CN108873834A - A kind of smart machine inter-linked controlling method and device - Google Patents

A kind of smart machine inter-linked controlling method and device Download PDF

Info

Publication number
CN108873834A
CN108873834A CN201810596854.9A CN201810596854A CN108873834A CN 108873834 A CN108873834 A CN 108873834A CN 201810596854 A CN201810596854 A CN 201810596854A CN 108873834 A CN108873834 A CN 108873834A
Authority
CN
China
Prior art keywords
time
control
control instruction
linkage
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810596854.9A
Other languages
Chinese (zh)
Inventor
林锦滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Fang Sheng Intelligent Engineering Co Ltd
Original Assignee
Guangzhou Fang Sheng Intelligent Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Fang Sheng Intelligent Engineering Co Ltd filed Critical Guangzhou Fang Sheng Intelligent Engineering Co Ltd
Priority to CN201810596854.9A priority Critical patent/CN108873834A/en
Publication of CN108873834A publication Critical patent/CN108873834A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4185Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication
    • G05B19/4186Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication by protocol, e.g. MAP, TOP
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The present invention provides a kind of smart machine inter-linked controlling method and devices, the control instruction that user sends to smart machine can be captured, and according to linkage control table preset in database, other smart machines associated with the smart machine that user currently controls are obtained, and send control instruction automatically to associated smart machine;Method and device provided by the present invention can analyze the behavior of user, help the smart machine in user's linkage control man, reduce the demand for control of user, improve user experience.

Description

A kind of smart machine inter-linked controlling method and device
Technical field
The present invention relates to smart home field, in particular to a kind of smart machine inter-linked controlling method and device.
Background technique
The development of intelligent home network technology at home starts from late 1990s, general to 2000 or so smart homes Thought starts to be publicized on a large scale, and the ordinarily resident in China is allowed to start to understand and receive the concept of smart home.Nowadays each The developer of cell also more considers the construction of intelligent infrastructure in the design phase of residential quarters and house, A small number of high-grade residential quarters oneself through mating quite perfect intelligent home network, many developers are by house " intelligence Change " it is largely publicized in the advertisement of real estate sale as a bright spot.
However, present smart home largely also rests on intelligent distant control level, user passes through such as mobile phone, plate electricity The smart machines such as brain, PC are remotely controlled all kinds of smart machines in family, or check the state of all kinds of smart machines, and distance is really Full-automatic intelligent can control there are also certain distance.
The optimal mode of smart home is exactly the presence for allowing people to forget " intellectual product ".Because of final all products It all can be intellectual product from now on, the meeting that we welcome is the epoch of one " object connects object ".Network-enabled intelligent is being experienced in electricity On brain and mobile phone bring it is convenient with it is excellent after, it is prosperous that the case where user is to current smart home industry analysis is that smart home has The demand of Sheng.In daily life, people are to non intelligent environment more discontented, it is following it is this it is discontented will be increasingly Strongly, resulting demand also can be more more and more urgent.
Summary of the invention
It is an object of the invention to overcome the shortage of prior art, a kind of smart machine inter-linked controlling method and dress are provided It sets, can be realized the linkage control between smart machine, when user opens one of smart machine in family, device can be certainly Dynamic control equipment associated with the smart machine starts automatically, reduces the operational requirements of user, improves user experience.
The following technical solution is employed to achieve the above object by the present invention:
In a first aspect, the present invention provides a kind of smart machine inter-linked controlling methods, including:
Obtain the first control instruction that user sends;
Preset linkage control table is read, wherein the linkage control table includes at least one preposition control instruction, at least One instructs with the preposition matched linkage control of control instruction;
Matched preposition control instruction is obtained from the linkage control table according to the first acquired control instruction;
Matched linkage control instruction is obtained from the linkage control table according to acquired preposition control instruction, is denoted as Second control instruction;
Second control instruction is sent to matched equipment.
In an embodiment of the present invention, the linkage control table further includes at least one and the linkage control instructions match The control time;
Then, described that second control instruction is sent to matched equipment, it specifically includes:
The matched control time is obtained from the linkage control table according to second control instruction;
Second control instruction is sent to matched equipment according to the control time.
In an embodiment of the present invention, the control time includes control interval time;
Then, it is described obtain user send the first control instruction, further include later:
Time when receiving first control instruction is obtained, is denoted as at the first time;
Then, second control instruction is sent to by matched equipment according to the control time, specifically included:
Current time is obtained in real time, is denoted as the second time;
When the difference of the first time and the second time and the control room are when time match, second control is referred to Order is sent to matched equipment.
In an embodiment of the present invention, the control time further includes the control duration;
Then, second control instruction is sent to by matched equipment according to the control time, specifically included:
Second control instruction is sent to matched equipment, and obtains sending time, is denoted as the third time;
Current time is obtained in real time, is denoted as the 4th time;
When the difference of the third time and the 4th time and the Duration match, is sent to the equipment and stop referring to It enables.
Second aspect, the present invention also provides a kind of smart machine linkage control devices, including the first control instruction to obtain Module presets linkage table read module, and preposition control instruction obtains module, and the second control instruction obtains module and sending module;
Wherein, first control instruction obtains module, for obtaining the first control instruction of user's transmission;
The default linkage table read module, for reading preset linkage control table, wherein the linkage control table packet At least one preposition control instruction is included, at least one is instructed with the preposition matched linkage control of control instruction;
The preposition control instruction obtains module, for according to the first acquired control instruction from the linkage control table It is middle to obtain matched preposition control instruction;
Second control instruction obtains module, for according to acquired preposition control instruction from the linkage control table It is middle to obtain matched linkage control instruction, it is denoted as the second control instruction;
The sending module, for second control instruction to be sent to matched equipment.
In an embodiment of the present invention, the linkage control table further includes at least one and the linkage control instructions match The control time;
Then, the sending module is also used to be sent to second control instruction according to the control time matched Equipment.
In an embodiment of the present invention, the control time includes control interval time;
Then, the smart machine linkage control device further includes obtaining module, the second time-obtaining module at the first time;
Wherein, the first time obtains module, and time when first control instruction is received for obtaining, is denoted as At the first time;
Second time-obtaining module was denoted as the second time for obtaining current time in real time;
The sending module is also used to when the difference of the first time and the second time with the control room every time match When, second control instruction is sent to matched equipment.
In an embodiment of the present invention, the control time further includes the control duration;
Then, the smart machine linkage control device further includes third time-obtaining module, the 4th time-obtaining module:
Wherein, the third time-obtaining module, for obtaining the sending time of the second control instruction, when being denoted as third Between;
4th time-obtaining module was denoted as the 4th time for obtaining current time in real time;
The sending module is also used to when the difference of the third time and the 4th time and the Duration match, Halt instruction is sent to the equipment.
Beneficial effects of the present invention:
The present invention provides a kind of smart machine inter-linked controlling method and devices, can capture user and send to smart machine Control instruction obtain associated with the smart machine that user currently controls and according to linkage control table preset in database Other smart machines, and send control instruction automatically to associated smart machine;Method and device energy provided by the present invention It is enough that the behavior of user is analyzed, the smart machine in user's linkage control man is helped, the demand for control of user is reduced, is improved User experience.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of smart machine inter-linked controlling method in one embodiment of the invention;
Fig. 2 is a kind of structural schematic diagram of smart machine linkage control device in one embodiment of the invention.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the present invention will be further described, illustrative examples therein and Illustrate only to be used to explain the present invention, but not as a limitation of the invention.
In a first aspect, as shown in Figure 1, the present invention provides a kind of smart machine inter-linked controlling methods, including:
S100:Obtain the first control instruction that user sends;
S200:Preset linkage control table is read, wherein the linkage control table includes at least one preposition control instruction, At least one is instructed with the preposition matched linkage control of control instruction;
S300:Matched preposition control is obtained from the linkage control table according to the first acquired control instruction to refer to It enables;
S400:Matched linkage control is obtained from the linkage control table according to acquired preposition control instruction to refer to It enables, is denoted as the second control instruction;
S500:Second control instruction is sent to matched equipment.
In an embodiment of the present invention, the linkage control table further includes at least one and the linkage control instructions match The control time;
Then, S500 is specifically included:
The matched control time is obtained from the linkage control table according to second control instruction;
Second control instruction is sent to matched equipment according to the control time.
In an embodiment of the present invention, the control time includes control interval time;
Then, S100 further includes later:
Time when receiving first control instruction is obtained, is denoted as at the first time;
Then, second control instruction is sent to by matched equipment according to the control time, specifically included:
Current time is obtained in real time, is denoted as the second time;
When the difference of the first time and the second time and the control room are when time match, second control is referred to Order is sent to matched equipment.
In an embodiment of the present invention, the control time further includes the control duration;
Then, second control instruction is sent to by matched equipment according to the control time, specifically included:
Second control instruction is sent to matched equipment, and obtains sending time, is denoted as the third time;
Current time is obtained in real time, is denoted as the 4th time;
When the difference of the third time and the 4th time and the Duration match, is sent to the equipment and stop referring to It enables.
In an of the invention concrete application scene, smart machine inter-linked controlling method provided by first aspect present invention by Control of intelligent terminal is completed, and the linkage control table is stored in the control of intelligent terminal, and the linkage control table includes extremely A few preposition control instruction, at least one with the matched linkage control instruction of the preposition control instruction and at least one with The control time of the linkage control instructions match, wherein when the control time includes control interval time and lasting control Between such as following table:
Preposition control instruction Linkage control instruction Control interval time Control the duration
Open porch lamp Open water heater 5 minutes 20 minutes
Open porch lamp Open air-conditioning 30 minutes 8 hours
Close compartment lamp Closing television 30 minutes -
…… …… …… ……
After user goes home, is sent by mobile phone to the control of intelligent terminal and open porch lamp instruction;The intelligence control Terminal processed is instructed according to the unlatching porch lamp received, and it includes opening that matched linkage control instruction is obtained from linkage control table Water heater opens air-conditioning;The control time with the unlatching water heater, unlatching air-conditioning instructions match is obtained simultaneously;Then, the intelligence It can control terminal and send to open to water heater and air-conditioning after receiving unlatching porch lamp and instructing 5 minutes and 30 minutes respectively and refer to It enables, and sends halt instruction to water heater after twenty minutes sending open command to water heater, and open sending to air-conditioning Air-conditioning transmission halt instruction is sent to after instructing 8 hours;
Meanwhile when user prepares during sleep, to control of intelligent terminal transmission closing compartment lamp instruction, the intelligence control Terminal processed is instructed according to the closing compartment lamp received, and it includes closing that matched linkage control instruction is obtained from linkage control table TV, control room are divided into 30 minutes, are not provided with the control duration;Then the control of intelligent terminal is receiving closing room Out code is sent to TV after lamp instruction 30 minutes;
Wherein it is possible to which what is understood be the control of intelligent terminal can be the computer in user family, smart home device control Equipment, the present invention such as device processed, Cloud Server are not particularly limited this.
Second aspect, the present invention also provides a kind of smart machine linkage control devices, including the first control instruction to obtain Module 100 presets linkage table read module 200, and preposition control instruction obtains module 300, and the second control instruction obtains module 400 And sending module 500;
Wherein, the first control instruction obtains module 100, for obtaining the first control instruction of user's transmission;
Default linkage table read module 200, for reading preset linkage control table, wherein the linkage control table includes At least one preposition control instruction, at least one is instructed with the preposition matched linkage control of control instruction;
Preposition control instruction obtains module 300, for according to the first acquired control instruction from the linkage control table It is middle to obtain matched preposition control instruction;
Second control instruction obtains module 400, for according to acquired preposition control instruction from the linkage control table It is middle to obtain matched linkage control instruction, it is denoted as the second control instruction;
Sending module 500, for second control instruction to be sent to matched equipment.
In an embodiment of the present invention, the linkage control table further includes at least one and the linkage control instructions match The control time;
Then, sending module 500 are also used to that second control instruction is sent to matched set according to the control time It is standby.
In an embodiment of the present invention, the control time includes control interval time;
Then, the smart machine linkage control device further includes obtaining module, the second time-obtaining module at the first time;
Wherein, the first time obtains module, and time when first control instruction is received for obtaining, is denoted as At the first time;
Second time-obtaining module was denoted as the second time for obtaining current time in real time;
Sending module 500 is also used to when the difference of the first time and the second time with the control room every time match When, second control instruction is sent to matched equipment.
In an embodiment of the present invention, the control time further includes the control duration;
Then, the smart machine linkage control device further includes third time-obtaining module, the 4th time-obtaining module:
Wherein, the third time-obtaining module, for obtaining the sending time of the second control instruction, when being denoted as third Between;
4th time-obtaining module was denoted as the 4th time for obtaining current time in real time;
Sending module 500 is also used to when the difference of the third time and the 4th time and the Duration match, to The equipment sends halt instruction.
In a concrete application scene of the invention, smart machine linkage control device collection provided by second aspect of the present invention At on the control of intelligent terminal of user, the linkage control table is stored in the control of intelligent terminal, the linkage control Table includes at least one preposition control instruction, at least one is instructed with the preposition matched linkage control of control instruction, and extremely Lack the control time of one with the linkage control instructions match, wherein the control time includes control interval time and control Duration such as following table processed:
Preposition control instruction Linkage control instruction Control interval time Control the duration
Open porch lamp Open water heater 5 minutes 20 minutes
Open porch lamp Open air-conditioning 30 minutes 8 hours
Close compartment lamp Closing television 30 minutes -
…… …… …… ……
After user goes home, is sent by mobile phone to the control of intelligent terminal and open porch lamp instruction;The intelligence control Terminal processed is instructed according to the unlatching porch lamp received, and it includes opening that matched linkage control instruction is obtained from linkage control table Water heater opens air-conditioning;The control time with the unlatching water heater, unlatching air-conditioning instructions match is obtained simultaneously;Then, the intelligence It can control terminal and send to open to water heater and air-conditioning after receiving unlatching porch lamp and instructing 5 minutes and 30 minutes respectively and refer to It enables, and sends halt instruction to water heater after twenty minutes sending open command to water heater, and open sending to air-conditioning Air-conditioning transmission halt instruction is sent to after instructing 8 hours;
Meanwhile when user prepares during sleep, to control of intelligent terminal transmission closing compartment lamp instruction, the intelligence control Terminal processed is instructed according to the closing compartment lamp received, and it includes closing that matched linkage control instruction is obtained from linkage control table TV, control room are divided into 30 minutes, are not provided with the control duration;Then the control of intelligent terminal is receiving closing room Out code is sent to TV after lamp instruction 30 minutes;
Wherein it is possible to which what is understood be the control of intelligent terminal can be the computer in user family, smart home device control Equipment, the present invention such as device processed, Cloud Server are not particularly limited this.
Obviously, above-described embodiment is used for the purpose of clearer expression technical solution of the present invention example, rather than right The restriction of embodiment of the present invention.To those skilled in the art, it can also make on the basis of the above description other Various forms of variations or variation, without departing from the inventive concept of the premise, these are all within the scope of protection of the present invention.Cause The scope of protection of the patent of the invention shall be subject to the appended claims for this.

Claims (8)

1. a kind of smart machine inter-linked controlling method, which is characterized in that including:
Obtain the first control instruction that user sends;
Preset linkage control table is read, wherein the linkage control table includes at least one preposition control instruction, at least one It is instructed with the preposition matched linkage control of control instruction;
Matched preposition control instruction is obtained from the linkage control table according to the first acquired control instruction;
Matched linkage control instruction is obtained from the linkage control table according to acquired preposition control instruction, is denoted as second Control instruction;
Second control instruction is sent to matched equipment.
2. smart machine inter-linked controlling method as described in claim 1, which is characterized in that the linkage control table further include to Lack the control time of one with the linkage control instructions match;
Then, described that second control instruction is sent to matched equipment, it specifically includes:
The matched control time is obtained from the linkage control table according to second control instruction;
Second control instruction is sent to matched equipment according to the control time.
3. smart machine inter-linked controlling method as claimed in claim 2, which is characterized in that the control time includes control room Every the time;
Then, it is described obtain user send the first control instruction, further include later:
Time when receiving first control instruction is obtained, is denoted as at the first time;
Then, second control instruction is sent to by matched equipment according to the control time, specifically included:
Current time is obtained in real time, is denoted as the second time;
When the difference of the first time and the second time and the control room are when time match, by second control instruction hair Give matched equipment.
4. smart machine inter-linked controlling method as claimed in claim 2, which is characterized in that the control time further includes control Duration;
Then, second control instruction is sent to by matched equipment according to the control time, specifically included:
Second control instruction is sent to matched equipment, and obtains sending time, is denoted as the third time;
Current time is obtained in real time, is denoted as the 4th time;
When the difference of the third time and the 4th time and the Duration match, halt instruction is sent to the equipment.
5. a kind of smart machine linkage control device, which is characterized in that obtain module including the first control instruction, preset linkage table Read module, preposition control instruction obtain module, and the second control instruction obtains module and sending module;
Wherein, first control instruction obtains module, for obtaining the first control instruction of user's transmission;
The default linkage table read module, for reading preset linkage control table, wherein the linkage control table includes extremely A few preposition control instruction, at least one is instructed with the preposition matched linkage control of control instruction;
The preposition control instruction obtains module, for being obtained from the linkage control table according to the first acquired control instruction Take matched preposition control instruction;
Second control instruction obtains module, for being obtained from the linkage control table according to acquired preposition control instruction It takes matched linkage control to instruct, is denoted as the second control instruction;
The sending module, for second control instruction to be sent to matched equipment.
6. smart machine linkage control device as claimed in claim 5, which is characterized in that the linkage control table further include to Lack the control time of one with the linkage control instructions match;
Then, the sending module is also used to that second control instruction is sent to matched equipment according to the control time.
7. smart machine linkage control device as claimed in claim 6, which is characterized in that the control time includes control room Every the time;
Then, the smart machine linkage control device further includes obtaining module, the second time-obtaining module at the first time;
Wherein, the first time obtains module, and time when first control instruction is received for obtaining, is denoted as first Time;
Second time-obtaining module was denoted as the second time for obtaining current time in real time;
The sending module is also used to when the difference of the first time and the second time with the control room when time match, Second control instruction is sent to matched equipment.
8. smart machine linkage control device as claimed in claim 6, which is characterized in that the control time includes that control is held The continuous time;
Then, the smart machine linkage control device further includes third time-obtaining module, the 4th time-obtaining module:
Wherein, the third time-obtaining module is denoted as the third time for obtaining the sending time of the second control instruction;
4th time-obtaining module was denoted as the 4th time for obtaining current time in real time;
The sending module is also used to when the difference of the third time and the 4th time and the Duration match, to institute It states equipment and sends halt instruction.
CN201810596854.9A 2018-06-11 2018-06-11 A kind of smart machine inter-linked controlling method and device Pending CN108873834A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810596854.9A CN108873834A (en) 2018-06-11 2018-06-11 A kind of smart machine inter-linked controlling method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810596854.9A CN108873834A (en) 2018-06-11 2018-06-11 A kind of smart machine inter-linked controlling method and device

Publications (1)

Publication Number Publication Date
CN108873834A true CN108873834A (en) 2018-11-23

Family

ID=64338615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810596854.9A Pending CN108873834A (en) 2018-06-11 2018-06-11 A kind of smart machine inter-linked controlling method and device

Country Status (1)

Country Link
CN (1) CN108873834A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110618627A (en) * 2019-09-02 2019-12-27 深圳绿米联创科技有限公司 Household equipment control method and device, electronic equipment and storage medium
CN112162492A (en) * 2020-11-03 2021-01-01 珠海格力电器股份有限公司 Control method and device of household equipment, edge computing gateway and storage medium
CN114077265A (en) * 2020-08-19 2022-02-22 漳州立达信光电子科技有限公司 Temperature control method and system, temperature control equipment and light switch

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102811416A (en) * 2011-05-30 2012-12-05 阿尔卡特朗讯公司 Method and system for controlling terminal device of Internet of things
CN104320480A (en) * 2014-11-03 2015-01-28 中国联合网络通信集团有限公司 Control method for intelligent home equipment and cloud server
CN105511286A (en) * 2016-01-14 2016-04-20 上海岂控信息科技有限公司 Smart home situation control method and system based on multi-condition judgment
CN105629745A (en) * 2015-06-19 2016-06-01 宇龙计算机通信科技(深圳)有限公司 Control method, control device, control system, smart home control center apparatus and terminal
CN106444403A (en) * 2016-10-29 2017-02-22 深圳智乐信息科技有限公司 Smart home scene setting and controlling method and system
CN106452802A (en) * 2016-09-14 2017-02-22 珠海市魅族科技有限公司 Linkage control method and linkage control device for equipment
CN107809355A (en) * 2016-09-08 2018-03-16 北京京东尚科信息技术有限公司 A kind of method and system of smart machine coordinated signals

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102811416A (en) * 2011-05-30 2012-12-05 阿尔卡特朗讯公司 Method and system for controlling terminal device of Internet of things
CN104320480A (en) * 2014-11-03 2015-01-28 中国联合网络通信集团有限公司 Control method for intelligent home equipment and cloud server
CN105629745A (en) * 2015-06-19 2016-06-01 宇龙计算机通信科技(深圳)有限公司 Control method, control device, control system, smart home control center apparatus and terminal
CN105511286A (en) * 2016-01-14 2016-04-20 上海岂控信息科技有限公司 Smart home situation control method and system based on multi-condition judgment
CN107809355A (en) * 2016-09-08 2018-03-16 北京京东尚科信息技术有限公司 A kind of method and system of smart machine coordinated signals
CN106452802A (en) * 2016-09-14 2017-02-22 珠海市魅族科技有限公司 Linkage control method and linkage control device for equipment
CN106444403A (en) * 2016-10-29 2017-02-22 深圳智乐信息科技有限公司 Smart home scene setting and controlling method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110618627A (en) * 2019-09-02 2019-12-27 深圳绿米联创科技有限公司 Household equipment control method and device, electronic equipment and storage medium
CN114077265A (en) * 2020-08-19 2022-02-22 漳州立达信光电子科技有限公司 Temperature control method and system, temperature control equipment and light switch
CN112162492A (en) * 2020-11-03 2021-01-01 珠海格力电器股份有限公司 Control method and device of household equipment, edge computing gateway and storage medium

Similar Documents

Publication Publication Date Title
CN104394045B (en) Recommend method and apparatus for the scene mode of smart machine
CN103345232B (en) Individualized intelligent appliance control method and system
CN104009898A (en) Household appliance and control method and device thereof
CN105353727A (en) Smart home central analysis and process method and server
CN112015095A (en) Networking configuration method and device of intelligent equipment, server and storage medium
CN108873834A (en) A kind of smart machine inter-linked controlling method and device
CN106647304A (en) Household electrical appliance linkage control method, household electrical appliance, server, and system
CN104618201A (en) Internet of things appliance control system, control method and appliance gateway
CN211043962U (en) Intelligent household control system
CN108572559A (en) A kind of smart home scene control method and system
CN104991539A (en) Smart home automated system
CN105491568A (en) Automatic router accessing method, device and intelligent terminal
CN106647295B (en) Smart home system and cooperative operation method thereof
CN108536026A (en) A kind of smart home device power consumption control method and system
CN113867161A (en) Intelligent home control system and control method based on big data
CN105182775A (en) Internet-of-things-based intelligent household mobile phone APP control system
CN112162492A (en) Control method and device of household equipment, edge computing gateway and storage medium
CN107749812A (en) Appliances equipment control method, device, intelligent domestic system and readable storage medium storing program for executing
CN108154036B (en) Control method and control device of intelligent equipment
CN107426064A (en) Internet of Things controls the collocation method and device of scene
CN104994129A (en) Smart home communication system and method equipped with Web Service functions
CN109507901A (en) A kind of intelligent home furnishing control method and system
CN105527952A (en) Smart home control device and electric appliance matching system and method
CN111431776A (en) Information configuration method, device and system
CN104991454A (en) Internet of Things safety remote control system based on WeChat

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123

RJ01 Rejection of invention patent application after publication