CN108870528A - A kind of method and heating system of heat supply - Google Patents

A kind of method and heating system of heat supply Download PDF

Info

Publication number
CN108870528A
CN108870528A CN201810580475.0A CN201810580475A CN108870528A CN 108870528 A CN108870528 A CN 108870528A CN 201810580475 A CN201810580475 A CN 201810580475A CN 108870528 A CN108870528 A CN 108870528A
Authority
CN
China
Prior art keywords
water
water supply
supply flow
temperature
circulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810580475.0A
Other languages
Chinese (zh)
Inventor
曾智勇
万绪财
余锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xie Cheng Power Engineering Design Co Ltd
Original Assignee
Sichuan Xie Cheng Power Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Xie Cheng Power Engineering Design Co Ltd filed Critical Sichuan Xie Cheng Power Engineering Design Co Ltd
Priority to CN201810580475.0A priority Critical patent/CN108870528A/en
Publication of CN108870528A publication Critical patent/CN108870528A/en
Priority to PCT/CN2018/119560 priority patent/WO2019233064A1/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The present invention is suitable for thermal technology field, provides the method and heating system of a kind of heat supply, and the method includes:If current time belongs to the first preset time period, it then controls heat accumulation equipment and carries out storage hot water, and the first water supply flow control command is sent to first circulation water pump, first water supply flow control command is used to indicate the water supply of first circulation water pump output target water supply flow to user terminal, if current time belongs to the second preset time period, the second water supply flow control command is then sent to second circulation water pump, second water supply flow control command is used to indicate the water storage of the default maximum water supply flow of second circulation water pump conveying to user terminal, third water supply flow is obtained according to target water supply flow and default maximum water supply flow, third water supply flow control command is sent to first circulation water pump, third water supply flow control command is used to indicate the water supply of first circulation water pump output third water supply flow to user terminal, significantly reduce heat cost.

Description

A kind of method and heating system of heat supply
Technical field
The invention belongs to heat supply process field more particularly to the methods and heating system of a kind of heat supply.
Background technique
Heat supply belongs to a great people's livelihood engineering, it is ensured that provides the heat source power of stable safety in cold winter, ensures and supply The normal life and production in warm region.
In the prior art, heating equipment can only energize user terminal when carrying out heat supply, and cannot utilize low-price electricity Energy storage is carried out, causing cannot be using heat accumulation heat supply again, and heat cost is higher.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of method of heat supply and heating system, to solve in the prior art Heat accumulation cannot be carried out using low-price electricity, causing cannot be using heat accumulation heat supply again, the higher problem of heat cost.
The first aspect of the embodiment of the present invention provides the method for heat supply, is applied to heating system, the heating system packet Include the first temperature monitoring unit, second temperature monitoring unit, first circulation water pump, second circulation water pump, heat accumulation equipment and user End, the first circulation water pump connect with the user terminal, the second circulation water pump respectively with the user terminal and the storage The water supplying pipe between the first circulation water pump and the user terminal is arranged in hot equipment connection, first temperature monitoring unit On road, the second temperature monitoring is arranged on the water return pipeline between the first circulation water pump and the user terminal.
The method of the heat supply includes:
Receive the supply water temperature that first temperature monitoring unit is sent and the return water temperature that second temperature monitoring unit is sent Degree.
Target water supply flow is calculated according to the supply water temperature and the return water temperature.
If current time belongs to the first preset time period, control the heat accumulation equipment and carry out storage hot water, and sends the One water supply flow control command to the first circulation water pump, the first water supply flow control command is used to indicate described first Water circulating pump exports the water supply of the target water supply flow to the user terminal.
If current time belongs to the second preset time period, the second water supply flow control command is sent to the second circulation Water pump, the second water supply flow control command are used to indicate the storage of the default maximum water supply flow of the second circulation water pump conveying Water is to the user terminal.
Third water supply flow is obtained according to the target water supply flow and the default maximum water supply flow.
Third water supply flow control command is sent to the first circulation water pump, the third water supply flow control command is used In indicating that the first circulation water pump exports the water supply of the third water supply flow to the user terminal.
The second aspect of the embodiment of the present invention provides a kind of heating system, and the heating system includes control unit, One temperature monitoring unit, second temperature monitoring unit, first circulation water pump, second circulation water pump, heat accumulation equipment and user terminal, institute State control unit respectively with first temperature monitoring unit, the second temperature monitoring unit, the first circulation water pump, institute It states second circulation water pump to connect with the heat accumulation equipment, the first circulation water pump is connect with the user terminal, and described second follows Ring water pump is connect with the user terminal and the heat accumulation equipment respectively, and the first temperature monitoring unit setting is followed described first On water supply line between ring water pump and the user terminal, the second temperature monitoring is arranged in the first circulation water pump and institute It states on the water return pipeline between user terminal;
Described control unit includes:
Temperature reception subelement, for receiving the supply water temperature and second temperature prison that first temperature monitoring unit is sent Control the return water temperature that unit is sent.
Target flow computation subunit, for calculating target for water flow according to the supply water temperature and the return water temperature Amount.
First control subelement, if belonging to the first preset time period for current time, control the heat accumulation equipment into Row storage hot water, and the first water supply flow control command is sent to the first circulation water pump, the first water supply flow control Order is used to indicate the first circulation water pump and exports the water supply of the target water supply flow to the user terminal.
Second control subelement sends the second water supply flow control if belonging to the second preset time period for current time To the second circulation water pump, the second water supply flow control command is used to indicate the second circulation water pump conveying for system order The water storage of default maximum water supply flow is to the user terminal;According to the target water supply flow and the default maximum water supply flow Obtain third water supply flow;Third water supply flow control command is sent to the first circulation water pump, the third water supply flow Control command is used to indicate the first circulation water pump and exports the water supply of the third water supply flow to the user terminal.
Existing beneficial effect is the embodiment of the present invention compared with prior art:The present embodiment is by receiving the first temperature prison The supply water temperature that unit is sent and the return water temperature that second temperature monitoring unit is sent are controlled, according to supply water temperature and return water temperature meter Target water supply flow is calculated to control heat accumulation equipment if current time belongs to the first preset time period and carry out storage hot water, and send For first water supply flow control command to first circulation water pump, it is defeated that the first water supply flow control command is used to indicate first circulation water pump The water supply of target water supply flow sends the second water supply flow if current time belongs to the second preset time period to user terminal out For control command to second circulation water pump, the second water supply flow control command is used to indicate the default maximum confession of second circulation water pump conveying The water storage of water flow is to user terminal;Third water supply flow is obtained according to target water supply flow and default maximum water supply flow;It sends For third water supply flow control command to first circulation water pump, it is defeated that third water supply flow control command is used to indicate first circulation water pump The water supply of third water supply flow is to user terminal out.The embodiment of the present invention is by controlling first circulation in the first preset time period Water pump output is supplied water to user terminal, and is controlled heat accumulation equipment and carried out heat accumulation, thus meeting while using energy demand of user terminal, Heat accumulation can be carried out using the corresponding low-price electricity of the first preset time period then control first circulation in the second preset time period It follows pump and second circulation water pump and conveys water supply jointly to user terminal, the heat for making full use of storage facilities to store is effectively reduced Heat cost.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the implementation process schematic diagram of the method for heat supply provided by one embodiment of the present invention;
Fig. 2 is the implementation process schematic diagram of the method for heat supply provided by one embodiment of the present invention;
Fig. 3 is the structural schematic diagram of heating system provided by one embodiment of the present invention;
Fig. 4 is the structural schematic diagram of heating system provided by one embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Embodiment 1:
Fig. 1 shows the implementation process of the method for the heat supply of one embodiment of the present of invention offer, the embodiment of the present invention Process executing subject can be control unit, and control unit is applied to heating system, and the heating system is supervised including the first temperature Unit, second temperature monitoring unit, first circulation water pump, second circulation water pump, heat accumulation equipment and user terminal are controlled, described first follows Ring water pump is connect with the user terminal, and the second circulation water pump is connect with the user terminal and the heat accumulation equipment respectively, institute It states on the water supply line that the first temperature monitoring unit is arranged between the first circulation water pump and the user terminal, described second Monitoring temperature is arranged on the water return pipeline between the first circulation water pump and the user terminal.The present embodiment process is described in detail such as Under:
In step s101, the supply water temperature and the transmission of second temperature monitoring unit that the first temperature monitoring unit is sent are received Return water temperature.
In the present embodiment, control unit includes terminal device, for example, computer.
In the present embodiment, the first temperature monitoring unit includes the first temperature sensor.
In the present embodiment, the temperature to supply water in the first temperature sensor detection water supply line, and the water supply that will test Temperature is sent to control unit.
In the present embodiment, supplying water indicates water supply, is the water for flowing to user terminal, and return water is the water flowed out from user terminal.
In the present embodiment, second temperature monitoring unit includes second temperature sensor.
In the present embodiment, the temperature to supply water in second temperature sensor detection water return pipeline, and the return water that will test Temperature is sent to control unit.
In one embodiment, hot water refers to the water of the first preset temperature, for example, 55 DEG C, cold water refers to the second default temperature The water of degree, for example, 17 DEG C.
In step s 102, target water supply flow is calculated according to supply water temperature and return water temperature.
In one embodiment of the invention, step S102 includes:
1) current heating demand is obtained.
2) according to current heating demand, supply water temperature and return water temperature, target water supply flow is calculated using following formula:
Wherein:G is target water supply flow;T1For supply water temperature;T2For return water temperature;Q is current heating demand;C is water Specific heat capacity.
In the present embodiment, current heating demand, supply water temperature and the return water temperature that will acquire substitute into respectivelyIn formula, target water supply flow is calculated.
In step s 103, it if current time belongs to the first preset time period, controls heat accumulation equipment and carries out storage hot water, And the first water supply flow control command is sent to first circulation water pump, the first water supply flow control command is used to indicate first circulation Water pump exports the water supply of target water supply flow to user terminal.
In the present embodiment, the first preset time period refer to paddy section and/or flat section, i.e., heating area execute paddy electricity valence and/ Or the period of ordinary telegram valence.
In the present embodiment, control unit just obtains current time every the default control time (for example, 0.5 hour), and Detection current time belongs to the first preset time period or the second preset time period.If it is default to detect that current time belongs to first Period, then it represents that the electricity price at current time is lower, can control heating equipment and carries out independent heat supply, and control heat accumulation equipment into Row storage heat, if detecting, current time belongs to the second preset time period, then it represents that current electricity prices are higher, just control heat accumulation and set Standby and heating equipment carries out heat supply together, since the hot water of heat accumulation equipment storage is limited, cannot individually carry out heat supply.
In the present embodiment, when control unit detects that current time belongs to the first preset time period, heat accumulation is just opened Equipment, heat accumulation equipment just bring into operation, and store hot water.
By taking a concrete application scene as an example, heat accumulation equipment includes heat storage water tank and electric heater, and control unit opens electricity Heater, electric heater heat the water in heat storage water tank, store hot water.
In the present embodiment, it when control unit detects that current time belongs to the first preset time period, searches target and supplies The corresponding frequency of water flow generates the first water supply flow control command and is sent to first circulation water pump, the control of the first water supply flow Order includes the corresponding frequency of target water supply flow, after first circulation water pump receives water supply flow control command, by itself Frequency is adjusted to the corresponding frequency of target water supply flow, so that the first circulation water pump can export the confession of target water supply flow Water, to realize the control of flow.
Wherein, first circulation water pump is frequency conversion water circulating pump.
In one embodiment, when control unit detects that current time belongs to the first preset time period, heat supply is controlled Equipment heats return water, and return water temperature is heated to supply water temperature.
In step S104, if current time belongs to the second preset time period, the second water supply flow control command is sent To second circulation water pump, the second water supply flow control command is used to indicate the default maximum water supply flow of second circulation water pump conveying Water storage is to user terminal;Third water supply flow is obtained according to target water supply flow and default maximum water supply flow;Third is sent to supply water To first circulation water pump, third water supply flow control command is used to indicate first circulation water pump output third and supplies flow control commands The water supply of water flow is to user terminal.
In the present embodiment, the first preset time period is crest segment, i.e. the period of heating area execution peak electricity price, i.e. heating area The domain electricity price highest period, for example, 8 points to 21 points.
In the present embodiment, if control unit detects that current time belongs to the second preset time period, then it represents that when current The electricity price at quarter is higher, and heat accumulation equipment is needed to carry out auxiliary heat supplying, just opens second circulation water pump, and second circulation water pump sets heat accumulation The hot water of standby storage is pumped to user terminal.
In the present embodiment, the maximum flow of water amount that maximum water supply flow can convey for second circulation water pump, due to heat accumulation The hot water of equipment storage is limited, and in order to which the hot water for allowing heat accumulation equipment to store obtains most effective utilization, that is, allows heating system Whole electricity consumption situation is minimum, and cost is minimum, and researcher obtains maximum water supply flow by constantly testing.
Wherein, second circulation water pump is frequency conversion water circulating pump.
In the present embodiment, the corresponding frequency of maximum water supply flow is searched, the second water supply flow control command is generated and sends To second circulation water pump, the second water supply flow control command includes the corresponding frequency of maximum water supply flow, when second circulation water pump After receiving the second water supply flow control command, own frequency is adjusted to the corresponding frequency of maximum water supply flow, thus this two Water circulating pump can export the water storage of maximum water supply flow, realize the control of flow.
In one embodiment of the invention, the difference for calculating target water supply flow and default maximum water supply flow, obtains Third water supply flow.
In the present embodiment, the corresponding frequency of third water supply flow is searched, third flow control commands is generated and is sent to the One water circulating pump, third flow control commands include the corresponding frequency of third water supply flow, when first circulation water pump receives After three water supply flow control commands, own frequency is adjusted to the corresponding frequency of third water supply flow, thus a water circulating pump The water supply of maximum water supply flow can be exported to user terminal, realize the heat supply of heating equipment.
In one embodiment, when control unit detects that current time belongs to the second preset time period, heat supply is controlled Equipment and heat accumulation equipment jointly heat return water, and return water temperature is heated to supply water temperature.
In one embodiment of the invention, heating system further includes smog monitoring unit and water injector.
In one embodiment of the invention, the method for heat supply further includes:
1) smokescope that smog monitoring unit is sent is received.
2) if smokescope is greater than preset concentration range, controls water injector and spray water.
In the present embodiment, smog monitoring unit includes at least smoke sensor device.
In the present embodiment, control unit is connect with smoke sensor device and water injector respectively.
In the present embodiment, smoke sensor device and water injector, smoke sensor device inspection are placed in the position that fire easily occurs The smokescope of the position is surveyed, and is spaced preset concentration acquisition time and smokescope is sent to control unit, control unit will The smokescope received is compared with preset concentration range, if smokescope is greater than preset concentration range, then it represents that smog Fire may occur for the position that concentration is greater than preset concentration range, and smokescope is greater than the position of preset concentration range as mesh Cursor position, then open the corresponding water injector in target position, and water injector is sprayed water.
Wherein, water injector may include spray head and the water tank that connect with spray head.
In the present embodiment, after the control water injector is sprayed water, including:
The smokescope that the smog monitoring unit of target position is sent is received again after being spaced the default fire detection time;
If received smokescope is still greater than preset concentration range again, sends fire help information to fire-fighting and control Room, the fire help information includes target position information.
In the present embodiment, after control unit control water injector is sprayed water, by the cigarette for continuing to test target position Whether mistiness degree is still greater than preset concentration range to judge the fire of target position either with or without being extinguished, if the smog of target position Concentration is still greater than preset concentration range, then it represents that and fire may be excessive, then directly transmits fire help information to fire protection control room, The fire fighter that seeks help stamps out a fire, and since fire help information includes target position information, fire fighter can look for quickly To the place that fire occurs, the time of searching is reduced.
In one embodiment, heating system further includes the first pressure monitoring unit connecting with control unit, the second pressure The water supplying pipe between first circulation water pump and user terminal is arranged in power monitoring unit and moisturizing dosing pump, first pressure monitoring unit On road, second pressure monitoring is arranged on the water return pipeline between the first circulation water pump and the user terminal, the heat supply Method further include:
1) water pipe pressure that first pressure monitoring unit is sent and the return water that second pressure monitoring unit is sent are received Pipeline pressure.
2) moisturizing is carried out according to water pipe pressure and water return pipeline pressure control moisturizing dosing pump.
In one embodiment, moisturizing is carried out according to water pipe pressure and water return pipeline pressure control moisturizing dosing pump, Including:
1) difference for calculating water pipe pressure and water return pipeline pressure, it is poor to obtain current pressure.
If 2) current pressure difference is poor greater than preset pressure, controls moisturizing dosing pump and carry out moisturizing until current pressure subtractive As low as preset pressure is poor.
In one embodiment, the control moisturizing dosing pump carries out moisturizing until current pressure subtractive is as low as described Preset pressure is poor, including:
1) control moisturizing dosing pump carries out moisturizing.
2) water pipe pressure that the first monitoring unit is sent and the water return pipeline pressure that the second monitoring unit is sent are received.
3) difference for calculating water pipe pressure and water return pipeline pressure, it is poor to obtain current pressure.
If 4) current pressure difference is poor greater than preset pressure, reclosing receives the transmission of the first monitoring unit after being spaced preset time Water pipe pressure and the second monitoring unit send water return pipeline pressure.
If 5) current pressure difference is poor no more than preset pressure, controls moisturizing dosing pump and stop moisturizing.
In one embodiment, first pressure monitoring unit includes first pressure sensor, first pressure sensor detection The hydraulic pressure to supply water in water supply line, obtains water pipe pressure, and water pipe pressure is sent to control unit.
In one embodiment, second pressure monitoring unit includes second pressure sensor, the detection of second pressure sensor The hydraulic pressure of return water in water return pipeline, obtains water return pipeline pressure, and water return pipeline pressure is sent to control unit.
In the present embodiment, since pipeline breakage and breakage of user terminal radiator etc. will cause the loss of water, from Hydraulic pressure in pipeline is caused not to be inconsistent standardization, therefore, it is necessary to carry out water-supply and pressure-stabling.
In the present embodiment, water pipe pressure and the transmission of second pressure sensor of first pressure sensor transmission are received Water return pipeline pressure, calculate water pipe pressure and water return pipeline pressure difference, obtain current water return pipeline and water supplying pipe The difference of hydraulic pressure is in road to get poor to current pressure.
In the present embodiment, when judging that current pressure difference is greater than preset pressure difference, the moisturizing of moisturizing dosing pump is just controlled, What the water pipe pressure and second pressure sensor that first pressure sensor transmission is continued to after preset time were sent Water return pipeline pressure recalculates the difference of water pipe pressure Yu water return pipeline pressure, and it is poor to obtain current pressure, will currently press Power difference is compared with preset pressure difference, if current pressure difference is poor greater than preset pressure, is spaced after preset time followed by continued access The water pipe pressure that first pressure sensor is sent and the water return pipeline pressure that second pressure sensor is sent are received, is recalculated Current pressure is poor, if current pressure difference is poor no more than preset pressure, controls small pump and stops moisturizing.
In one embodiment, heating system further includes the water quality testing meter connecting with control unit.
In one embodiment, at least one current water quality parameter value that water quality testing meter is sent is received, if it exists currently Water quality parameter value is not equal to corresponding standard value, then controls moisturizing dosing pump and carry out dosing.
In one embodiment of the invention, the control moisturizing dosing pump progress dosing specifically includes:
1) difference of current water quality parameter value and corresponding standard value is calculated.
2) the corresponding additive amount of medicament of difference is obtained from the default medicament addition table of comparisons.
3) it sends medicament and adds control command to moisturizing dosing pump, medicament addition control command is used to indicate moisturizing dosing pump Medicament is exported according to additive amount of medicament.
In the present embodiment, water quality parameter may include PH (Hydrogen ion concentration, hydrogen ion concentration Index) and ammonia nitrogen (ammonia nitrogen) etc..
In the present embodiment, heating system further includes the water sampler connecting with water quality testing meter, and water-quality sampler is set It sets on water supply line, water sample is delivered to water quality testing meter for acquiring water sample, and by hose, water quality testing meter detects water Sample obtains current water quality parameter value, such as the current pH value of water.
In the present embodiment, after the first preset time of water quality testing meter interval, current water quality parameter value is just sent to control Unit processed.
In the present embodiment, standard value is the standard value of water quality parameter.
In the present embodiment, each current water quality parameter value is compared with corresponding standard value, for example, current water quality Parameter value is respectively A and B, and the corresponding standard value of A is a, and the corresponding standard value of B is b, is respectively compared A with a, B with b, if There are current water quality parameter value and standard value are unequal, then the difference of current water quality parameter value and corresponding standard value is calculated.
In the present embodiment, after moisturizing dosing pump receives medicament addition control instruction, moisturizing dosing pump just exports medicine Agent, output pharmaceutical quantities are additive amount of medicament, for example, the medicament A of 20 milliliters of output, since water is circulation, when change water supply water After matter, it correspondingly can also change return water water quality, it, can also be with to change the water quality of the water in whole water supply lines and water return pipeline Protective conduit extends the service life of pipeline, for example, if the pH value of water is too low, it can corrosion pipeline.
In the present embodiment, moisturizing force (forcing) pump is connect at least one chemicals dosing plant, and each chemicals dosing plant bottom is equipped with Dosing solenoid valve, dosing solenoid valve are connect with control unit, wherein chemicals dosing plant is equipped with medicament.
In the present embodiment, a number is distributed for each dosing solenoid valve, each number is unique.From default medicine Agent, which is added, obtains the corresponding additive amount of medicament of difference, first flow and solenoid valve number in the table of comparisons, open solenoid valve number Corresponding solenoid valve, the corresponding chemicals dosing plant of solenoid valve can export medicament to moisturizing dosing pump, and moisturizing dosing pump exports medicine Agent is to water supply line.
In the present embodiment, moisturizing force (forcing) pump can be variable frequency pump.
Further, control unit sends medicament and conveys control command to moisturizing dosing pump, and medicament conveys control command and uses In instruction moisturizing force (forcing) pump conveying first flow medicament to water supply line, and control unit is according to additive amount of medicament and first-class Amount calculates the shut-in time, after reaching the shut-in time, then closes solenoid valve and numbers corresponding solenoid valve.
In the present embodiment, by the way that in the first preset time period, control first circulation water pump output is supplied water to user terminal, And control heat accumulation equipment and carry out heat accumulation, so that the first preset time can be utilized meeting while using energy demand of user terminal The corresponding low-price electricity of section carries out heat accumulation, in the second preset time period, then controls that first circulation follows pump and second circulation water pump is total It supplies water with conveying to user terminal, the heat for making full use of storage facilities to store significantly reduces heat cost.
Fig. 2 shows another embodiment of the present invention provides heat supply method implementation process, process is described in detail such as Under:
In step s 201, the monitor video that monitoring device is sent is received.
In one embodiment of the invention, heating system further includes monitoring device.
In one embodiment, monitoring device is connect with control unit.
In the present embodiment, monitoring device is used to acquire the monitor video comprising key equipment in heating system, and key is set Standby includes first circulation water pump, second circulation water pump, heat accumulation equipment and heating equipment etc..
In the present embodiment, acquisition is arrived monitor video real-time Transmission to control unit by monitoring device.
In step S202, the transmission of video request that mobile terminal is sent is received, transmission of video request includes mobile terminal Number, transmission mode and transmission speed.
In this embodiment, control unit can also be carried out wireless communication with mobile terminal, realize telecommunication.
Wherein, control unit can also include Bluetooth communication subelement and WIFI (WIreless-FIdelity, wireless guarantor Very) communicate subelement etc..
In the present embodiment, the transmission of video request that mobile terminal is sent is received, proposes movement from transmission of video request Terminal number, transmission mode and transmission speed.
Wherein, transmission mode indicates that mobile terminal receives the communication mode of monitor video.
Wherein, transmission speed indicates that monitor video is transferred to the speed of mobile terminal from control unit, for example, 10Mbps (Million bits per second, Gigabits per second).
In step S203, judge whether monitor video being sent to mobile terminal according to transmission request.
In the present embodiment, the transmission request that control unit is sent according to mobile terminal judges whether mobile terminal is legal User terminal, legitimate user end indicate the user terminal of available monitor video.
In one embodiment of the invention, step S203 includes:
1) judge whether mobile terminal number belongs to preset numbers list.
If 2) mobile terminal number belongs to preset numbers list, connection is established based on transmission mode and mobile terminal, when After establishing connection with mobile terminal, monitor video is sent to mobile terminal according to transmission speed.
3) if mobile terminal number is not belonging to preset numbers list, connection failure information is sent to mobile terminal.
In the present embodiment, judge whether mobile terminal belongs to preset numbers list, if belonging to preset numbers list, table Bright mobile terminal is legitimate user end, just establishes connection based on transmission mode and mobile terminal, when establishing connection with mobile terminal Afterwards, monitor video is sent to mobile terminal according to transmission speed, if being not belonging to preset numbers list, shows that mobile terminal is Illegal user end sends connection failure information to mobile terminal, which cannot obtain monitor video.
By taking a concrete application scene as an example, the transmission mode for including in the transmission of video request that mobile terminal is sent is indigo plant Tooth communication, transmission speed 10Mbps are then established with the mobile terminal when mobile terminal number belongs to mobile terminal list Bluetooth connection, after bluetooth connection is successfully established, then with the speed transmission real time monitoring video of 10Mbps.
In the present embodiment, the transmission mode and transmission speed monitor video required according to video request side passes It is defeated, efficiency of transmission is greatly improved, the number of transmission of video failure is reduced.
In the present embodiment, judge whether mobile terminal is legitimate user end according to mobile terminal number, so that decision is No transmitting, monitoring video improves the safety of transmission to the mobile terminal.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Embodiment 2:
Fig. 3 shows the control unit 110 of one embodiment of the present of invention offer, for executing implementation corresponding to Fig. 1 The system of method and step in example, the embodiment of the present invention is applied to heating system, and heating system includes control unit, the first temperature Monitoring unit, second temperature monitoring unit, first circulation water pump, second circulation water pump, heat accumulation equipment and user terminal, control unit Connect respectively with the first temperature monitoring unit, second temperature monitoring unit, first circulation water pump, second circulation water pump and heat accumulation equipment It connects, first circulation water pump is connect with user terminal, and second circulation water pump is connect with user terminal and heat accumulation equipment respectively, the first temperature prison Control unit is arranged on the water supply line between first circulation water pump and user terminal, and second temperature monitoring is arranged in first circulation water On water return pipeline between pump and user terminal, control unit 110 includes:
Temperature reception subelement 120, for receiving the supply water temperature and second temperature prison of the transmission of the first temperature monitoring unit Control the return water temperature that unit is sent.
Target flow computation subunit 130, for calculating target water supply flow according to supply water temperature and return water temperature.
First control subelement 140 controls heat accumulation equipment progress if belonging to the first preset time period for current time Hot water is stored, and sends the first water supply flow control command to first circulation water pump, the first water supply flow control command is for referring to Show the water supply of first circulation water pump output target water supply flow to user terminal.
Second control subelement 150 sends the second water supply flow if belonging to the second preset time period for current time For control command to second circulation water pump, the second water supply flow control command is used to indicate the default maximum confession of second circulation water pump conveying The water storage of water flow is to user terminal;Third water supply flow is obtained according to target water supply flow and default maximum water supply flow;It sends For third water supply flow control command to first circulation water pump, it is defeated that third water supply flow control command is used to indicate first circulation water pump The water supply of third water supply flow is to user terminal out.
In one embodiment of the invention, target flow computation subunit 130 includes:
Heating demand obtains module, for obtaining current heating demand.
Target flow computing module, for utilizing following formula according to current heating demand, supply water temperature and return water temperature Calculate target water supply flow:
Wherein:G is target water supply flow;T1For supply water temperature;T2For return water temperature;Q is current heating demand;C is water Specific heat capacity.
In one embodiment of the invention, the second control subelement 140 is also used to:
The difference for calculating target water supply flow and default maximum water supply flow, obtains third water supply flow.
In one embodiment of the invention, heating system further includes smog monitoring unit and water injector.
In one embodiment of the invention, control unit 110 further includes:
Smokescope receiving unit, for receiving the smokescope of smog monitoring unit transmission.
Control unit of spraying water controls water injector and sprays water if being greater than preset concentration range for smokescope.
As shown in figure 4, in one embodiment of the invention, heating system further includes the prison connecting with described control unit Control device, Fig. 4 show another embodiment of the present invention provides control unit structural schematic diagram comprising:
Video reception subelement 160, for receiving the monitor video of monitoring device transmission.
Transmission request receiving subelement 170, for receiving the transmission of video request of mobile terminal transmission, transmission of video request Including mobile terminal number, transmission mode and transmission speed.
Judgment sub-unit 180 is transmitted, for judging whether monitor video being sent to mobile terminal according to transmission request.
In one embodiment of the invention, transmission judgment sub-unit 180 includes:
Number judgment module, for judging whether mobile terminal number belongs to preset numbers list.
First processing module is based on transmission mode and movement if belonging to preset numbers list for mobile terminal number Terminal establishes connection, and after establishing connection with mobile terminal, monitor video is sent to mobile terminal according to transmission speed.
Second processing module sends connection failure information if being not belonging to preset numbers list for mobile terminal number To mobile terminal.
In one embodiment, control unit 110 further includes other function module/unit, for realizing each in embodiment 1 Method and step in embodiment.

Claims (10)

1. a kind of method of heat supply, which is characterized in that be applied to heating system, the heating system includes the first monitoring temperature list Member, second temperature monitoring unit, first circulation water pump, second circulation water pump, heat accumulation equipment and user terminal, the first circulation water Pump is connect with the user terminal, and the second circulation water pump is connect with the user terminal and the heat accumulation equipment respectively, and described the One temperature monitoring unit is arranged on the water supply line between the first circulation water pump and the user terminal, the second temperature Monitoring is arranged on the water return pipeline between the first circulation water pump and the user terminal;
The method of the heat supply includes:
Receive the supply water temperature that first temperature monitoring unit is sent and the return water temperature that second temperature monitoring unit is sent;
Target water supply flow is calculated according to the supply water temperature and the return water temperature;
If current time belongs to the first preset time period, controls the heat accumulation equipment and carry out storage hot water, and send first and supply Water flow control command to the first circulation water pump, the first water supply flow control command is used to indicate the first circulation Water pump exports the water supply of the target water supply flow to the user terminal;
If current time belongs to the second preset time period, the second water supply flow control command is sent to the second circulation water Pump, the second water supply flow control command are used to indicate the water storage of the default maximum water supply flow of the second circulation water pump conveying To the user terminal;Third water supply flow is obtained according to the target water supply flow and the default maximum water supply flow;It sends For third water supply flow control command to the first circulation water pump, the third water supply flow control command is used to indicate described One water circulating pump exports the water supply of the third water supply flow to the user terminal.
2. the method for heat supply as described in claim 1, which is characterized in that described according to the supply water temperature and the return water temperature Degree calculates target water supply flow, including:
Obtain current heating demand;
According to the current heating demand, the supply water temperature and the return water temperature, the target is calculated using following formula Water supply flow:
Wherein:G is the target water supply flow;T1For the supply water temperature;T2For the return water temperature;Q is the current heat supply Load;C is the specific heat capacity of water.
3. the method for heat supply as described in claim 1, which is characterized in that the heating system further includes monitoring device;
The method of the heat supply further includes:
Receive the monitor video that the monitoring device is sent;
The transmission of video request that mobile terminal is sent is received, the transmission of video request includes mobile terminal number, transmission mode And transmission speed;
Judge whether the monitor video being sent to the mobile terminal according to transmission request.
4. the method for heat supply as claimed in claim 3, which is characterized in that described to be judged whether according to transmission request by institute It states monitor video and is sent to the mobile terminal, including:
Judge whether the mobile terminal number belongs to preset numbers list;
If the mobile terminal number belongs to preset numbers list, is established and connected based on the transmission mode and the mobile terminal It connects, after establishing connection with the mobile terminal, the monitor video is sent to the movement eventually according to the transmission speed End;
If the mobile terminal number is not belonging to preset numbers list, connection failure information is sent to the mobile terminal.
5. the method for heat supply as described in claim 1, which is characterized in that described according to the target water supply flow and described pre- If maximum water supply flow obtains third water supply flow, including:
The difference for calculating the target water supply flow and the default maximum water supply flow, obtains the third water supply flow.
6. the method for heat supply as described in claim 1, which is characterized in that the heating system further include smog monitoring unit and Water injector;
The method of the heat supply further includes:
Receive the smokescope that the smog monitoring unit is sent;
If the smokescope is greater than preset concentration range, controls the water injector and spray water.
7. a kind of heating system, which is characterized in that the heating system includes control unit, the first temperature monitoring unit, second Temperature monitoring unit, first circulation water pump, second circulation water pump, heat accumulation equipment and user terminal, described control unit respectively with institute State the first temperature monitoring unit, the second temperature monitoring unit, the first circulation water pump, the second circulation water pump and institute State heat accumulation equipment connection, the first circulation water pump connect with the user terminal, the second circulation water pump respectively with the use Family end is connected with the heat accumulation equipment, and first temperature monitoring unit is arranged in the first circulation water pump and the user terminal Between water supply line on, the return water between the first circulation water pump and the user terminal is arranged in second temperature monitoring On pipeline;
Described control unit includes:
Temperature reception subelement, for receiving the supply water temperature and second temperature monitoring list that first temperature monitoring unit is sent The return water temperature that member is sent;
Target flow computation subunit, for calculating target water supply flow according to the supply water temperature and the return water temperature;
First control subelement controls the heat accumulation equipment and is stored up if belonging to the first preset time period for current time Hot water is deposited, and sends the first water supply flow control command to the first circulation water pump, the first water supply flow control command It is used to indicate the first circulation water pump and exports the water supply of the target water supply flow to the user terminal;
Second control subelement sends the second water supply flow control life if belonging to the second preset time period for current time It enables to the second circulation water pump, it is default that the second water supply flow control command is used to indicate the second circulation water pump conveying The water storage of maximum water supply flow is to the user terminal;It is obtained according to the target water supply flow and the default maximum water supply flow Third water supply flow;Third water supply flow control command is sent to the first circulation water pump, the third water supply flow control Order is used to indicate the first circulation water pump and exports the water supply of the third water supply flow to the user terminal.
8. heating system as claimed in claim 7, which is characterized in that the target flow computation subunit includes:
Heating demand obtains module, for obtaining current heating demand;
Target flow computing module, for utilizing according to the current heating demand, the supply water temperature and the return water temperature Following formula calculates the target water supply flow:
Wherein:G is the target water supply flow;T1For the supply water temperature;T2For the return water temperature;Q is the current heat supply Load;C is the specific heat capacity of water.
9. heating system as claimed in claim 7, which is characterized in that the heating system further includes connecting with described control unit The monitoring device connect;
Described control unit further includes:
Video reception subelement, the monitor video sent for receiving the monitoring device;
Transmission request receiving subelement, for receiving the transmission of video request of mobile terminal transmission, the transmission of video request packet Include mobile terminal number, transmission mode and transmission speed;
Judgment sub-unit is transmitted, it is described mobile whole for judging whether for the monitor video to be sent to according to transmission request End.
10. heating system as claimed in claim 9, which is characterized in that the transmission judgment sub-unit includes:
Number judgment module, for judging whether the mobile terminal number belongs to preset numbers list;
First processing module, if for the mobile terminal number belong to preset numbers list, based on the transmission mode with The mobile terminal establishes connection, after establishing connection with the mobile terminal, regards the monitoring according to the transmission speed Frequency is sent to the mobile terminal;
Second processing module sends connection failure information if being not belonging to preset numbers list for mobile terminal number To the mobile terminal.
CN201810580475.0A 2018-06-07 2018-06-07 A kind of method and heating system of heat supply Pending CN108870528A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810580475.0A CN108870528A (en) 2018-06-07 2018-06-07 A kind of method and heating system of heat supply
PCT/CN2018/119560 WO2019233064A1 (en) 2018-06-07 2018-12-06 Heat supply method and heat supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810580475.0A CN108870528A (en) 2018-06-07 2018-06-07 A kind of method and heating system of heat supply

Publications (1)

Publication Number Publication Date
CN108870528A true CN108870528A (en) 2018-11-23

Family

ID=64337284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810580475.0A Pending CN108870528A (en) 2018-06-07 2018-06-07 A kind of method and heating system of heat supply

Country Status (2)

Country Link
CN (1) CN108870528A (en)
WO (1) WO2019233064A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019233064A1 (en) * 2018-06-07 2019-12-12 四川协成电力工程设计有限公司 Heat supply method and heat supply system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0035068A1 (en) * 1980-02-29 1981-09-09 ATELIERS DE CONSTRUCTIONS ELECTRIQUES DE CHARLEROI (ACEC) Société Anonyme Water-tank heat accumulator
CN102635890A (en) * 2011-05-16 2012-08-15 大连船舶重工集团装备制造有限公司 Electrode hot-water boiler heat-storage-type heat supplying system
CN103686085A (en) * 2013-12-11 2014-03-26 东方网力科技股份有限公司 Method, device and system for processing monitoring video data
CN104515194A (en) * 2013-09-26 2015-04-15 珠海格力电器股份有限公司 Control method and device of heating system
CN205536068U (en) * 2016-02-02 2016-08-31 辽宁鑫源重工有限公司 Heating system is united with two electric boilers to phase change energy storage equipment
CN206919400U (en) * 2017-06-07 2018-01-23 山西奥通环保自动锅炉有限公司 A kind of phase change heat accumulating boiler
CN107943171A (en) * 2017-11-29 2018-04-20 深圳市亿兆互联技术有限公司 A kind of machine room's intelligence control system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002048397A (en) * 2000-08-07 2002-02-15 Sanyo Electric Co Ltd Hot water storage control method of heat pump hot water supply apparatus and heat pump hot water supply apparatus
JP5525853B2 (en) * 2010-02-18 2014-06-18 株式会社ガスター Solar heat source equipment
CN203586393U (en) * 2012-11-16 2014-05-07 格兰富控股联合股份公司 Heat balancing unit and control device thereof
CN205174552U (en) * 2015-10-29 2016-04-20 陕西华夏新能源科技有限公司 Heating system intelligence remote control device
CN106979544B (en) * 2017-04-07 2019-06-11 西安交通大学 A kind of air source inter-critical CO2Heat pump couples heating system with more fusing point phase-transition heat-storages
CN108870528A (en) * 2018-06-07 2018-11-23 四川协成电力工程设计有限公司 A kind of method and heating system of heat supply

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0035068A1 (en) * 1980-02-29 1981-09-09 ATELIERS DE CONSTRUCTIONS ELECTRIQUES DE CHARLEROI (ACEC) Société Anonyme Water-tank heat accumulator
CN102635890A (en) * 2011-05-16 2012-08-15 大连船舶重工集团装备制造有限公司 Electrode hot-water boiler heat-storage-type heat supplying system
CN104515194A (en) * 2013-09-26 2015-04-15 珠海格力电器股份有限公司 Control method and device of heating system
CN103686085A (en) * 2013-12-11 2014-03-26 东方网力科技股份有限公司 Method, device and system for processing monitoring video data
CN205536068U (en) * 2016-02-02 2016-08-31 辽宁鑫源重工有限公司 Heating system is united with two electric boilers to phase change energy storage equipment
CN206919400U (en) * 2017-06-07 2018-01-23 山西奥通环保自动锅炉有限公司 A kind of phase change heat accumulating boiler
CN107943171A (en) * 2017-11-29 2018-04-20 深圳市亿兆互联技术有限公司 A kind of machine room's intelligence control system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李善化等: "《实用集中供热手册》", 31 March 2006, 中国电力出版社 *
江萍: "《建筑设备自动化》", 31 January 2016, 中国建材工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019233064A1 (en) * 2018-06-07 2019-12-12 四川协成电力工程设计有限公司 Heat supply method and heat supply system

Also Published As

Publication number Publication date
WO2019233064A1 (en) 2019-12-12

Similar Documents

Publication Publication Date Title
CN105004067B (en) A kind of solar energy and air-source and heating system
CN102213489B (en) A kind of method and system realizing gas heater multi-machine parallel connection
CN103759330A (en) Heat exchanging station intelligent network control system
CN108870527A (en) A kind of method and energy supplying system of energy supply
CN108870528A (en) A kind of method and heating system of heat supply
CN103851769B (en) The prioreception heating means and its hot-water heating system of a kind of hot-water heating system
CN106247629A (en) Fuel gas water heating system based on wireless temperature-measuring sensor and preheating control method
CN102467133A (en) Fully-automatic water level control system for boiler water supply
CN205747546U (en) A kind of long-range solar control system of intelligent monitoring energy consumption
CN108006440A (en) Distributed gas leak detection system
CN210373657U (en) Intelligent building water mixing heat supply unit
CN209470292U (en) The control system of air heat source pump and thermal storage electric boiler combined cycle heating system
CN104791884B (en) A kind of Bidirectional circulation heating method and the heating boiler with bidirectional circulating system
CN201066170Y (en) Heating supply system buildings or entrance valve automatic regulating system
CN211316605U (en) Intelligent control system based on multiple hot water energy preparation modes
CN114877405A (en) Two-network balance detection system based on sensor fusion
CN210320247U (en) Heating system
CN107676982A (en) Circulate pre-heating system
CN107289628A (en) Without return pipe circulator and its pre-heating mean
CN101545661A (en) Water delivery pressure control system and method
CN203501315U (en) Intelligent heating monitor station
CN218179008U (en) Intelligent heating system
CN209470291U (en) The control system of novel joint circulating heat supply system
CN205447997U (en) Automatic control and remote network monitoring system for centralized heating
CN214548932U (en) Fault detection device of water dispenser

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123

RJ01 Rejection of invention patent application after publication