CN108842903A - A kind of reservoir and its water quality monitoring system - Google Patents

A kind of reservoir and its water quality monitoring system Download PDF

Info

Publication number
CN108842903A
CN108842903A CN201810726648.5A CN201810726648A CN108842903A CN 108842903 A CN108842903 A CN 108842903A CN 201810726648 A CN201810726648 A CN 201810726648A CN 108842903 A CN108842903 A CN 108842903A
Authority
CN
China
Prior art keywords
water quality
pond body
strainer
fixedly connected
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810726648.5A
Other languages
Chinese (zh)
Other versions
CN108842903B (en
Inventor
余蝶双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810726648.5A priority Critical patent/CN108842903B/en
Publication of CN108842903A publication Critical patent/CN108842903A/en
Application granted granted Critical
Publication of CN108842903B publication Critical patent/CN108842903B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/50Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with multiple filtering elements, characterised by their mutual disposition
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/62Regenerating the filter material in the filter
    • B01D29/64Regenerating the filter material in the filter by scrapers, brushes, nozzles, or the like, acting on the cake side of the filtering element
    • B01D29/6407Regenerating the filter material in the filter by scrapers, brushes, nozzles, or the like, acting on the cake side of the filtering element brushes
    • B01D29/6415Regenerating the filter material in the filter by scrapers, brushes, nozzles, or the like, acting on the cake side of the filtering element brushes with a rotary movement with respect to the filtering element
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/105Accessories, e.g. flow regulators or cleaning devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/18Water

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Hydrology & Water Resources (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Analytical Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Medicinal Chemistry (AREA)
  • Food Science & Technology (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The invention discloses a kind of reservoir and its water quality monitoring systems, including pond body, the side upper end of the pond body is fixedly connected with water inlet pipe, the other side of the pond body is fixedly connected with outlet pipe on the side wall of lower end, and the inner wall of the pond body is equipped with anti-jamming mechanism corresponding with outlet pipe position etc.;The present invention is dynamic impact blade using the water outlet of outlet pipe by setting fixing sleeve, shaft, blade, and then drive shaft rotates.By the way that fixed cylinder, screw-conveyer-shaft, first bevel gear, second bevel gear is arranged, it can be rotated by shaft and drive screw-conveyer-shaft rotation, and then siltation is rolled in the silt of pool bottom and is delivered up, in time clean up the silt of pool bottom.

Description

A kind of reservoir and its water quality monitoring system
Technical field
The present invention relates to reservoir technical field more particularly to a kind of reservoir and its water quality monitoring systems.
Background technique
Reservoir be manually material build, the storing facilities of water with antiseepage effect.Form and classification according to its landform and Soil condition can be built on the ground or underground, that is, be divided into open and closed two major classes, can be divided into circle again by features of shape Shape and two kinds of rectangle, because construction material difference can be divided into:Brick pond, stone masonry pond, concrete sump etc., the water storage for hydraulic engineering Pond is typically all to be used for water conservancy adjusting.
Existing hydraulic engineering reservoir, since rubbish, the sundries in water body are more, silt can be deposited on bottom of pond influence Reservoir storage needs to remove in time, and in reservoir draining, often because impurities in water sundries blocks water outlet, and causes to store Water discharge in pond slowly influences the use of reservoir, and the artificial sundries for removing blocking is needed when water outlet is blocked, time-consuming to take Power, it is therefore proposed that a kind of reservoir and its water quality monitoring system.
Summary of the invention
The purpose of the present invention is to solve disadvantage existing in the prior art, and a kind of reservoir and its water quality proposed Monitoring system.
To achieve the goals above, present invention employs following technical solutions:
A kind of reservoir, including pond body, the side upper end of the pond body are fixedly connected with water inlet pipe, the pond body it is another Side is fixedly connected with outlet pipe on the side wall of lower end, and the inner wall of the pond body is equipped with corresponding with outlet pipe position anti-blocking Mechanism, is equipped with valve on the water inlet pipe and outlet pipe, and the inner transverse of the pond body is provided with the second strainer, and described second Strainer is fixedly connected on the inner wall of pond body, and the second strainer is obliquely installed, and the middle part of second strainer, which is run through, is equipped with both ends There is the fixed cylinder of opening, and fixed cylinder is vertically arranged, the fixed cylinder is fixedly connected with the second strainer, is set in the fixed cylinder There is silt hoisting mechanism, the lower section of second strainer is equipped with the first strainer vertically, and the upper end of first strainer is fixedly connected In the lower end of the second strainer, the lower end of first strainer and two sides side wall are fixedly connected on the inner wall of pond body.
Beneficial effects of the present invention:
It by the way that fixing sleeve, shaft, blade is arranged, i.e., is dynamic impact blade using the water outlet of outlet pipe, and then drive Shaft rotation.By the way that fixed cylinder, screw-conveyer-shaft, first bevel gear, second bevel gear is arranged, it can be rotated by shaft and drive auger Axis rotation, and then siltation is rolled in the silt of pool bottom and is delivered up, the silt of pool bottom is cleaned up in time.It is logical Setting flabellum, rotating bar, the first fixed link, the second fixed link, bristle are crossed, the outlet pipe flabellum of water flow driving from inside to outside can be passed through Rotation, driving rotating bar rotation, and then the rotation of the second fixed link is driven, it is cleaned by surface of the bristle to third strainer, Opening is avoided to block.Furthermore the present invention is also greatly reduced sample frequency, can the water quality to different phase accurately supervised It surveys, has saved data resource, improved the quality of data.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of reservoir proposed by the present invention;
Fig. 2 is a kind of structural schematic diagram of the anti-jamming mechanism of reservoir proposed by the present invention.
In figure:1 pond body, 2 outlet pipes, 3 shields, 4 first strainers, 5 screw-conveyer-shafts, 6 fixed cylinders, 7 fixing sleeves, 8 valves, 9 Water inlet pipe, 10 blades, 11 shafts, 12 first bevel gears, 13 second bevel gears, 14 second strainers, 15 flabellums, 16 openings, 17 the Three strainers, 18 rotating bars, 19 first fixed links, 20 second fixed links, 21 bristles.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-2, a kind of reservoir and its water quality monitoring system, including pond body 1, the side upper end of pond body 1 is fixed to be connected It is connected to water inlet pipe 9, the other side of pond body 1 is fixedly connected with outlet pipe 2 on the side wall of lower end, and the inner wall of pond body 1 is equipped with It is equipped with valve 8 on anti-jamming mechanism corresponding with 2 position of outlet pipe, water inlet pipe 9 and outlet pipe 2, the inner transverse of pond body 1 is set It is equipped with the second strainer 14, the second strainer 14 is fixedly connected on the inner wall of pond body 1, and the second strainer 14 is obliquely installed, the second filter The middle part of net 14, which is run through, is equipped with the fixed cylinder 6 that there is opening at both ends, and fixed cylinder 6 is vertically arranged, fixed cylinder 6 and the second strainer 14 are fixedly connected, and silt hoisting mechanism is equipped in fixed cylinder 6, and the inner bottom wall of pond body 1 is cone structure, assemble convenient for silt, just It is cleared out in by silt, the lower section of the second strainer 14 is equipped with the first strainer 4 vertically, and the upper end of the first strainer 4 is fixedly connected on second The lower end of strainer 14, the lower end of the first strainer 4 and two sides side wall are fixedly connected on the inner wall of pond body 1.
In the present invention, anti-jamming mechanism includes the shield 3 being fixedly connected on 1 inner wall of pond body, on the side wall of shield 3 Through set there are two opening 16, and two opening 16 be symmetrical arranged, be fixedly connected with third strainer 17 on 16 inner wall that is open, prevent Run through on the side wall of shield 3 and be equipped with rotating bar 18, and rotating bar 18 and shield 3 are rotatablely connected, rotating bar 18 is located at shield 3 One end of inside is fixedly connected with flabellum 15, and one end that rotating bar 18 is located at 3 outside of shield is fixedly connected with the first fixed link 19, the first fixed link 19 is welded in rotating bar 18, and the both ends of the first fixed link 19 are fixedly connected to the second fixed link 20, and Second fixed link 20 is parallel with the side wall of shield 3, and the second fixed link 20 is evenly equipped with brush on the side side wall of shield 3 Hair 21, when opening outlet pipe 2 discharges water, by outlet pipe 2, water flow drives flabellum 15 to rotate from inside to outside, and driving rotating bar 18 rotates, And then the rotation of the second fixed link 20 is driven, it is cleaned by surface of the bristle 21 to third strainer 17, avoids opening 16 stifled Plug.
Further silt hoisting mechanism includes the screw-conveyer-shaft 5 being arranged in inside fixed cylinder 6, the lower end rotation of screw-conveyer-shaft 5 It being connected in 1 inner bottom wall of pond body, the upper end of screw-conveyer-shaft 5 extends the outside of fixed cylinder 6 and is fixedly connected with second bevel gear 13, The inner transverse of pond body 1 is equipped with shaft 11, and the both ends of shaft 11 are rotatably connected on the inner wall of pond body 1, fixed in shaft 11 It is socketed with fixing sleeve 7 corresponding with 9 position of water inlet pipe, is circumferentially equidistantly fixedly connected on the side wall of fixing sleeve 7 along it multiple Blade 10, fixing sleeve 7 and blade 10 are integrally formed, and fixing sleeve is connected to first bevel gear 12 in shaft 11, first bevel gear 12 with Second bevel gear 13 engages, in use, being filled the water by water inlet pipe 9 into pond body 1, the second strainer 14 can effectively stop some volumes Slightly larger rubbish, the first strainer 4 can effectively stop silt, water impact blade 10, and drive shaft 11 rotates, and pass through 11 turns of shaft It is dynamic that screw-conveyer-shaft 5 is driven to rotate, and then the silt by siltation in 1 bottom of pond body is rolled and is delivered up, in time by 1 bottom of pond body Silt cleans up.
In the present invention, in use, being filled the water by water inlet pipe 9 into pond body 1, the second strainer 14 can effectively stop some volumes Slightly larger rubbish, the first strainer 4 can effectively stop silt, water impact blade 10, and drive shaft 11 rotates, and pass through shaft 11 Rotation drives screw-conveyer-shaft 5 to rotate, and then the silt by siltation in 1 bottom of pond body is rolled and is delivered up, in time by 1 bottom of pond body Silt cleans up, and when opening outlet pipe 2 discharges water, passing through outlet pipe 2, water flow drives flabellum 15 to rotate from inside to outside, drives rotating bar 18 rotations, and then the rotation of the second fixed link 20 is driven, it is cleaned, is avoided out by surface of the bristle 21 to third strainer 17 Mouth 16 blocks.
The water quality monitoring system of the reservoir includes following part:
Water quality monitoring node, aggregation node, central control system, warning system and user terminal;
The water quality monitoring node is located in pond body, and the water quality monitoring node passes through aggregation node and central control system Communication, the signal output end of the central control system and the signal input part of warning system connect, the user terminal and center Control system passes through wireless network connection.
The water quality monitoring Node distribution is on the second strainer in the pond body of down space.
The central control system includes:
Presetting module, for presetting parameter threshold,
Comparison module is compared for that will receive water quality parameter data with pre-set parameter threshold, if detection It as a result is more than preset threshold value, it will triggering warning system works and sounds an alarm, while water quality information is transmitted to user terminal.
The central control system further includes:
The data that different quality monitoring node acquires are put into difference for splitting data by data processing module Array;The voltage class of each water quality monitoring node is obtained by each array, then construct set of source data and is normalized, It extracts the number that the corresponding monitoring node of set of source data is waken up and is normalized;It initializes source data and is currently waken up Monitoring node accounts for the weight of all monitoring nodes, and normalization initializes source data and currently being waken up monitoring node accounts for all prisons The weight of node is surveyed, merges normalization set of source data and normalization target training dataset respectively, calculates and merge normalization source Error between data set and normalization target training dataset, the traversal that repeats the above steps is to each aggregation node, to each The number that the corresponding monitoring node of aggregation node is waken up carries out renormalization;
Refresh the topology module, for detecting the topology connection structure of water quality monitoring node and aggregation node, if water quality is supervised The topology connection structure for surveying node and aggregation node, which is sent, to be changed, then show state automatically with the change of topology connection structure and Refresh;
Graphics module realizes real-time dynamic display and node data DYNAMIC DRAWING for handling by central control system, Then DYNAMIC DRAWING is transmitted to user terminal.
The water quality monitoring system of the reservoir of reservoir according to claim 8, feature
It is, the central control system includes:
Water quality information code module for extracting noise corpus pair in water quality information, and statisticallys analyze code and its retouches State the correlation between the meaning of water quality information;Filter out the redundancy of code snippet and its noise corpus pair;To own The water quality information code construction of monitoring node is transmitted to user terminal at table or histogram.
The water quality monitoring method of the reservoir includes the following steps:
001. is powered on and initialized, and each node in system carries out networking;
002. water quality monitoring node enters the dormant stage;
After 003. water quality monitoring node receives sample command, it is waken up, acquires water quality data immediately;
004. sampling after the completion of send water quality parameter to aggregation node, data be sent completely rear water quality monitoring node again into Enter the dormant stage;
Water quality parameter data are uploaded to central control system by 005. aggregation node;
006. central control system receives water quality parameter data and stores, and central control system is preset
There is parameter threshold, water quality parameter data will be received and be compared with pre-set parameter threshold, if detection knot Fruit is more than preset threshold value, it will triggering warning system works and sounds an alarm, while water quality information is transmitted to user terminal;Such as Fruit testing result is not above preset threshold value, then return step 002;
007. user consults water quality information by user terminal.
The step 006 is further comprising the steps of:
Central control system splits data after receiving water quality parameter data, and different quality monitoring node is acquired Data are put into different arrays;
The voltage class of each water quality monitoring node is obtained by each array, then construct set of source data and carries out normalizing Change, extract the number that the corresponding monitoring node of set of source data is waken up and is normalized;Initialize source data and currently quilt The weight that monitoring node accounts for all monitoring nodes is waken up, normalization initializes source data and currently being waken up monitoring node accounts for institute There is the weight of monitoring node, merges normalization set of source data and normalization target training dataset respectively, calculate and merge normalizing Change set of source data and normalize the error between target training dataset, the traversal that repeats the above steps is right to each aggregation node The number that the corresponding monitoring node of each aggregation node is waken up carries out renormalization;
The topology connection structure of water quality monitoring node and aggregation node is detected, if water quality monitoring node and aggregation node Topology connection structure, which is sent, to be changed, then shows that state refreshes with the change of topology connection structure automatically;
It is handled by central control system and realizes real-time dynamic display and node data DYNAMIC DRAWING, then by DYNAMIC DRAWING It is transmitted to user terminal.
It is further comprising the steps of before water quality information is transmitted to user terminal in the step 006:
061. in water quality information extract noise corpus pair, and statistically analyze code and its describe water quality information meaning it Between correlation;
062. filters out the redundancy of code snippet and its noise corpus pair;
The water quality information code construction of all monitoring nodes is transmitted to user terminal at table or histogram by 063..
The step 061 specifically includes following steps:
0611. will statistically analyze one eigenmatrix of code constructionThe dimension of representing matrix, row Vector is the characteristic value of every water quality information corpus, and column vector is the distribution of the characteristic value of each water pollution rank;Wherein generation The characteristic value dimension of code part is M, and the characteristic value dimension of description water quality information meaning part is N;
Eigenmatrix F in 0612. pair of step 0611 is normalized in M+N dimension, respectively by this
M are considered as two L dimensional signals constantly converted with N number of feature, convert a signal into T/F space, then The matrix of description sectionIn M signal be converted into wavelet tree set { TTree1,....,TTreeM, code portions The matrix dividedIn N number of signal be converted into wavelet tree set { CTree1,....,CTreeN};
The coefficient vector of identical leaf node in two wavelet tree set is spliced into coefficient matrix by column by 0613. (i=1 ..., P } and P≤log2M+1) and(i=1 ..., Q } and Q≤log2N+1), whereinWithRespectively The dimension of representing matrix;
0614. calculates sytem matrix A in step 0613 by expectation-maximization algorithmiAnd BiLinear fusion weight lay equal stress on The signal for newly constituting new time domain is filtered the signal of new time domain.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. a kind of reservoir, including pond body (1), which is characterized in that the side upper end of the pond body (1) is fixedly connected with water inlet pipe (9), the other side of the pond body (1) is fixedly connected with outlet pipe (2) on the side wall of lower end, the inner wall of the pond body (1) It is equipped with anti-jamming mechanism corresponding with outlet pipe (2) position, is equipped with valve (8) on the water inlet pipe (9) and outlet pipe (2), The inner transverse of the pond body (1) is provided with the second strainer (14), and second strainer (14) is fixedly connected on the interior of pond body (1) On wall, and the second strainer (14) is obliquely installed, and the middle part of second strainer (14), which is run through, is equipped with the fixation that there is opening at both ends Cylinder (6), and fixed cylinder (6) is vertically arranged, the fixed cylinder (6) is fixedly connected with the second strainer (14), in the fixed cylinder (6) Equipped with silt hoisting mechanism, the lower section of second strainer (14) is equipped with the first strainer (4) vertically, first strainer (4) Upper end is fixedly connected on the lower end of the second strainer (14), and the lower end of first strainer (4) and two sides side wall are fixedly connected with On the inner wall of pond body (1);The anti-jamming mechanism includes the shield (3) being fixedly connected on pond body (1) inner wall, the shield (3) run through on side wall and be open (16) there are two setting, and two openings (16) are symmetrical arranged, on the inner wall of the opening (16) admittedly Surely it is connected with third strainer (17), through being equipped with rotating bar (18) on the side wall of the shield (3), and rotating bar (18) and anti- Shield (3) rotation connection, the rotating bar (18) is located at one end on the inside of shield (3) and is fixedly connected with flabellum (15), described One end that rotating bar (18) is located on the outside of shield (3) is fixedly connected with the first fixed link (19), first fixed link (19) Both ends be fixedly connected to the second fixed link (20), and the second fixed link (20) is parallel with the side wall of shield (3), described Two fixed links (20) are evenly equipped with bristle (21) on the side side wall of shield (3), and the silt hoisting mechanism includes setting In the internal screw-conveyer-shaft (5) of fixed cylinder (6), the lower end of the screw-conveyer-shaft (5) is rotatably connected in pond body (1) inner bottom wall, described The upper end of screw-conveyer-shaft (5) is extended the outside of fixed cylinder (6) and is fixedly connected with second bevel gear (13), the pond body (1) Inner transverse is equipped with shaft (11), and the both ends of the shaft (11) are rotatably connected on the inner wall of pond body (1), the shaft (11) fixing sleeve is connected to fixing sleeve (7) corresponding with water inlet pipe (9) position on, along its circumferential direction on the side wall of the fixing sleeve (7) It being equidistantly fixedly connected with multiple blades (10), fixing sleeve is connected to first bevel gear (12) on the shaft (11), and described first Bevel gear (12) engages with second bevel gear (13).
2. reservoir according to claim 1, which is characterized in that the fixing sleeve (7) and blade (10) are integrally formed.
3. reservoir according to claim 2, which is characterized in that the inner bottom wall of the pond body (1) is cone structure.
4. reservoir according to claim 3, which is characterized in that first fixed link (19) is welded on rotating bar (18) On.
5. reservoir according to claim 1, which is characterized in that the water quality monitoring system of the reservoir includes following Part:
Water quality monitoring node, aggregation node, central control system, warning system and user terminal;
The water quality monitoring node is located in pond body, and the water quality monitoring node is logical by aggregation node and central control system Letter, the signal output end of the central control system and the signal input part of warning system connect, and the user terminal and center are controlled System processed passes through wireless network connection.
6. the water quality monitoring system of reservoir according to claim 5, which is characterized in that the water quality monitoring node point It is distributed on the second strainer in the pond body of down space.
7. the water quality monitoring system of the reservoir of reservoir according to claim 6, which is characterized in that the center control System processed includes:
Presetting module, for presetting parameter threshold,
Comparison module is compared, if testing result with pre-set parameter threshold for that will receive water quality parameter data More than preset threshold value, it will triggering warning system works and sounds an alarm, while water quality information is transmitted to user terminal.
8. the water quality monitoring system of the reservoir of reservoir according to claim 7, which is characterized in that the center control System processed further includes:
The data that different quality monitoring node acquires are put into different arrays for splitting data by data processing module; The voltage class of each water quality monitoring node is obtained by each array, then construct set of source data and is normalized, is extracted Number that the corresponding monitoring node of set of source data is waken up simultaneously is normalized;It initializes source data and is currently waken up monitoring Node accounts for the weight of all monitoring nodes, and normalization initialization source data and the current monitoring node that is waken up account for all monitorings sections The weight of point merges normalization set of source data and normalization target training dataset respectively, calculates and merge normalization source data Error between collection and normalization target training dataset, the traversal that repeats the above steps is to each aggregation node, to each convergence The number that the corresponding monitoring node of node is waken up carries out renormalization;
Refresh the topology module, for detecting the topology connection structure of water quality monitoring node and aggregation node, if water quality monitoring section The topology connection structure of point and aggregation node, which is sent, to be changed, then shows that state is brushed with the change of topology connection structure automatically Newly;
Graphics module realizes real-time dynamic display and node data DYNAMIC DRAWING for handling by central control system, then DYNAMIC DRAWING is transmitted to user terminal.
9. the water quality monitoring system of the reservoir of reservoir according to claim 8, which is characterized in that the center control System processed includes:
Water quality information code module for extracting noise corpus pair in water quality information, and statisticallys analyze code and its description water Correlation between the meaning of matter information;Filter out the redundancy of code snippet and its noise corpus pair;By all monitorings The water quality information code construction of node is transmitted to user terminal at table or histogram.
CN201810726648.5A 2018-07-04 2018-07-04 Reservoir and water quality monitoring system thereof Active CN108842903B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810726648.5A CN108842903B (en) 2018-07-04 2018-07-04 Reservoir and water quality monitoring system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810726648.5A CN108842903B (en) 2018-07-04 2018-07-04 Reservoir and water quality monitoring system thereof

Publications (2)

Publication Number Publication Date
CN108842903A true CN108842903A (en) 2018-11-20
CN108842903B CN108842903B (en) 2020-06-12

Family

ID=64200030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810726648.5A Active CN108842903B (en) 2018-07-04 2018-07-04 Reservoir and water quality monitoring system thereof

Country Status (1)

Country Link
CN (1) CN108842903B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110400261A (en) * 2019-04-04 2019-11-01 桑尼环保(江苏)有限公司 Adaptive environment clears up platform
CN113332762A (en) * 2021-06-02 2021-09-03 *** Municipal administration sewage treatment filter equipment
CN113431169A (en) * 2021-08-06 2021-09-24 郝丽坤 Drainage device for highway engineering and construction method thereof
CN113565169A (en) * 2021-08-13 2021-10-29 河南华尔工程技术有限公司 Water supply system with self-cleaning filtering function
CN113884336A (en) * 2021-10-12 2022-01-04 北京华能新锐控制技术有限公司 Hydroelectric power generation rivers sampling system
CN115069021A (en) * 2022-08-22 2022-09-20 东营冰楚技术服务有限公司 Petrochemical sewage treatment device and use method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201343777Y (en) * 2009-01-16 2009-11-11 张培锁 Contamination removing device for water storage well and inspection shaft
CN202512124U (en) * 2012-04-01 2012-10-31 华南理工大学 Water quality monitoring early warning system based on radio frequency identification (RFID) and wireless sensing network
CN107610702A (en) * 2017-09-22 2018-01-19 百度在线网络技术(北京)有限公司 Terminal device standby wakeup method, apparatus and computer equipment
CN207032368U (en) * 2017-04-09 2018-02-23 徐玲燕 One kind building rainwater-collecting primarily efficient filter slag-draining device
CN207324223U (en) * 2017-09-08 2018-05-08 浙江伊瑞尔净水设备有限公司 A kind of fore filter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201343777Y (en) * 2009-01-16 2009-11-11 张培锁 Contamination removing device for water storage well and inspection shaft
CN202512124U (en) * 2012-04-01 2012-10-31 华南理工大学 Water quality monitoring early warning system based on radio frequency identification (RFID) and wireless sensing network
CN207032368U (en) * 2017-04-09 2018-02-23 徐玲燕 One kind building rainwater-collecting primarily efficient filter slag-draining device
CN207324223U (en) * 2017-09-08 2018-05-08 浙江伊瑞尔净水设备有限公司 A kind of fore filter
CN107610702A (en) * 2017-09-22 2018-01-19 百度在线网络技术(北京)有限公司 Terminal device standby wakeup method, apparatus and computer equipment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110400261A (en) * 2019-04-04 2019-11-01 桑尼环保(江苏)有限公司 Adaptive environment clears up platform
CN113332762A (en) * 2021-06-02 2021-09-03 *** Municipal administration sewage treatment filter equipment
CN113431169A (en) * 2021-08-06 2021-09-24 郝丽坤 Drainage device for highway engineering and construction method thereof
CN113565169A (en) * 2021-08-13 2021-10-29 河南华尔工程技术有限公司 Water supply system with self-cleaning filtering function
CN113565169B (en) * 2021-08-13 2023-02-24 河南华尔工程技术有限公司 Water supply system with self-cleaning filtering function
CN113884336A (en) * 2021-10-12 2022-01-04 北京华能新锐控制技术有限公司 Hydroelectric power generation rivers sampling system
CN113884336B (en) * 2021-10-12 2024-04-05 北京华能新锐控制技术有限公司 Hydroelectric generation rivers sampling system
CN115069021A (en) * 2022-08-22 2022-09-20 东营冰楚技术服务有限公司 Petrochemical sewage treatment device and use method thereof
CN115069021B (en) * 2022-08-22 2022-11-01 东营冰楚技术服务有限公司 Petrochemical sewage treatment device and use method thereof

Also Published As

Publication number Publication date
CN108842903B (en) 2020-06-12

Similar Documents

Publication Publication Date Title
CN108842903A (en) A kind of reservoir and its water quality monitoring system
CN108894308A (en) A kind of reservoir and its water quality monitoring method
CN104747186B (en) A kind of automatic landwaste drags for cleaning device
CN204032302U (en) A kind of berry cleaning machine
CN108837581A (en) A kind of hydraulic engineering fence rubbish cleaning equipment
CN211773432U (en) Hydraulic engineering fence of decontaminating
CN203735275U (en) Device for cleaning pool
CN206052822U (en) A kind of hydraulic engineering row's silt device
CN111877511A (en) Afforestation rainwater collection utilizes system
CN106049588A (en) Silt discharging device for water conservancy project
CN203452180U (en) Scouring and silting adsorption plant for urban sewage conduits
CN107912106A (en) A kind of gardens tree planting digging apparatus
CN105170549B (en) A kind of crop root automatic clearing apparatuss
CN112913639B (en) Shrimp and rice symbiotic green irrigation device
CN107771730A (en) A kind of shrimp culture pond of easy cleaning
CN211340936U (en) Hydraulic engineering irrigation channel rubbish cleaning device
CN103485413B (en) Urban sewage pipeline erosion and deposition adsorption pipeline
CN110882992B (en) Cut-injury-preventing plant root and soil cleaning and separating device
CN207268014U (en) Municipal drainage pipeline is removed contamination system
CN209429086U (en) A kind of ecological canal suitable for paddy field drainage
CN210315941U (en) Pump station prevents stifled water inlet that blocks dirt
CN209369013U (en) A kind of hydraulic engineering pipe dredging interface
CN220013915U (en) Sewage discharge device for hydraulic engineering
CN216629906U (en) Pipe device for underground water super-exploitation treatment
CN216194831U (en) Ecological bank protection of garden design

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant