warning report.
Further, step 1) judges in accurate distance of the Measure section away from measurement initial position, including:
Laser range finder is installed on detection vehicle, and the data measured obtain after the vibration compensation of dynamic benchmark measuring system Section test point is obtained at a distance from mounting structure central point;
Assuming that rail plane midpoint is the coordinate origin (0,0) of the measuring system, manual measurement learns that laser scanner is being examined The installation site coordinate of measuring car front end is (M, N), and the ranging of Shu Jiguang is L, measurement angle α, calculates the seat of detection corresponding points Marking (x, y) is
Another object of the present invention is to provide a kind of subway tunnel 3 d deformation monitoring realized based on datum tool with Early warning system includes:
The mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module:For under track operating environment to tunnel knot Vertical laser measurement sensor network geometric configuration is constructed, the transmitting of tunnel shape changing detection and positioning datum is carried out;
The acquisition of tunnel cross-section measurement data and analysis module:For carrying out multisensor syste calibration, sensor self-stabilization System, sensor network configuration, laser ranging system is synchronous, multisensor mass data transfers store, multi-sensor data melts Conjunction processing, tunnel deformation analysis are issued with early warning, building section station-keeping data domain and station level monitoring computer real-time, interactive Data transmission mechanism;And system is monitored by each communication interface software to each integrated tunnel cross-section deformation detection school bus by station level Software parameter configured and modified;
Tunnel cross-section deformation detection module:For cross section deformation measuring instrument to be integrated in vehicle mounted integrated system;Carry out section Deformation measurement, damping supporting detection, longitudinal register system, detection control and data prediction;Vehicle mounted integrated system passes through wireless Network is communicated with host computer;
Tunnel deformation early warning mechanism memory module:Become information for storing, analyzing and issue tunnel-type, forms tunnel deformation Early warning mechanism.
Further, the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module and is also used to establish measured data With the transmission mechanism of station level data processing system, the theoretical model of tunnel three-dimensional measurement is constructed.
Further, the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes the longitudinal direction that module is also used to integrated detection vehicle Positioning system carries out the position of each Measure section in tunnel, judges accurate distance of the Measure section away from measurement initial position.
Further, the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module and is also used to establish laser ranging system Integrated Solution and the key parameter matching of system, data transmission system, vehicle positioning system, real-time data acquisition and feedback system; Carry out detection error analysis, profile comparison and early warning troubleshooting.
Further, the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module, including:
The transfer module of tunnel shape changing detection and positioning datum establishes Laser Measuring to tunnel structure under track operating environment The configuration of quantity sensor network geometry, carries out the transmitting of tunnel shape changing detection and positioning datum;
The theoretical model of tunnel three-dimensional measurement constructs module, establishes the biography of measured data and station level data processing system Defeated mechanism constructs the theoretical model of tunnel three-dimensional measurement;
Measure section integrates the longitudinal register system of detection vehicle away from measurement initial position spacing module, carries out every in tunnel The position of one Measure section judges accurate distance of the Measure section away from measurement initial position;
Error analysis, profile compares and early warning fault processing module, establishes laser ranging system, data transmission system, vehicle Carry Integrated Solution and the key parameter matching of positioning system, real-time data acquisition and feedback system;Carry out detection error analysis, wheel Exterior feature compares and early warning troubleshooting.
In conclusion advantages of the present invention and good effect are:
The present invention is on the basis of conventional tunnel measuring technique, by by laser ranging technique, PLC control technology, calculating The machine communication technology combines, and proposes based on laser ranging technique to tunnel structure shape changing detection domain early warning scheme.This, which is that one kind is non-, connects Touch and high-precision detection technique continuously measure each section of tunnel inner wall using vehicle-mounted laser rangefinder, obtain The distance between laser emission point and section test point transmit measurement data to station level data processing system by wireless communication, By network analysis tunnel deformed state and timely early warning.
Tunnel cross-section deformation auto-monitoring system of the invention is ground for hot work in progress or subway tunnel of having started operation System, detection vehicle is equipped with PLC on detection vehicle along the progressive traveling of track of subway tunnel, controls laser range finder to tunnel Section carries out continuous wheel measuring, and measured data are first stored in the PLC on detection vehicle, after section to be detected has travelled, Laser range finder stops measurement, and the data in PLC are transmitted to station level data processing system through wireless communication.In conjunction with inspection The longitudinal register system of measuring car, that is, photoelectric encoder is installed at Tunnel testing vehicle bottom, determine each Measure section in tunnel Position, i.e., the section away from measurement initial position accurate distance.Data processing is mainly to carry out tunnel to measured data The contour fitting of section obtains the wheel in tunnel section by curve matching according to the position coordinates of point limited on tunnel cross-section Exterior feature, the timely early warning of disaster by compared with original design profile, obtaining the deformation situation of tunnel cross-section, to that may occur.
Relative to traditional tunnel manual detection mode, not only precision is high, stability is good for this system, also saves a large amount of people Power material resources, have saved the plenty of time, are expected to create huge economic value.
Main advantages of the present invention have:
1) the sequence section survey of high-precision three-dimensional tunnel and early warning system are established.
The present invention can divide institute's measured data by software kit with precise measurement tunnel cross-section geomery data Analysis obtains profile data, carries out the drafting of measured profile figure, the drafting of design section, the calculating of measured profile area, designs and break The calculating of face area, measured profile and design section it is linear compared with (the i.e. position of measured profile each point and design section respective point Set and compare), early warning is provided to the disaster that may occur.On this basis, it is compiled by loading onto photoelectricity on the wheel of detection trolley Code device, can be obtained the real-time lengthwise position of trolley, therefore, the data for being not only some single section that this system obtains, and And be the three-dimensional data for further including longitudinal coordinate, it can very easily obtain the lengthwise position of critical section.This is to positioning dangerous The rapidity of section is repaired.
2) establish that multisensor is synchronous, relative positioning determines multi level control under appearance and environmental disturbances.
This system is logical with laser ranging technique, PLC control technology, computer on the basis of conventional tunnel measuring technique Letter technology combines, and has integrated software and hardware, hardware includes laser range finder, rangefinder controller, wireless communicator, detection Vehicle and photoelectric encoder etc., software module can carry out the Fitting Analysis of tunnel contour according to data measured, overcome including more High-precise synchronization, relative positioning between the calibration of sensor network, multisensor determine the interference such as the irregular vibration of appearance and basis Under multi level control the problems such as.
It is innovated by above-mentioned key technology, the present invention is obtained in the practical technique novel aspects of the safety monitoring of tunnel structure It breaks through, the technical system for formation rail traffic facility reliability design and analysis, test, evaluation lays the foundation, and obtains in the field Obtain a collection of technology, method and utility system with independent intellectual property rights.
The analysis results that the present invention obtains in addition to the monitoring for subway tunnel, the present invention can also be generalized to it is many other Field.For example, China possesses highways most in the world, railway tunnel, the present invention also can be used for the section of highway, railway tunnel Deformation monitoring.When for railway tunnel, principle is substantially similar to subway tunnel, and detection vehicle is slowly travelled along rail;With When on vcehicular tunnel, the homing device based on lane line can be added, makes to detect vehicle always in a certain lane center traveling; It can be also used for coal mine landslide, early warning etc. before water leak accident, there is huge market application prospect.
Detailed description of the invention
Fig. 1 is that the subway tunnel three-dimensional provided in an embodiment of the present invention based on datum tool becomes The mounted measuring apparatus for vehicle figure of shape monitoring.
In figure:1, laser range finder;2, obliquity sensor;3, vehicle main body is measured;4, photoelectric encoder;5, PLC controller; 6, wireless communicator.
Fig. 2 be each measurement point of tunnel cross-section provided in an embodiment of the present invention to rangefinder apart from detection principle diagram.
Fig. 3 is detection profiled outline fitted figure provided in an embodiment of the present invention.
Fig. 4 is tunnel axis datum tool method figure provided in an embodiment of the present invention.
Fig. 5 is the work flow diagram of all section surveys in transit tunnel provided in an embodiment of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
The required hardware and software environment of the present invention has substantially, possesses ground Dynamic Data Acquiring vehicle and various at present Face laser scanner etc..
Such as Fig. 1, the vehicle load measurement of the subway tunnel 3 d deformation monitoring provided in an embodiment of the present invention based on datum tool Device, including:
Laser range finder 1, obliquity sensor 2, high-precision rotary platform 3, photoelectric encoder 4, PLC controller 5 and channel radio Believe device 6;
Laser range finder 1, obliquity sensor 2, high-precision rotary platform 3, PLC controller 5 integrate jointly for high speed ranging, Angle measurement, rotatable laser ranging system;Tunnel contour is measured with discrete multipoint system;
In combination with the photoelectric encoder 4 being installed on the measuring wheel of Tunnel testing vehicle bottom, detection vehicle is obtained along tunnel axis Fixed displacement amount on direction between initial position and traveling-position, trigger, the specific position in tunnel that will test Data are transmitted to host computer by wireless communicator 6;
It is analyzed and processed by station level data processing system, obtains the contour fitting of Tunnel testing section;
Intelligent network is set using distribution and carries out adjacent section relative displacement detection, by the transmitting of positioning datum, is obtained every The absolute displacement amount of a monitoring section, and monitored using cross section deformation measuring instrument and analyze tunnel cross-section deformation;By to displacement The analysis of size and variation tendency carries out the early warning of tunnel deformation state.
Subway tunnel 3 d deformation monitoring method for early warning provided in an embodiment of the present invention based on datum tool, including:
1) mounted measuring apparatus for vehicle for carrying out the tunnel deformation of datum tool is constituted;To tunnel structure under track operating environment Laser measurement sensor network geometric configuration is established, the transmitting of tunnel shape changing detection and positioning datum is carried out;
The transmission mechanism for establishing measured data and station level data processing system, constructs the theoretical mould of tunnel three-dimensional measurement Type;
Specifically have:
Certain point (such as monitoring station position of tunnel portal) originated in subway tunnel is used as datum mark (origin), from The datum mark sets out Tunnel testing vehicle along the gradual traveling of track in subway tunnel.It can although the rail trend in tunnel has There can be the situation for deviateing straight line, the rail axis along direction of advance is equivalent to the linear positive Z axis in tunnel threedimensional model (such as Shown in figure, Z-direction, horizontally to the right straight line), it is installed on the measuring wheel of Tunnel testing vehicle bottom and is compiled for measuring the photoelectricity of operating range Code device, obtaining detection vehicle initial position to fixed displacement amount between traveling-position, different location along tunnel axis direction has Different Z values, such as Za,Zb,Zc... .., to determine the position of each Measure section in tunnel, i.e., the section is away from measurement start bit The accurate distance Z set.
On different tunnel axis positions, the PLC module control vehicle-mounted laser rangefinder on detection vehicle is mounted on to difference Post-tunnel section (section and rail axis be vertical) continuous wheel measuring of carry out, every it is fixed exercise distance again into The wheel measuring of tunnel cross-section of row.What the measurement of different location tunnel cross-section indicated is all a series of angles from 0 ° --> The distance of test point and vehicle-mounted laser rangefinder mounting structure central point (M, N) on 360 ° of arc-shaped tunnel cross-sections when gradually scanning Li(subscript i=1,2,3......).Measured data (range data that arc-shaped tunnel cross-section one encloses) are all first kept in every time Enter in the PLC detected on vehicle.The absolute coordinate of each test point should be (x on so arc-shaped tunnel cross-sectioni,yi), conversion is closed It is as follows:
(test point of certain section different scanning angle [alpha] is indicated with i=1,2,3...... Position)
In formula, the angle of laser beam and horizontal plane, i.e. scanning angle when α is vehicle-mounted laser stadia surveying;
M, N are laser range finder positions when initial position is to traveling-position Z along tunnel axis direction, this is with tunnel The absolute position of Tunnel testing vehicle laser range finder central point, is indicated as with three dimensional space coordinate, is when interior starting point is origin (M,N,Z);
X, y are a series of test point (x, y) absolute coordinates of the detection section, are calculated according to the position (M, N);
L be the detection section a series of test points relative to vehicle-mounted laser rangefinder laser emitting point distance.
By above-mentioned calculating, one group of data (x corresponding with certain arc-shaped tunnel cross-section is obtainedi,yi,Z).Area to be detected After the tunnel cross-section measurement of Duan Suoyou tested point, laser range finder just stops measurement, and the data in PLC pass through wired or nothing The mode of line communication is transmitted to station level data processing system.Data processing is mainly to carry out tunnel cross-section to measured data Contour fitting just can obtain actual measurement tunnel section according to the position coordinates of point limited on tunnel cross-section by curve matching Profile.
The data that there is station level data center in this way are a series of (xi,yi,Z)Ω, wherein Ω=a, b, c... indicate a system The tunnel cross-section sequence of column, and i=1,2,3,4.... indicate that a series of laser rangings of current tunnel section detect point sequence.It is soft Part system recalls corresponding software and is intended each detection profiled outline respectively according to the coordinate value of test points all on each section Conjunction comes out.The method of fitting can be selected according to precision or in real time needs, for example can use linear regression, least square method Etc..A curve can be fitted to obtain by the data of all test points of some section, this curve is exactly surveyed tunnel at that time The contour line in road section.Certainly.At the beginning of tunnel is built up or by after the assay was approved, also being measured according to same method Initial the normal data (being considered normal data) for meeting design requirement, is fitted the curve that these data obtain at this time and is considered Standard curve.Theoretically, the two contour lines should be concentric circles, and if there is deformation, the circumference data of two concentric circles can occur Deviation.By compared with original design profile, obtaining the deformation situation of tunnel cross-section, thus timely to the disaster that may occur Early warning.
The longitudinal register system of integrated detection vehicle, carries out the position of each Measure section in tunnel, judge Measure section away from Measure the accurate distance of initial position;
Establish the collection of laser ranging system, data transmission system, vehicle positioning system, real-time data acquisition and feedback system It is matched at scheme and key parameter;Carry out detection error analysis, profile comparison and early warning troubleshooting;
The profile compares and early warning troubleshooting specifically includes:
The profiled outline judgement whether deformation occurs on certain tunnel axis position of Tunnel testing vehicle first, this need by In the memory of all test point (x, y) coordinates deposit PLC of the detection section, data are passed to station level data processing system later System.Laser institute's ranging on current section circular contour based on eye point from the absolute position based on tunnel initial point or origin Conversion relation is as follows:
(test point of certain section different scanning angle [alpha] is indicated with i=1,2,3...... Position)
In formula, the angle of laser beam and horizontal plane, i.e. scanning angle when α is vehicle-mounted laser stadia surveying;
M, N are laser range finder positions when initial position is to traveling-position Z along tunnel axis direction, this is with tunnel The absolute position of Tunnel testing vehicle laser range finder central point, is indicated as with three dimensional space coordinate, is when interior starting point is origin (M,N,Z);
X, y are a series of test point (x, y) absolute location coordinates of the detection section, are calculated according to the position (M, N);
L be the detection section a series of test points relative to vehicle-mounted laser rangefinder laser emitting point distance.
By above-mentioned calculating, one group of data (x corresponding with certain arc-shaped tunnel cross-section is obtainedi,yi,Z).Area to be detected After the tunnel cross-section measurement of Duan Suoyou tested point, laser range finder just stops measurement, and the data in PLC pass through wired or nothing The mode of line communication is transmitted to station level data processing system.Data processing is mainly to carry out tunnel cross-section to measured data Contour fitting just can obtain actual measurement tunnel section according to the position coordinates of point limited on tunnel cross-section by curve matching Profile.
System recalls corresponding software according to the coordinate values of test points all on each section for each detection profiled outline It fits and respectively.The method of fitting can be selected according to precision or in real time needs, for example can use linear regression, minimum Square law etc..A curve can be fitted to obtain by the data of all test points, this curve is exactly surveyed tunnel at that time The contour line in section.Certainly.At the beginning of tunnel is built up or by after the assay was approved, also having been measured most according to same method First the normal data (being considered normal data) for meeting design requirement, is fitted the curve that these data obtain at this time and is considered to mark Directrix curve.Theoretically, the two contour lines should be concentric circles, and if there is deformation, the circumference data of two concentric circles can occur partially Difference.
The followed by early warning of deformation.If deformation within the allowed band of design, although tunnel is whole at present Deformation is also within the acceptable range.But no matter using which kind of deformation judgement algorithm (such as maximum deviation method or minimum Square law etc.), the maximum deviation or comprehensive deviation of data point have a lasting, stable, unidirectional speed of deformation.By this speed , may be in some following time interval if accumulation, this deviation can be more than permissible value.Therefore this method can be to such Phenomenon can judge in advance, provide early warning.
2) acquisition of tunnel cross-section measurement data and analysis are carried out:
Progress multisensor syste calibration, sensor self-stabilization system, sensor network configuration, laser ranging system are same Step, the storage of multisensor mass data transfers, multisensor data fusion processing, tunnel deformation analysis are issued with early warning, building The data transmission mechanism in section station-keeping data domain and station level monitoring computer real-time, interactive;Mainly passed by wireless network It is defeated, by a series of (x of had plenty of sectionsi,yi, Z) and data sequence, by certain coding mode by each group of data point packet A data packet (containing redundancy and calibration) is dressed up, a data packet is once sent, is with station level monitoring system at tunnel exit Shi Jinhang data exchange.
And system is monitored by each communication interface software to the software of each integrated tunnel cross-section deformation detection school bus by station level Parameter is configured and is modified;
3) tunnel cross-section deformation detection is carried out:
Cross section deformation measuring instrument is integrated in vehicle mounted integrated system;Carry out cross section deformation measurement, damping supporting detection, longitudinal direction Positioning system, detection control and data prediction;Vehicle mounted integrated system is communicated by wireless network and host computer;
In data prediction, specifically include:
The data that vehicle-mounted laser rangefinder on Tunnel testing vehicle directly measures are a series of test points relative to vehicle The range data for carrying the laser emitting point of laser range finder, is that can not be used for tunnel deformation just with these one-dimensional data Detection and early warning.The data of actually drawing three-dimensional tunnel cross-section are a series of three-dimensional datas (x, y, z).Z number among these According to the photoelectric detector under Tunnel testing vehicle at measuring wheel, i.e., using starting point in tunnel as origin when to Tunnel testing vehicle Absolute position z between laser range finder central point, and (x, y) precalculates acquisition according to the following formula:
(each letter meaning see on).
Furthermore x is obtained, the data such as y, z need the sensor synergism of whole system to work, the raw sensory collected Data cannot generally be directly used as the drafting of three-dimensional tunnel section, need to carry out the processing and conversion of early period.Substantially transformational relation, I.e.:
Laser range finder directly obtains laser emitting point to the distance L of tunnel cross-section different location point, is converted to these points (x, y);
Obliquity sensor directly obtains the angle between laser emitting direction and horizontal direction, i.e. angle measurement α;
High-precision rotary platform directly controls laser emitting direction and degree gradually scans from 0 degree to 360, even if angle measurement α=0~ 360 ° of variations;
Photoelectric encoder is installed on the measuring wheel of Tunnel testing vehicle bottom, is directly detected vehicle and is originated along tunnel axis direction Fixed displacement amount z between position and traveling-position;
PLC controller;System for controlling and managing all parts such as high speed ranging, angle measurement, rotation or sensor.It obtains It takes and collects all measurement point three-dimensional coordinates (x, y, z) in each tunnel section;
4) it stores, analyzes and issue tunnel-type change information, form tunnel deformation early warning mechanism.
Step 4), including:
Spatial database is established to store and issue tunnel deformation information;
The data for acquiring simultaneously convergence analysis multisensor carry out Three-Dimensional Dynamic modeling to tested tunnel;By to each observation The analysis of point historical data generates early warning report.
Step 1) integrates the longitudinal register system of detection vehicle, carries out the position of each Measure section in tunnel, judges to measure In accurate distance of the section away from measurement initial position,
Laser range finder is installed on detection vehicle, and the data measured obtain after the vibration compensation of dynamic benchmark measuring system Section test point is obtained at a distance from mounting structure central point;
Assuming that rail plane midpoint is the coordinate origin (0,0) of the measuring system, manual measurement learns that laser scanner is being examined The installation site coordinate of measuring car front end is (a, b), and the ranging of Shu Jiguang is L, measurement angle α, calculates the seat of detection corresponding points Marking (x, y) is
Subway tunnel 3 d deformation monitoring provided in an embodiment of the present invention based on datum tool includes with early warning system:
The mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module:
Laser measurement sensor network geometric configuration is established to tunnel structure under track operating environment, carries out tunnel deformation The transmitting of detection and positioning datum;
The transmission mechanism for establishing measured data and station level data processing system, constructs the theoretical mould of tunnel three-dimensional measurement Type;
The longitudinal register system of integrated detection vehicle, carries out the position of each Measure section in tunnel, judge Measure section away from Measure the accurate distance of initial position;
Establish the collection of laser ranging system, data transmission system, vehicle positioning system, real-time data acquisition and feedback system It is matched at scheme and key parameter;Carry out detection error analysis, profile comparison and early warning troubleshooting;
The acquisition of tunnel cross-section measurement data and analysis module:
Progress multisensor syste calibration, sensor self-stabilization system, sensor network configuration, laser ranging system are same Step, the storage of multisensor mass data transfers, multisensor data fusion processing, tunnel deformation analysis are issued with early warning, building The data transmission mechanism in section station-keeping data domain and station level monitoring computer real-time, interactive;And passed through by station level monitoring system Each communication interface software is configured and is modified to the software parameter of each integrated tunnel cross-section deformation detection school bus;
Tunnel cross-section deformation detection module:
Cross section deformation measuring instrument is integrated in vehicle mounted integrated system;Carry out cross section deformation measurement, damping supporting detection, longitudinal direction Positioning system, detection control and data prediction;Vehicle mounted integrated system is communicated by wireless network and host computer;
Tunnel deformation early warning mechanism memory module:Become information for storing, analyzing and issue tunnel-type, forms tunnel deformation Early warning mechanism.
The mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module, including:
The transfer module of tunnel shape changing detection and positioning datum establishes Laser Measuring to tunnel structure under track operating environment The configuration of quantity sensor network geometry, carries out the transmitting of tunnel shape changing detection and positioning datum;
The theoretical model of tunnel three-dimensional measurement constructs module, establishes the biography of measured data and station level data processing system Defeated mechanism constructs the theoretical model of tunnel three-dimensional measurement;
Measure section integrates the longitudinal register system of detection vehicle away from measurement initial position spacing module, carries out every in tunnel The position of one Measure section judges accurate distance of the Measure section away from measurement initial position;
Error analysis, profile compares and early warning fault processing module, establishes laser ranging system, data transmission system, vehicle Carry Integrated Solution and the key parameter matching of positioning system, real-time data acquisition and feedback system;Carry out detection error analysis, wheel Exterior feature compares and early warning troubleshooting.
Below with reference to concrete analysis, the invention will be further described,
Demonstration Application
In practical application verifying, using a section in the metro company operation tunnel of Hangzhou City as Demonstration, realize The safety monitoring of tunnel structure and deformation analysis and early warning publication.And it compares and tests with design tunnel and conventional method Card, forms the safety monitoring and practical technique of tunnel structure.
The mounted measuring apparatus for vehicle for the subway tunnel 3 d deformation monitoring based on datum tool that inventive embodiments provide,
Using the non-operation of subway tunnel and repair time, tunnel inner wall is measured by vehicle-mounted laser rangefinder.
Vehicle is detected along the progressive traveling of track of subway tunnel, PLC is housed on detection vehicle, controls laser range finder to tunnel Road section carries out continuous wheel measuring, and measured data are first stored in the PLC on detection vehicle, and section to be detected has travelled Afterwards, laser range finder stops measurement, and the data in PLC are transmitted to station level data processing system through wireless communication.Knot The longitudinal register system of detection vehicle is closed, that is, photoelectric encoder is installed at Tunnel testing vehicle bottom, to determine each survey in tunnel Measure the position of section, i.e. accurate distance of the section away from measurement initial position.Data processing mainly to measured data into The contour fitting of row tunnel cross-section just can obtain tunnel by curve matching according to the position coordinates of point limited on tunnel cross-section The profile in road section, by compared with original design profile, obtaining the deformation situation of tunnel cross-section, thus to possible generation The timely early warning of disaster.
Vehicular laser ranging system illustraton of model is as shown in Figure 1, be divided into three parts:Tunnel cross-section laser ranging system, Detect vehicle longitudinal movement positioning device and wireless data communication device.System is mainly by laser range finder, obliquity sensor, high-precision Spend turntable, photoelectric encoder, PLC controller and wireless communicator composition.Wherein, by laser range finder, obliquity sensor and High-precision rotary platform combines, and forming one can be with high speed ranging, angle measurement, rotatable laser ranging system.System is with PLC For controller, tunnel contour is measured with discrete multipoint system by laser ranging system, in combination with being installed on Photoelectric encoder on the measuring wheel of Tunnel testing vehicle bottom obtains detection vehicle initial position and traveling-position along tunnel axis direction Between fixed displacement amount, trigger, the data of specific position in tunnel that will test are transmitted to by wireless communicator Host computer is analyzed and processed by station level data processing system, to obtain the contour fitting of Tunnel testing section.
Intelligent network is set using distribution and carries out adjacent section relative displacement detection, by the transmitting of positioning datum, is obtained every The absolute displacement amount of a monitoring section, and monitored using cross section deformation measuring instrument and analyze tunnel cross-section deformation.By to displacement The analysis of size and variation tendency carries out the early warning of tunnel deformation state.This project is analysis object with one section of section.
Fig. 2 is tunnel cross-section provided in an embodiment of the present invention apart from detection principle diagram.
Fig. 3 is detection profiled outline fitted figure provided in an embodiment of the present invention.
Fig. 4 is tunnel axis datum tool method figure provided in an embodiment of the present invention.
Fig. 5 is the work flow diagram of all section surveys in transit tunnel provided in an embodiment of the present invention.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of subway tunnel 3 d deformation monitoring method for early warning based on datum tool, which is characterized in that described to be based on benchmark The subway tunnel 3 d deformation monitoring method for early warning of transmitting includes:
1) mounted measuring apparatus for vehicle for carrying out the tunnel deformation of datum tool is constituted;Tunnel structure is established under track operating environment Laser measurement sensor network geometric configuration carries out the transmitting of tunnel shape changing detection and positioning datum;
The transmission mechanism for establishing measured data and station level data processing system, constructs the theoretical model of tunnel three-dimensional measurement;
The longitudinal register system of integrated detection vehicle, carries out the position of each Measure section in tunnel, judges Measure section away from measurement The accurate distance of initial position;
Establish the integrated side of laser ranging system, data transmission system, vehicle positioning system, real-time data acquisition and feedback system Case and key parameter matching;Carry out detection error analysis, profile comparison and early warning troubleshooting;
2) acquisition of tunnel cross-section measurement data and analysis are carried out:
Progress multisensor syste calibration, sensor self-stabilization system, sensor network configuration, laser ranging system are synchronous, more The storage of sensor mass data transfers, multisensor data fusion processing, tunnel deformation analysis are issued with early warning, construct section phase To the data transmission mechanism of position data field and station level monitoring computer real-time, interactive;And each communication is passed through by station level monitoring system Interface software is configured and is modified to the software parameter of each integrated tunnel cross-section deformation detection school bus;
3) tunnel cross-section deformation detection is carried out:
Cross section deformation measuring instrument is integrated in vehicle mounted integrated system;Carry out cross section deformation measurement, damping supporting detection, longitudinal register System, detection control and data prediction;Vehicle mounted integrated system is communicated by wireless network and host computer;
4) it stores, analyzes and issue tunnel-type change information, form tunnel deformation early warning mechanism.
2. the subway tunnel 3 d deformation monitoring method for early warning based on datum tool as described in claim 1, which is characterized in that Step 1) judge Measure section away from measurement initial position accurate distance in, including:
Laser range finder is installed on detection vehicle, and the data measured are broken after the vibration compensation of dynamic benchmark measuring system Face test point is at a distance from mounting structure central point;
Assuming that rail plane midpoint is the coordinate origin (0,0) of the measuring system, manual measurement learns laser scanner in detection vehicle The installation site coordinate of front end is (M, N), and the ranging of Shu Jiguang is L, measurement angle α, calculate detection corresponding points coordinate (x, Y) it is
3. the subway tunnel 3 d deformation monitoring method for early warning based on datum tool as described in claim 1, which is characterized in that Step 4), including:
Spatial database is established to store and issue tunnel deformation information;
The data for acquiring simultaneously convergence analysis multisensor carry out Three-Dimensional Dynamic modeling to tested tunnel;By being gone through to each observation point The analysis of history data generates early warning report.
4. a kind of subway tunnel 3 d deformation monitoring method for early warning realized described in claim 1 based on datum tool based on base The subway tunnel 3 d deformation monitoring and early warning system of quasi- transmitting, which is characterized in that the subway tunnel based on datum tool 3 d deformation monitoring includes with early warning system:
The mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module:For being constructed under track operating environment to tunnel knot Vertical laser measurement sensor network geometric configuration, carries out the transmitting of tunnel shape changing detection and positioning datum;
The acquisition of tunnel cross-section measurement data and analysis module:For carry out multisensor syste calibration, sensor self-stabilization system, Sensor network configuration, laser ranging system is synchronous, multisensor mass data transfers store, at Fusion Reason, tunnel deformation analysis are issued with early warning, construct the number in section station-keeping data domain and station level monitoring computer real-time, interactive According to transmission mechanism;And system is monitored by each communication interface software to the soft of each integrated tunnel cross-section deformation detection school bus by station level Part parameter is configured and is modified;
Tunnel cross-section deformation detection module:For cross section deformation measuring instrument to be integrated in vehicle mounted integrated system;Carry out cross section deformation Measurement, damping supporting detection, longitudinal register system, detection control and data prediction;Vehicle mounted integrated system passes through wireless network It is communicated with host computer;
Tunnel deformation early warning mechanism memory module:Become information for storing, analyzing and issue tunnel-type, forms tunnel deformation early warning Mechanism.
5. the subway tunnel 3 d deformation monitoring based on datum tool and early warning system, feature exist as claimed in claim 4 In the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module and is also used to establish at measured data and station level data The transmission mechanism of reason system constructs the theoretical model of tunnel three-dimensional measurement.
6. the subway tunnel 3 d deformation monitoring based on datum tool and early warning system, feature exist as claimed in claim 4 In, the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes the longitudinal register system that module is also used to integrated detection vehicle, into The position of each Measure section in row tunnel judges accurate distance of the Measure section away from measurement initial position.
7. the subway tunnel 3 d deformation monitoring based on datum tool and early warning system, feature exist as claimed in claim 4 In the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module and is also used to establish laser ranging system, data transmission system Integrated Solution and the key parameter matching of system, vehicle positioning system, real-time data acquisition and feedback system;Carry out detection error point Analysis, profile compares and early warning troubleshooting.
8. the subway tunnel 3 d deformation monitoring based on datum tool and early warning system, feature exist as claimed in claim 4 In, the mounted measuring apparatus for vehicle of the tunnel deformation of datum tool constitutes module, including:
The transfer module of tunnel shape changing detection and positioning datum is established laser measurement to tunnel structure under track operating environment and is passed The configuration of sensor network geometry, carries out the transmitting of tunnel shape changing detection and positioning datum;
The theoretical model of tunnel three-dimensional measurement constructs module, establishes the conveyer of measured data and station level data processing system System constructs the theoretical model of tunnel three-dimensional measurement;
Measure section integrates the longitudinal register system of detection vehicle away from measurement initial position spacing module, carries out each survey in tunnel The position for measuring section judges accurate distance of the Measure section away from measurement initial position;
Error analysis, profile compares and early warning fault processing module, establishes laser ranging system, data transmission system, vehicle-mounted fixed Integrated Solution and the key parameter matching of position system, real-time data acquisition and feedback system;Carry out detection error analysis, profile ratio Pair and early warning troubleshooting.
9. a kind of subway tunnel 3 d deformation monitoring method for early warning realized described in claim 1 based on datum tool based on base The mounted measuring apparatus for vehicle of the subway tunnel 3 d deformation monitoring of quasi- transmitting, which is characterized in that the subway based on datum tool The mounted measuring apparatus for vehicle of tunnel 3 d deformation monitoring includes:
High-precision rotary platform;
High-precision rotary platform is fixed by the bracket in measurement vehicle main body;
Laser range finder, obliquity sensor are installed on high-precision rotary platform;
Photoelectric encoder is installed on the vehicle bottom measuring wheel of measurement vehicle main body, and PLC controller is installed on measurement vehicle main body side, nothing Line communicator is mounted on measurement vehicle main body top;
Laser range finder, obliquity sensor, high-precision rotary platform, PLC controller integrate jointly for high speed ranging, angle measurement, can The laser ranging system of rotation;Tunnel contour is measured with discrete multipoint system;Laser range finder is for monitoring And analyze tunnel cross-section deformation;By the analysis to displacement and variation tendency, the early warning of tunnel deformation state is carried out;
Laser ranging system combination photoelectric encoder, acquisition detection vehicle is along tunnel axis direction between initial position and traveling-position Fixed displacement amount, trigger the program built in PLC controller, the data of specific position in tunnel that will test are by wireless Communicator is transmitted to host computer.
10. the mounted measuring apparatus for vehicle of the subway tunnel 3 d deformation monitoring based on datum tool as described in claim 1, special Sign is that the mounted measuring apparatus for vehicle of the subway tunnel 3 d deformation monitoring based on datum tool further comprises:Positioned at tunnel The station level data processing system at road section both ends, for being analyzed and processed, obtaining the profile of Tunnel testing section and being intended It closes;Station level data processing system carries out adjacent sections relative displacement detection using distributed intelligence network, passes through positioning datum Transmitting, obtains the absolute displacement amount of each monitoring section.
CN201811114196.1A 2018-09-25 2018-09-25 The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool Pending CN108917638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811114196.1A CN108917638A (en) 2018-09-25 2018-09-25 The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811114196.1A CN108917638A (en) 2018-09-25 2018-09-25 The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool

Publications (1)

Publication Number Publication Date
CN108917638A true CN108917638A (en) 2018-11-30

Family

ID=64409629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811114196.1A Pending CN108917638A (en) 2018-09-25 2018-09-25 The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool

Country Status (1)

Country Link
CN (1) CN108917638A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145366A (en) * 2019-05-10 2019-08-20 山东大学 A kind of vehicular Tunnel Landslide monitoring and pre-warning system and method
CN110514133A (en) * 2019-09-30 2019-11-29 西南石油大学 It is a kind of based on photogrammetric unmanned plane tunnel deformation detection method
CN110530281A (en) * 2019-08-30 2019-12-03 武汉理工大学 Cage guide deformation measuring device based on two dimensional laser scanning instrument
CN110631535A (en) * 2019-09-02 2019-12-31 北京星航机电装备有限公司 Machining reference transmission method for large casting cabin type structural part
CN110672424A (en) * 2019-09-30 2020-01-10 广州市建筑科学研究院有限公司 Visual safety monitoring system and method for large-tonnage static load test bed
CN110823180A (en) * 2019-10-17 2020-02-21 山东大学 Intelligent tunnel full-section convergence monitoring device and using method
CN111412884A (en) * 2020-04-07 2020-07-14 广东电网有限责任公司 Three-dimensional information recovery method based on attitude information
CN112361981A (en) * 2020-10-09 2021-02-12 河海大学 Multifunctional integrated tunnel three-dimensional laser scanning platform
CN112815909A (en) * 2020-12-31 2021-05-18 山东高速工程检测有限公司 Tunnel deformation measuring method and system and measuring robot
CN112862790A (en) * 2021-02-18 2021-05-28 中国矿业大学(北京) Subway tunnel crack positioning device and method based on linear array camera
CN113074694A (en) * 2021-03-31 2021-07-06 中煤科工集团重庆研究院有限公司 Automatic monitoring device for tunnel section deformation
CN113074651A (en) * 2021-03-31 2021-07-06 中煤科工集团重庆研究院有限公司 Single-path laser ranging tunnel deformation monitoring system and method
CN113188589A (en) * 2021-04-01 2021-07-30 山东大学 Full-time intelligent monitoring equipment and method for subway tunnel
CN113960049A (en) * 2021-10-19 2022-01-21 中南大学 Tunnel surface disease detection device and detection method
CN114674281A (en) * 2022-03-25 2022-06-28 贵州省交通规划勘察设计研究院股份有限公司 Tunnel automatic monitoring and measuring equipment and method based on scattered point fitting measurement
CN114705128A (en) * 2022-03-25 2022-07-05 贵州省交通规划勘察设计研究院股份有限公司 Tunnel automatic monitoring and measuring equipment and method based on fixed-point itinerant measurement
CN114858143A (en) * 2022-05-17 2022-08-05 武汉大学 GNSS static PPP-based subway station inter-station plane control reference transfer device and method
CN114993198A (en) * 2022-07-18 2022-09-02 中建安装集团有限公司 Automatic deformation monitoring system and method for collinear subway structure under proximity construction condition
US11673587B2 (en) 2019-05-10 2023-06-13 Tongji University Comprehensive inspection vehicle for subway tunnel
CN117889823A (en) * 2024-03-11 2024-04-16 福建省高速公路科技创新研究院有限公司 Transfer type monitoring method for vault settlement in tunnel operation period
CN118111347A (en) * 2024-03-01 2024-05-31 甘肃省交通科学研究院集团有限公司 Tunnel intelligent monitoring device based on laser ranging technology and control method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040108382A (en) * 2004-12-02 2004-12-23 (주)지오넷 The measuring device to displacement in the turren inside using laser beams and the method thereof
CN101943577A (en) * 2010-08-16 2011-01-12 上海地铁盾构设备工程有限公司 Metro tunnel fracture surface deformation detection system
CN103791849A (en) * 2014-01-27 2014-05-14 武汉长澳大地工程有限公司 Monitoring system and measuring method for laser intelligent response type tunnel convergence
CN104034275A (en) * 2014-06-09 2014-09-10 同济大学 Total station instrument based subway tunnel deformation automatic monitoring method and device
CN104964653A (en) * 2015-05-27 2015-10-07 苏州合欣美电子科技有限公司 Subway tunnel inner wall deformation detection system
CN106705876A (en) * 2016-12-12 2017-05-24 浙江大学 Laser ranging railway tunnel detection vehicle based on gyroscope positioning and detection method
CN106969749A (en) * 2017-04-27 2017-07-21 上海同岩土木工程科技股份有限公司 A kind of detection method of deformation of cross section of subway tunnel
CN107063179A (en) * 2017-04-27 2017-08-18 上海同岩土木工程科技股份有限公司 A kind of movable tunnel cross section deformation detection means
CN209541686U (en) * 2018-09-25 2019-10-25 浙江科技学院 The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040108382A (en) * 2004-12-02 2004-12-23 (주)지오넷 The measuring device to displacement in the turren inside using laser beams and the method thereof
CN101943577A (en) * 2010-08-16 2011-01-12 上海地铁盾构设备工程有限公司 Metro tunnel fracture surface deformation detection system
CN103791849A (en) * 2014-01-27 2014-05-14 武汉长澳大地工程有限公司 Monitoring system and measuring method for laser intelligent response type tunnel convergence
CN104034275A (en) * 2014-06-09 2014-09-10 同济大学 Total station instrument based subway tunnel deformation automatic monitoring method and device
CN104964653A (en) * 2015-05-27 2015-10-07 苏州合欣美电子科技有限公司 Subway tunnel inner wall deformation detection system
CN106705876A (en) * 2016-12-12 2017-05-24 浙江大学 Laser ranging railway tunnel detection vehicle based on gyroscope positioning and detection method
CN106969749A (en) * 2017-04-27 2017-07-21 上海同岩土木工程科技股份有限公司 A kind of detection method of deformation of cross section of subway tunnel
CN107063179A (en) * 2017-04-27 2017-08-18 上海同岩土木工程科技股份有限公司 A kind of movable tunnel cross section deformation detection means
CN209541686U (en) * 2018-09-25 2019-10-25 浙江科技学院 The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020228380A1 (en) * 2019-05-10 2020-11-19 山东大学 Vehicle-mounted tunnel collapse monitoring and early-warning system and method
AU2020273629B2 (en) * 2019-05-10 2021-09-30 Shandong University Vehicle-mounted monitoring, warning system and method for tunnel collapse
US11673587B2 (en) 2019-05-10 2023-06-13 Tongji University Comprehensive inspection vehicle for subway tunnel
CN110145366A (en) * 2019-05-10 2019-08-20 山东大学 A kind of vehicular Tunnel Landslide monitoring and pre-warning system and method
CN110145366B (en) * 2019-05-10 2020-04-21 山东大学 Vehicle-mounted tunnel collapse monitoring and early warning system and method
CN110530281A (en) * 2019-08-30 2019-12-03 武汉理工大学 Cage guide deformation measuring device based on two dimensional laser scanning instrument
CN110530281B (en) * 2019-08-30 2021-07-06 武汉理工大学 Cage guide deformation measuring device based on two-dimensional laser scanner
CN110631535A (en) * 2019-09-02 2019-12-31 北京星航机电装备有限公司 Machining reference transmission method for large casting cabin type structural part
CN110672424A (en) * 2019-09-30 2020-01-10 广州市建筑科学研究院有限公司 Visual safety monitoring system and method for large-tonnage static load test bed
CN110514133A (en) * 2019-09-30 2019-11-29 西南石油大学 It is a kind of based on photogrammetric unmanned plane tunnel deformation detection method
CN110672424B (en) * 2019-09-30 2022-09-09 广州市建筑科学研究院有限公司 Visual safety monitoring system and method for large-tonnage static load test bed
CN110823180A (en) * 2019-10-17 2020-02-21 山东大学 Intelligent tunnel full-section convergence monitoring device and using method
CN111412884A (en) * 2020-04-07 2020-07-14 广东电网有限责任公司 Three-dimensional information recovery method based on attitude information
CN112361981A (en) * 2020-10-09 2021-02-12 河海大学 Multifunctional integrated tunnel three-dimensional laser scanning platform
CN112815909A (en) * 2020-12-31 2021-05-18 山东高速工程检测有限公司 Tunnel deformation measuring method and system and measuring robot
CN112815909B (en) * 2020-12-31 2022-05-17 山东高速工程检测有限公司 Tunnel deformation measuring method and system and measuring robot
CN112862790A (en) * 2021-02-18 2021-05-28 中国矿业大学(北京) Subway tunnel crack positioning device and method based on linear array camera
CN112862790B (en) * 2021-02-18 2023-08-22 中国矿业大学(北京) Subway tunnel crack positioning device and method based on linear array camera
CN113074651A (en) * 2021-03-31 2021-07-06 中煤科工集团重庆研究院有限公司 Single-path laser ranging tunnel deformation monitoring system and method
CN113074694B (en) * 2021-03-31 2022-11-04 中煤科工集团重庆研究院有限公司 Automatic monitoring device for tunnel section deformation
CN113074694A (en) * 2021-03-31 2021-07-06 中煤科工集团重庆研究院有限公司 Automatic monitoring device for tunnel section deformation
CN113188589A (en) * 2021-04-01 2021-07-30 山东大学 Full-time intelligent monitoring equipment and method for subway tunnel
CN113960049A (en) * 2021-10-19 2022-01-21 中南大学 Tunnel surface disease detection device and detection method
CN114674281A (en) * 2022-03-25 2022-06-28 贵州省交通规划勘察设计研究院股份有限公司 Tunnel automatic monitoring and measuring equipment and method based on scattered point fitting measurement
CN114705128A (en) * 2022-03-25 2022-07-05 贵州省交通规划勘察设计研究院股份有限公司 Tunnel automatic monitoring and measuring equipment and method based on fixed-point itinerant measurement
CN114674281B (en) * 2022-03-25 2024-01-09 贵州省交通规划勘察设计研究院股份有限公司 Tunnel automation monitoring measurement equipment and method based on scattered point fitting measurement
CN114858143A (en) * 2022-05-17 2022-08-05 武汉大学 GNSS static PPP-based subway station inter-station plane control reference transfer device and method
CN114993198A (en) * 2022-07-18 2022-09-02 中建安装集团有限公司 Automatic deformation monitoring system and method for collinear subway structure under proximity construction condition
CN114993198B (en) * 2022-07-18 2022-11-01 中建安装集团有限公司 Automatic deformation monitoring system and method for collinear subway structure under proximity construction condition
CN118111347A (en) * 2024-03-01 2024-05-31 甘肃省交通科学研究院集团有限公司 Tunnel intelligent monitoring device based on laser ranging technology and control method thereof
CN117889823A (en) * 2024-03-11 2024-04-16 福建省高速公路科技创新研究院有限公司 Transfer type monitoring method for vault settlement in tunnel operation period

Similar Documents

Publication Publication Date Title
CN108917638A (en) The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool
CN209541686U (en) The mounted measuring apparatus for vehicle of subway tunnel 3 d deformation monitoring based on datum tool
CN105783868B (en) Subway tunnel deformation online monitoring system and monitoring method
CN109238162A (en) A kind of tunnel 3 d deformation monitoring and method for early warning
CN205327082U (en) Urban railway detection device based on integrated synchro control of multisensor
CN101408410B (en) Tunnel volume element deformation movable monitoring system and method
CN101962925B (en) Method for efficiently measuring three-dimensional coordinates of track based on track precise control net
Monsberger et al. Distributed fiber optic shape sensing along shotcrete tunnel linings: Methodology, field applications, and monitoring results
CN109278053B (en) Railway tunnel operation state detection and monitoring method
CN107700280B (en) Existing double railway lines line position reconstructing method
CN102251451A (en) Track geometric state measurement system and method based on multisource information fusion technology
CN110057344B (en) Sedimentation detection method and platform
CN108280969A (en) A kind of high slope surface deformation monitoring and warning system and its method for early warning
CN111623719B (en) Laser net monitoring system and monitoring method for monitoring deformation and settlement of building
CN114132358B (en) Multi-platform intelligent track comprehensive detection system
CN114312877B (en) Railway comprehensive inspection system
CN108444432A (en) A kind of Existing Railway Line control net and railway line shape synchro measure system and method
CN111895962A (en) Method for monitoring deformation of operation subway station
CN106758719A (en) A kind of Two-wheeled road face repair robot system and road surface repair method
CN110081854A (en) The sedimentation monitoring system and method for a kind of pair of Ballast track railway ballast
CN106871867A (en) One kind has runed long range subway tunnel structure real-time displacement monitoring system and method for testing
CN116518945A (en) Subway tunnel structure safety monitoring method based on measuring robot
Glaus Kinematic track surveying by means of a multi-sensor platform
Engstrand Railway surveying-A case study of the GRP 5000
Li et al. High-speed railway track integrated inspecting by GNSS-INS multisensor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination