CN108843298A - The quick well choosing method of coal bed gas well refracturing and device based on mining data - Google Patents

The quick well choosing method of coal bed gas well refracturing and device based on mining data Download PDF

Info

Publication number
CN108843298A
CN108843298A CN201810675687.7A CN201810675687A CN108843298A CN 108843298 A CN108843298 A CN 108843298A CN 201810675687 A CN201810675687 A CN 201810675687A CN 108843298 A CN108843298 A CN 108843298A
Authority
CN
China
Prior art keywords
well
target well
target
mining data
refracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810675687.7A
Other languages
Chinese (zh)
Other versions
CN108843298B (en
Inventor
李小刚
易良平
杨兆中
贾敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201810675687.7A priority Critical patent/CN108843298B/en
Publication of CN108843298A publication Critical patent/CN108843298A/en
Application granted granted Critical
Publication of CN108843298B publication Critical patent/CN108843298B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Separation Of Solids By Using Liquids Or Pneumatic Power (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of quick well choosing method of coal bed gas well refracturing and device based on mining data, is related to oil gas field renovation technique field, the method includes:Obtain the mining data of the offset well of target well and target well;Mining data according to preset classifying rules according to target well and the offset well of target well classify to target well;The target well that can carry out refracturing is chosen according to classification results.Based on target well and its offset well etc. mining data easy to collect, it is analyzed by the mining data to more wells to classify to target well, target well is rationally and effectively divided into multiple classifications, there can be detailed division to each index of target well, it overcomes existing coal bed gas well refracturing well selecting principle and establishes this defect on single well analysis basis mostly, required basic data is few, classify convenient and efficient, the selection for fast implementing the target well that may be repeated pressure break can be assisted.

Description

The quick well choosing method of coal bed gas well refracturing and device based on mining data
Technical field
The present invention relates to oil gas field renovation technique fields, in particular to a kind of coal bed gas well based on mining data The quick well choosing method of refracturing and device.
Background technique
China's coal bed gas resource very abundant, buried depth are about 36.8 trillion with shallow coal bed gas resource total amount at 2000 meters m3, mining resources are abundant, and development and utilization coal bed gas has very big economic value and social benefit.Since coal seam is low porosity and low permeability Compact reservoir, the methane stored in coal seam in coal petrography, therefore are generally required with ADSORPTION STATE preservation and carry out hydraulic fracturing to coal seam Transformation, then carries out drainage and step-down, could produce the methane for being adsorbed in coal petrography surface.Due to Occurrence of Coalbed Methane state and open Originating party formula and conventional gas and oil have very big difference, therefore conventional oil gas well refracturing well selecting principle is not fully appropriate for coal bed gas Well, and current coal bed gas well refracturing well selecting principle is established mostly on single well analysis basis, and base required for well is selected Plinth data are more, and it is complicated to select well step, and often scene lacks related data, therefore is restricted when field application.
Summary of the invention
In view of this, the embodiment of the present invention is designed to provide a kind of coal bed gas well refracturing based on mining data Quick well choosing method and device, with provide it is a kind of quickly and well choosing method, improve existing conventional oil gas well refracturing and select well Principle is not applied for the problem of coal bed gas well.
The technical solution adopted by the present invention is as follows:
The embodiment of the invention provides a kind of quick well choosing method of coal bed gas well refracturing based on mining data, it is described Method includes:Obtain the mining data of the offset well of target well and the target well;According to preset classifying rules according to the mesh The mining data of the offset well of mark well and the target well classify to the target well;Being chosen according to the classification results can be into The target well of row refracturing.
Further, the mining data include the day during the entire mining of the offset well of target well and the target well Water yield and daily output tolerance.
Further, the mining data according to preset classifying rules according to the target well and the offset well of the target well The step of classifying to the target well include:If the current daily output tolerance of the target well is greater than the first preset value, by institute It states target well and is divided into first kind target well.
Further, the mining according to preset classifying rules according to the target well and the offset well of the target well The step of data classify to the target well further include:When the current daily output tolerance of the target well is less than the first preset value And historical high daily output tolerance be greater than the first preset value when:If the current daily output tolerance of the offset well of the target well is pre- less than first If value, is divided into the 4th class target well for the target well;When the current daily output tolerance of the target well is less than the first preset value And historical high daily output tolerance be greater than the first preset value when:If it is pre- that the current daily output tolerance of the offset well of the target well is greater than first If value, and the current water yield per day of the target well is greater than the second preset value, and the target well is divided into the second class target well; When the current daily output tolerance of the target well is less than the first preset value and historical high daily output tolerance is greater than the first preset value:If The current daily output tolerance of the offset well of the target well is greater than the first preset value, and the current water yield per day of the target well is less than the The target well is divided into tertiary target well by two preset values.
Further, the mining according to preset classifying rules according to the target well and the offset well of the target well The step of data classify to the target well further include:When the current daily output tolerance of the target well and the target well are gone through History highest daily output tolerance is when being respectively less than the first preset value, if to be greater than first default for the current daily output tolerance of the offset well of the target well Value, is divided into the 5th class target well for the target well.
Further, the mining according to preset classifying rules according to the target well and the offset well of the target well The step of data classify to the target well further include:When the current daily output tolerance of the target well and the target well are gone through History highest daily output tolerance is when being respectively less than the first preset value, if the offset well of the target well it is current daily output tolerance it is default less than first Value, is divided into the 6th class target well for the target well.
Further, the offset well of the target well includes that distance is the smallest on multiple preset directions with the target well Well.
Further, first preset value is 500m3
The present invention also provides a kind of quick well selecting device of coal bed gas well refracturing based on mining data, described device For executing the quick well choosing method of coal bed gas well refracturing based on mining data, described device includes:Module is obtained, is used for Obtain the mining data of the offset well of target well and the target well;Rule establishes module, for establishing classifying rules;Classification mould Block is classified for being based on classifying rules according to the mining data of the target well and the offset well of the target well;Choose mould Block, for choosing the target well that can carry out refracturing according to the classification results.
Further, the mining data include the day during the entire mining of the offset well of target well and the target well Water yield and daily output tolerance.
Compared with the prior art, the invention has the advantages that:
A kind of quick well choosing method of coal bed gas well refracturing and device based on mining data provided by the invention.It is described Method includes:Obtain the mining data of the offset well of target well and the target well;According to preset classifying rules according to the mesh The mining data of the offset well of mark well and the target well classify to the target well;Being chosen according to the classification results can be into The target well of row refracturing.Based on target well and its offset well etc. mining data easy to collect, pass through the mining to more wells Data are analyzed to classify to target well, are overcome existing coal bed gas well refracturing well selecting principle and are established mostly in list This defect on well analysis foundation, required basic data is few, and required basic data, classification facilitate fast live easily collecting together It is prompt.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of embodiment of the present invention Attached drawing be briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with root Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 shows a kind of schematic diagram for selecting well system provided by the present invention.
Fig. 2 shows the flow charts of the quick well choosing method of coal bed gas well refracturing based on mining data.
Fig. 3 shows the classification process figure of step S20.
Fig. 4 shows the functional block diagram of the quick well selecting device of coal bed gas well refracturing based on mining data.
Icon:100- selects well system;101- memory;102- storage control;103- processor;104- Peripheral Interface; 105- display unit;106- input-output unit;Coal bed gas well refracturing quick well selecting device of the 200- based on mining data; 210- obtains module;220- rule establishes module;230- categorization module;240- chooses module.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below Range, but it is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it is also necessary to explanation, herein, such as first and second or the like relationship art Language is only used to distinguish one entity or operation from another entity or operation, without necessarily requiring or implying this There are any actual relationship or orders between a little entities or operation.The terms "include", "comprise" or its it is any its He is intended to non-exclusive inclusion by variant, so that the process, method, article or equipment including a series of elements is not Only include those elements, but also including other elements that are not explicitly listed, or further include for this process, method, Article or the intrinsic element of equipment.In the absence of more restrictions, being wanted by what sentence "including a ..." limited Element, it is not excluded that there is also other identical elements in the process, method, article or apparatus that includes the element.For For those skilled in the art, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
With reference to the accompanying drawing, it elaborates to some embodiments of the present invention.In the absence of conflict, following Feature in embodiment and embodiment can be combined with each other.
Fig. 1 shows a kind of block diagram for selecting well system 100 of present pre-ferred embodiments offer.It is described to select well system 100 can be desktop computer, laptop, tablet computer, smart phone, personal digital assistant (personal Digital assistant, PDA) etc..It is described that select well system 100 include that the coal bed gas well refracturing based on mining data is fast Fast well selecting device 200, memory 101, storage control 102, processor 103, Peripheral Interface 104, display unit 105, input Output unit 106.
The memory 101, storage control 102, processor 103, Peripheral Interface 104, display unit 105, input are defeated Each element of unit 106 is directly or indirectly electrically connected between each other out, to realize the transmission or interaction of data.For example, these Element can be realized by one or more communication bus or signal wire be electrically connected between each other.The coal based on mining data The layer quick well selecting device 200 of gas well refracturing includes that at least one can be stored in the form of software or firmware (firmware) In the memory 101 or the software that is solidificated in the operating system (operating system, OS) for selecting well system 100 Functional module.The processor 103 is used to execute the executable module stored in memory 101, such as described based on mining number According to the quick well selecting device 200 of the coal bed gas well refracturing software function module or computer program that include.
Wherein, memory 101 may be, but not limited to, random access memory (Random Access Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), Electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc.. Wherein, memory 101 is for storing program, and the processor 103 executes described program, this hair after receiving and executing instruction Method performed by the server defined as process that bright any embodiment discloses can be applied in processor 103, Huo Zheyou Processor 103 is realized.
Processor 103 may be a kind of IC chip, the processing capacity with signal.Above-mentioned processor 103 can To be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit (Network Processor, abbreviation NP) etc.;Can also be digital signal processor (DSP), specific integrated circuit (ASIC), Field programmable gate array (FPGA) either other programmable logic device, discrete gate or transistor logic, discrete hard Part component.It may be implemented or execute disclosed each method, step and the logic diagram in the embodiment of the present invention.General processor It can be microprocessor, which is also possible to any conventional processor 103 etc..
Various input/output devices are couple processor 103 and memory 101 by the Peripheral Interface 104.Some In embodiment, Peripheral Interface 104, processor 103 and storage control 102 can be realized in one single chip.Other one In a little examples, they can be realized by independent chip respectively.
Display unit 105 provides interactive interface (such as user's operation circle in described select between well system 100 and user Face) or for display image data give user reference.For example, the classification results etc. of display coal bed gas well.In the present embodiment, The display unit 105 can be liquid crystal display or touch control display.It, can be to support single-point and more if touch control display Capacitance type touch control screen or resistance type touch control screen of point touch control operation etc..Single-point and multi-point touch operation is supported to refer to touch control display It can sense one or more positions while the touch control operation generated on the touch control display, and the touching that this is sensed Control operation transfers to processor 103 to be calculated and handled.
Input-output unit 106 realizes user and the interaction for selecting well system 100 for being supplied to user input data, Such as it can be used for inputting the mining data of the offset well of target well and target well, such as the neck of target well and target well can be inputted The Production curve etc. of prize.
China's coal bed gas resource very abundant, buried depth are about 36.8 trillion with shallow coal bed gas resource total amount at 2000 meters m3, mining resources are abundant, and development and utilization coal bed gas has very big economic value and social benefit.Since coal seam is low porosity and low permeability Compact reservoir, the methane stored in coal seam in coal petrography, therefore are generally required with ADSORPTION STATE preservation and carry out hydraulic fracturing to coal seam Transformation, then carries out drainage and step-down, could produce the methane for being adsorbed in coal petrography surface.Due to Occurrence of Coalbed Methane state and open Originating party formula and conventional gas and oil have very big difference, therefore conventional oil gas well refracturing well selecting principle is not fully appropriate for coal bed gas Well, and current coal bed gas well refracturing well selecting principle is established mostly on single well analysis basis, and base required for well is selected Plinth data are more, and it is complicated to select well step, and often scene lacks related data, therefore is restricted when field application.
First embodiment
The present embodiment provides a kind of quick well choosing method of coal bed gas well refracturing based on mining data, it is existing to improve Conventional oil gas well refracturing well selecting principle the problem of being not applied for coal bed gas well.Referring to Fig. 2, Fig. 2 shows this realities The flow chart of the quick well choosing method of coal bed gas well refracturing based on mining data of example offer is provided.Base provided in this embodiment In the quick well choosing method of coal bed gas well refracturing of mining data include step S10~step S40.
Step S10:Obtain the mining data of the offset well of target well and the target well.
The mining data of the offset well of target coal seam gas well and the target coal seam gas well are obtained, it can be by being stored with mesh The server for marking the mining data of the offset well of well and the target well sends data requesting instructions and obtains, can also be by staff Upload above-mentioned data.The offset well of the target well refers to the target well the smallest well of distance on multiple preset directions. For example, Si Koujing nearest with a distance from the four direction of target well east, south, west, north.The mining data include target well and its neighbour The mining data of well, such as:Water yield per day during entire mining of target well and its offset well, daily output tolerance, liquid level, Casing pressure etc..
Preferably, the mining data can also be that the Production curve of the offset well from the target well or target well obtains.
Step S20:Establish classifying rules.
Mining data based on the target well and its offset well establish classifying rules.According to target well and the offset well of target well Water yield per day, currently produce tolerance daily, the data such as history daily output tolerance, liquid level, casing pressure establish classifying rules.
Referring to Fig. 3, Fig. 3 shows the classification process figure of the classifying rules of the present embodiment.Preferably, setting first is default Value and the second preset value will currently be produced daily tolerance and be classified based on first preset value.If the current daily gas of the target well Amount is greater than the first preset value, then the target well is divided into first kind target well.
For currently producing target well of the tolerance less than the first preset value daily, then tolerance, current daily output are produced daily according to its history Water and the current daily output tolerance of offset well are classified.
When the current daily output tolerance of the target well is less than the first preset value and historical high daily output tolerance is greater than first in advance If when value:If the current daily output tolerance of the offset well of the target well is divided into the 4th less than the first preset value, by the target well Class target well.
Preferably, when the current daily output tolerance of the target well less than the first preset value and historical high daily output tolerance be greater than When the first preset value:If the offset well of the target well current daily output tolerance is greater than the first preset value, and the target well is worked as Preceding water yield per day is greater than the second preset value, and the target well is divided into the second class target well.
When the current daily output tolerance of the target well is less than the first preset value and historical high daily output tolerance is greater than first in advance If when value:If the current daily output tolerance of the offset well of the target well is greater than the first preset value, and the current daily output of the target well Water is divided into tertiary target well less than the second preset value, by the target well.
Preferably, when the current daily output tolerance of the target well and target well historical high daily output tolerance are respectively less than the When one preset value, if the current daily output tolerance of the offset well of the target well is greater than the first preset value, the target well is divided into 5th class target well.
It is preset when the current daily output tolerance of the target well and target well historical high daily output tolerance are respectively less than first When value, if the target well is divided into the 6th class less than the first preset value by the current daily output tolerance of the offset well of the target well Target well.
In this present embodiment, first preset value can be set to 500m3, second preset value is set as 2m3, but It is without being limited thereto, it can also be the other numerical value set up according to the actual situation.
Step S30:Mining data according to preset classifying rules according to the target well and the offset well of the target well Classify to the target well.
The mining data of the offset well of the target well and the target well that will acquire are based on the classifying rules preestablished to institute Target well is stated to classify.
Step S40:The target well that can carry out refracturing is chosen according to the classification results.
In this implementation, first kind target well is that current daily output tolerance is greater than 500m3, such well daily output tolerance is medium, It is not recommended that carrying out refracturing.
Second class well is that current daily output tolerance is less than 500m3, daily output water is greater than 2m3, but historical high daily output tolerance is greater than 500m3, and the current daily output tolerance of offset well is greater than 500m3.Since the daily gas of offset well is greater than 500m3, illustrate near the target well Current mining resources are abundant, and daily output water is greater than 2m3, it is unobstructed to the main seepage channel of pit shaft to illustrate stratum, but daily gas is less than 500m3, explanation may lead to far and near area coal petrography matrix micropores gap or micro- due to stopping finding time longer or stopping taking out more frequent Gas lock effect is formed in crack.Such well suggestion carries out refracturing, releases gas lock effect.
Third class well is that current daily output tolerance is less than 500m3, daily output water is less than 2m3, but history maximum daily output tolerance is greater than 500m3, and offset well daily output tolerance is greater than 500m3.Since offset well daily gas is greater than 500m3, illustrate current near the well to adopt money Source is abundant.Due to daily gas and daily output water all very littles, explanation may cause since pump drainage speed early period is excessive or midway stops taking out Coal dust plugs seepage channel.Such well suggestion carries out refracturing, dredges seepage channel again.
4th class well is that current daily output tolerance is less than 500m3, offset well daily output tolerance is again smaller than 500m3, but history maximum day Gas production is greater than 500m3.This kind of well is in the preferable region of reservoir properties, but current well and its offset well daily output tolerance is small In 500m3, this may be because that the well group comes into the underproduction phase, it is also possible to be that operating condition reason causes all wells of the well group all to be sent out Anger lock or coal seam blocking, specific reason for low yield are unknown.Therefore such well is it is not recommended that preferential refracturing.
5th class well is to produce tolerance daily during entire mining to be both less than 500m3, but offset well it is current daily output it is large-minded In 500m3.Since offset well daily gas is greater than 500m3, illustrate that mining resources current near the well are abundant, but entire mining process Middle daily output tolerance is both less than 500m3, illustrate that possible first time fracturing reform is insufficient.Therefore such well suggestion carries out repeating pressure It splits, increases transformation volume.
6th class well is to produce tolerance daily during entire mining to be both less than 500m3, the current gas production of offset well again smaller than 500m3.This kind of well is likely to be at the poor region of reservoir properties, it is also possible to be that the well group first time fracturing reform does not fill Point, specific reason for low yield is unknown.Therefore such well is it is not recommended that preferential refracturing.
According to the classifying and selecting rule of setting, if the target well belongs to second, third or the 5th class, it is recommended that carrying out weight Multiple pressure break.
In this present embodiment, according to the classifying and selecting of setting rule, the row of the offset well based on the target well and target well Data are adopted, export the classification results to target well, and provide whether suggestion carries out refracturing.
Second embodiment
A kind of quick well selecting device 200 of the coal bed gas well refracturing based on mining data is present embodiments provided, it is described The quick well choosing method of coal bed gas well refracturing based on mining data that device provides for realizing first embodiment.
It is quickly selected referring to Fig. 4, Fig. 4 shows the coal bed gas well refracturing provided in this embodiment based on mining data The functional block diagram of well device 200.
It should be noted that the coal bed gas well refracturing quick well selecting device provided in this embodiment based on mining data 200, the quick well choosing method base of the coal bed gas well refracturing based on mining data that basic principle and first embodiment provide This is identical, and to briefly describe, the present embodiment is no longer described in detail, and the present embodiment does not introduce detailed place, please refers to first Related content in embodiment.
The quick well selecting device 200 of the coal bed gas well refracturing based on mining data includes obtaining module 210, rule It establishes module 220, categorization module 230 and chooses module 240.
Wherein, module 210, the mining data of the offset well for obtaining target well and the target well are obtained.It can be to depositing The server for containing the mining data of the offset well of target well and the target well sends data requesting instructions and obtains, can also be by work Make personnel and above-mentioned data are uploaded by input-output unit 106.The offset well of the target well refers to the target well more The smallest well of distance on a preset direction.For example, Si Koujing nearest with a distance from the four direction of target well east, south, west, north.Institute The mining data that mining data include target well and its offset well are stated, such as:Day during target well and its entire mining of offset well Water yield, daily output tolerance, liquid level, casing pressure etc..
Rule establishes module 220, and the mining data classification for establishing the offset well based on target well and the target well is advised Then.In this present embodiment, according to target well and the water yield per day of the offset well of target well, currently produce tolerance daily, history produce daily tolerance, The data such as liquid level, casing pressure establish classifying rules.The target well is divided into the first kind to the 6th class totally six kinds of classifications.
Categorization module 230, for being based on classification gauge according to the mining data of the target well and the offset well of the target well Then classify.
Based on the mining data for the offset well for obtaining target well and the target well that module 210 obtains, established according to rule The classifying rules that module 220 is established classifies to target well, obtains classification results.
Module 240 is chosen, for choosing the target well that can carry out refracturing according to the classification results.According to setting Classifying rules and classification results, selection meet the target well that may be repeated pressure break.
In conclusion the quick well choosing method of coal bed gas well refracturing that the present invention provides a kind of based on mining data and Device.The method includes:Obtain the mining data of the offset well of target well and the target well;According to preset classifying rules according to Classify according to the mining data of the target well and the offset well of the target well to the target well;According to the classification results Choose the target well that can carry out refracturing.Based on target well and its offset well etc. mining data easy to collect, by more The mining data of well are analyzed to classify to target well, and target well is rationally and effectively divided into multiple classifications, can There is detailed division to each index of target well, overcomes existing coal bed gas well refracturing well selecting principle and established mostly in list This defect on well analysis foundation, required basic data is few, and required basic data, classification facilitate fast live easily collecting together Victory can assist the selection for fast implementing the target well that may be repeated pressure break.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and block diagram in attached drawing Show the device of multiple embodiments according to the present invention, the architectural framework in the cards of method and computer program product, Function and operation.In this regard, each box in flowchart or block diagram can represent the one of a module, section or code Part, a part of the module, section or code, which includes that one or more is for implementing the specified logical function, to be held Row instruction.It should also be noted that function marked in the box can also be to be different from some implementations as replacement The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes It can execute in the opposite order, this depends on the function involved.It is also noted that every in block diagram and or flow chart The combination of box in a box and block diagram and or flow chart can use the dedicated base for executing defined function or movement It realizes, or can realize using a combination of dedicated hardware and computer instructions in the system of hardware.
In addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation together Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention. And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-OnlyMemory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, RandomAccessMemory), magnetic or disk.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter exist Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing It is further defined and explained.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. a kind of quick well choosing method of coal bed gas well refracturing based on mining data, which is characterized in that the method includes:
Obtain the mining data of the offset well of target well and the target well;
According to preset classifying rules according to the mining data of the target well and the offset well of the target well to the target well Classify;
The target well that can carry out refracturing is chosen according to the result of the classification.
2. the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 1, which is characterized in that The mining data include the water yield per day and daily output tolerance during the entire mining of the offset well of target well and the target well.
3. the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 1, which is characterized in that The target well is carried out according to the mining data of the target well and the offset well of the target well according to preset classifying rules The step of classification includes:
If the current daily output tolerance of the target well is greater than the first preset value, the target well is divided into first kind target well.
4. the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 1, which is characterized in that The target well is carried out according to the mining data of the target well and the offset well of the target well according to preset classifying rules The step of classification further includes:
When the current daily output tolerance of the target well is less than the first preset value and historical high daily output tolerance is greater than the first preset value When:If the current daily output tolerance of the offset well of the target well is divided into the 4th classification less than the first preset value, by the target well Mark well;
When the current daily output tolerance of the target well is less than the first preset value and historical high daily output tolerance is greater than the first preset value When:If the current daily output tolerance of the offset well of the target well is greater than the first preset value, and the current water yield per day of the target well Greater than the second preset value, the target well is divided into the second class target well;
When the current daily output tolerance of the target well is less than the first preset value and historical high daily output tolerance is greater than the first preset value When:If the current daily output tolerance of the offset well of the target well is greater than the first preset value, and the current water yield per day of the target well Less than the second preset value, the target well is divided into tertiary target well.
5. the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 1, which is characterized in that The target well is carried out according to the mining data of the target well and the offset well of the target well according to preset classifying rules The step of classification further includes:
When the current daily output tolerance of the target well and target well historical high daily output tolerance are respectively less than the first preset value, If the current daily output tolerance of the offset well of the target well is greater than the first preset value, the target well is divided into the 5th class target Well.
6. the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 1, which is characterized in that The target well is carried out according to the mining data of the target well and the offset well of the target well according to preset classifying rules The step of classification further includes:
When the current daily output tolerance of the target well and target well historical high daily output tolerance are respectively less than the first preset value, If the current daily output tolerance of the offset well of the target well is divided into the 6th class target less than the first preset value, by the target well Well.
7. the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 1, which is characterized in that The offset well of the target well include with the target well on multiple preset directions the smallest well of distance.
8. the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 3~6 any one, It is characterized in that, first preset value is 500m3
9. a kind of quick well selecting device of coal bed gas well refracturing based on mining data, which is characterized in that described device is used for Execute the quick well choosing method of coal bed gas well refracturing based on mining data as described in claim 1~8 any one, institute Stating device includes:
Obtain module, the mining data of the offset well for obtaining target well and the target well;
Rule establishes module, for establishing classifying rules;
Categorization module is divided for being based on classifying rules according to the mining data of the target well and the offset well of the target well Class;
Module is chosen, for choosing the target well that can carry out refracturing according to the result of the classification.
10. the quick well selecting device of coal bed gas well refracturing based on mining data, feature exist as claimed in claim 9 In the mining data include the water yield per day and daily gas during the entire mining of the offset well of target well and the target well Amount.
CN201810675687.7A 2018-06-26 2018-06-26 Drainage and production data-based repeated fracturing rapid well selection method and device for coal-bed gas well Active CN108843298B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810675687.7A CN108843298B (en) 2018-06-26 2018-06-26 Drainage and production data-based repeated fracturing rapid well selection method and device for coal-bed gas well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810675687.7A CN108843298B (en) 2018-06-26 2018-06-26 Drainage and production data-based repeated fracturing rapid well selection method and device for coal-bed gas well

Publications (2)

Publication Number Publication Date
CN108843298A true CN108843298A (en) 2018-11-20
CN108843298B CN108843298B (en) 2020-09-25

Family

ID=64202822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810675687.7A Active CN108843298B (en) 2018-06-26 2018-06-26 Drainage and production data-based repeated fracturing rapid well selection method and device for coal-bed gas well

Country Status (1)

Country Link
CN (1) CN108843298B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111931114A (en) * 2020-07-17 2020-11-13 中国石油大学(华东) Quick decision-making method for repeated fracturing well selection of coal-bed gas well
CN112593901A (en) * 2021-03-03 2021-04-02 西南石油大学 Shale gas well full production cycle production system and drainage and extraction process intelligent optimization method
CN117495206A (en) * 2023-12-29 2024-02-02 四川富利斯达石油科技发展有限公司 Gas well drainage and production process well selection method based on artificial intelligence algorithm

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017074355A1 (en) * 2015-10-28 2017-05-04 Halliburton Energy Services, Inc. Pressure wave tool for unconventional well recovery
CN106651615A (en) * 2016-12-15 2017-05-10 中国科学院沈阳自动化研究所 Oil well measure-based well selection method and apparatus
CN106991236A (en) * 2017-04-05 2017-07-28 西南石油大学 A kind of refracturing well and stratum selection method based on four-dimensional crustal stress dynamic change
CN107358367A (en) * 2017-07-20 2017-11-17 河南理工大学 The evaluation method of well is selected in a kind of low yield list coal bed gas well transformation
CN107387051A (en) * 2017-09-05 2017-11-24 西南石油大学 The method that low permeable and heterogeneity reservoir multistage pressure break horizontal well refracturing selects well
CN108119120A (en) * 2017-12-07 2018-06-05 中国石油天然气股份有限公司 A kind of gas well refracturing well and stratum selection method
CN108119121A (en) * 2017-12-11 2018-06-05 中国石油天然气股份有限公司 A kind of horizontal well refracturing potentiality well rapid screening method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017074355A1 (en) * 2015-10-28 2017-05-04 Halliburton Energy Services, Inc. Pressure wave tool for unconventional well recovery
CN106651615A (en) * 2016-12-15 2017-05-10 中国科学院沈阳自动化研究所 Oil well measure-based well selection method and apparatus
CN106991236A (en) * 2017-04-05 2017-07-28 西南石油大学 A kind of refracturing well and stratum selection method based on four-dimensional crustal stress dynamic change
CN107358367A (en) * 2017-07-20 2017-11-17 河南理工大学 The evaluation method of well is selected in a kind of low yield list coal bed gas well transformation
CN107387051A (en) * 2017-09-05 2017-11-24 西南石油大学 The method that low permeable and heterogeneity reservoir multistage pressure break horizontal well refracturing selects well
CN108119120A (en) * 2017-12-07 2018-06-05 中国石油天然气股份有限公司 A kind of gas well refracturing well and stratum selection method
CN108119121A (en) * 2017-12-11 2018-06-05 中国石油天然气股份有限公司 A kind of horizontal well refracturing potentiality well rapid screening method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
倪小明 等: "《单一煤层重复水力压裂综合选井研究》", 《煤矿安全》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111931114A (en) * 2020-07-17 2020-11-13 中国石油大学(华东) Quick decision-making method for repeated fracturing well selection of coal-bed gas well
CN111931114B (en) * 2020-07-17 2021-05-14 中国石油大学(华东) Quick decision-making method for repeated fracturing well selection of coal-bed gas well
CN112593901A (en) * 2021-03-03 2021-04-02 西南石油大学 Shale gas well full production cycle production system and drainage and extraction process intelligent optimization method
CN117495206A (en) * 2023-12-29 2024-02-02 四川富利斯达石油科技发展有限公司 Gas well drainage and production process well selection method based on artificial intelligence algorithm
CN117495206B (en) * 2023-12-29 2024-03-22 四川富利斯达石油科技发展有限公司 Gas well drainage and production process well selection method based on artificial intelligence algorithm

Also Published As

Publication number Publication date
CN108843298B (en) 2020-09-25

Similar Documents

Publication Publication Date Title
Zhu et al. Cluster spacing and well spacing optimization using multi-well simulation for the lower Spraberry shale in Midland basin
CN108843298A (en) The quick well choosing method of coal bed gas well refracturing and device based on mining data
US10768592B2 (en) Control apparatus for industrial plant data processing and associated methods
Siddiqui et al. Well interference effects for multiwell configurations in unconventional reservoirs
Aibazarov et al. Well Spacing Verification At Gas Condensate Field Using Deconvolution Driven Long-Term Pressure and Rate Analysis
CN104252499B (en) The method and electronic display unit of page division
Permadi Fast horizontal-well coning evaluation method
Li et al. Determination of the aquifer activity level and the recovery of water drive gas reservoirs
Warpinski Hydraulic fracture height in gas shale reservoirs
Filev et al. Technology for Determining the Inflow from Near and Far Zones of Fractures During Hydraulic Fracturing by Chemical Tracers in a Production Well
Elrafie et al. Comprehensive evaluation of horizontal wells with transverse hydraulic fractures in the upper bahariyia reservoirs
Gurianov et al. Big Data in Field Development Projects
AbdelMawla Deciphering the performance of multi-lateral and extended reach wells for reserves evaluation in unconventional resource plays
Qasem et al. Modeling inflow performance relationships for wells producing from multi-layer solution-gas drive reservoirs
Gao et al. Automatic history matching of parent-child wells in shale gas reservoirs with complex fracture hits
Zhang et al. Deep-Learning-Based Approach for Optimizing Infill Well Placement
Wadleigh et al. Deeper completions really lower water-oil ratios!
Xie et al. Completion influence on Haynesville shale gas well performance
Liu et al. Field Optimization via Data Approach: A Case Study of Data Mining for Tight Gas Flowback Evaluations
Mohammed et al. Evaluating Multiple Fractured Cased Hole Completion Performance for Gas Wells in the Upper and the Lower Montney Formation, Canada
Samolovov et al. Development of Methods for Optimizing the Parameters of the Oil Rim Development System
Li et al. A New analytical Model for Production Data Analysis in Horizontal Wells of Tight Gas Reservoirs
Yanze et al. Optimised combined underground gas storage and enhanced oil recovery
Yudin et al. Approach to determining the optimal parameters of well performance in fractured reservoirs with a gas cap: Orenburg GCF case study
Morozovskiy et al. Comprehensive substantiation of a horizontal wellbore inflow model in a fractured carbonate reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant