CN108868092A - A kind of jack up scaffold of the construction equipped with scaling platform - Google Patents

A kind of jack up scaffold of the construction equipped with scaling platform Download PDF

Info

Publication number
CN108868092A
CN108868092A CN201810894689.5A CN201810894689A CN108868092A CN 108868092 A CN108868092 A CN 108868092A CN 201810894689 A CN201810894689 A CN 201810894689A CN 108868092 A CN108868092 A CN 108868092A
Authority
CN
China
Prior art keywords
scaffold
fixedly connected
groove
bearing
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810894689.5A
Other languages
Chinese (zh)
Inventor
董晶龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810894689.5A priority Critical patent/CN108868092A/en
Publication of CN108868092A publication Critical patent/CN108868092A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of jack up scaffolds of the construction equipped with scaling platform, it is related to technical field of building construction, including pedestal, the upper surface of the pedestal offers the first groove, the inner bottom wall of first groove is fixedly connected with transmission mechanism, the lower part of the pedestal is equipped with fixed mechanism, and fixed mechanism is located at the lower section of transmission mechanism.This is equipped with the construction jack up scaffold of scaling platform, by being provided with disk and handle, it can make the more convenient rotation of the second threaded rod of the scaffold, make the scaffold convenient for worker's use, by being provided with supporting block, the stroke of movable block can be limited, supporting block can make movable block stop movement when lifter plate is raised to highest point, keep lifter plate stronger, by being provided with drill bit, the second threaded rod can be made to be easier to enter underground, to make the second threaded rod reinforce the construction with jack up scaffold, keep the construction jack up scaffold more stable.

Description

A kind of jack up scaffold of the construction equipped with scaling platform
Technical field
The present invention relates to technical field of building construction, specially a kind of jack up foot of the construction equipped with scaling platform Hand cradle.
Background technique
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also be with It says it is various lines on design drawing, in specified place, becomes process in kind, it includes basic engineering construction, master Body structure construction, roof construction and decorative engineering construction etc., the place of construction operation is known as construction site or cries to apply Work scene, is also named building site.
Construction scaffold does not have the function of lifting generally, and worker, which needs to climb, to be got to above scaffold Platform, and worker is easy to happen danger during climbing, and climbing wastes time, and reduces working efficiency, thus we A kind of jack up scaffold of the construction equipped with scaling platform is proposed, to solve the problems, such as this.
Summary of the invention
The object of the invention is in order to make up for the deficiencies of the prior art, provide a kind of building equipped with scaling platform to apply Work jack up scaffold, it has the advantages that automatic lifting, solves construction scaffold without elevating function Problem.
The present invention is in order to solve the above technical problems, provide the following technical solutions:A kind of construction equipped with scaling platform With jack up scaffold, including pedestal, the upper surface of the pedestal offers the first groove, and the inner bottom wall of first groove is solid Surely it is connected with transmission mechanism, the lower part of the pedestal is equipped with fixed mechanism, and fixed mechanism is located at the lower section of transmission mechanism.
The inside of first groove is placed with lifter plate, is fixedly connected with left shield on the left of the lifter plate upper surface Column is fixedly connected with right guardrail on the right side of the lifter plate upper surface, rear guardrail, institute is fixedly connected with above the lifter plate The back side at the back side and right guardrail of stating left guardrail is fixedly connected with the front of rear guardrail, and the positive top of left guardrail passes through First pin is fixedly hinged with fender rod, and the upper surface of the right guardrail offers the second groove, the right end position of the fender rod In the inside of the second groove.
The transmission mechanism includes support rod, pin rod, sliding block, movable block, the first threaded rod, cavity, 3rd bearing, first Bearing, clockwise and anticlockwise motor, supporting block, the second pin, the first screwed pipe and second bearing.
The fixed mechanism include disk, the second screwed pipe, drill bit, electric pushrod, the 4th pin, third groove, idler wheel, Second threaded rod, fixed plate and handle.
Further, the inside of the pedestal offers cavity, and the cavity is located at the right side of the first groove, the cavity Inner sidewall fixation be inlaid with first bearing, and first bearing is connected with the first groove, and the cavity is far from first bearing Inner sidewall is fixedly connected with clockwise and anticlockwise motor, and the output end of the clockwise and anticlockwise motor is fixedly connected with the first threaded rod, and described One groove is inlaid with second bearing far from the inner sidewall fixation of first bearing, and the inside of first groove is placed with movable block, The right side of the movable block is fixed to be inlaid with the first screwed pipe, the left end of first threaded rod sequentially pass through first bearing and First screwed pipe and the inside for extending to second bearing, and the fixed company of the inner ring of the outer surface of the first threaded rod and first bearing It connects, the outer surface of first threaded rod is threadedly coupled with the inner ring of the first screwed pipe, the appearance of first threaded rod left end Face is fixedly connected with the inner ring of second bearing, and the top of the movable block is fixedly hinged with pin rod, the liter by the second pin Fixed block is fixedly connected in the middle part of drop board bottom face, the fixed block passes through the one end of third pin and pin rod far from the second pin Fixed hinge.
Further, the bottom surface of the pedestal offers third groove, four edges of the third groove inner roof wall It is fixedly connected to electric pushrod, the output end of the electric pushrod is fixedly hinged with idler wheel, the pedestal by the 4th pin Left and right sides be fixedly connected to fixed plate, the fixation of the upper surface of each fixed plate is inlaid with the second screwed pipe, The inside of each second screwed pipe is threaded with the second threaded rod compatible with the second screwed pipe, and each described The bottom surface of two threaded rods is fixedly connected to drill bit.
Further, the upper surface of each second threaded rod is fixedly connected to disk, each disk it is upper Surface is fixedly connected to handle.
By using above-mentioned technical proposal, make more convenient turn of the second threaded rod of the construction jack up scaffold It is dynamic, make the construction jack up scaffold convenient for worker's use.
Further, the inner bottom wall of first groove is fixedly connected with supporting block, and the left side of supporting block and fixation The right side of block is located at same vertical plane.
By using above-mentioned technical proposal, the stroke of movable block can be limited, supporting block can be raised to highest in lifter plate So that movable block is stopped movement when point, keeps lifter plate stronger.
Further, the right side fixation of the supporting block is inlaid with 3rd bearing, the outer surface of first threaded rod It is fixedly connected with the inner ring of 3rd bearing.
By using above-mentioned technical proposal, rotates the first threaded rod more smooth, prevent the first threaded rod from rotating During occur Caton or inclination the phenomenon that, keep the construction jack up scaffold more durable.
Further, the inner sidewall of first groove is opened up there are two symmetrical sliding slot, each sliding slot it is interior Portion is connected with sliding block.
By using above-mentioned technical proposal, keeps lifter plate more stable during lifting, prevent lifter plate from going up and down During occur tilting or the phenomenon that Caton keeps the construction jack up scaffold more convenient to use.
Further, two sliding block one sides close to each other are fixedly connected to support rod, each support The upper surface of bar is fixedly connected with the bottom surface of lifter plate.
By using above-mentioned technical proposal, increase the stability of lifter plate, lifter plate is enable to go up and down more by sliding block Add stabilization.
Further, the upper surface of each sliding block offers slide opening, and the inside of each sliding slot is fixed to be connected It is connected to slide bar, and slide bar is plugged with slide opening.
By using above-mentioned technical proposal, the stability of lifter plate can be further increased, makes lifter plate in the mistake of lifting It is more stable in journey, keep the construction jack up scaffold more durable, it is safer.
Compared with prior art, should have equipped with the construction jack up scaffold of scaling platform following beneficial to effect Fruit:
1, the present invention is by being provided with being used cooperatively for disk and handle, can make the of the construction jack up scaffold The more convenient rotation of two threaded rods makes the construction jack up scaffold convenient for worker's use, by being provided with supporting block, The stroke of movable block can be limited, supporting block can make movable block stop movement when lifter plate is raised to highest point, make lifter plate It is stronger, by being provided with drill bit, the second threaded rod can be made to be easier to enter underground, so that the second threaded rod be made to build this It builds construction to be reinforced with jack up scaffold, keeps the construction jack up scaffold more stable.
2, the present invention can be such that the first threaded rod rotates more smooth, prevent the first spiral shell by being provided with 3rd bearing There is the phenomenon that Caton or inclination in the course of rotation in rasp bar, keeps the construction jack up scaffold more durable, leads to It crosses and is provided with being used cooperatively for sliding slot and sliding block, lifter plate can be made more stable during lifting, prevent lifter plate from existing Occur tilting during lifting or the phenomenon that Caton keeps the construction jack up scaffold more convenient to use, by setting It is equipped with being used cooperatively for first bearing and second bearing, the first threaded rod can be made to rotate more smooth, prevent the first screw thread There is the phenomenon that Caton in the course of rotation in bar.
3, the present invention increases the stability of lifter plate, lifter plate is enable to go up and down by sliding block by being provided with support rod It is more stable, by being provided with being used cooperatively for slide opening and slide bar, the stability of lifter plate can be further increased, make to go up and down Plate is more stable during lifting, keeps the construction jack up scaffold more durable, safer, passes through setting There is fender rod, worker can be facilitated to pass in and out the construction jack up scaffold, and fender rod can also prevent worker from falling, increases Process the safety of people.
Detailed description of the invention
Fig. 1 is the cross-sectional view of pedestal front view of the present invention;
Fig. 2 is the side view of right guardrail of the present invention;
Fig. 3 is structure enlargement diagram at A in Fig. 1 of the present invention.
In figure:1- pedestal, 2- transmission mechanism, 3- fixed mechanism, 4- third pin, 5- lifter plate, 6- fender rod protect after 7- Column, 8- right guardrail, 9- left guardrail, 10- fixed block, the first pin of 11-, 12- slide bar, 13- sliding slot, the second groove of 14-, 15- are sliding Hole, the first groove of 16-, 201- support rod, 202- pin rod, 203- sliding block, 204- movable block, the first threaded rod of 205-, 206- are empty Chamber, 207- 3rd bearing, 208- first bearing, 209- clockwise and anticlockwise motor, 210- supporting block, the second pin of 211-, 212- first Screwed pipe, 213- second bearing, 301- disk, the second screwed pipe of 302-, 303- drill bit, 304- electric pushrod, 305- the 4th are sold Nail, 306- third groove, 307- idler wheel, the second threaded rod of 308-, 309- fixed plate, 310- handle.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution:A kind of construction jack up equipped with scaling platform Scaffold, including pedestal 1, the upper surface of pedestal 1 offer the first groove 16, and the inner bottom wall of the first groove 16 is fixedly connected with biography The lower part of motivation structure 2, pedestal 1 is equipped with fixed mechanism 3, and fixed mechanism 3 is located at the lower section of transmission mechanism 2.
The inside of first groove 16 is placed with lifter plate 5, and left guardrail 9 is fixedly connected on the left of 5 upper surface of lifter plate, rises Drop is fixedly connected with right guardrail 8 on the right side of 5 upper surface of plate, and the top of lifter plate 5 is fixedly connected with rear guardrail 7, the back of left guardrail 9 Face and the back side of right guardrail 8 are fixedly connected with the front of rear guardrail 7, and the positive top of left guardrail 9 is solid by the first pin 11 Surely it is hinged with fender rod 6, the upper surface of right guardrail 8 offers the second groove 14, and the right end of fender rod 6 is located at the second groove 14 The quota of inside, left guardrail 9, right guardrail 8 and fender rod 6 uses, and can increase the peace of the construction jack up scaffold Quan Xing prevents work man-hour from falling from scaffold, keeps worker safer, and fender rod 6 is fixed hinge, facilitates worker Disengaging, keep the construction jack up scaffold more convenient to use.
Transmission mechanism 2 includes support rod 201, pin rod 202, sliding block 203, movable block 204, the first threaded rod 205, cavity 206,3rd bearing 207, first bearing 208, clockwise and anticlockwise motor 209, supporting block 210, the second pin 211, the first screwed pipe 212 With second bearing 213, the inside of pedestal 1 offers cavity 206, and cavity 206 is located at the right side of the first groove 16, cavity 206 Inner sidewall fixation is inlaid with first bearing 208, and first bearing 208 is connected with the first groove 16, and cavity 206 is far from first axle The inner sidewall for holding 208 is fixedly connected with clockwise and anticlockwise motor 209, and what clockwise and anticlockwise motor 209 represented is that motor rotates clockwise and inverse Hour hands rotation, it is that motor rotates forward that motor, which rotates clockwise, and it is motor reversal that motor, which rotates counterclockwise, clockwise and anticlockwise motor 209 it is defeated Outlet is fixedly connected with the first threaded rod 205, and the first groove 16 is inlaid with the second axis far from the inner sidewall fixation of first bearing 208 Hold 213, being used cooperatively for first bearing 208 and second bearing 213 can be such that the first threaded rod 205 rotates more smooth, prevent Only there is the phenomenon that Caton in the course of rotation in the first threaded rod 205, and the inside of the first groove 16 is placed with movable block 204, The right side fixation of movable block 204 is inlaid with the first screwed pipe 212, and the left end of the first threaded rod 205 sequentially passes through first bearing 208 and first screwed pipe 212 and extend to the inside of second bearing 213, and the outer surface of the first threaded rod 205 and first bearing 208 inner ring is fixedly connected, and the outer surface of the first threaded rod 205 is threadedly coupled with the inner ring of the first screwed pipe 212, the first screw thread The outer surface of 205 left end of bar is fixedly connected with the inner ring of second bearing 213, and the first threaded rod 205 can pass through the first screwed pipe 212 drive movable blocks 204 are moved left and right, and are that the lifting of lifter plate 5 is more convenient, and the top of movable block 204 passes through second Pin 211 is fixedly hinged with pin rod 202, and fixed block 10 is fixedly connected in the middle part of 5 bottom surface of lifter plate, and fixed block 10 passes through third Pin 4 and one end fixed hinge of the pin rod 202 far from the second pin 211, movable block 204 can be by pin rod 202 to lifter plate 5 The adjusting gone up and down adjusts the construction jack up scaffold more convenient.
Fixed mechanism 3 includes disk 301, the second screwed pipe 302, drill bit 303, electric pushrod 304, the 4th pin 305, the Three grooves 306, idler wheel 307, the second threaded rod 308, fixed plate 309 and handle 310, the bottom surface of pedestal 1 offer third groove 306, four edges of 306 inner roof wall of third groove are fixedly connected to electric pushrod 304, and electric pushrod 304 is a kind of incites somebody to action The rotary motion of motor is changed into the power-driven gear of the straight reciprocating motion of push rod, can be used for various simple or complicated It is used in process flow as execution is mechanical, to realize far distance control, centralized control and automatic control, electric pushrod 304 Output end is fixedly hinged with idler wheel 307 by the 4th pin 305, and electric pushrod 304 facilitates idler wheel 307 to be stored, builds this It is more convenient to use to build construction jack up scaffold, and idler wheel 307 can be stored can to increase the construction jack up The stability of scaffold, the left and right sides of pedestal 1 are fixedly connected to fixed plate 309, and the upper surface of each fixed plate 309 is equal Fixed to be inlaid with the second screwed pipe 302, the second screwed pipe 302 can be such that the second threaded rod 308 of rotation moves down, conveniently make Second threaded rod 308 is embedded to underground, increases the stability of the construction jack up scaffold, each second screwed pipe 302 Inside be threaded with second threaded rod 308 compatible with the second screwed pipe 302, the bottom of each second threaded rod 308 Face is fixedly connected to drill bit 303, and drill bit 303 can make the second threaded rod 308 be easier to enter underground, to make the second screw thread Bar 308 reinforces the construction with jack up scaffold, keeps the construction jack up scaffold more stable.
Further, the upper surface of each second threaded rod 308 is fixedly connected to disk 301, each disk 301 it is upper Surface is fixedly connected to handle 310, makes 308 more convenient turns of the second threaded rod of the construction jack up scaffold It is dynamic, make the construction jack up scaffold convenient for worker's use.
Further, the inner bottom wall of the first groove 16 is fixedly connected with supporting block 210, and the left side of supporting block 210 with The right side of fixed block 10 is located at same vertical plane, can limit the stroke of movable block 204, and supporting block 210 can be in lifter plate 5 So that movable block 204 is stopped movement when being raised to highest point, keeps lifter plate 5 stronger.
Further, the right side fixation of supporting block 210 is inlaid with 3rd bearing 207, the outer surface of the first threaded rod 205 It is fixedly connected with the inner ring of 3rd bearing 207, rotates the first threaded rod 205 more smooth, prevent the first threaded rod 205 from existing Occur the phenomenon that Caton or inclination during rotation, keeps the construction jack up scaffold more durable.
Further, the inner sidewall of the first groove 16 is opened up there are two symmetrical sliding slot 13, the inside of each sliding slot 13 It is connected with sliding block 203, keeps lifter plate 5 more stable during lifting, prevents lifter plate 5 from occurring during lifting The phenomenon that inclination or Caton, keeps the construction jack up scaffold more convenient to use.
Further, two one sides close to each other of sliding block 203 are fixedly connected to support rod 201, each support rod 201 upper surface is fixedly connected with the bottom surface of lifter plate 5, increases the stability of lifter plate 5, lifter plate 5 is enable to pass through cunning Block 203 is gone up and down more stable.
Further, the upper surface of each sliding block 203 offers slide opening 15, and the inside of each sliding slot 13 is fixedly connected with There is slide bar 12, and slide bar 12 is plugged with slide opening 15, can further increase the stability of lifter plate 5, is going up and down lifter plate 5 During it is more stable, keep the construction jack up scaffold more durable, it is safer.
Working principle:Electric pushrod 304 and clockwise and anticlockwise motor 209 are connected with city with power supply, start electric pushrod 304, Electric pushrod 304 drives idler wheel 307 to stretch out, and idler wheel 307 is made to land, and then pushes the construction jack up scaffold mobile Suitable position, be then shut off electric pushrod 304, idler wheel 307 stored, so that the bottom of pedestal 1 is landed, then rotate Handle 310, the second threaded rod 308 are rotated down movement under the action of the second screwed pipe 302, make under the action of drill bit 303 Second threaded rod 308 enters underground, fixes the construction with jack up scaffold more stable, opens fender rod 6, work People enters the landing stage of scaffold from fender rod 6, then in the inside for the right end of fender rod 6 being put into the second groove 14, then turns Dynamic clockwise and anticlockwise motor 209, the first threaded rod 205 drive movable block 204 to move right by the first screwed pipe 212, movable block 204 It drives lifter plate 5 to move up by pin rod 202, worker is sent to suitable height, stop operating clockwise and anticlockwise motor 209, should Construction is simple with jack up scaffolding structure, is equipped with the safety that guardrail increases worker, solves construction foot Hand cradle does not have the problem of elevating function.
In the description of the present invention, the terms "include", "comprise" or its any other variant are intended to nonexcludability Include so that include a series of elements process, method, article or equipment not only include those elements, but also Including other elements that are not explicitly listed, or further include for this process, method, article or equipment intrinsic want Element.It should be noted that, in this document, the relational terms of such as " first ", " second " or the like are used merely to an entity Or operation is distinguished with another entity or operation, is existed without necessarily requiring or implying between these entities or operation Any actual relationship or order.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of jack up scaffold of the construction equipped with scaling platform, including pedestal(1), it is characterised in that:The bottom Seat(1)Upper surface offer the first groove(16), first groove(16)Inner bottom wall be fixedly connected with transmission mechanism (2), the pedestal(1)Lower part be equipped with fixed mechanism(3), and fixed mechanism(3)Positioned at transmission mechanism(2)Lower section;
First groove(16)Inside be placed with lifter plate(5), the lifter plate(5)It is fixedly connected on the left of upper surface Left guardrail(9), the lifter plate(5)Right guardrail is fixedly connected on the right side of upper surface(8), the lifter plate(5)Top it is solid Surely it is connected with rear guardrail(7), the left guardrail(9)The back side and right guardrail(8)The back side with rear guardrail(7)Front it is fixed Connection, the left guardrail(9)Positive top passes through the first pin(11)It is fixedly hinged with fender rod(6), the right guardrail(8) Upper surface offer the second groove(14), the fender rod(6)Right end be located at the second groove(14)Inside;
The transmission mechanism(2)Including support rod(201), pin rod(202), sliding block(203), movable block(204), the first threaded rod (205), cavity(206), 3rd bearing(207), first bearing(208), clockwise and anticlockwise motor(209), supporting block(210), second Pin(211), the first screwed pipe(212)And second bearing(213);
The fixed mechanism(3)Including disk(301), the second screwed pipe(302), drill bit(303), electric pushrod(304), the 4th Pin(305), third groove(306), idler wheel(307), the second threaded rod(308), fixed plate(309)And handle(310).
2. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: The pedestal(1)Inside offer cavity(206), the cavity(206)Positioned at the first groove(16)Right side, the cavity (206)Inner sidewall fixation be inlaid with first bearing(208), and first bearing(208)With the first groove(16)It is connected, it is described Cavity(206)Far from first bearing(208)Inner sidewall be fixedly connected with clockwise and anticlockwise motor(209), the clockwise and anticlockwise motor (209)Output end be fixedly connected with the first threaded rod(205), first groove(16)Far from first bearing(208)It is interior Side wall fixation is inlaid with second bearing(213), first groove(16)Inside be placed with movable block(204), the activity Block(204)Right side fixation be inlaid with the first screwed pipe(212), first threaded rod(205)Left end sequentially pass through One bearing(208)With the first screwed pipe(212)And extend to second bearing(213)Inside, and the first threaded rod(205)It is outer Surface and first bearing(208)Inner ring be fixedly connected, first threaded rod(205)Outer surface and the first screwed pipe (212)Inner ring be threadedly coupled, first threaded rod(205)The outer surface of left end and second bearing(213)Inner ring fix Connection, the movable block(204)Top pass through the second pin(211)It is fixedly hinged with pin rod(202), the lifter plate(5) Fixed block is fixedly connected in the middle part of bottom surface(10), the fixed block(10)Pass through third pin(4)With pin rod(202)Far from the Two pins(211)One end fixed hinge.
3. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: The pedestal(1)Bottom surface offer third groove(306), the third groove(306)Four edges of inner roof wall are solid Surely it is connected with electric pushrod(304), the electric pushrod(304)Output end pass through the 4th pin(305)It is fixedly hinged with rolling Wheel(307), the pedestal(1)Left and right sides be fixedly connected to fixed plate(309), each fixed plate(309)'s Upper surface fixation is inlaid with the second screwed pipe(302), each second screwed pipe(302)Inside be threaded with Second screwed pipe(302)Compatible second threaded rod(308), each second threaded rod(308)Bottom surface fixed connect It is connected to drill bit(303).
4. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: Each second threaded rod(308)Upper surface be fixedly connected to disk(301), each disk(301)Upper table Face is fixedly connected to handle(310).
5. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: First groove(16)Inner bottom wall be fixedly connected with supporting block(210), and supporting block(210)Left side and fixed block (10)Right side be located at same vertical plane.
6. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: The supporting block(210)Right side fixation be inlaid with 3rd bearing(207), first threaded rod(205)Outer surface with 3rd bearing(207)Inner ring be fixedly connected.
7. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: First groove(16)Inner sidewall open up there are two symmetrical sliding slot(13), each sliding slot(13)Inside block It is connected to sliding block(203).
8. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: Two sliding blocks(203)One side close to each other is fixedly connected to support rod(201), each support rod(201) Upper surface and lifter plate(5)Bottom surface be fixedly connected.
9. a kind of jack up scaffold of the construction equipped with scaling platform according to claim 1, it is characterised in that: Each sliding block(203)Upper surface offer slide opening(15), each sliding slot(13)Inside be fixedly connected to Slide bar(12), and slide bar(12)With slide opening(15)It plugs.
CN201810894689.5A 2018-08-08 2018-08-08 A kind of jack up scaffold of the construction equipped with scaling platform Pending CN108868092A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810894689.5A CN108868092A (en) 2018-08-08 2018-08-08 A kind of jack up scaffold of the construction equipped with scaling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810894689.5A CN108868092A (en) 2018-08-08 2018-08-08 A kind of jack up scaffold of the construction equipped with scaling platform

Publications (1)

Publication Number Publication Date
CN108868092A true CN108868092A (en) 2018-11-23

Family

ID=64318508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810894689.5A Pending CN108868092A (en) 2018-08-08 2018-08-08 A kind of jack up scaffold of the construction equipped with scaling platform

Country Status (1)

Country Link
CN (1) CN108868092A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388039A (en) * 2019-08-16 2019-10-29 永康微唯智能科技有限公司 A kind of lift for interior architecture construction
CN110453902A (en) * 2019-08-19 2019-11-15 贾云香 A kind of construction platform
CN110541552A (en) * 2019-09-10 2019-12-06 中建协和建设有限公司 mobile operation platform
CN112211386A (en) * 2020-10-30 2021-01-12 湖南迈豪斯建筑科技有限公司 Scaffold for building construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206942101U (en) * 2017-07-11 2018-01-30 曲直 A kind of municipal works are speedily carried out rescue work with shaking type lifting device
CN207122116U (en) * 2017-07-04 2018-03-20 祝星晨 A kind of Architecture Outer Curtain Wall scaffold
CN207332275U (en) * 2017-09-24 2018-05-08 胡现勇 A kind of temporary construction hoistable platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207122116U (en) * 2017-07-04 2018-03-20 祝星晨 A kind of Architecture Outer Curtain Wall scaffold
CN206942101U (en) * 2017-07-11 2018-01-30 曲直 A kind of municipal works are speedily carried out rescue work with shaking type lifting device
CN207332275U (en) * 2017-09-24 2018-05-08 胡现勇 A kind of temporary construction hoistable platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388039A (en) * 2019-08-16 2019-10-29 永康微唯智能科技有限公司 A kind of lift for interior architecture construction
CN110388039B (en) * 2019-08-16 2020-04-17 日照大象房屋建设有限公司 A companion ladder for indoor building construction
CN110453902A (en) * 2019-08-19 2019-11-15 贾云香 A kind of construction platform
CN110541552A (en) * 2019-09-10 2019-12-06 中建协和建设有限公司 mobile operation platform
CN112211386A (en) * 2020-10-30 2021-01-12 湖南迈豪斯建筑科技有限公司 Scaffold for building construction

Similar Documents

Publication Publication Date Title
CN108868092A (en) A kind of jack up scaffold of the construction equipped with scaling platform
CN110388039A (en) A kind of lift for interior architecture construction
CN210989377U (en) Architectural design removes show stand
CN110965754A (en) Building construction device with protection function
CN110259081A (en) A kind of scaffold for indoor coating coating
CN209509443U (en) A kind of easy-to-dismount scaffold of civil engineering
CN113775160A (en) A liftable support protection platform for in construction wall construction
CN211974246U (en) Hydraulic engineering construction auxiliary assembly that ascends a height
CN209958773U (en) Formwork removing tool for floor aluminum alloy building formwork
CN211850711U (en) Building construction device with protection function
CN214885496U (en) Building engineering construction is with hanging mould device
CN214006473U (en) Novel high strength aluminum alloy attached lifting scaffold
CN214532755U (en) Quick fire escape and rescue ladder
CN111056229A (en) Building site automatic transportation companion ladder
CN208533989U (en) Carrying frame is built in a kind of adjustable height formula room
CN220522568U (en) Well cementation device
CN221370494U (en) Lifting table for bridge engineering operation
CN219654218U (en) Building construction frame that stability is strong
CN220056279U (en) Building construction whitewashes elevating platform
CN215829971U (en) Building platform for outdoor building and indoor decoration
CN218205579U (en) Scaffold for constructional engineering
CN110878671B (en) Ladder for indoor roof decoration
CN214423922U (en) Scaffold of interior decoration with safety mechanism
CN213683359U (en) Bus shelter convenient to installation
CN221422619U (en) Construction frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181123