CN108879704A - 用电负荷调度方法、装置与负荷调度控制器 - Google Patents
用电负荷调度方法、装置与负荷调度控制器 Download PDFInfo
- Publication number
- CN108879704A CN108879704A CN201810934607.5A CN201810934607A CN108879704A CN 108879704 A CN108879704 A CN 108879704A CN 201810934607 A CN201810934607 A CN 201810934607A CN 108879704 A CN108879704 A CN 108879704A
- Authority
- CN
- China
- Prior art keywords
- charging
- charging equipment
- power
- load
- surplus capacity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
变量名 | 说明 |
Pt | 变压器功率量测值 |
Ptmax | 变压器功率允许上限值 |
Pn | 第n个充电设备功率测量值 |
Pnmax | 平台下发的第n个充电设备功率上限值 |
Pload | 该变压器下除充电设备之外的功率值 |
Pu | 当前可分配负荷 |
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810934607.5A CN108879704A (zh) | 2018-08-17 | 2018-08-17 | 用电负荷调度方法、装置与负荷调度控制器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810934607.5A CN108879704A (zh) | 2018-08-17 | 2018-08-17 | 用电负荷调度方法、装置与负荷调度控制器 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108879704A true CN108879704A (zh) | 2018-11-23 |
Family
ID=64318934
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810934607.5A Pending CN108879704A (zh) | 2018-08-17 | 2018-08-17 | 用电负荷调度方法、装置与负荷调度控制器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108879704A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110658567A (zh) * | 2019-10-09 | 2020-01-07 | 李华 | 基于无线通信的探测平台及方法 |
CN112766627A (zh) * | 2019-11-06 | 2021-05-07 | 珠海优特电力科技股份有限公司 | 可控电气设施的管控方法及装置、存储介质、电子装置 |
CN113147455A (zh) * | 2020-01-22 | 2021-07-23 | 西安杭爱山电子科技有限公司 | 一种基于虚拟软交换技术的充电桩配电增容*** |
CN115759444A (zh) * | 2022-11-24 | 2023-03-07 | 北京国电通网络技术有限公司 | 电力设备分配方法、装置、电子设备和计算机可读介质 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101895115A (zh) * | 2010-06-30 | 2010-11-24 | 周锡卫 | 一种层级构造的分布式电源智能电网构建方法 |
CN102055215A (zh) * | 2010-10-15 | 2011-05-11 | 国家电网公司 | 一种电动汽车充换电站控制方法和运行监控*** |
CN104993554A (zh) * | 2015-08-05 | 2015-10-21 | 南京捷泰电力设备有限公司 | 一种电动汽车充电装置及其运行方法 |
CN105337331A (zh) * | 2014-08-12 | 2016-02-17 | 青岛特锐德电气股份有限公司 | 一种电动汽车群充电方法及*** |
US20160370806A1 (en) * | 2012-09-04 | 2016-12-22 | Recargo, Inc. | Conditioning an electric grid using electric vehicles |
CN106684968A (zh) * | 2016-12-05 | 2017-05-17 | 杭州嘉畅科技有限公司 | 一种充电调度***及其控制方法 |
CN106786904A (zh) * | 2016-12-26 | 2017-05-31 | 广东欧珀移动通信有限公司 | 充电选择方法、装置及充电设备 |
CN107394857A (zh) * | 2017-08-31 | 2017-11-24 | 国家电网公司 | 基于变压器台区负荷信息的交流充电桩及其控制电路 |
CN108215820A (zh) * | 2017-04-28 | 2018-06-29 | 国家电网公司 | 一种基于台区用电信息的电动汽车充电控制***及方法 |
-
2018
- 2018-08-17 CN CN201810934607.5A patent/CN108879704A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101895115A (zh) * | 2010-06-30 | 2010-11-24 | 周锡卫 | 一种层级构造的分布式电源智能电网构建方法 |
CN102055215A (zh) * | 2010-10-15 | 2011-05-11 | 国家电网公司 | 一种电动汽车充换电站控制方法和运行监控*** |
US20160370806A1 (en) * | 2012-09-04 | 2016-12-22 | Recargo, Inc. | Conditioning an electric grid using electric vehicles |
CN105337331A (zh) * | 2014-08-12 | 2016-02-17 | 青岛特锐德电气股份有限公司 | 一种电动汽车群充电方法及*** |
CN104993554A (zh) * | 2015-08-05 | 2015-10-21 | 南京捷泰电力设备有限公司 | 一种电动汽车充电装置及其运行方法 |
CN106684968A (zh) * | 2016-12-05 | 2017-05-17 | 杭州嘉畅科技有限公司 | 一种充电调度***及其控制方法 |
CN106786904A (zh) * | 2016-12-26 | 2017-05-31 | 广东欧珀移动通信有限公司 | 充电选择方法、装置及充电设备 |
CN108215820A (zh) * | 2017-04-28 | 2018-06-29 | 国家电网公司 | 一种基于台区用电信息的电动汽车充电控制***及方法 |
CN107394857A (zh) * | 2017-08-31 | 2017-11-24 | 国家电网公司 | 基于变压器台区负荷信息的交流充电桩及其控制电路 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110658567A (zh) * | 2019-10-09 | 2020-01-07 | 李华 | 基于无线通信的探测平台及方法 |
CN112766627A (zh) * | 2019-11-06 | 2021-05-07 | 珠海优特电力科技股份有限公司 | 可控电气设施的管控方法及装置、存储介质、电子装置 |
CN112766627B (zh) * | 2019-11-06 | 2023-11-28 | 珠海优特电力科技股份有限公司 | 可控电气设施的管控方法及装置、存储介质、电子装置 |
CN113147455A (zh) * | 2020-01-22 | 2021-07-23 | 西安杭爱山电子科技有限公司 | 一种基于虚拟软交换技术的充电桩配电增容*** |
CN115759444A (zh) * | 2022-11-24 | 2023-03-07 | 北京国电通网络技术有限公司 | 电力设备分配方法、装置、电子设备和计算机可读介质 |
CN115759444B (zh) * | 2022-11-24 | 2023-10-20 | 北京国电通网络技术有限公司 | 电力设备分配方法、装置、电子设备和计算机可读介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108879704A (zh) | 用电负荷调度方法、装置与负荷调度控制器 | |
US20230207905A1 (en) | Method and apparatus for dynamic management and control of lithium battery energy storage system, and electronic device therewith | |
CN109435753A (zh) | 一种有序充电控制方法、控制器及*** | |
Papic | Simulation model for discharging a lead-acid battery energy storage system for load leveling | |
WO2015081740A1 (zh) | 电动汽车充放电控制***及方法 | |
WO2016137630A1 (en) | Delivery of multiple grid services with energy storage system | |
CN111619393B (zh) | 一种面向用户的台区电动汽车有序充电控制方法 | |
CN104600731B (zh) | 一种用于光储***削峰填谷的储能***控制方法 | |
CN114142532B (zh) | 分布式光伏参与源网荷储协调控制的方法及*** | |
CN109980667A (zh) | 一种用于电动汽车的有序充电方法 | |
CN105305549A (zh) | 电池充电装置和电池充电方法 | |
Huang | Day-ahead optimal control of PEV battery storage devices taking into account the voltage regulation of the residential power grid | |
CN206099371U (zh) | 一种社区新能源微网*** | |
CN106558876B (zh) | 一种交直流混合主动配电网的运行控制方法 | |
CN107528313A (zh) | 一种充电站的功率监控方法、装置及*** | |
CN106026151B (zh) | 一种电动车储换电站的调度方法及装置 | |
CN109728369A (zh) | 基于动力电池的链式储能***的自适应控制方法及*** | |
CN110797928A (zh) | 一种充电站负载均衡管理方法及装置 | |
Poulios et al. | Optimal placement and sizing of battery storage to increase the PV hosting capacity of low voltage grids | |
CN103094630B (zh) | 一种电池管理方法及*** | |
CN110571838A (zh) | 一种储能电池早高峰负荷削减控制方法和装置 | |
Astero et al. | Improvement of RES hosting capacity using a central energy storage system | |
CN114583735A (zh) | 一种储能***调度控制方法及*** | |
CN117879003A (zh) | 一种储能调控方法、装置、***及存储介质 | |
CN106602681A (zh) | 充电***及其控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 266000 Shandong Province, Qingdao city Laoshan District Songling Road No. 336 Applicant after: QINGDAO TGOOD ELECTRIC Co.,Ltd. Applicant after: Telai New Energy Co.,Ltd. Address before: 266000 Shandong Province, Qingdao city Laoshan District Songling Road No. 336 Applicant before: QINGDAO TGOOD ELECTRIC Co.,Ltd. Applicant before: QINGDAO TELD NEW ENERGY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200630 Address after: Room 1001, 10 / F, No. 336, Songling Road, Laoshan District, Qingdao City, Shandong Province Applicant after: Qingdao teltel New Energy Technology Co.,Ltd. Address before: 266000 Shandong Province, Qingdao city Laoshan District Songling Road No. 336 Applicant before: QINGDAO TGOOD ELECTRIC Co.,Ltd. Applicant before: Telai New Energy Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181123 |
|